Helipad
Helipad
Helipad
Earth/Gravel/
Metal
Sand
loading
10.00
12.80
unloading
8.50
8.70
stacking
5.50
8.70
0.25
50.00
110.00
0.5
75.00
110.00
1
2
3
4
5
6
7
100.00
106.00
112.00
118.00
124.00
130.00
136.00
120.00
126.00
132.00
138.00
144.00
150.00
156.00
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
142.00
148.00
154.00
160.00
166.00
172.00
178.00
184.00
190.00
196.00
202.00
208.00
214.00
219.00
224.00
229.00
234.00
239.00
244.00
249.00
254.00
259.00
264.00
268.80
273.60
278.40
283.20
288.00
292.80
297.60
302.40
307.20
312.00
316.80
162.00
168.00
174.00
180.00
186.00
192.00
198.00
204.00
210.00
216.00
222.00
228.00
234.00
239.75
245.50
251.25
257.00
262.75
268.50
274.25
280.00
285.75
291.50
297.00
302.50
308.00
313.50
319.00
324.50
330.00
335.50
341.00
346.50
352.00
360.00
390.00
500.00
136.00
117.00
71.00
95.00
114.00
98.00
114.00
156.00
39.75
82.00
500.00
830.00
845.00
690.00
560.00
430.00
234.00
225.00
56.00
500.00
830.00
845.00
690.00
560.00
430.00
175.00
60.00
51700.00
46600.00
4400.00
43200.00
70.00
67.00
45.00
20.00
36.00
188.00
193.40
146.00
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
321.60
326.40
331.20
336.00
340.80
345.60
350.40
355.20
360.00
364.60
369.20
373.80
378.40
383.00
387.60
392.20
396.80
401.40
406.00
410.60
415.20
419.80
424.40
429.00
433.60
438.20
442.80
447.40
452.00
456.60
461.20
465.80
470.40
475.00
479.60
484.20
488.80
493.40
498.00
502.40
506.80
511.20
515.60
520.00
524.40
528.80
533.20
537.60
542.00
546.40
357.50
363.00
368.50
374.00
379.50
385.00
390.50
396.00
401.50
406.50
411.50
416.50
421.50
426.50
431.50
436.50
441.50
446.50
451.50
456.50
461.50
466.50
471.50
476.50
481.50
486.50
491.50
496.50
501.50
506.50
511.50
516.50
521.50
526.50
531.50
536.50
541.50
546.50
551.50
556.25
561.00
565.75
570.50
575.25
580.00
584.75
589.50
594.25
599.00
603.75
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer
2760.00
2600.00
2250.00
1320.00
575.00
1550.00
540.00
345.00
345.00
345.00
345.00
370.00
1320.00
290.00
940.00
690.00
15525.00
1090.00
2070.00
1320.00
1035.00
920.00
1550.00
1090.00
620.00
345.00
450.00
4.50
40.00
5.00
4.80
4.60
4.40
4.20
5.75
5.50
5.00
4.75
4.50
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
550.80
555.20
559.60
564.00
568.40
572.80
577.20
581.60
586.00
590.20
594.40
598.60
602.80
607.00
611.20
615.40
619.60
623.80
628.00
632.20
636.40
640.60
644.80
649.00
653.20
657.40
661.60
665.80
670.00
674.20
678.40
682.60
686.80
691.00
695.20
699.40
703.60
707.80
712.00
716.20
720.40
724.60
728.80
733.00
737.20
741.40
745.60
749.80
754.00
758.20
608.50
613.25
618.00
622.75
627.50
632.25
637.00
641.75
646.50
651.00
655.50
660.00
664.50
669.00
673.50
678.00
682.50
687.00
691.50
696.00
700.50
705.00
709.50
714.00
718.50
723.00
727.50
732.00
736.50
741.00
745.50
750.00
754.50
759.00
763.50
768.00
772.50
777.00
781.50
786.00
790.50
795.00
799.50
804.00
808.50
813.00
817.50
822.00
826.50
831.00
142
143
144
145
146
147
148
149
150
762.40
766.60
770.80
775.00
779.20
783.40
787.60
791.80
796.00
835.50
840.00
844.50
849.00
853.50
858.00
862.50
867.00
871.50
LEADS
Calculation of weighted average lead distances for different constructons materials
1 HBG metal from Katheru Quarry.
Qurry to Lalacheruvu
Lalacheruvu to Ravulapalem ( NH 5)
From km 31.735 to 61.425 of NH5 to RP
From km 123.935 to 115.760 of NH 217
From km 81.600 to 96.000 of KANF road
2.200
38.310
29.690
8.175
14.400
1.000
93.775
94.00 Kms
(60.200-55.600)
(183.200 - 156.690)
(61.425-31.735)
(123.935-118.000)
(96.000-81.600)
4.600
26.510
29.690
5.935
14.400
1.000
82.135
82.00 Kms
(61.425-49.072)
(123.935-118.000)
(96.000-81.600)
34.00 Kms
0.110
0.220
12.353
5.935
14.400
1.000
34.018
Sl.No
1
2
3
4
5
6
7
8
9
10
11
Description of Metal
A) FOR ROAD WORKS
60 to 63 mm IRC and MoRTH
HBG metal
50 to 55 mm IRC and MoRTH
HBG metal
40 to 45 mm IRC and MoRTH
HBG metal
SS Revetment work 300mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone
HBG metal
40 to 45 mm IRC and MoRTH
HBG M/C metal
25 to 27 mm IRC and MoRTH
HBG M/C metal
19 to 22 mm IRC and MoRTH
HBG M/C metal
12 to 14 mm IRC and MoRTH
HBG M/C metal
9.5 to 11.20 mm IRC and MoRTH
HBG M/C metal
Source of
Supply
katheru
katheru
katheru
kesavaram
katheru
katheru
katheru
katheru
katheru
katheru
katheru
Lead in
Conveyance
Kms
Initial rate
Blasting
charges
Machine
Seigniorage
crushing
charges
charges
Deduct
stacking
charges for
conveyance
Toal Cost
per Cum
94
618.00
351.30
70.00
0.00
45.00
-8.70
1075.60
94
618.00
381.30
70.00
0.00
45.00
-8.70
1105.60
94
618.00
491.30
70.00
0.00
45.00
-8.70
1215.60
618.00
0.00
0.00
0.00
45.00
-8.70
654.30
94
618.00
0.00
0.00
0.00
45.00
-8.70
654.30
94
618.00
0.00
0.00
0.00
45.00
-8.70
654.30
94
618.00
491.30
70.00
122.83
45.00
-8.70
1338.43
94
618.00
821.30
70.00
205.33
45.00
-8.70
1750.93
94
618.00
836.30
70.00
209.08
45.00
-8.70
1769.68
94
618.00
681.30
70.00
170.33
45.00
-8.70
1575.93
94
618.00
551.30
70.00
137.83
45.00
-8.70
1413.43
12
katheru
94
618.00
421.30
70.00
105.33
45.00
-8.70
1250.93
13
14
15
katheru
Gravel
94
618.00
225.30
70.00
56.33
45.00
-8.70
1005.93
94
618.00
216.30
0.00
0.00
45.00
-8.70
870.60
kadiam
82
506.80
50.50
0.00
0.00
20.00
-5.50
571.80
katheru
katheru
94
618.00
491.30
70.00
122.83
45.00
-8.70
1338.43
17
katheru
94
618.00
821.30
70.00
205.33
45.00
-8.70
1750.93
18
katheru
94
618.00
836.40
70.00
209.10
45.00
-8.70
1769.80
19
katheru
94
618.00
681.30
70.00
170.33
45.00
-8.70
1575.93
20
katheru
94
618.00
551.30
70.00
137.83
45.00
-8.70
1413.43
21
katheru
94
618.00
421.30
70.00
105.33
45.00
-8.70
1250.93
22
River
34
283.20
169.50
0.00
0.00
36.00
-5.50
483.20
23
River
34
283.20
54.50
0.00
0.00
36.00
-5.50
368.20
24
HYSD Steel
31500.00
0.00
0.00
0.00
25
31500.00
0.00
0.00
0.00
26
Mild Steel
32500.00
27
Cement
4300.00
0.00
0.00
0.00
Description
Nos
Measurements
B
D
750848
Contents
Rate
Per
101.25
102.00
Cum
40.50
Cum
16.88
17.00
Cum
2276.00
Cum
For Helipad
15.00
15.00
0.45
or say
15.00
15.00
0.075
or say
15.00
15.00
0.075
16.88
or say
17.00
Cum
2648.00
Cum
4 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG
crushed stone aggregate and fine aggregate conforming to table 1000-2 of
MoRT&H including cost, seigniorage conveyance of all materials to site and
labour charges, centering, machine mixing, laying, Vibrating, curing etc.,
including all other incidental and operational charges of all T&P etc.,
complete for finished item of work as per MoRT&H specification 1500,1700,
2100 (4th Revision) and as directed by the Engineer-in-Charge for base
coarse below CC Pavement.
For Helipad
15.00
15.00
0.10
or say
22.50
23.00
Cum
3169.00
Cum
45.00
45.00
Cum
4879.00
Cum
543.00
Cum
15.00
15.00
0.20
or say
6 Forming and levelling the Ground with selective soils of MDD not less than
17.50 kN/cum from outside road boundary with all leads and lifts
C590conveyance of soil, depositing the soil on the embankment, spreading
soil, breaking clods, sectioning, grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H,
including all hire and operational charges of T&P and seigniorage charges,
complete for finished item of work as per MoRT&H specification 401& 407
(4th revision)
For Helipad
Deduct
For approach to helipad
1
1
1
45.00
15.00
60.00
45.00
15.00
3.00
0.10
0.10
0.15
Or say
202.50
-22.50
27.00
207.00
207.00
cum
7 White cement paint in two coats with appoved brand including cost and
conveyance of all materials to site and labour charges curing etc. complete
for H Mark and Outer Square etc. complete.
For " H " marking
Outer Square
2
1
1
3.66
1.83
60.00
0.40
0.40
0.30
Or say
2.93
0.73
18.00
21.66
22.00
403.00 10 Sqm
Sqm
8 Provision for Providing Fencing for Safety Area including Cost of R.C.C.
Poles and Chain link mesh and labour charges for all Operations etc.
complete.
1
550.00
1.50
825.00
Sqm
2575
10 Sqm
Total
750848
Amount
4131
38692
45016
72887
219555
112401
887
212438
706007
28240
14000
2601
750848
550
3
41400
184
28240.264
14120.132
1753
DATAS
0
1 Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in
accordance with requirements of lines , grades and cross sections etc., complete including seignioarge charges
for finished item of work for trench cutting as per MoRT&H specification 301(4th Revision) and as directed by the
Engineer-in-Charge
Unit : Cum
Taking out put = 180 Cum
(A) Labour
0.08
day
2.00
day
(B) Machinery
180.00 cum
Rate as per G.O. Ms No 10, Dt 26/7/2005
(C) Seigniorage charges
180.00 Cum
Seigniorage charges
188.00
146.00
day
day
13.00
cum
20.00
cum
2 Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of Grade - II - IRC &
MoRT&H - H.B.G Metal (Machine crushed metal for 22.40mm and below) as per Table 400-7&9 of MoRT&H
Specification 404 of 4th revision for Water Bound Macadam specification including cost, conveyance and seignorage
charges and spreading in uniform thickness, hand packing, rolling with Power Road Roller 8- 10 Tonnes in stages
to proper grade and camber applying and brooming requisite type ' A ' screenings as per table 400-8&9 and binding
materials as to fill up the interstices of coarse aggregates,watering and compacting to the required density for
finished item of work as per MoRT&H specification 404 (4 th revision) and as directed by the Engineer-in-Charge
Unit = cum
Page 104,105,106 of MoRT&H SDB
Taking output = 360 cum
(A) Labour
10.08 nos.
Mate
188.00
2.00 nos.
Mazdoor skilled
193.40
250.00 nos.
Mazdoor
146.00
Total
(B) Machinery
smooth wheeled roller 8 Ton
12.00 hr
540.00
24.00 hr
water tanker 6 KL
345.00
Total
(C) Material
217.80 cum
63mm IRC&MoRT&H HBG metal
1075.60
200.38 cum
45mm IRC&MoRT&H HBG metal
1338.43
17.42
cum
22.40 mm IRC&MoRT&H HBG M/C metal
1769.68
57.60
cum
Screenings 13.2mm@ 0.12cum/10sqm
1575.93
(Ave of 9.5-11.2
& 5-7
mm/ 10sqm
M/C ) (Rate of 2.36mm
28.80
cum
Binding
material mm
@ 0.06
cum
870.60
& Below)
Total
day
day
day
hr
hr
cum
cum
cum
cum
cum
Unit = cum
Page 104,105,106 of MoRT&H SDB
Taking output = 360 cum
(A) Labour
10.08 nos.
Mate
188.00
2.00 nos.
Mazdoor skilled
193.40
250.00 nos.
Mazdoor
146.00
Total
(B) Machinery
smooth wheeled roller 8 Ton
12.00 hr
540.00
24.00 hr
water tanker 6 KL
345.00
Total
(C) Material
357.19 cum
45mm IRC&MoRT&H HBG metal
1338.43
78.41 cum
22.40mm IRC&MoRT&H HBG M/C metal
1769.68
86.40 cum
Screenings 11.2mm @0.18cum/10sqm
1413.43
(Av. Ratematerial
of 2.36 @
- 5mm
2.36mm
and Below)
28.80 cum
Binding
0.06 &
cum
/ 10sqm
870.60
(Rate of 2.36mm & Below)
Total
(D) Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)+( C)
6.00 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 360 cum (E) + (F)
Rate per 1 cum
Rate to be adopted per 1 cum
day
day
day
hr
hr
cum
cum
cum
cum
4 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site
and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700,
2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos
1.00 nos
Mate
Mason
188.00
193.40
day
day
15.00 nos
13.50
6.75
2.43
(B) Material
cum
cum
MT
Mazdoor
Total
146.00
day
1338.43
483.20
4300.00
cum
cum
MT
345.00
620.00
345.00
hr
hr
hr
Machinery
hr
Concrete mixer 0.4/0.28 cum
hr
Generator set 35 KVA
hr
Water tanker 6 KL
Total
(D) Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)+( C)
6.00 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E) + (F)
Rate for 1 cum
Rate to be adopted
6.00
6.00
2.00
5 Vibrated cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate
conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, seigniorage conveyance
of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all
other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500, 1700, 2100 & 2702 (4 th Revision) and as directed by the Engineer-in-Charge for C.C
Pavement.
Unit = cum
Page 345,346 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
1.50 nos
20.00 nos
(B) Material
8.10 cum
5.40 cum
6.75 cum
6.10 MT
Mate
Mason
Mazdoor
Total
188.00
206.00
146.00
day
day
day
1769.80
1413.43
483.20
4300.00
cum
cum
cum
MT
345.00
620.00
hr
hr
60640.18
Cum
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
(D) Form work
3.50 %
Form work @ 3.50% on (A)+(B)+( C)
(E) Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)+( C)+(D)
6.00 %
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
6 Forming shoulders with selective soils of MDD not less than 17.50 kN/cum from outside road boundary with all
leads and lifts C590conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods,
sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of
MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of
work as per MoRT&H specification 401& 407 (4th revision)
Unit : Cum
Taking out put = 100 Cum
Page 68,69 of MoRT&H SDB
(A) Labour
0.04 day
Mate
188.00
day
1.00 day
Mazdoor unskilled
146.00
day
(B) Machinery
100.00 cum
Rate as per G.O. Ms No 10, Dt 26/7/2005
7840.00 t.km
Tipper (for 49 Km = 160x49 =5920)
Add 10% of cost of carriage to cover cost of loading and
unloading
0.50 hr
Dozer 80 HP for spreading @ 200 cum per hour
1.00 hr
Motor Grador for Grading @ 100 cum per hour
4.00 hr
Water tanker 6 KL
1.00 hr
Vibratory roller 8T
(C) Seigniorage charges
100.00 Cum
Seigniorage charges
13.00
4.50
cum
t.km
2760.00
0.00
345.00
1550.00
hr
hr
hr
hr
20.00
cum
7 White cement paint in two coats with appoved brand including cost and conveyance of all materials
to site and labour charges curing etc. complete
3.5 kgs
10 sqm
25.00
315.70
1 kg
10sqm
8 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem
specification including cost,seignorage of all materials and including premixing the material with water at OMC in
Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base
courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as
directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4 th revision) for finished item of work.
Unit = cum
Taking output = 225 cum
(A) Labour
0.48 nos.
Mate
2.00 nos.
Mazdoor skilled
10.00 nos.
Mazdoor
Total
188.00
193.40
146.00
day
day
day
(B) Machinery
6.60 hr
Wet mix plant of 60 tonne hr. capacity
6.00 hr
Electric generating set 125 KVA
6.00 hr
front end loader 1 cum capacity
6.00 hr
Mechanical Paver finisher 100 TPH
3.90 hr
Vibratory roller 8-10 T
3.00 hr
Water tanker
Total
(C) Material
89.10 cum
45 to 22.40mm IRC&MoRT&H HBG M/C metal@ 30%
(Av. Of 40-45, 25-27, 19-22mm )
118.80 cum
22.4 to 2.36mm IRC&MoRT&H HBG M/C metal@40%
(Av. Of 19-22mm, 12-14mm, 9.5-11.2mm, 5-7mm,
2.36 - 5mm )
89.10 cum
2.36mm to 75 micron @ 30% (2.36mm & below)
1320.00
1090.00
1320.00
1090.00
1550.00
345.00
hr
hr
hr
hr
hr
hr
1619.68
cum
1403.18
cum
870.60
cum
Total
(D) Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)+( C)
6.00 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 225 cum (E) + (F)
Rate per 1 cum
Rate to be adopted per 1 cum
9 Provision for Providing Fencing for Safety Area including Cost of R.C.C. Poles and Chain link mesh and labour
charges for all Operations etc. complete.
10.00 Sqm
3.00 Nos
10.00 Sqm
170.00
Sqm
R.C.C. Poles
250.00
Each
Labour charges
125.00
10 Sqm
Rs
15.04
292.00
307.04
2340.00
3600.00
374.82
6621.86
662.19
7284.05
40.47
40.50
1 Cum
1895.04
386.80
36500.00
38781.84
6480.00
8280.00
14760.00
234265.68
268194.60
30827.83
90773.57
25073.28
649134.96
42160.61
744837.41
74483.74
819321.15
2275.89
2276.00
Cum
ates of Grade - III - IRC &
ble 400-7& 9 of MoRT&H
onveyance and seignorage
ler 8- 10 Tonnes in stages
as per table 400-8&9 and
to the required density for
e Engineer-in-Charge
1895.04
386.80
36500.00
38781.84
6480.00
8280.00
14760.00
478073.81
138760.61
122120.35
25073.28
764028.05
49054.19
866624.08
86662.41
953286.49
2648.02
2648.00
Cum
120.32
193.40
2190.00
2503.72
18068.81
3261.60
10449.00
31779.41
2070.00
3720.00
690.00
6480.00
2445.79
43208.92
4320.89
47529.81
3168.65
3169.00
1 Cum
161.68
309.00
2920.00
3390.68
14335.38
7632.52
3261.6
26230
51459.5
2070.00
3720.00
5790.00
2122.41
3765.76
66528.35
6652.84
73181.19
4878.75
4879.00
1 Cum
de road boundary with all
ading soil, breaking clods,
C to meet requirement of
mplete for finished item of
7.52
146.00
153.52
1300.00
35280.00
3528.00
1380.00
0.00
1380.00
1550.00
44418.00
2000.00
2794.29
49365.81
4936.58
54302.39
543.02
543.00
1 Cum
87.50
315.70
403.20
403.00
90.24
386.80
1460.00
1937.04
8712.00
6540.00
7920.00
6540.00
6045.00
1035.00
36792.00
144313.49
166697.78
77570.46
388581.73
25638.65
452949.42
45294.94
498244.36
2214.42
2214.00
Cum
1700.00
750.00
125.00
2575.00
10 Sqm
Description
Nos
Measurements
B
D
672279
Contents
Rate
Per
101.25
102.00
Cum
40.50
Cum
33.75
34.00
Cum
2214.00
Cum
22.50
23.00
Cum
3169.00
Cum
For Helipad
15.00
15.00
0.45
or say
15.00
15.00
0.150
or say
HBG
etc.,
15.00
15.00
0.10
or say
15.00
15.00
0.20
or say
45.00
45.00
Cum
4879.00
Cum
543.00
Cum
6 Forming and levelling the Ground with selective soils of MDD not less than
17.50 kN/cum from outside road boundary with all leads and lifts
C590conveyance of soil, depositing the soil on the embankment, spreading
soil, breaking clods, sectioning, grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H,
including all hire and operational charges of T&P and seigniorage charges,
complete for finished item of work as per MoRT&H specification 401& 407
(4th revision)
For Helipad
Deduct
For approach to helipad
1
1
1
45.00
15.00
60.00
45.00
15.00
3.00
0.10
0.10
0.15
Or say
202.50
-22.50
27.00
207.00
207.00
cum
7 White cement paint in two coats with appoved brand including cost and
conveyance of all materials to site and labour charges curing etc. complete
for H Mark and Outer Square etc. complete.
For " H " marking
Outer Square
2
1
1
3.66
1.83
60.00
0.40
0.40
0.30
Or say
2.93
0.73
18.00
21.66
22.00
Sqm
403.00 10 Sqm
8 Provision for Providing Fencing for Safety Area including Cost of R.C.C.
Poles and Chain link mesh and labour charges for all Operations etc.
complete.
1
370.00
1.50
555.00
Sqm
2575
10 Sqm
672279
Amount
4131
75276
72887
219555
550
3
41400
112401
887
142913
628050
24500
25121.984
12500
12560.992
184
7229
672279
650000
-22279
Description
Nos
Measurements
B
D
#REF!
Contents
Rate
Per
135.00
135.00
Cum
40.50
Cum
33.75
34.00
Cum
Err:509
Cum
15.00
15.00
0.60
or say
15.00
15.00
0.15
or say
15.00
15.00
0.15
or say
33.75
34.00
Cum
Cum
Err:509
Cum
4 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG
crushed stone aggregate and fine aggregate conforming to table 1000-2
of MoRT&H including cost, seigniorage conveyance of all materials to site
and labour charges, centering, machine mixing, laying, Vibrating, curing
etc., including all other incidental and operational charges of all T&P etc.,
complete for finished item of work as per MoRT&H specification
1500,1700, 2100 (4th Revision) and as directed by the Engineer-inCharge for base coarse below CC Pavement.
For Helipad
15.00
15.00
0.10
or say
22.50
23.00
Cum
3169.00 Cum
45.00
45.00
Cum
Err:509
15.00
15.00
0.20
or say
Cum
6 Forming and levelling the Ground with selective soils of MDD not less
than 17.50 kN/cum from outside road boundary with all leads and lifts
C590conveyance of soil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with
8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of
MoRT&H, including all hire and operational charges of T&P and
seigniorage charges, complete for finished item of work as per MoRT&H
specification 401& 407 (4th revision)
For Helipad
Deduct
1
1
45.00
15.00
45.00
15.00
0.10
0.10
Or say
202.50
-22.50
180.00
180.00
cum
Err:509
Cum
7 Painting to Inner and outer circles & "H" mark with Oil bound Distemper
including one coat of primer (total 3 coats) including cost and conveyance
of all materials to site and labour charges cost of brushes etc. complete.
For " H " marking
For Inner circle Strip
For Outer circle Strip
2
1
1
1
3.66
0.40
1.83
0.40
22/28 x ( 12.302 - 12.00 2)
22/28 x ( 22.802 - 22.50 2)
Or say
2.928
0.732
5.73
10.68
20.07
21.00
Sqm
706.00 10 Sqm
Total
#REF!
Amount
5468
Err:509
Err:509
72887
Err:509
Err:509
1483
Err:509
Sl No
Item of work
Man Mazdoor
Rs146 /each
Qty
Amount
Woman Mazdoor
Rs116/each
Qty
Amount
Total
0.21
43.26
0.49
92.12
135.38
per 10sqm
0.21
43.26
0.49
92.12
135.38
per 10sqm
0.36
74.16
0.84
157.92
232.08
per 10sqm
0.21
43.26
0.48
90.24
133.50
per 10sqm
0.09
18.54
0.21
39.48
0.50
73.00
1.00
146.00
277.02
per 10sqm
0.15
30.90
0.35
65.80
0.50
73.00
1.00
146.00
315.70
per 10sqm
0.11
22.66
0.25
47.00
0.37
54.02
0.60
87.60
211.28
per 10sqm
0.15
30.90
0.35
65.80
0.50
73.00
0.80
116.80
286.50
per 10sqm
0.09
18.54
0.21
39.48
0.50
73.00
1.00
146.00
277.02
per 10sqm
10
0.15
30.90
0.35
65.80
0.50
73.00
1.00
146.00
315.70
per 10sqm
11
0.21
43.26
0.48
90.24
0.70
102.20
235.70
per 10sqm
12
0.33
67.98
0.77
144.76
1.10
160.60
373.34
per 10sqm
13
0.33
67.98
0.77
144.76
0.30
43.80
1.90
277.40
533.94
per 10sqm
14
0.48
98.88
1.12
210.56
0.50
73.00
2.70
394.20
776.64
per 10sqm
15
0.21
43.26
0.78
146.64
189.90
per 10sqm
16
0.33
67.98
0.77
144.76
212.74
per 10sqm
17
0.06
12.36
0.14
26.32
1.80
262.80
1.40
204.40
505.88
per 1 cum
18
0.12
24.72
0.28
52.64
2.10
306.60
3.50
511.00
894.96
per 1 cum
19
R.R. Masonary
0.54
111.24
1.26
236.88
1.40
204.40
1.40
204.40
756.92
per 1 cum
20
Brick Masonary
0.42
86.52
0.98
184.24
0.70
102.20
2.10
306.60
679.56
per 1 cum
21
0.33
67.98
0.77
144.76
0.50
73.00
1.10
160.60
446.34
per 10sqm
22
0.66
135.96
1.54
289.52
0.50
73.00
3.20
467.20
965.68
per 10sqm
23
0.15
30.90
0.35
65.80
1.00
146.00
1.10
160.60
403.30
per 10sqm
0.18
37.08
0.42
78.96
1.00
146.00
262.04
per 10sqm
665.34
24
0.30
61.80
0.70
131.60
0.33
67.98
0.70
131.60
1.00
146.00
1.80
262.80
602.20
per 10sqm
1.10
160.60
360.18
per 10sqm
962.38
25
Gronolatic flooring
0.15
30.90
0.35
65.80
1.10
160.60
4.30
627.80
885.10
per 10sqm
26
0.96
197.76
2.24
421.12
2.20
321.20
1.10
160.60
27
0.70
144.20
7.70
1124.20
28
0.96
197.76
2.24
421.12
2.20
321.20
2.10
306.60
29
30
0.48
98.88
1.12
210.56
1.10
160.60
4.30
627.80
0.66
135.96
1.54
289.52
1.10
160.60
5.40
788.40
0.30
61.80
0.70
131.60
1.10
160.60
3.30
481.80
835.80
per 10sqm
0.15
30.90
0.35
65.80
1.10
160.60
2.20
321.20
578.50
per 10sqm
per 10sqm
32
33
34
0.33
67.98
0.77
144.76
0.80
116.80
329.54
35
0.96
197.76
2.24
421.12
3.20
467.20
36
5.31
1093.86
12.39
2329.32
8.80
1284.80
4707.98
Putup
per 1 cum
37
0.33
67.98
0.77
144.76
0.70
102.20
1.40
204.40
519.34
per 1 cum
DATAS
S.noQuabtity
1
2
Description of itemS
3
Rate per
4
1 Filling in Basement
with sand including cost and conyance from approved
source to site and labour charges for filling in layers of 15cm watering and ramming
etc.comlete complying to standard specifications 309 & 310
1.00
1.00
cum
cum
368.20
23.00
cum
cum
3 White cement paint in single coat with appoved brand including cost and conveyance
of all materials to site and labour charges curing etc. complete
2 kgs
10 sqm
25.00
277.02
1 kg
10sqm
4 Oil based distemper to interior faces of walls two coats of approved distemper,
including cost and conveyance of all materials to site and labour charges cost of
brushes etc. complete.
1.34 Lit
10 sqm
Cost of Distemper
Labour charges
69.00
286.50
1 Lit
10sqm
327.02
10sqm
10 sqm
378.96
10sqm
Amount
5
368.20
23.00
391.20
391.00
1231.36
222.27
946.00
505.88
45.00
2950.51
2951.00
50.00
277.02
327.02
327.00
92.46
286.50
378.96
379.00
327.02
378.96
705.98
706.00
Sl No
Material
Rate
C.M (1:2)
at 720 kgs
C.M (1:3)
C.M (1:4)
C.M (1:5)
C.M (1:6)
C.M (1:8)
at 480 kgs
at 360 kgs
at 288 kgs
at 240 kgs
at 180 kgs
483.20
483.20
483.20
483.20
483.20
483.20
483.20
4300.00
3096.00
2064.00
1548.00
1238.40
1032.00
774.00
28.00
28.00
28.00
28.00
28.00
28.00
28.00
3607.20
2575.20
2059.20
1749.60
1543.20
1285.20
Per 1 cum
Per 1 cum
Per 1 cum
Per 1 cum
Per 1 cum
Per 1 cum
3 Mixing charges
Total Rs.