CDP Sasaram
CDP Sasaram
CDP Sasaram
EXECUTIVE SUMMARY
CDP Prepared By:
Overview
Sasaram is believed to be named after the sage Parashurama and the legendary King
Sahastrabahu. Sasaram was also the birthplace of Sher Shah Suri, who ruled Delhi from 1540 to 1545 AD. The town is located in the south western part of Bihar and is the district headquarters of Rohtas District. The Kaimur Hills (12 km from the town) and the Kudra River are located towards the south. The southern part of the town has a rough topography with a slope from north to south and including areas such as Tara Chandi Hill and Chandan Shaheed or Peer while the northern and central town area is mostly plain.
Sasaram is located on NH-2 (Shershah Suri Marg) and is regionally connected with Delhi and Kolkata. The NH-2 runs in an east-west direction dividing the town into two parts. The town is connected to Patna on NH-30 via Arrah through SH-12. The town is also connected with Varanasi on the west and Gaya and Bodhgaya on the east through NH-2. Sasaram has a railway station located in the city centre on the Grand Trunk Road. This is an important station on the Grand Chord Broad Gauge Line of the Eastern Railway and is linked by rail to all the major cities in India. Sasaram is a Nagar Parishad with an area of 10.90 sq km. It is divided into 40 wards and has an estimated population of 178719 (2011). The town has a number of water bodies and heritage sites. The competitive advantage of Sasaram lies in its good connectivity and the historical importance of the town. The town has several National and State Highways, especially the Grand Trunk Road (now NH 2), that support its connectivity to other parts of the state and region. The town has a rich heritage that can potentially yield greater tourist attraction.
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 1 of 15
CITY VISION The vision for Aurangabad was derived on the basis of the status assessment of the city, stakeholder consultations and focused group discussions. Participatory consultations during the visioning process concluded that there is need to revive growth and improve the overall quality of life of its citizens. The identified Vision is as follows: Sasaram is visualized to be tourist destination prominently appearing on the tourism map of the Bihar; a regional service cum commercial centre with well-defined heritage & leisure destinations; a thriving sustained economy based on tourism, handloom and allied activities supported by quality basic physical & social infrastructure for citizenry and visiting tourist. The identified vision forms the basis of sector-specific strategies adopted in framing the action plan.
Demography
The population of Sasaram city was 131172 in 2001 and it has been steadily increasing over the years. The population growth rate in the town till 1951 was low but in the last three decades there has been a tremendous increase in the growth of population. Sasaram is a tourist place as well as an administrative head quarter. It is estimated that the floating population of the town is about 1012%. The density of population is high at 12034 persons per sq.km. The central core of the town and the south eastern part are very congested. Based on population figures from Census 1961 to 2001, a population projection has been done using three different methods namely, Arithmetic Increase method, Geometric Method and Exponential Graphic Increase method that was found to be the most suitable in terms of trends identified through the census. The estimated projection shows that the population of Aurangabad will increase to about 3.22 lakhs (approx.) by year 2030.
2001
2011
2021
2031
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 2 of 13
Main W/S pipeline Fixtures and Fittings (20% of Main) Up-gradation of existing pipeline Distribution W/S pipeline Fixtures and Fittings (20% of Distribution Line) Construction of underground Tank, Pump house with 4 no. of pump sets (Raw Water) Overhead reservoirs (10 lakh capacity each) Pumps and pumping station (20% of OHR) Fixtures and Fittings (20% OHT + Pumps) Underground reservoirs Filtration / treatment works (40 MLD capacity) Contingency Charges (10% ) Sub Total Grand Total
8.00 3Nos. 1.60 1.92 3.20 2Nos. 11.78 4.24 46.66 Rs. 73.07 crores
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 3 of 13
Quantity Investment (In Quanti Investment (In Quantity Investment Rs. Crores) ty Rs. Crores) (In Rs. Crores) Main Pipe line installation 10 Km 10 Secondary & Collector line 50 Km 17.5 26 km 9.1 15 Km 5.25 1 nos. of treatment plant of 50 MLD Community Toilet Public Toilet Sub Total Grand Total 8 Nos. 2 Nos. 0.2 0.1 27.80 1 Nos. 2 Nos. 25 0.05 34.15 Rs. 67.20 crores 5.25
Strategies: The key strategies in the CDP are: Design of a drainage disposal system to reduce the pollution load in the Sher Shah Suri Canal Construction of new drains and strengthening existing drains on priority Installation of waste water treatment plants
Page 4 of 13
logging prone areas include the south and old market areas and low lying areas along Gandhi Path, Bauliya Road, GT Road and Bus Stand Area. Project Quantity Main drain line installation 10 km Secondary & Tertiary drains 154.35km Strengthening of existing drains Construction of Waste Water Treatment Plant of 5 MLD capacity each Sub Total Grand Total 7.65km 1Nos. Phase I (2011-2016) Investment (In Rs. Crores) 3.00 30.87 0.38 0.25 34.50 Rs. 40.75 crores Quantity 30km 1 Nos. Phase II (2016-2021) Investment (In Rs. Crores) 6.00 0.25 6.25
Solid Waste Management (Operational Cost from Collection to Disposal) Vehicles and Equipments 800 Nos. related to collection, transportation & disposal *
Quantity Investment Quantity Investment Quantity Investment (In Rs. Crore) (In Rs. Crore) (In Rs. Crore) 13.69 -
3.95
400
1.98
242
1.19
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 5 of 13
0.04 17.68
1.98
1.19
* Community bins, Containers, handcarts, tricycles, dumper, trailer, bulldozer, compacters, excavators etc.
Project
Investment Investment Investment (In (In Rs. Quantity (In Rs. Quantity Rs. Crores) Crores) Crores) 1Nos. 2.50 1 Nos. 15.00 10 1.50 10 1.50 2 5.00 2 5.00 6 40 33 6 1 0.60 20.80 16.50 0.12 0.50 2 15 13 5 1 0.20 22.50 6.50 0.10 0.50 -
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 6 of 13
Junctions and Traffic signal improvement Comprehensive Mobility Plan Sub Total Grand Total
5 -
2.00 64.52
3 1
1.20
Project
Investment Investment Investment (In (In Rs. Quantity (In Rs. Quantity Rs. Crores) Crores) Crores) 1500 Nos. 4.50 800 Nos. 2.40 190 Nos. 0.57 500 Nos. 2.00 250 Nos. 1.00 100 Nos. 0.40 6.50 3.40 0.97 Rs. 10.87 crores
Investment Quantity Investment Quantity Investment (In (In Rs. Crore) (In Rs. Crore) Rs. Crore) 25.00 2000 Nos. 20.00 1454 Nos. 14.54
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 7 of 13
H) Social Infrastructure
An assessment of social infrastructure in Sasaram was done. The town has 3 Cinema Halls, 3 Post Offices, 2 Playgrounds, 1 Multipurpose Community Hall, 3 Public Libraries and 2 Parks (Nehru Childrens Park and Sher Shah Park). Sasaram has 5 colleges, 1 General Hospital (100 bed). There are limited facilities for specialized medical treatment in the town. Detailed Project Phase-I (2011-16) Quantity Multipurpose/ Community Hall Neighborhood Parks Recreational Centers City Park Playgrounds Night Shelters Welcome Gate Fire Station Cremation Ground Sub Total Grand Total 2 Nos. 3 Nos. 1 Nos. 1 Nos. 1 Nos. 1 Nos. 2 Nos. 1 Nos. 3 Nos. Strategies: The key strategies in the CDP are: Development of recreational facilities Development of city park & open spaces Installation of Entry and Exit Gates Night shelters for the poor
Phase-II (2016-21)
Phase-III (2021-30)
Investment Quantity Investment Quantity Investment Requirements Requirements Requirements (In Rs. Crore) (In Rs. Crore) (In Rs. Crore) 1.00 1 Nos. 0.50 1 Nos. 0.50 0.75 1.50 0.40 0.20 0.05 0.07 5.00 0.15 9.12 2 Nos. 1Nos. 1 Nos. 2 Nos. 0.50 0.04 5.00 0.10 1.14 Rs. 16.45 crores 1 Nos. 1 Nos. 1 Nos. 0.25 0.40 0.05 6.20
I) Local Economy
It is estimated that the workforce participation in the town is 22.68%. Main workers account for 88% and marginal workers 12%. This region is known as Dhaan ka katora (Bowl of Food Grains). Trade and commerce constitutes the major economic base Sasaram serves as a regional trade and commercial centre. The commodities traded are food grains, cloth, ornaments, building materials, medicines. The major markets in the town are Gandhi Chowk Market, Chaukhandi, Gola Market and Navratan Bazar. The government services also provide some Strategies: The key strategies in the CDP are: Development of organised market complexes Promotion of household and small scale units Development of agricultural produce processing units Establishment of permanent platforms for weekly vegetable market
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 8 of 13
employment opportunities. There are some small and medium scale units stone mining, rice polishing, flour mills, wooden furniture, iron rods (gates, windows etc). Most of these economic activities are unorganized adding to the overall haphazard development in the town. Detailed Project Phase-I (2011-16) Quantity Investment Required (In Rs. Crore) 1.20 15.00 Phase-II (2016-21) Quantity Investment Required (In Rs. Crore) 2 Nos. 0.80 -
Renovation of existing municipal 3 Nos. Markets Construction of Industrial Sheds / 75 Nos. of Promotion Zone to accommodate 250 50 sq m household and small scale Units/ each industries with storage Shopping / Commercial Complex 1 Nos. Platforms for Weekly Market/ Vegetable 1 Nos. Sub Total Grand Total
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 9 of 13
Municipal Expenditure Year 2008-09 2009-10 2010-11* Annual Growth Rate Key Parameters Total Income (Rs. Lakhs) 2008-09 81.24 2009-2010 453.67 2010-11 266.00 Average Year Total Expenditure (Rs. Lakhs) 85.87 87.45 90.00 Surplus /Deficit (Rs. Lakhs) -4.63 366.22 176.00 Income from Financial Own Sources (Rs. Sustainability Lakhs) (%) -5.69 78.39 -9.54 80.72 173.43 50.42 66.17 117.00 76.92 47.07 39.27 % Non Development Expenses (Rs. Lakhs) 81.38 82.71 85.00 2.17 Development Expenditure (Rs. Lakhs) 85.87 87.45 90.00 2.35 Total Expenditure (Rs. Lakhs) 85.87 87.45 90.00 2.35
Key Findings: The key findings in municipal finance identified in the CDP are: 91.69% of expenditure is for non developmental purposes and only 8.31% is for development purposes Average surplus with the ULB is 54.89% in the last three decades The share of own resources in total income is about 20.02% On an average 39.27% of expenditure is financed by own sources of the ULB
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited Page 10 of 13
Economic Development Water Supply Sewerage and Sanitation Drainage Solid Waste Management Roads and Transportation Street Lights and Power Social Infrastructure Services to Urban Poor Heritage and Conservation E-governance and Municipal Reforms TOTAL Phase-wise Distribution (%)
33.00 73.07 67.20 40.75 20.85 102.52 10.87 16.46 59.54 39.20 3.95 467.41 100.00
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 11 of 13
Water Supply Sewerage and Sanitation Drainage SWM Transport Social Infrastructure Urban Poor E-Governance Economic Development Street Light Heritage & conservation Total
The FOP assumes that in the short term: At least 10% contribution of the overall fund requirement will be from the ULB Rs. 0.10 crores (Sewerage and Sanitation) for public toilets will be through PPP Rs. 4.00 crores (Solid Waste Management) towards vehicles and equipments will be through PPP Rs. 22.50 crores (Roads and Transportation) towards up-gradation of bus terminal, construction of truck terminal and parking lots will be through PPP The key considerations for the FOP are: At least 10% of the overall fund requirement will be from the ULB therefore, stringent steps and interventions are required to enhance its own resource base It is assumed that in cases where funding other than state government will be available (could be loans from financial institutions, central government, other funded programmes), there will be part contribution from the state government and the ULB will contribute at least 10% Emphasis to be on developing projects on PPP wherever possible
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited Page 12 of 13
Overall Assessment
An overall assessment of the existing service delivery levels on various indicators. It is observed that in Sasaram town the service levels give a mixed scenario, but still inclining towards Below Average. Parameter 1 Status of Infrastructure and Service Delivery Levels Indicators Coverage of Water Supply Connections 30% Per Capita Availability of Water Continuity of Water Supply Coverage of Individual Toilets Door to Door Collection of SWM Collection Efficiency of Solid Waste Operating Ratio Growth in Revenue Income % of Below Poverty Line (BPL) Population Staffing pattern, availability of sufficient staff, competency level of existing staff for implementing proposed projects Leadership quality, awareness and understanding regarding urban sector, proactive approach for implementing reform measures Potential for Development, linkages to the state capital and other cities, status of existing infrastructure Status of Environment, quality of water, air Level of Participation from Citizen/Citizen Forums/Welfare Association in municipal affairs Status of reform implementation and preparedness for implementation 25 30 LPCD 4 hrs 77.6% 0% 40% >1 59.3% approx.. 24% Observation Based Category Colour Code for Status
2 3 4
Observation Based
6 7 8 9
Legend Alarming
Average
Below Average
Good
EXE CDP Prepared By: Egis India Consulting Engineers Private Limited
Page 13 of 13