Fds Pengabuan Medco
Fds Pengabuan Medco
Fds Pengabuan Medco
Integra Automasi
2 3
NM NM
HT HT
HH HH
REV
DATE
ISSUE TYPE
PREPD BY
REVD BY
APPD BY
CLIENT APPD
0 1 2 3
FEB 19, 2012 SEP 4, 2012 SEP 28, 2012 NOV 13, 2012
AT NM NM NM
HT HT HT HT
HH HH HH HH
2 OF 9
TABLE OF CONTENT
SYSTEM ARCHITECTURE SCADA System Architecture Pengabuan Station Existing System Architecture Pengabuan Station Proposed System Architecture Bandwidth Requirement SCADA/HMI DESIGN Overview Pengabuan Station Alarms Trending BILL OF MATERIALS
4 4 4 5 6 7 7 7 8 9
3 OF 9
1 SYSTEM ARCHITECTURE
The Operator Station shall be based on standard off-the-shelf workstation hardware running on a Windows based operating system. Vijeo Citect is using full 32 bit (65 million) colors. For integration with existing Historian we use Matrikon OPC Server client for ODBC. This OPC server is using for logging data to SQL Server. 1.1 SCADA System Architecture
SCADA System centralizes in Soka Office. All parameter in all stations can be monitor in Central Monitoring room SCADA at Soka Office.
1.2
An Existing HMI runtime is Experion HS. and set of redundant PLC system using Honeywell PLC MasterLogic 200.
Pengabuan Station Function Design Specification
4 OF 9
1.3
5 OF 9
1.4
Bandwidth Requirement
Bandwidth requirement for SCADA is less than 32 Kbps. Please find this example below. This example is for bandwidth calculation. Status Register The 128 Status Register will be retrieve every 250 ms and using Modbus Function code 2 Request 8 bytes Response 15 bytes
This results is 23 bytes every 250 ms = 92 bytes per second or 736 bits per second = 0.7 kbps
Input Register The 64 Input Register will be retrieve every 250 ms and using Modbus Function code 4 Request 8 bytes Response 133 bytes
This results is 141 bytes every 250 ms = 564 bytes per second or 4512 bits per second = 4.5 kbps
6 OF 9
2 SCADA/HMI DESIGN
2.1 Overview Pengabuan Station
2.2
Alarms
7 OF 9
2.3
Trending
8 OF 9
3 BILL OF MATERIALS
ITEM NO. DESCRIPTION Hardware & Software Pengabuan Station SCADA Hardware Wall Mounted Panel Cable and Accessories Engineering and Services Pengabuan Station Engineering Documents Manufacture Model Qty Unit
1 1.1
Fortuna
12 U
1 1 1
Ea Lot Lot
9 OF 9