LT89
LT89
LT89
SECTION
LT
LIGHTING SYSTEM
CONTENTS
PRECAUTIONS .......................................................... 4
Precautions for Supplemental Restraint System
(SRS) AIR BAG and SEAT BELT PRE-TENSIONER .................................................................. 4
HEADLAMP (FOR USA) ............................................ 5
Component Parts and Harness Connector Location..... 5
System Description .................................................. 5
OUTLINE ............................................................... 5
HEADLAMP OPERATION .................................... 6
COMBINATION SWITCH READING FUNCTION..... 6
EXTERIOR LAMP BATTERY SAVER CONTROL..... 6
CAN COMMUNICATION SYSTEM DESCRIPTION ......................................................................... 6
Schematic ................................................................ 7
Wiring Diagram ........................................................ 8
Terminals and Reference Values for BCM ............. 12
Terminals and Reference Values for IPDM E/R ..... 12
How to Perform Trouble Diagnoses ....................... 12
Preliminary Check .................................................. 12
CHECK POWER SUPPLY AND GROUND CIRCUIT FOR BCM .................................................. 12
CHECK POWER SUPPLY AND GROUND CIRCUIT FOR IPDM E/R .......................................... 12
CONSULT-II Function (BCM) ................................. 12
CONSULT-II START PROCEDURE .................... 12
WORK SUPPORT ............................................... 12
DATA MONITOR ................................................. 12
ACTIVE TEST ..................................................... 13
SELF-DIAGNOSTIC RESULTS .......................... 13
CONSULT-II Function (IPDM E/R) ......................... 13
CONSULT-II START PROCEDURE .................... 13
DATA MONITOR ................................................. 14
ACTIVE TEST ..................................................... 14
Headlamp High Beam Does Not Illuminate (Both
Sides) ..................................................................... 14
Headlamp High Beam Does Not Illuminate (One
Side) ....................................................................... 17
High Beam Indicator Lamp Does Not Illuminate ... 18
Headlamp Low Beam Does Not Illuminate (Both
Sides) ..................................................................... 18
LT-1
2007 Versa
LT
LT-2
2007 Versa
Schematic ............................................................... 95
Wiring Diagram INT/L .................................... 96
Terminals and Reference Values for BCM ............ 101
How to Proceed With Trouble Diagnosis .............. 101
Preliminary Check ................................................ 101
CHECK POWER SUPPLY AND GROUND CIRCUIT FOR BCM ................................................ 101
CONSULT-II Function (BCM) ............................... 101
CONSULT-II START PROCEDURE .................. 101
WORK SUPPORT ............................................. 101
DATA MONITOR ............................................... 101
ACTIVE TEST ................................................... 102
WORK SUPPORT ............................................. 102
DATA MONITOR ............................................... 102
Interior Room Lamp Control Does Not Operate
(With Map Lamp) .................................................. 103
Interior Room Lamp Control Does Not Operate
(Without Map Lamp) ............................................. 105
Bulb Replacement ................................................ 107
ROOM LAMP .................................................... 107
Removal and Installation ...................................... 107
ROOM LAMP .................................................... 107
ILLUMINATION ....................................................... 108
System Description ............................................... 108
ILLUMINATION OPERATION BY LIGHTING
SWITCH ............................................................ 108
EXTERIOR LAMP BATTERY SAVER CONTROL. 109
CAN Communication System Description ............ 109
Schematic ............................................................. 110
Wiring Diagram ILL .......................................111
Bulb Replacement ................................................ 115
GLOVE BOX LAMP ........................................... 115
BULB SPECIFICATIONS ........................................ 116
Headlamp ............................................................. 116
Exterior Lamp ....................................................... 116
Interior Lamp/Illumination ..................................... 116
LT
LT-3
2007 Versa
PRECAUTIONS
PRECAUTIONS
PFP:00011
Precautions for Supplemental Restraint System (SRS) AIR BAG and SEAT
BELT PRE-TENSIONER
EKS00IM8
The Supplemental Restraint System such as AIR BAG and SEAT BELT PRE-TENSIONER, used along
with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passenger for certain
types of collision. This system includes seat belt switch inputs and dual stage front air bag modules. The SRS
system uses the seat belt switches to determine the front air bag deployment, and may only deploy one front
air bag, depending on the severity of a collision and whether the front occupants are belted or unbelted.
Information necessary to service the system safely is included in the SRS and SB section of this Service Manual.
WARNING:
To avoid rendering the SRS inoperative, which could increase the risk of personal injury or death
in the event of a collision which would result in air bag inflation, all maintenance must be performed by an authorized NISSAN/INFINITI dealer.
Improper maintenance, including incorrect removal and installation of the SRS, can lead to personal injury caused by unintentional activation of the system. For removal of Spiral Cable and Air
Bag Module, see the SRS section.
Do not use electrical test equipment on any circuit related to the SRS unless instructed to in this
Service Manual. SRS wiring harnesses can be identified by yellow and/or orange harnesses or
harness connectors.
LT-4
2007 Versa
PFP:26010
A
EKS00HVB
G
WKIA5469E
1.
4.
2.
System Description
EKS00HVC
Headlamp operation is controlled by the BCM (body control module) based on inputs from the combination
switch (lighting switch). When the lighting switch is placed in the 2ND position, the BCM receives an input signal requesting the headlamps (and tail lamps) illuminate. The BCM sends a signal, via the CAN communication lines, to the IPDM E/R (intelligent power distribution module engine room) requesting the headlamps be
turned ON. The CPU (central processing unit) located in the IPDM E/R controls ground for the headlamp high
and headlamp low relay coils. These relays direct power to the respective headlamps, which then illuminate.
LT
OUTLINE
Power is supplied at all times
through 40A fusible link (letter g , located in fuse and fusible link block)
LT-5
2007 Versa
to BCM terminal 67
HEADLAMP OPERATION
Low Beam Operation
With the lighting switch in 2ND position, the BCM receives an input signal requesting the headlamps to illuminate. The BCM then sends a signal, via the CAN communication lines, to the IPDM E/R requesting the low
beam headlamps be turned ON. The CPU located in the IPDM E/R controls ground to the headlamp low relay
coil, which when energized, directs power
to headlamp LH terminal 3.
Ground is supplied
to headlamp LH terminal 1.
Ground is supplied
EKS00HVD
LT-6
2007 Versa
EKS00ICC
LT
WKWA4971E
LT-7
2007 Versa
EKS00HVG
LKWA0318E
LT-8
2007 Versa
LT
LKWA0319E
LT-9
2007 Versa
LKWA0320E
LT-10
2007 Versa
LT
LKWA0321E
LT-11
2007 Versa
EKS00HVH
EKS00HVI
EKS00HVJ
Preliminary Check
EKS00HVK
EKS00IM9
CONSULT-II can display each diagnostic item using the diagnostic test modes shown following.
BCM diagnostic
test item
Diagnostic mode
WORK SUPPORT
DATA MONITOR
ACTIVE TEST
Inspection by part
SELF-DIAG RESULTS
CAN DIAG SUPPORT MNTR
ECU PART NUMBER
CONFIGURATION
Description
Supports inspections and adjustments. Commands are transmitted to the BCM
for setting the status suitable for required operation, input/output signals are
received from the BCM and received data is displayed.
Displays BCM input/output data in real time.
Operation of electrical loads can be checked by sending drive signal to them.
Displays BCM self-diagnosis results.
The result of transmit/receive diagnosis of CAN communication can be read.
BCM part number can be read.
Performs BCM configuration read/write functions.
WORK SUPPORT
Display Item List
Item
Description
CONSULT-II
Factory setting
ON
OFF
DATA MONITOR
Display Item List
Monitor item
Contents
IGN ON SW
"ON/OFF"
Displays "IGN position (ON)/OFF, ACC position (OFF)" judged from the ignition switch signal.
ACC ON SW
"ON/OFF"
Displays "ACC (ON)/OFF, Ignition OFF (OFF)" status judged from ignition switch signal.
HI BEAM SW
"ON/OFF"
Displays status (high beam switch: ON/Others: OFF) of high beam switch judged from lighting
switch signal.
LT-12
2007 Versa
Contents
HEAD LAMP SW 1
"ON/OFF"
Displays status (headlamp switch 1: ON/Others: OFF) of headlamp switch 2 judged from lighting
switch signal.
HEAD LAMP SW 2
"ON/OFF"
Displays status (headlamp switch 2: ON/Others: OFF) of headlamp switch 2 judged from lighting
switch signal.
LIGHT SW 1ST
"ON/OFF"
Displays status (lighting switch 1st position: ON/Others: OFF) of lighting switch judged from lighting switch signal.
PASSING SW
"ON/OFF"
Displays status (flash-to-pass switch: ON/Others: OFF) of flash-to-pass switch judged from lighting switch signal.
FR FOG SW
"ON/OFF"
Displays status (front fog lamp switch: ON/Others: OFF) of front fog lamp switch judged from lighting switch signal.
DOOR SW - DR
"ON/OFF"
Displays status of the front door LH as judged from the front door switch LH signal. (Door is open:
ON/Door is closed: OFF)
DOOR SW - AS
"ON/OFF"
Displays status of the front door RH as judged from the front door switch RH signal. (Door is
open: ON/Door is closed: OFF)
DOOR SW - RR
"ON/OFF"
Displays status of the rear door as judged from the rear door switch (RH) signal. (Door is open:
ON/Door is closed: OFF)
DOOR SW - RL
"ON/OFF"
Displays status of the rear door as judged from the rear door switch (LH) signal. (Door is open:
ON/Door is closed: OFF)
BACK DOOR SW
"ON/OFF"
Displays status of the back door as judged from the back door switch signal. (Door is open: ON/
Door is closed: OFF)
TURN SIGNAL R
"ON/OFF"
Displays status (Turn right: ON/Others: OFF) as judged from lighting switch signal.
TURN SIGNAL L
"ON/OFF"
Displays status (Turn left: ON/Others: OFF) as judged from lighting switch signal.
ENGINE RUNNote 1
"ON/OFF"
Displays status (Engine running: ON/Others: OFF) as judged from engine status signal.
PKB SWNote 1
"ON/OFF"
Displays status (Parking brake switch: ON/Others: OFF) as judged from parking brake switch signal.
Note 1: Vehicles without daytime light system may display this item, but cannot monitor it.
ACTIVE TEST
Display Item List
Test item
Description
TAIL LAMP
LT
HEAD LAMP
FR FOG LAMP
SELF-DIAGNOSTIC RESULTS
Display Item List
Monitored item
CAN communication
CAN communication system
M
CONSULT-ll display
Description
EKS00IMA
CONSULT-II can display each diagnostic item using the diagnostic test modes shown following.
IPDM E/R diagnostic Mode
SELF-DIAG RESULTS
DATA MONITOR
Description
Displays IPDM E/R self-diagnosis results.
Displays IPDM E/R input/output data in real time.
ACTIVE TEST
LT-13
2007 Versa
Display or
unit
TAIL&CLR REQ
Item name
Parking, license plate
and tail lamps request
MAIN
SIGNALS
SELECTION
FROM MENU
Description
ON/OFF
HL LO REQ
ON/OFF
HL HI REQ
ON/OFF
FR FOG REQ
ON/OFF
DTRL REQ
ON/OFF
NOTE:
Perform monitoring of IPDM E/R data with the ignition switch ON. When the ignition switch is at ACC, the display may not be correct.
ACTIVE TEST
Test item
Tail lamp relay output
Headlamp relay (HI, LO) output
LAMPS
Description
Allows tail lamp relay to operate by switching operation ON-OFF at
your option.
Allows headlamp relay (HI, LO) to operate by switching operation
(OFF, HI, LO) at your option (Head lamp high beam repeats ON-OFF
every 1 second).
Allows fog lamp relay (FOG) to operate by switching operation ONOFF at your option.
EKS00IMB
: HI BEAM SW ON
Without CONSULT-II
Refer to LT-68, "Combination Switch Inspection" .
PKIA7585E
OK or NG
OK
>> GO TO 2.
NG
>> Check combination switch (lighting switch). Refer to LT-68, "Combination Switch Inspection" .
LT-14
2007 Versa
With CONSULT-II
Select IPDM E/R on CONSULT-II. Select ACTIVE TEST on
SELECT DIAG MODE screen.
2. Select EXTERNAL LAMPS on SELECT TEST ITEM screen.
3. Touch HI screen.
4. Make sure headlamp high beam operates.
1.
Without CONSULT-II
Start auto active test. Refer to PG-21, "Auto Active Test" .
Make sure headlamp high beam operates.
PKIC0936E
OK or NG
OK
>> GO TO 3.
NG
>> GO TO 4.
: HL HI REQ ON
J
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Replace BCM. Refer to BCS-25, "Removal and Installation of BCM" .
LT
PKIB8696E
5. BULB INSPECTION
Inspect inoperative headlamp bulbs.
OK or NG
OK
>> GO TO 6.
NG
>> Replace headlamp bulb. LT-25, "HEADLAMP (HIGH/LOW)" .
LT-15
2007 Versa
With CONSULT-II
Turn ignition switch OFF.
Disconnect headlamp connector.
Select IPDM E/R on CONSULT-II. Select ACTIVE TEST on SELECT DIAG MODE screen.
Select EXTERNAL LAMPS on SELECT TEST ITEM screen.
Touch HI screen.
When headlamp high beam is operating, check voltage between
headlamp harness connector and ground (Headlamp high beam
repeats ONOFF every 2 seconds).
Terminal
(+)
Headlamp connector
1.
2.
3.
4.
RH
E26
LH
E25
Terminal
1
()
Ground
Voltage
Battery voltage
PKIC0960E
Without CONSULT-II
Turn ignition switch OFF.
Disconnect headlamp connector.
Start auto active test. Refer to PG-21, "Auto Active Test" .
When headlamp high beam is operating, check voltage between headlamp harness connector and
ground.
Terminal
(+)
Headlamp connector
RH
E26
LH
E25
Terminal
1
()
Ground
Voltage
Battery voltage
OK or NG
OK
>> GO TO 7.
NG
>> GO TO 8.
E26
LH
E25
Terminal
2
Continuity
Ground
Yes
OK or NG
OK
>> Check front combination lamp connector for damage or
poor connection. Repair as necessary.
NG
>> Repair harness.
LT-16
PKIC0961E
2007 Versa
Connector
E47
Terminal
Connector
56
E26
55
E25
Terminal
Continuity
Yes
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Repair harness or connector.
WKIA5470E
EKS00IMC
2. CHECK BULB
Check headlamp bulb which does not illuminate.
OK or NG
OK
>> GO TO 3.
NG
>> Replace bulb. Refer to LT-25, "HEADLAMP (HIGH/LOW)" .
LT
Terminal
(+)
Headlamp connector
RH
E26
LH
E25
Voltage
Terminal
1
()
Ground
Battery voltage
OK or NG
OK
>> GO TO 4.
NG
>> GO TO 5.
WKIA5552E
LT-17
2007 Versa
E26
LH
E25
Terminal
Continuity
Ground
Yes
OK or NG
OK
>> Check connecting condition headlamp harness connector.
NG
>> Repair harness or connector.
PKIC0961E
A
Connector
B
Terminal
Connector
56
E26
55
E25
E47
Terminal
Continuity
Yes
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Repair harness or connector.
WKIA5470E
EKS00IW4
1. BULB INSPECTION
Inspect CAN communication system. Refer to LAN-44, "TROUBLE DIAGNOSIS" .
OK or NG
OK
>> Replace combination meter. Refer to DI-23, "Removal and Installation" .
NG
>> Repair as necessary.
EKS00IMD
: HEAD LAMP SW 1 ON
: HEAD LAMP SW 2 ON
Without CONSULT-II
Refer to LT-68, "Combination Switch Inspection" .
PKIA7586E
OK or NG
OK
>> GO TO 2.
NG
>> Check combination switch (lighting switch). Refer to LT-68, "Combination Switch Inspection" .
Revision: June 2006
LT-18
2007 Versa
With CONSULT-II
Select IPDM E/R on CONSULT-II. Select ACTIVE TEST on
SELECT DIAG MODE screen.
2. Select EXTERNAL LAMPS on SELECT TEST ITEM screen.
3. Touch LO screen.
4. Make sure headlamp low beam operates.
1.
PKIC0936E
1.
2.
: HL LO REQ ON
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Replace BCM. Refer toBCS-25, "Removal and Installation of BCM" .
J
PKIA7644E
LT
5. BULB INSPECTION
Inspect inoperative headlamp bulbs.
OK or NG
OK
>> GO TO 6.
NG
>> Replace headlamp bulb.LT-25, "HEADLAMP (HIGH/LOW)" .
LT-19
2007 Versa
With CONSULT-II
Turn ignition switch OFF.
Disconnect headlamp connector.
Select IPDM E/R on CONSULT-II. Select ACTIVE TEST on SELECT DIAG MODE screen.
Select EXTERNAL LAMPS on SELECT TEST ITEM screen.
Touch LO screen.
When headlamp low beam is operating, check voltage between
headlamp harness connector and ground.
Terminal
(+)
Headlamp connector
1.
2.
3.
4.
RH
E26
LH
E25
Terminal
3
()
Ground
Voltage
Battery voltage
Without CONSULT-II
PKIC0963E
Turn ignition switch OFF.
Disconnect headlamp connector.
Start auto active test. Refer to PG-21, "Auto Active Test" .
When headlamp low beam is operating, check voltage between headlamp harness connector and ground.
Terminal
(+)
Headlamp connector
RH
E26
LH
E25
()
Voltage
Terminal
3
Ground
Battery voltage
OK or NG
OK
>> GO TO 7.
NG
>> GO TO 8.
E26
LH
E25
Terminal
2
Continuity
Ground
Yes
OK or NG
OK
>> Check front combination lamp connector for damage or
poor connection. Repair as necessary.
NG
>> Repair harness.
LT-20
PKIC0961E
2007 Versa
A
Connector
E47
B
Terminal
Connector
54
E26
52
E25
Terminal
Continuity
Yes
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Repair harness or connector.
WKIA5471E
EKS00IME
2. CHECK BULB
Check bulb of headlamp which does not illuminate.
OK or NG
OK
>> GO TO 3.
NG
>> Replace bulb. Refer to LT-25, "HEADLAMP (HIGH/LOW)" .
LT
Terminal
(+)
Headlamp connector
RH
E26
LH
E25
Voltage
Terminal
3
()
Ground
Battery voltage
OK or NG
OK
>> GO TO 4.
NG
>> GO TO 5.
WKIA5551E
LT-21
2007 Versa
E26
LH
E25
Terminal
Continuity
Ground
Yes
OK or NG
OK
>> Check condition of headlamp harness connector.
NG
>> Repair harness or connector.
PKIC0961E
A
Connector
E47
B
Terminal
Connector
54
E26
52
E25
Terminal
Continuity
Yes
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-28, "IPDM E/R Power/
Ground Circuit Inspection" .
NG
>> Repair harness or connector.
WKIA5471E
EKS00IMF
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Check combination switch (lighting switch). Refer to LT68, "Combination Switch Inspection" .
LT-22
PKIA7588E
2007 Versa
D
PKIA7627E
Aiming Adjustment
EKS00IMG
WKIA5417E
1.
Headlamp
A.
B.
LT
Adjusting screw
LT-23
2007 Versa
WKIA4287E
A.
Right
B.
C.
D.
Left
E.
F.
G.
H.
J.
K.
L.
Aim each headlamp individually and ensure other headlamp beam pattern is blocked from screen.
For horizontal headlamp aiming, adjust headlamp until beam pattern is at horizontal center point.
For vertical headlamp aiming, adjust headlamp until beam pattern is positioned per specified dimensions.
Description
Halogen Headlamp
4 mm (0.157 in.)
30 mm (1.181 in.)
LT-24
2007 Versa
EKS00IMH
CAUTION:
After installing bulb, be sure to install plastic cap and bulb socket securely to ensure watertightness.
HEADLAMP (HIGH/LOW)
1.
2.
3.
4.
G
EKS00IMI
REMOVAL
1.
2.
3.
4.
LT
PKIC1223E
INSTALLATION
Installation is in the reverse order of removal.
LT-25
2007 Versa
EKS00IMJ
WKIA5418E
1.
Retaining spring
2.
3.
4.
5.
Back cover
6.
7.
8.
9.
Bumper stay
A.
Screw
DISASSEMBLY
1.
2.
3.
4.
5.
6.
7.
ASSEMBLY
Assembly is in the reverse order of disassembly.
CAUTION:
After installing bulb, be sure to install plastic cap securely to insure water tight seal.
LT-26
2007 Versa
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM Component Parts and Harness Connector Location
PFP:26010
A
EKS00ICD
G
WKIA5555E
1.
2.
4.
5.
6.
System Description
EKS00ICE
Headlamp operation is controlled by the BCM (body control module) based on inputs from the combination
switch (lighting switch). When the lighting switch is placed in the 2ND position, the BCM receives an input signal requesting the headlamps (and tail lamps) illuminate. The request is then communicated to the IPDM E/R J
(intelligent power distribution module engine room) via the CAN communication lines. The CPU (central processing unit) located in the IPDM E/R controls ground for the headlamp high and headlamp low relay coils.
These relays direct power to the respective headlamps, which then illuminate. When the headlamp switch is
LT
OFF or in the 1ST position (parking lamps ON), the parking brake is released and the engine is running, the
IPDM E/R de-energizes the headlamp relays and supplies ground to the daytime light relay 1 to actuate the
daytime light function.
L
OUTLINE
through 40A fusible link (letter g , located in fuse and fusible link box)
through 10A fuse (No. 26, located in fuse and fusible link box)
LT-27
2007 Versa
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM to the ignition relay (located in IPDM E/R),
HEADLAMP OPERATION
Low Beam Operation
With the lighting switch in 2ND position, the BCM receives an input signal requesting the headlamps to illuminate. This input signal is communicated to the IPDM E/R via the CAN communication lines. The CPU located
in the IPDM E/R controls the headlamp low relay coil, which when energized, directs power
LT-28
2007 Versa
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM to front combination lamp RH terminal 2 via
LT
EKS00ICF
LT-29
2007 Versa
EKS00ICH
WKWA4972E
LT-30
2007 Versa
EKS00ICI
LT
LKWA0322E
LT-31
2007 Versa
LKWA0323E
LT-32
2007 Versa
LT
LKWA0324E
LT-33
2007 Versa
LKWA0325E
LT-34
2007 Versa
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM Terminals and Reference Values for BCM
EKS00ICJ
EKS00ICK
EKS00ICL
Preliminary Check
E
EKS00IM0
Confirm BCM configuration for "DTRL" is set to "WITH". Refer toBCS-19, "READ CONFIGURATION PROCEDURE" .
OK or NG
OK
>> Continue preliminary check. Refer to BCS-16, "BCM Power Supply and Ground Circuit Check" .
NG
>> Change BCM configuration for "DTRL" to "WITH". Refer to BCS-21, "WRITE CONFIGURATION
PROCEDURE" .
J
EKS00IM1
LT
EKS00IM2
Daytime Light Control Does Not Operate Properly (High Beam Headlamps Operate Properly)
EKS00IM3
Inspect daytime light relay fuse 10A fuse (No. 26, located in the fuse and fusible link box).
OK or NG
OK
>> GO TO 2.
NG
>> Repair harness.
LT-35
2007 Versa
OK or NG
OK
>> GO TO 3.
NG
>> Repair harness or connector.
WKIA3305E
Apply battery voltage to daytime light relay 1 terminal 2 and supply ground to terminal 1.
Check continuity between terminals 3 and 5.
3-5
OK or NG
OK
>> GO TO 4.
NG
>> Replace daytime light relay 1.
WIIA0291E
: DTRL REQ ON
: DTRL REQ OFF
OK or NG
OK
>> GO TO 6.
NG
>> GO TO 5.
WKIA1449E
SKIA1039E
LT-36
2007 Versa
C
A
Continuity
Connector
Terminal
Connector
Terminal
E43
E37
Yes
OK or NG
OK
>> Replace the IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Repair harness or connector.
E
WKIA5553E
Aiming Adjustment
EKS00IM4
LT
WKIA5417E
1.
Headlamp
A.
B.
LT-37
Adjusting screw
2007 Versa
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM ADJUSTMENT USING AN ADJUSTMENT SCREEN (LIGHT/DARK BORDERLINE)
WKIA4287E
A.
Right
B.
C.
D.
Left
E.
F.
G.
H.
J.
K.
L.
Aim each headlamp individually and ensure other headlamp beam pattern is blocked from screen.
For horizontal headlamp aiming, adjust headlamp until beam pattern is at horizontal center point.
For vertical headlamp aiming, adjust headlamp until beam pattern is positioned per specified dimensions.
Description
Halogen Headlamp
4 mm (0.157 in.)
30 mm (1.181 in.)
LT-38
2007 Versa
EKS00IM5
CAUTION:
After installing bulb, be sure to install plastic cap and bulb socket securely to ensure watertightness.
HEADLAMP (HIGH/LOW)
1.
2.
3.
4.
G
EKS00IM6
REMOVAL
1.
2.
3.
4.
LT
PKIC1223E
INSTALLATION
Installation is in the reverse order of removal.
LT-39
2007 Versa
EKS00IM7
WKIA5418E
1.
Retaining spring
2.
3.
4.
5.
Back cover
6.
7.
8.
9.
Bumper stay
A.
Screw
DISASSEMBLY
1.
2.
3.
4.
5.
6.
7.
ASSEMBLY
Assembly is in the reverse order of disassembly.
CAUTION:
After installing bulb, be sure to install plastic cap securely to insure water tight seal.
LT-40
2007 Versa
PFP:26150
A
EKS00HX5
D
WKIA5554E
1.
2.
3.
System Description
The front fog lamps are controlled by lighting switch inputs to the BCM (body control module). The lighting
switch must be in the 1ST or 2ND position with the high beams OFF before the BCM will request the IPDM E/
R (intelligent power distribution module engine room) to turn the front fog lamps on. The BCM requests the
front fog lamps over the CAN communication lines to the IPDM E/R. The CPU (central processing unit) of the
IPDM E/R controls the front fog lamp relay coil ground. When energized, the relay directs power to the front
fog lamps.
OUTLINE
Power is supplied at all times:
through 40A fusible link (letter g , located in the fuse and fusible link box)
to BCM terminal 67
LT-41
LT
2007 Versa
EKS00HX7
LT-42
2007 Versa
EKS00HXA
LT
LKWA0326E
LT-43
2007 Versa
LKWA0327E
LT-44
2007 Versa
EKS00HXB
EKS00HXC
EKS00HXD
Preliminary Check
E
EKS00HXE
G
EKS00HXF
EKS00HXG
EKS00HXH
LT
1.
2.
: FR FOG SW ON
With CONSULT-II
Select BCM on CONSULT-II. With HEAD LAMP data monitor,
make sure FR FOG SW turns ON-OFF linked with operation of
PKIA7598E
front fog lamp switch.
Without CONSULT-II
Refer to LT-68, "Combination Switch Inspection" .
OK or NG
OK
>> GO TO 3.
NG
>> Check combination switch (lighting switch). Refer to LT-68, "Combination Switch Inspection" .
LT-45
2007 Versa
Without CONSULT-II
Start auto active test. Refer to PG-21, "Auto Active Test" .
Make sure front fog lamp operates.
PKIC0936E
: FR FOG REQ ON
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Replace BCM. Refer toBCS-25, "Removal and Installation of BCM" .
LT-46
SKIA5898E
2007 Versa
With CONSULT-II
Turn ignition switch OFF.
Disconnect front fog lamp connector.
Select IPDM E/R on CONSULT-II, and select ACTIVE TEST on SELECT DIAG MODE screen.
Select EXTERNAL LAMPS on SELECT TEST ITEM screen.
Touch FOG screen.
When front fog lamp relay is operating, check voltage between
front fog lamp harness connector and ground.
(+)
()
1.
2.
3.
4.
RH
E28
LH
E27
Ground
(+)
E28
LH
E27
Battery voltage
()
Voltage
Ground
Battery voltage
RH
LT
LH
E47
Terminal
Connector
51
E28
50
E27
B
Terminal
Continuity
Yes
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Repair harness or connector.
Connector
I
1
Circuit
Terminal
OK or NG
OK
>> GO TO 7.
NG
>> GO TO 6.
1.
2.
3.
Without CONSULT-II
Turn ignition switch OFF.
PKIA6276E
Disconnect front fog lamp connector.
Start auto active test. Refer to PG-21, "Auto Active Test" .
When front fog lamp relay is operating, check voltage between front fog lamp harness connector and
ground.
RH
Voltage
Terminal
1
LT-47
WKIA4408E
2007 Versa
E28
LH
E27
Terminal
Continuity
Ground
Yes
OK or NG
OK
>> Check front fog lamp bulbs.
NG
>> Repair harness or connector.
PKIA6277E
1.
EKS00HXI
CHECK BULB
Circuit
RH
A
Connector
B
Terminal
Connector
51
E28
50
E27
E47
LH
Terminal
Continuity
Yes
OK or NG
OK
>> GO TO 3.
NG
>> Repair harness or connector.
WKIA4408E
E28
LH
E27
Terminal
2
Continuity
Ground
Yes
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Repair harness or connector.
LT-48
PKIA6277E
2007 Versa
EKS00HXJ
The front fog lamp is a semi-sealed beam type which uses a replaceable halogen bulb. Before performing
aiming adjustment, make sure of the following.
Set that there is no-load in vehicle other than the driver (or equivalent weight placed in drivers position).
Coolant, engine oil filled up to correct level and full fuel tank.
Adjust aiming in the vertical direction by turning the adjusting screw (A).
F
PKIC1070E
1.
2.
3.
Set the distance (C) between the screen and the center of front
fog lamp lens (E) as shown.
Turn front fog lamps (1) to ON.
Adjust front fog lamps using adjusting screw so that the top edge
of the high intensity zone (A) is as shown.
LT
NOTE:
When performing adjustment, if necessary, cover the headlamps
and opposite front fog lamp.
M
WKIA5419E
Bulb Replacement
1.
2.
3.
4.
5.
EKS00HXK
PKIC1071E
LT-49
2007 Versa
EKS00HXL
WKIA5420E
1.
2.
3.
Bolt
REMOVAL
1.
2.
3.
4.
Turn over the fender protector and undercover to obtain work space between the fender protector and
fender.
Disconnect front fog lamp connector.
Remove pawl, and front bumper finisher from front bumper.
Remove bolt and remove front fog lamp from bracket.
INSTALLATION
Installation is in the reverse order of removal.
LT-50
2007 Versa
PFP:26120
A
EKS00HXZ
G
WKIA5493E
1.
4.
2.
3.
System Description
EKS00HY0
through 40A fusible link (letter g , located in the fuse and fusible link box)
through 10A fuse [No. 13, located in the fuse block (J/B)]
through 10A fuse [No. 20, located in the fuse block (J/B)]
LT
LT-51
2007 Versa
through 40A fusible link (letter g , located in fuse, fusible link and relay box)
LT-52
2007 Versa
through 40A fusible link (letter g , located in fuse, fusible link and relay box)
EKS00HY1
LT-53
2007 Versa
EKS00HY3
WKWA4974E
LT-54
2007 Versa
EKS00HY4
LT
LKWA0329E
LT-55
2007 Versa
LKWA0330E
LT-56
2007 Versa
LT
LKWA0331E
LT-57
2007 Versa
LKWA0332E
LT-58
2007 Versa
EKS00HY5
EKS00HY6
Preliminary Check
D
EKS00HY7
EKS00HY8
EKS00HY9
With CONSULT-II
Select BCM on CONSULT-II. Select FLASHER on SELECT
TEST ITEM screen.
2. Select DATA MONITOR on SELECT DIAG MODE screen.
Make sure that TURN SIGNAL R and TURN SIGNAL L turns
ON-OFF linked with operation of lighting switch.
1.
: TURN SIGNAL R ON
J
: TURN SIGNAL L ON
PKIA7600E
Without CONSULT-II
Refer to LT-68, "Combination Switch Inspection" .
OK or NG
OK
>> Replace the BCM. BCS-25, "Removal and Installation of BCM"
NG
>> Check combination switch (lighting switch). Refer to LT-68, "Combination Switch Inspection" .
EKS00IXB
1. CHECK BULB
Verify the bulb standard of each turn signal lamp is correct. Refer to LT-116, "Exterior Lamp" .
OK or NG
OK
>> GO TO 2.
NG
>> Replace turn signal lamp bulb. Refer to LT-64, "Bulb Replacement of Front Turn Signal Lamp" .
LT-59
2007 Versa
LT
4.
WKIA5612E
OK or NG
OK
>> GO TO 3.
NG
>> Repair harness or connector.
2.
OK or NG
OK
>> Inspect connection at front combination lamp.
NG
>> Repair harness.
WKIA5613E
EKS00IXC
1. CHECK BULB
Verify the bulb standard of each turn signal lamp is correct. Refer to LT-116, "Exterior Lamp" .
OK or NG
OK
>> GO TO 2.
NG
>> Replace turn signal lamp bulb. Refer to LT-64, "Bulb Replacement of Rear Turn Signal Lamp" .
LT-60
2007 Versa
60 - 6
4.
Check continuity between BCM harness connector M20 (A) terminal 61 and rear combination lamp RH harness connector
B107 (B) terminal 6.
61 - 6
WKIA5614E
OK or NG
OK
>> GO TO 3.
NG
>> Repair harness or connector.
1 - Ground
2.
OK or NG
OK
>> Check rear combination lamp connector for proper connection. Repair as necessary.
NG
>> Repair harness or connector.
J
WKIA5615E
LT
LT-61
2007 Versa
EKS00HYA
: HAZARD SW ON
PKIA7601E
Without CONSULT-II
Check voltage between BCM harness connector and ground.
Terminal
(+)
BCM
connector
Terminal
M18
29
Condition
()
Ground
Voltage
Hazard switch is ON
0V
Battery voltage
OK or NG
OK
>> Replace BCM. Refer to BCS-25, "Removal and Installation of BCM" .
NG
>> GO TO 2.
PKIC1014E
Continuity
Connector
Terminal
Connector
Terminal
M18
29
M55
Yes
OK or NG
OK
>> GO TO 3.
NG
>> Repair harness or connector.
PKIC1015E
LT-62
2007 Versa
Check continuity between hazard switch harness connector M55 terminal 1 and ground.
1 Ground
OK or NG
OK
>> GO TO 4.
NG
>> Repair harness or connector.
D
PKIC1016E
Condition
Continuity
Hazard switch is ON
Yes
No
OK or NG
OK
>> Replace BCM if hazard warning lamps do not operate
after setting the connector again. Refer to BCS-25,
"Removal and Installation of BCM" .
NG
>> Replace hazard switch.
H
PKIC1017E
EKS00J8H
LT
LT-63
2007 Versa
EKS00HYB
EKS00HYC
EKS00HYE
EKS00HYF
LT-64
2007 Versa
PFP:25540
A
EKS00HYH
REMOVAL
1.
2.
E
PKIC1018E
INSTALLATION
F
LT
LT-65
2007 Versa
HAZARD SWITCH
HAZARD SWITCH
Removal and Installation
PFP:25290
EKS00HYI
REMOVAL
1.
2.
3.
WKIA5421E
INSTALLATION
Installation is in the reverse order of removal.
LT-66
2007 Versa
COMBINATION SWITCH
COMBINATION SWITCH
Wiring Diagram COMBSW
PFP:25567
A
EKS00HYJ
LT
LKWA0333E
LT-67
2007 Versa
COMBINATION SWITCH
Combination Switch Reading Function
EKS00HYK
EKS00HYL
EKS00HYN
EKS00HYO
1. SYSTEM CHECK
Referring to table below, check which system malfunctioning switch belongs to.
System 1
System 2
System 3
System 4
System 5
FRONT WASHER
FRONT WIPER LO
TURN LH
TURN RH
FRONT WIPER HI
PASSING
HEAD LAMP 1
INT VOLUME 1
HEAD LAMP 2
HI BEAM
INT VOLUME 3
LIGHT SW 1ST
INT VOLUME 2
FRONT FOG
2. SYSTEM CHECK
With CONSULT-II
CAUTION:
If CONSULT-II is used with no connection of CONSULT-II CONVERTER, malfunctions might be
detected in self-diagnosis depending on control unit which carry out CAN communication.
1. Connect CONSULT-II, and select COMB SW on SELECT
TEST ITEM screen.
2. Select DATA MONITOR.
3. Select START, and confirm that other switches in the system
operate normally.
Example: When turn signal LH is inoperative, confirm that
PASSING, HEAD LAMP 2 or FRONT FOG (if equipped) turn
ON-OFF normally.
PKIA7602E
Without CONSULT-II
Operating combination switch, and confirm that other switches in the system operate normally.
Example: When a turn signal switch is inoperative, confirm that FRONT WIPER LO or FRONT WIPER INT
turn ON-OFF normally.
Check results
Other switches in the system operate normally.>>Replace lighting switch or wiper switch.
Other switches in the system do not operate normally.>>GO TO 3.
LT-68
2007 Versa
COMBINATION SWITCH
3. HARNESS INSPECTION
1.
2.
3.
Suspect
system
A
Connector
M18
4.
Connector
Terminal
Input 1
Output 1
36
Input 2
Output 2
35
Input 3
10
Output 3
34
Input 4
Output 4
33
Input 5
Output 5
32
M28
Continuity
E
Yes
WKIA5497E
Check for continuity between of BCM harness connector in suspect system and ground.
Suspect
system
Connector
BCM
M18
Continuity
Terminal
Input 1
Output 1
36
Input 2
Output 2
35
Input 3
Output 3
34
Input 4
Output 4
33
Input 5
Output 5
32
J
Ground
No
WKIA5500E
OK or NG
OK
>> GO TO 4.
NG
>> Check harness between BCM and combination switch for open or short circuit.
LT
LT-69
2007 Versa
COMBINATION SWITCH
Suspect
system
(+)
Combination
switch
connector
Terminal
Reference value
()
PKIC1020E
PKIB4958J
M28
1.2V
Ground
PKIB8643J
1.2V
OK or NG
OK
>> Open circuit in combination switch, GO TO 5.
NG
>> Replace BCM. Refer to BCS-25, "Removal and Installation of BCM" .
2
Confirm
check
results
3
OK
INSPECTION END
NG
4
Confirm
check
results
5
OK
INSPECTION END
NG
6
Confirm
check
results
7
OK
INSPECTION END
NG
EKS00HYP
LT-70
2007 Versa
STOP LAMP
STOP LAMP
Wiring Diagram STOP/L
PFP:26550
A
EKS00HYQ
LT
LKWA0334E
LT-71
2007 Versa
STOP LAMP
Bulb Replacement of High-Mounted Stop Lamp
EKS00HYR
EKS00HYS
EKS00HYT
REMOVAL
1.
2.
3.
Remove rear hatch finish panel. Refer to EI-42, "LUGGAGE FLOOR TRIM" .
Disconnect the high-mounted stop lamp connector.
Remove nuts and remove high-mounted stop lamp from rear hatch.
INSTALLATION
Installation is in the reverse order of removal.
CAUTION:
Properly seal the high-mounted stop lamp base to the rear hatch to prevent water leaks.
EKS00HYU
LT-72
2007 Versa
BACK-UP LAMP
BACK-UP LAMP
Wiring Diagram BACK/L
PFP:26550
A
EKS00HYV
LT
LKWA0335E
LT-73
2007 Versa
BACK-UP LAMP
Bulb Replacement
EKS00HYW
EKS00HYX
LT-74
2007 Versa
PFP:26550
A
EKS00HYY
D
WKIA5554E
1.
2.
System Description
EKS00HYZ
F
The control of the parking, license plate and tail lamp operation is dependent upon the position of lighting
switch. When the lighting switch is placed in the 1ST position, the BCM (body control module) receives input
signal requesting the parking, license plate and tail lamps to illuminate. This input signal is communicated to
the IPDM E/R (intelligent power distribution module engine room) via the CAN communication lines. The CPU G
(central processing unit) located in the IPDM E/R controls the tail lamp relay coil. This relay, when energized,
directs power to parking, license plate and tail lamps, which then illuminate.
Power is supplied at all times
H
through 40A fusible link (letter g , located in fuse and fusible link block)
to BCM terminal 67
LT-75
2007 Versa
EKS00HZ0
LT-76
2007 Versa
EKS00HZ2
LT
WKWA4975E
LT-77
2007 Versa
EKS00HZ3
LKWA0336E
LT-78
2007 Versa
LT
LKWA0337E
LT-79
2007 Versa
LKWA0338E
LT-80
2007 Versa
EKS00HZ4
EKS00HZ5
EKS00HZ6
Preliminary Check
E
EKS00HZ7
G
EKS00HZ8
EKS00HZ9
EKS00HZA
Inspect tail lamp 10A fuse (No. 37, located in IPDM E/R).
OK or NG
OK
>> GO TO 2.
NG
>> Repair harness.
LT
With CONSULT II
1. Select BCM on CONSULT-II. Select HEAD LAMP on
SELECT TEST ITEM screen.
2. Select DATA MONITOR on SELECT DIAG MODE screen.
Make sure LIGHT SW 1ST turns ON-OFF linked with operation of lighting switch.
When lighting switch is 1ST
position
: LIGHT SW 1ST ON
Without CONSULT II
Refer to LT-68, "Combination Switch Inspection" .
PKIA7607E
OK or NG
OK
>> GO TO 3.
NG
>> Check combination switch (lighting switch). Refer to LT-68, "Combination Switch Inspection" .
LT-81
2007 Versa
3. ACTIVE TEST
With CONSULT-II
Select IPDM E/R on CONSULT-II, and select ACTIVE TEST
on SELECT DIAG MODE screen.
2. Select EXTERNAL LAMPS on SELECT TEST ITEM screen.
3. Touch TAIL on "ACTIVE TEST" screen.
4. Make sure parking, license plate and tail lamps operate.
1.
Without CONSULT-II
Start auto active test. Refer to PG-21, "Auto Active Test" .
Make sure parking, license plate and tail lamps operate.
PKIC0936E
Select IPDM E/R on CONSULT-II, and select DATA MONITOR on SELECT DIAG MODE screen.
Make sure TAIL&CLR REQ turns ON when lighting switch is in
1ST position.
When lighting switch is 1ST
position
: TAIL&CLR REQ ON
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Replace BCM. Refer to BCS-25, "Removal and Installation of BCM" .
LT-82
SKIA5958E
2007 Versa
1.
2.
3.
4.
5.
6.
With CONSULT-II
Turn ignition switch OFF.
Disconnect front combination lamp, license plate lamp and rear combination lamp connectors.
Select IPDM E/R on CONSULT-II, and select ACTIVE TEST on SELECT DIAG MODE screen.
Select EXTERNAL LAMPS on SELECT TEST ITEM screen.
Touch TAIL on "ACTIVE TEST" screen.
When tail lamp relay is operating, check voltage between front combination lamp, license plate lamp and
rear combination lamp harness connector and ground.
1.
2.
3.
4.
Without CONSULT-II
Turn ignition switch OFF.
Disconnect front combination lamp, license plate lamp and rear combination lamp connectors.
Start auto active test. Refer to PG-21, "Auto Active Test" .
When tail lamp relay is operating, check voltage between front combination lamp, license plate lamp and
rear combination lamp harness connector and ground.
Terminal
(+)
()
E54
LH
E53
Voltage
Terminal
6
Ground
Battery voltage
I
WKIA5502E
Terminal
(+)
License plate lamp
connector
RH
B17
LH
B16
Terminal
1
()
Ground
Voltage
LT
Battery voltage
WKIA5503E
Terminal
(+)
Rear combination lamp
connector
(Tail lamp)
RH
B107
LH
B25
Voltage
Terminal
()
Ground
Battery voltage
OK or NG
OK
>> GO TO 7.
NG
>> GO TO 6.
PKIC1118E
LT-83
2007 Versa
B
Terminal
E45
Connector
Terminal
27
RH
E54
26
LH
E53
Continuity
Yes
WKIA5505E
4.
Connector
Terminal
E45
28
Connector
Terminal
RH
B17
LH
B16
Continuity
Yes
WKIA5506E
5.
Connector
E45
B
Terminal
Connector
29
RH
B107
28
LH
B25
Terminal
4
Continuity
Yes
OK or NG
OK
>> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG
>> Repair harness or connector.
LT-84
WKIA5508E
2007 Versa
Check continuity between front combination lamp harness connector and ground.
E54
LH
E53
Terminal
7
Continuity
Ground
Yes
D
WKIA5509E
2.
B17
LH
B16
Terminal
Continuity
Ground
2
Yes
WKIA5510E
3.
Check continuity between rear combination lamp harness connector and ground.
Rear combination lamp
connector
RH
B107
LH
B25
Terminal
Continuity
Ground
Yes
OK or NG
OK
>> Check bulbs.
NG
>> Repair harness or connector.
LT
PKIC1029E
Parking, License Plate and Tail Lamps Do Not Turn OFF (After Approx. 10 Minutes)
EKS00HZB
This symptom is related to the ignition relay in IPDM E/R. Refer to PG-18, "Function of Detecting Ignition
Relay Malfunction" .
Select BCM on CONSULT-II. Select HEADLAMP on SELECT TEST ITEM screen and select DATA
MONITOR on SELECT DIAG MODE screen. If LIGHT SW 1ST is OFF when lighting switch is OFF,
replace IPDM E/R.
LT-85
2007 Versa
EKS00HZC
PARKING LAMP
Refer to LT-87, "Bulb Replacement" .
Remove the license plate lamp. Refer to LT-86, "LICENSE PLATE LAMP" .
Turn bulb socket counterclockwise and unlock it.
Remove bulb from the socket.
Installation is in the reverse order of removal.
TAIL LAMP
Refer to LT-87, "Bulb Replacement" .
EKS00HZD
PARKING LAMP
Refer to LT-87, "Removal and Installation" .
LKIA0759E
1.
A.
Pawl
B.
Hook
Removal
1.
2.
Press the license plate lamp pawl on the side of the rear bumper fascia, then swing the license plate lamp
down to release the license plate lamp hook from the rear bumper fascia.
Disconnect the license plate lamp connector and remove the licence plate lamp.
Installation
Installation is in the reverse order of removal.
TAIL LAMP
Refer to LT-87, "Removal and Installation" .
LT-86
2007 Versa
PFP:26554
A
EKS00IBB
I
LKIA0760E
1.
2.
3.
4.
5.
6.
Bumper stay
A.
Grommet
B.
Nut
C.
Clip
D.
Nuts
E.
Clip
Bulb Replacement
1.
2.
3.
LT
EKS00HZE
Remove the rear combination lamp. Refer to LT-87, "Removal and Installation" .
Turn bulb socket counterclockwise and unlock it.
Remove bulb.
M
EKS00HZF
REMOVAL
1.
2.
3.
INSTALLATION
Installation is in the reverse order of removal.
EKS00IBC
DISSASEMBLY
1.
2.
3.
LT-87
2007 Versa
LT-88
2007 Versa
INTERIOR LAMP
INTERIOR LAMP
Map lamp
PFP:28491
A
EKS00HZH
BULB REPLACEMENT
1.
2.
3.
LKIA0773E
Insert a suitable tool and disengage the pawl (A) fittings the map
lamp (1).
Disconnect map lamp connector and remove map lamp (1).
PKIC1038E
Installation
Installation is in the reverse order of removal.
LT
PKIC1039E
Assembly
Assembly is in the reverse order of disassembly.
LT-89
2007 Versa
INTERIOR LAMP
Luggage Compartment Lamp
EKS00HZI
BULB REPLACEMENT
LKIA0761E
1.
1.
2.
3.
2.
A.
Tab A
Remove luggage compartment lamp from the luggage side finisher LH.
Disconnect luggage compartment lamp connector.
Installation
Installation is in the reverse order of removal.
LT-90
2007 Versa
PFP:26410
A
EKS00HZJ
G
WKIA5545E
1.
2.
3.
4.
5.
6.
System Description
EKS00HZK
When room lamp switch is in DOOR position, room lamp ON/OFF is controlled by timer according to signals
from switches including key switch, front door switch LH, unlock signal from keyfob, door lock and unlock
switch, key cylinder lock and unlock switch, ignition switch.
J
When room lamp turns ON, there is a gradual brightening over 1 second.
When room lamp turns OFF, there is a gradual dimming over 1 second.
Interior room lamp timer is controlled by BCM (body control module).
LT
Interior room lamp timer control settings can be changed with CONSULT-II.
through 40A fusible link (letter g , located in fuse and fusible link box)
through 10A fuse (No. 31, located in fuse and fusible link box)
through 40A fusible link (letter g , located in fuse and fusible link box)
LT-91
2007 Versa
to BCM terminal 67
to BCM terminal 47
to BCM terminal 12
to BCM terminal 48
to BCM terminal 13
to BCM terminal 43
to BCM terminal 7
SWITCH OPERATION
When map lamp switch is ON (with map lamp), ground is supplied
LT-92
2007 Versa
When room lamp switch is in DOOR position, and when all conditions below are met, BCM performs timer F
control (maximum 30 seconds) for room lamp ON/OFF.
In addition, when the interior room lamp turns ON or OFF there is gradual brightening or dimming over 1 second.
G
Power is supplied
to BCM terminal 7
Front door LH is locked (locked front door key cylinder switch LH).
through 10A fuse (No. 31, located in fuse and fusible link box)
LT-93
2007 Versa
to BCM terminal 7
Front door LH is locked (with keyfob or front door key cylinder switch LH).
key is removed from ignition key cylinder or inserted in ignition key cylinder, or the ignition knob switch is
pushed or released.
Interior lamp battery saver control time period can be changed by the function setting of CONSULT-II.
LT-94
2007 Versa
EKS00HZL
LT
WKWA4976E
LT-95
2007 Versa
EKS00HZM
LKWA0339E
LT-96
2007 Versa
LT
LKWA0340E
LT-97
2007 Versa
LKWA0341E
LT-98
2007 Versa
LT
LKWA0342E
LT-99
2007 Versa
LKWA0343E
LT-100
2007 Versa
EKS00HZN
EKS00HZO
Preliminary Check
D
EKS00HZP
EKS00HZQ
CONSULT-II can display each diagnostic item using the diagnostic test modes shown following.
BCM diagnostic
test item
Diagnostic mode
Description
WORK SUPPORT
DATA MONITOR
ACTIVE TEST
Inspection by part
SELF-DIAG RESULTS
CAN DIAG SUPPORT MNTR
ECU PART NUMBER
CONFIGURATION
LT
WORK SUPPORT
Display Item List
L
Item
Description
CONSULT-II
The 30 second operating function of the interior room lamps can be selected
when the front door LH is released (unlocked).
ON/OFF
The time in order to escalate illumination can be adjusted when interior room
lamps are turned on.
MODE 1 7
The time in order to diminish illumination can be adjusted when interior room
lamps are turned off.
MODE 1 7
Time (sec.)
0.5
DATA MONITOR
Display Item List
Monitor item
Contents
IGN ON SW
ON/OFF
Displays IGN position (ON)/OFF, ACC position (OFF) judged from ignition switch signal.
KEY ON SW
ON/OFF
Displays Key inserted (ON)/key removed (OFF) status judged from key switch signal.
LT-101
2007 Versa
Contents
DOOR SW - DR
ON/OFF
Displays status of front door LH as judged from front door switch LH signal. (Door is
open: ON/Door is closed: OFF)
DOOR SW - AS
ON/OFF
Displays Door open (ON)/Door closed (OFF) status, determined from front door switch
RH signal.
DOOR SW - RR
ON/OFF
Displays Door open (ON)/Door closed (OFF) status, determined from rear door switch
RH signal.
DOOR SW - RL
ON/OFF
Displays Door open (ON)/Door closed (OFF) status, determined from rear door switch
LH signal.
LOCK STATUS
ON/OFF
Display status (door is locked: ON/door is unlocked: OFF) of front door lock actuator LH
(unlock sensor) judged from the front door lock actuator LH (unlock sensor) signal.
CDL LOCK SW
ON/OFF
Displays Door locked (ON)/Door unlocked (OFF) status, determined from locking
detection switch in the front door LH.
CDL UNLOCK SW
ON/OFF
Displays Door unlocked (OFF) status, determined from locking detection switch in
front door RH.
I KEY LOCKNOTE
ON/OFF
I KEY UNLOCKNOTE
ON/OFF
NOTE:
Vehicles without intelligent key system display this item, but cannot be monitored.
ACTIVE TEST
Display Item List
Test item
INT LAMP
Description
Interior room lamp can be operated by any ON-OFF operations.
WORK SUPPORT
Display Item List
Item
Description
CONSULT-II
Interior room lamp battery saver control mode can be changed in this mode.
Select interior room lamp battery saver control mode between ON and OFF.
MODE 1: 30 min.
MODE 2: 60 min.
ON/OFF
DATA MONITOR
Display Item List
Monitor item
Contents
IGN ON SW
ON/OFF
Displays IGN position (ON)/OFF, ACC position (OFF) judged from ignition switch signal.
KEY ON SW
ON/OFF
Displays Key inserted (ON)/key removed (OFF) status judged from key switch signal.
DOOR SW - DR
ON/OFF
Displays status of front door LH as judged from front door switch LH signal. (Door is
open: ON/Door is closed: OFF)
DOOR SW - AS
ON/OFF
Displays Door open (ON)/Door closed (OFF) status, determined from front door switch
RH signal.
DOOR SW - RR
ON/OFF
Displays Door open (ON)/Door closed (OFF) status, determined from rear door switch
RH signal.
DOOR SW - RL
ON/OFF
Displays Door open (ON)/Door closed (OFF) status, determined from rear door switch
LH signal.
LOCK STATUS
ON/OFF
Display status (door is locked: ON/door is unlocked: OFF) of front door lock actuator LH
(unlock sensor) judged from the front door lock actuator LH (unlock sensor) signal.
CDL LOCK SW
ON/OFF
Displays Door locked (ON)/Door unlocked (OFF) status, determined from locking
detection switch in front door LH.
CDL UNLOCK SW
ON/OFF
Displays Door unlocked (OFF) status, determined from locking detection switch in passengers door.
LT-102
2007 Versa
Contents
I KEY LOCKNOTE
ON/OFF
I KEY UNLOCKNOTE
ON/OFF
NOTE:
Vehicles without Intelligent Key system display this item, but cannot be monitored.
Interior Room Lamp Control Does Not Operate (With Map Lamp)
EKS00HZR
PKIB0263E
2. ACTIVE TEST
1.
2.
LKIA0092E
LT
: Battery voltage.
OK or NG
OK
>> GO TO 6.
NG
>> GO TO 4.
WKIA5512E
LT-103
2007 Versa
: Battery voltage.
OK or NG
OK
>> GO TO 5.
NG
>> Repair harness or connector.
WKIA5513E
OK or NG
OK
>> Replace map lamp.
NG
>> Repair harness or connector.
WKIA5514E
Condition
Continuity
Yes
No
OK or NG
OK
>> GO TO 7.
NG
>> Check bulb. If OK, replace interior room lamp.
WKIA5609E
OK or NG
OK
>> GO TO 8.
NG
>> Replace map lamp.
WKIA5608E
LT-104
2007 Versa
OK or NG
OK
>> GO TO 9.
NG
>> Repair harness or connector.
D
WKIA5556E
OK or NG
OK
>> Replace BCM if room lamp does not work after setting
the connector again. Refer to BCS-25, "Removal and
Installation of BCM" .
NG
>> Repair harness or connector.
H
WKIA5518E
Interior Room Lamp Control Does Not Operate (Without Map Lamp)
EKS00IMK
LT
PKIB0263E
2. ACTIVE TEST
1.
2.
OK or NG
OK
>> Replace BCM. Refer to BCS-25, "Removal and Installation of BCM" .
NG
>> GO TO 3.
LKIA0092E
LT-105
2007 Versa
OK or NG
OK
>> GO TO 4.
NG
>> GO TO 6.
WKIA5610E
Condition
Terminal
Continuity
Yes
No
OK or NG
OK
>> GO TO 5.
NG
>> Check bulb. If OK, replace room lamp. Refer to LT-107, "ROOM LAMP" .
WKIA5609E
OK or NG
OK
>> GO TO 6.
NG
>> Repair harness or connector.
WKIA5559E
OK or NG
OK
>> Replace BCM if interior lamp does not work after setting
the connector again. Refer to BCS-25, "Removal and
Installation of BCM" .
NG
>> Repair harness or connector.
WKIA5560E
LT-106
2007 Versa
EKS00HZS
ROOM LAMP
1.
2.
3.
D
PKIC1048E
EKS00HZT
ROOM LAMP
Removal
1.
2.
Remove lens (1) and remove the room lamp by pulling down to
release the room lamp metal clips (A).
Disconnect connector and remove room lamp.
PKIC1049E
Installation
Installation is in the reverse order of removal.
J
LT
LT-107
2007 Versa
ILLUMINATION
ILLUMINATION
System Description
PFP:27545
EKS00HZU
The control of the illumination lamps operation is dependent upon the position of the lighting switch. When the
lighting switch is placed in the 1ST or 2ND position, the BCM (body control module) receives input signal
requesting the illumination lamps to illuminate. This input signal is communicated to IPDM E/R (intelligent
power distribution module engine room) across CAN communication lines. CPU (central processing unit)
located in the IPDM E/R controls the tail lamp relay coil. This relay, when energized, directs power to the illumination lamps, which then illuminate.
Power is supplied at all times
through 40A fusible link (letter g , located in fuse and fusible link box)
to BCM terminal 67
LT-108
2007 Versa
ILLUMINATION
to illumination control switch terminal 3
EKS00HZV
LT
LT-109
2007 Versa
ILLUMINATION
Schematic
EKS00HZX
WKWA4977E
LT-110
2007 Versa
ILLUMINATION
Wiring Diagram ILL
EKS00HZY
LT
LKWA0344E
LT-111
2007 Versa
ILLUMINATION
LKWA0345E
LT-112
2007 Versa
ILLUMINATION
A
LT
LKWA0346E
LT-113
2007 Versa
ILLUMINATION
LKWA0347E
LT-114
2007 Versa
ILLUMINATION
Bulb Replacement
EKS00HZZ
1.
2.
3.
PKIC1053E
LT
LT-115
2007 Versa
BULB SPECIFICATIONS
BULB SPECIFICATIONS
Headlamp
PFP:26297
EKS00I00
Item
Wattage (W)
60/55 (H4)
Exterior Lamp
EKS00I01
Item
Front combination lamp
Wattage (W)
21 (amber)
5
21/5
21 (amber)
Back-up lamp
21
35 (H8)
18
Interior Lamp/Illumination
EKS00I02
Item
Wattage (W)
1.4
Map lamp
Room lamp
LT-116
2007 Versa