LPG Medan
LPG Medan
LPG Medan
r o
Project Framing
Medan LPG Terminal 4 x 5000 M3 (4 x 2500 MT)
Inisiatives History
Small team had been starting the preproject inisiatives
since July 2011:
Pre-Survey study for site selection:
Social economy
Geographic
Preiminary Bathimetry and Topography Survey
Utility and access
e p
www.epro-resources.com
Facility Description
e p
www.epro-resources.com
Units
Propane LPG
Butane LPG
Mixed LPG
(C3:C4 = 60:40)
Density (liquid)
Kg/m3
506.4
572.1
546.5
Density (gas/vapor)
Vapor pressure
@ T-max (38.2 degC)
Vapor Pressure
@T-normal (28 degC)
Vapor Pressure
@T-min (17.8 degC)
Kg/m3
1.77
2.4
2.2
barg
11 (max)
2.4 (max)
6.55 (max)
barg
9.0
1.5
4.85
barg
6.5 (min)
0.83 (min)
3.45 (min)
Viscosity (liquid)
cP
0.1
0.15
0.13
Viscosity (gas)
cP
0.01
0.01
0.01
Gr/mole
44
58
52.5
0.98
0.97
0.975
330
335
333
Gas MW
Gas Compressibility Factor (Z)
e p
www.epro-resources.com
8.50% p.a.
CostEscalation
6.00% p.a.
LoanPeriod
OperatingCost
Rp11,568,000,000
7 years
US$1= Rp9,000
ThruputfeeLAUT $29.50 Rp265,500
ThruputfeeDARAT $22.00 Rp198,000
Daysinyear
312
Loan $55,000,000.00 110%ofCAPEX
Year
MT/dayLAUT
MT/yearLAUT
MT/dayDARAT
MT/yearDARAT
CASHIN
Loan
ThruputfeeLAUT
ThruputfeeDARAT
360,000,000,000
270,000,000,000
180,000,000,000
96,707,764,478
96,707,764,478
(6,707,764,478) (141,707,764,478)
Monthlyexpenses
e p
Installment1
$10,745,307 Rp96,707,764,478
Rp1,200,000,000
Rp180,000,000
Total
Rp636,000,000 Rp14,192,900,000
10
11
12
13
14
15
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
300
93,600
1,000
312,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
24,850,800,000
61,776,000,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
86,626,800,000
14,192,900,000
96,707,764,478
15,044,474,000
96,707,764,478
15,947,142,440
96,707,764,478
16,903,970,986
96,707,764,478
17,918,209,246
96,707,764,478
18,993,301,800
20,132,899,908
21,340,873,903
22,621,326,337
23,978,605,917
25,417,322,272
26,942,361,609
28,558,903,305
18,993,301,800
20,132,899,908
21,340,873,903
22,621,326,337
23,978,605,917
25,417,322,272
26,942,361,609
28,558,903,305
Rp608,900,000
135,000,000,000
CapexCost
Onshoreoffshore
$50,000,000 Rp450,000,000,000
Salary
Consumables
Maintenance
Rent
Operations
(24,273,864,478)
(24,273,864,478)
(25,125,438,478)
(49,399,302,956)
(26,028,106,918)
(75,427,409,874)
(26,984,935,464)
(102,412,345,338)
(27,999,173,723)
(130,411,519,061)
67,633,498,200
(62,778,020,862)
66,493,900,092
3,715,879,230
65,285,926,097
69,001,805,327
64,005,473,663
133,007,278,990
62,648,194,083
195,655,473,073
61,209,477,728
256,864,950,801
59,684,438,391
316,549,389,192
58,067,896,695
374,617,285,887
1,182,741,667
1,253,706,167
1,328,928,537
1,408,664,249
1,493,184,104
1,582,775,150
1,677,741,659
1,778,406,159
1,885,110,528
1,998,217,160
2,118,110,189
2,245,196,801
2,379,908,609
www.epro-resources.com
Next Plan
No.
Description
By Who
By When
Estimated
Cost
1.
Maris
Sept-2012
USD 50,000
2.
FEED Study
Bambang
Sept-2012
USD 250,000
3.
Contract Awarding
Strategy
Small Team
Oct-2012
USD 50,000
4.
Small Team
Oct-2012
USD 50,000
5.
Small Team
Nov-2012
USD 50,000
6.
Project Execution
Preparation
Small Team
Dec-2012
USD 50,000
Total Estimated
Cost
e p
www.epro-resources.com
USD 500,000
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
r o
Company Profile
PT. Energy Project Resources
Address:
Graha Simatupang 1st Building, 5 th floor D
Jl. Letjend. TB Simatupang Kav. 38 Jati Padang, Jakarta Selatan
Telepon/Fax : +62 21 782 9157 / +62 21 782 9158
e-mail: bari@epro-resources.com; business@epro-resources.com
website: www.epro-resources.com
Welcome !
e p
www.epro-resources.com
Value Realization
Good
Project
Execution
Good
Project
Definition
VALUE
B
Poor Project
Execution
C
Poor Project
Definition
Phase 1
Opportunity
Identified
e p
Phase 2
Generate &
Select
Alternatives
www.epro-resources.com
D
Phase 3
Develop
Preferred
Alternative
Phase 4
Execute
Phase 5
Operate
Who is EPRO?
Vision
OUR VISION
OUR PERFORMANCE
OUR MISSION
Mission
OUR VALUES
Value
e p
www.epro-resources.com
EPRO Way
e p
r o
Profitable Growth
Continues
Performance
Improvement
Strong
Leadership
and
Master
Company
Plan
(Strategic
and
Tactical)
Cost Reduction
Continues Learning
and People
Competencies
Development
e p
www.epro-resources.com
Continues Productivity
Improvement
Performance Development
and Monitoring
Sustained
Superior
Performance
Operation
Excellence
(Word Class
Services)
Introduction (1)
FOREWORD
EPRO is a national engineering consultant which established in 2007 with the
objective of providing professional, high-quality, cost competitive engineering
services that meet the expanding needs of the Indonesia oil and gas,
petrochemical, infrastructure and other related energy industries. EPRO
resources are consisted of experienced and competence man-powers who
have completed many engineering projects for rapidly expanding industry for
over the past 15 years.
The entire EPRO Organization is project based and designed to focus on
efficient and dependable in what we do with a smart resources network to
guarantee proximity to our customers.
OUR PURPOSE
To create value added for our people and stakeholders.
e p
www.epro-resources.com
Introduction (2)
PHILOSOPHY OF EPRO COMPETENCY
The experience and expertise of every member of the organization will be
transformed into high quality products and services providing maximum benefit
for the customer..
e p
www.epro-resources.com
Introduction (3)
QUALITY PHILOSOPHY OF PROJECT DELIVERABLE
EPRO core expertise is its engineering and project management excellence and
its approach to ensuring that the design and technology selected is right for its
intended use.
Our excellence in the area of EPCCM is founded on the principle of do it right
for the first time. The advantages to YOUR COMPANY of this EPCCM
excellence include the delivery of improved lifecycle costs for the plant, ease of
constructability and enhanced operation and maintenance, reliability, shorter
construction schedules and an allied safer site.
Our philosophy is to be close to our client and his team. This integrated open
approach works to deliver an excellent project. This will be particularly noted in
the areas of industrial relations, heritage and environmental management. We
will enthusiastically work to align ourselves and our values with those of YOUR
COMPANY and its team.
e p
www.epro-resources.com
Introduction (4)
HEALTH, SAFETY AND ENVIRONMENT (HSE)
Safety, and the whole gamut of modern HSE, is an extremely high priority for
EPRO Project Team. Our safety performance is excellent and complemented
by safety support systems. This will be primary in our approach and
performance and is demonstrated by our experience on previous projects. Our
large EPCCM project clients can, and will, enthusiastically vouch for our
performance and enthusiasm for safety.
TEAM AND TEAMWORK
Our team comprises very experienced and competent professionals who are
used to working in a dynamic team and taskforce environment to deliver a
project in a timely manner. We have used our l resources to ensure that the
best people are in the team and can be an integral part of the project delivery. It
will be seen that the quality of the team members is first class and experienced
in the engineering, project execution and construction skills required.
e p
www.epro-resources.com
THE COMPETITIVE
INTELLIGENCE CONVERSION
PROCESS
By synthesizing and analyzing
data, we can transform data
into information.
Next we apply high levels of
experience and insights to
information, transforming it
into intelligence.
And if we can act on the
intelligence, then it is value
added by helping us in
strategic decision making.
e p
www.epro-resources.com
Data
Analyze
Synthesize
Information
Insight
Intelligence
Competitive
Advantage
Experience
Organizational Capability
e p
www.epro-resources.com
Company Organization
PT. Energy Project Resources
PT.ENERGY PROJECT RESOURCES
(HOLDING)
SBU 1
Project Management and
Engineering Consultant
Project
Management
e p
Multi-Disciplines
Engineering
SBU 2
Engineering Procurement Construction and
Installation (EPCI) Contractor
Engineering
www.epro-resources.com
Procurement
Construction/
Installation
Commissioning/
Startup
SBU 3
Operation and
Maintenance Services
Maintenance
Services
Operation
Services
SBU 3
Operation and Maintenance
Services
Operation
Services
Operation
Engineering
e p
Man Power
Supply
Maintenance
Services
Process
Equipment Rental
www.epro-resources.com
Tank and
Machinery
Pipeline
Maintenance
Field
Instrumentation/
Metering/
Industrial
Controls
Scope of Supply
Operation Services
Operator
Engineer
Man
Power
Supply
Technician
Operation Management
Security
Operation Trainings
PIMS
Reliability Engineering
Predictive/ Preventive Maintenance
Operation
Engineering
Tank
Operation Assurance
Operation Excellence
Process
Equipment
Rental
e p
www.epro-resources.com
Scope of Supply
Maintenance Services
ROW Clearing and Maintenance
Pipeline Repair
Tank Cleaning
On Site Painting
Hydro Testing
Tank and
Machinery
Tank Painting
Tank Repair
Heavy Hauling
Machinery Lubrication
Pipeline
Services
(Onshore
/
Offshore)
Hot tapping
Road Boring
Leak Detection
Pipeline Pigging, Cleaning and Drying
Pipeline Inspection
New Pipeline Installation
e p
www.epro-resources.com
Field
Instrumentation/
Metering/
Industrial
Controls
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
www.epro-resources.com
e p
www.epro-resources.com
EPC, 20 MW Gas Turbine Power Plant, IPP Project, Tarakan, Cahaya Sakti/ Medcomm Power, 2012.
PMC Services (Project Management and Engineering Services), Makassar LPG Terminal, 20.000 m3
capacity, Bosowa and Pertamina, 2010.
PMC Services, Mixed Use Balikpapan Project, a Property Project, PT. Rumpaka Jaya, 2009.
PMC Services (Project Management and Engineering Services), Santan Crude Terminal Safety Ugrade
(Fire Protection System), Chevron Indonesia company, with PT. Elnusa, 2009.
PMC Services (Project Management and Engineering Services), Gresik LPG Terminal, 20.000 m3 capacity,
Maspion Energy Mitratama and Pertamina, 2009.
PMC Services (Project Management and Engineering Services), FEED Design, Maspion Jetty Fire
Protection Improvement, HESS-Pangkah Indonesia, with PT. Promatcon Tepat Guna, 2008.
Detail Instrument and Electrical Design, Area 12 North Duri Development, Chevron Pacific Indonesia, Riau,
Indonesia, with Truba Jaya, 2008.
PMC Services (Project Management and Engineering Services), FEED Pondok Tengah, Oil and Gas
Production Facility, 20.000 BOPD, 15 MMSCFD Gas, including Water Treatment Plant, Oil and Gas
Terminal, SPM and SPL and Power Plant, Fire Potection System, Pertamina EP, Indonesia, with Singgar
Mulia, 2007.
FEED of Coal Fired Power Plant 2x7 MW Gorontalo, Wali Nusa Energi, Indonesia, with MLD/ DHV, 2007.
Feasibility Study and FEED of Coal Fired Power Plant 2x100 MW, West Sumatra, PLN, Indonesia, with
PPGT, University of Indonesia Jakarta, 2007.
Feasibility Study and FEED of Coal Fired Power Plant 2x100 MW, Lampung, PLN, Indonesia, with PPGT,
University of Indonesia Jakarta, 2007.
Site Selection Study, Suban Gas Plant phase 3 project, ConocoPhillips, Indonesia, with MLD/ DHV, 20072008.
e p
www.epro-resources.com
EPC Project, Well Surveillance SCADA Project Covering Instrument and Electrical Engineering Design,
EPC, Commissioning and Start-up, included developing SCADA standard for the organization, US 12 MM.
EPC Project, Duri Central Gathering Station (CGS) 10 Project, PT. Oil and Gas Facility Pacific Indonesia,
US 115 MM
EPC Project, Duri Automatic Well Test 10 Project, PT. Oil and Gas Facility Pacific Indonesia, US 10 MM
EPC Project, Duri CGS Sand Plant Project, PT. Oil and Gas Facility Pacific Indonesia, US 28 MM
EPC Project, Duri Automatic Well Test 8 project, PT. Oil and Gas Facility Pacific Indonesia, US 5 MM
FEED Study, Reliability Improvement of Duri 13.8 KV Power Distribution Project, PT. Oil and Gas Facility
Pacific Indonesia, US 300 K
SCADA of COGEN Power Plant Project, PT. Oil and Gas Facility Pacific Indonesia, US 100 K
EPC Project, Minas 6D Power Substation Project, 2 x 28 MVA. Including the control room building, 115 KV/
13.8 KV Switchyard and its SCADA, PT. Oil and Gas Facility Pacific Indonesia, US 3 MM
EPC Project, Minas Power Plant 9 Project, Gas Turbine, 33 MVA. Including the control room building, 115
KV/ 13.8 KV switchyard and its SCADA, PT. Oil and Gas Facility Pacific Indonesia, US 15 MM
EPC Project, Minas Power Plant 10 Project, Gas Turbine, 33 MVA. Including the control room building, 115
KV/ 13.8 KV switchyard and its SCADA, PT. Oil and Gas Facility Pacific Indonesia, US 16 MM