OceanStor S5600T&S5800T&S6800T Storage System V100R005 Quick Installation Guide (SAN Volume) 04
OceanStor S5600T&S5800T&S6800T Storage System V100R005 Quick Installation Guide (SAN Volume) 04
OceanStor S5600T&S5800T&S6800T Storage System V100R005 Quick Installation Guide (SAN Volume) 04
Storage System
V100R005
Quick Installation Guide (SAN Volume)
Issue: 04
Date: 2014-10-30
Overview
This document guides you through a time-saving process for installing a storage system. For more information, see
the OceanStor S5600T&S5800T&S6800T Storage System V100R005 Installation Guide.
Feedback
Your feedback is important to us. If you have any comments about this document, please submit them to us on
the Huawei Enterprise website.
Safety Information
Do not operate devices or handle cables on a stormy day.
To avoid eye injuries, do not look into the optical outlets without eye protection.
CAUTION
Arrange for at least three persons to carry and install a fully configured enclosure to avoid
personal injury or device damage.
Do not wear an ESD wrist strap during power-on to avoid electric shocks.
Scenario 1 Wearing an ESD wrist strap whose
ground terminal is a plug
Installation Process
A generic view
of cable connections
Checking components
Connecting Cables
Installing Devices
Checking device installation
Installation Preparations
Checking
Hardware Installation
(Optional) Installing Host Software
Powering On the
Storage System
Switching on external
power supplies
Pressing the power button
on either controller
Checking status indicators
on the enclosures
Installing front panels
1 Installation Preparations
1a Checking installation tools
1c Checking components
Installation template
(for 4 U devices)
Installation template
(for 2 U devices)
Cable tray (2 U)
Controller enclosure (4 U)
Front panel of a 2 U
controller enclosure
Front panel of a 4 U
controller enclosure
Disk enclosure (2 U)
Disk enclosure (4 U)
Multi-mode optical
fiber cable
Network cable
Ground cable
For information about the full list of required components, see the Packing List. The bag containing the
Packing List is attached to the surface of the box.
2 Installing Devices
2a Planning device installation positions
Total required cabinet space = 4 U + 2 U x (Number of 2 U disk enclosures) + 4 U x (Number of 4 U disk
enclosures)
Note: The height of the storage system is measured by the unit of U. 1 U equals 44.5 mm (1.75 inches).
Recommended installation positions
Tips
Controller enclosure (4 U)
Install the controller
enclosure in the middle of an
empty 42 U cabinet, namely
Disk enclosure (4 U)
Disk enclosure (4 U)
Disk enclosure (4 U)
Be certain to next install
other devices below the
Disk enclosure (4 U)
Scenario 2
Installation position of a 4 U device
Front
Scenario 2
Attaching adjustable guide rails for a 4 U device
Rear
Front
2e Installing the controller enclosure and disk enclosures into the cabinet
NOTICE
To avoid device damage, do not stack any components but install them onto guide rails.
Install a disk enclosure onto the adjustable guide rails using the same method as installing the
controller enclosure.
Rear
Front
Scenario 2
Installing the cable tray onto the controller
3 Connecting Cables
3a A generic view of cable connections
Maintenance
terminal
Application
server
External
power
External
power
Controller
enclosure
Disk
enclosure
Ground
cable
3c Connecting enclosures
Port P0 on controller A (B) must be connected to port PRI on expansion module A (B) on the configuration
disk enclosure (the one with coffer disks).
All the EXP ports on the storage system connect only to the PRI ports.
For a storage system with two or more disk enclosures, set up multiple loops based on the number of
expansion ports on the controller enclosure, and evenly allocate those disk enclosures to the loops.
Connect disk enclosures except the configuration disk enclosure in one loop over two separate links for
optimal network reliability.
Disk
enclosure 2
Disk
enclosure 1
Controller
enclosure
Slot B0
Slot A0
Disk
Enclosure 3
Expansion
module A
Expansion
module B
Disk
Enclosure 4
10
Controller
enclosure
Controller
enclosure
11
Ethernet
switch
Ethernet
switch
Controller
enclosure
Fibre Channel
switch
Fibre Channel
switch
Controller
enclosure
12
Controller
enclosure
External
power
Disk
enclosure
Controller
enclosure
13
Disk
enclosure
Controller
enclosure
14
Normal
Abnormal
Normal
Abnormal
Ground cable
Optical fiber cable
Mini SAS cable
Network cable
Serial cable
AC power cable
DC power cable
The power-on process takes three to five minutes. The system is completely powered on until the power
indicator of controller enclosure does not blink continually.
Follow the correct power-on sequence of the storage system: switch on external power supplies press
the power button on either controller module switch on the Ethernet or Fibre Channel switch switch
on the application servers.
Follow the correct power-off sequence of the storage system: stop host services press and hold the
power button on either controller module until the system is completely powered off (five seconds)
disconnect the controller enclosure and the disk enclosures from their power supplies.
15
Front
Disk alarm/location
indicator: steady green
Disk enclosure
Alarm/Location indicator
of the disk enclosure: off
Alarm indicator of the
disk enclosure: off
For details and rectification suggestions on the indicators, refer to the OceanStor
S2200T&S2600T&S5500T&S5600T&S5800T&S6800T Storage System V100R005 Quick Maintenance Guide.
16
17
For details about initializing the storage system, refer to the OceanStor S5600T&S5800T&S6800T
Storage System V100R005 Installation Guide.
The default user name and password of the storage system are admin and Admin@storage
respectively.
You are advised to change the default login password immediately after you have logged in to
the storage system for the first time and periodically change your login password in the future.
This reduces the password leakage risks.
Obtain the documentation for the UltraAPM and UltraPath from the delivery-attached CD-ROM.
18
18