Description Unit Unit Cost Earthworks
Description Unit Unit Cost Earthworks
Description Unit Unit Cost Earthworks
DESCRIPTION
UNIT
UNIT COST
EARTHWORKS
Soil Poisoning
s.m.
116
Gravel bed
cu.m
1,097.00
Portland
Bags
271
cu.m
1,271.00
cu.m
1,097.00
White Sand
cu.m
982
CONCRETE WORKS
REBARS
16 mm Dia. deformed bars
kgs
44
kgs
44
kgs
44
Steel Deck
s.m
473
rolls
2,541.00
s.m
173
s.m
173
Suspended slab
s.m
231
Stairs
s.m
347
PLUMBING WORKS
Water Supply Pipes (PPR)
69
25mm dia.
length
687
pcs
55
pcs
263
pcs
61
pcs
50
pcs
312
pcs
40
pcs
28
pcs
42
pcs
44
pcs
36
pcs
866
pcs
605
pcs
788
50mm x 3m long
pcs
404
75mm x 3m long
pcs
866
100mm x 3m long
pcs
1,155.00
50mm.
pcs
40
75mm.
pcs
69
100mm.
pcs
104
50mm.
pcs
40
75mm.
pcs
69
100mm.
pcs
104
50mm.
pcs
98
75mm
pcs
144
100mm
pcs
217
100 x 50mm
pcs
179
50mm.
pcs
64
75mm.
pcs
144
50mm.
pcs
144
Consumables
lot
PVC Wye
PVC Tee
PVC P-trap
5,775.00
PVC Pipe
20mm.dia.
length
133
25mm.dia.
length
200
50mm.dia.
length
400
length
1,432.00
RSC Pipe
40mm.dia.
Conduit Fittings
PVC Coupling 20mm dia.
pcs.
pcs.
pcs.
24
pcs.
74
pcs.
pcs.
11
pcs.
23
pcs.
71
pcs.
235
pcs.
24
107
360
490
l.m.
31
l.m.
45
l.m.
69
l.m.
383
l.m.
556
set
4,515.00
set
11,637.00
set
301
set
435
set
569
Duplex outlet
set
648
Range outlet
set
1,650.00
Ref outlet
set
447
ACU outlet
set
586
set
447
set
144
Earth Fill
Soil Treatment
CHB 100x200x400mm,
150x200x400mm,
200x200x400mm,
Rebars 10mm x 6m
12mm x 6m
16mm x 6m
#16 G.I Wire For Tying
Common Wire Nails 50mm (2")
75mm (3")
100mm(4")
Concrete Nails, 75mm (2")
Concrete Nails, 75mm (3")
Formworks, Staging & Scaffoldings
1/4" x 4' x 8' Ord. Plywood
2" X 2" X 10' Coco Lumber
2" X 3" X 10' Coco Lumber
(Consumable) Nylon Chord, Chalk stone etc..
Finishing Materials
Decorative stone finish, wainscoating
Glass Block
Counter tops
PLUMBING WORKS
Water line (for Roughing Items)
3/4" PVC Blue Pipe
1/2" PVC Blue Pipe
3/4" PVC Blue Elbow
1/2" PVC Blue Elbow
1/2" PVC Blue Elbow (Threaded)
3/4" x 1/2" PVC Blue Tee
1/2" PVC Blue Tee (Threaded)
1/2" PVC Blue Cap
3/4" PVC Blue Union
3/4" G.I. Check Valve
3/4" G.I. Gate Valve
3/4" Water Meter
Solvent (Neltex)
Teflon tape
Water Line (For Finishing fixture items)
Kitchen Sink
Kitchen Sink Faucet
Kithcen Sink Supply Hose
Kitchen Sink Angle Valve
Lavatory, self-rimming
Lavatory Faucet
Lavatory Supply Hose
Lavatory Angle Valve
Shower Set/s
Shower Valve
Shower Faucet
Service Area Sink Faucet
Garage Hose Bibb
Bathtub
Water Closet
Water Closet Supply hose
Water Closet Angle Valve
Soap holder
Tissue holder
Mirror & Frame
Shower Rod (Curtain Enclosure)
Shower Rod (Towels)
Water Tank
1hp Motor pump
Overhead Tank
Storm drainage & Downspout (For Roughing items)
3" PVC Pipe (DS)
3" PVC 1/4 Bend Elbow (DS)
4" PVC Pipe (Drainage)
2" PVC Pipe
2" PVC 1/4 Bend Elbow
3" x 2" PVC Tee
Epoxy (Pioneer A&B)
Sanitary Line (For Roughing Items)
2" PVC Pipe
3" PVC Pipe
4" PVC Pipe
4" x 2" PVC Tee
2" PVC 1/4 Bend Elbow
2" PVC U-Type
4" PVC 1/4 Bend Elbow
4" PVC Clean Out
3" PVC 1/8 Bend Elbow
4" x 3" PVC Wye
2" PVC P-Trap
2" PVC Tee
4" x 2" PVC Reducer
4" PVC Wye
4" PVC 1/8 Bend
4" x 2" PVC Wye
2" PVC 1/8 Bend
4" Tee
Solvent (Neltex brand)
Epoxy (Pioneer A&B)
ELECTRICAL WORKS
Private Pole
Entrance Cap - 25mm (1")
Rigid Steel Conduit - 25mm x 3.00m
Tile Roof
2" x 2" x 3/16 Angular (4.5mm thk)
2" x 2" x 3/16 Angular (4mm thk)
2" x 2" x 3/16 Angular (3.5mm thk)
1-1/2" x 3/16 Angular (4mm thk)
1-1/2" x 3/16 Angular (4mm thk)
1-1/2" x 3/16 Angular (3.5mm thk)
C- Purlins
2"x6" Cee Purlins
2"x4" Cee Purlins (1.5mm thk)
2"x4" Cee Purlins (1.9mm thk)
2"x3" Cee Purlins
1" x 1" x 1.5 Tubular
2" x 2" x 1.5 Tubular
2" X 3" x 1.5 Tubular
Hinges
Welding Rod
Grinding Wheel
Grinding Wheel
Inside Gutter
HARDWARE
Concealed Hinges-Full Lap
Concealed Hinges-Half Lap
Main door Knob with Dead Bolt
CEM
ENT
F.A
.
C.
A.
WAT
ER
CEM
ENT
RATI
O
0.25
1.5
2.5
WAT
ER
PER
50K
G
BAG
OF
CEM
ENT
12.5
CEMENT
BY
WEI
GHT
(KG)
BY
NUM
BER
OF
BAGS
1015
20.3
SAN
D
(CU
M)
CRUS
HED
STON
ES
(CUM
)
0.71
0
0.28
14
815
16.3
0.85
5
0.3
15
687
13.74
0.96
3
0.35
17.5
585
11.7
1.02
3
0.4
20
505
10.1
1.06
0.53
26.5
395
7.9
1.10
6
0.7
35
285
5.7
1.19
7
0.9
45
220
4.4
1.23
2
0.3
15
560
11.2
0.39
2
0.784
0.42
21
430
8.6
0.60
2
0.602
1.5
0.42
21
395
7.9
0.41
4
0.828
1.6
6
3.3
3
0.48
24
363
7.26
0.41
9
0.838
0.5
25
385
7.7
0.53
9
0.808
3.5
0.53
26.5
330
6.6
0.46
2
0.808
0.55
27.5
310
6.2
0.43
4
0.868
2.5
3.5
0.57
28.5
305
6.1
0.53
4
0.748
2.5
0.6
30
285
5.7
0.49
9
0.798
0.65
32.5
265
5.3
0.55
6
0.742
2.5
0.65
32.5
255
5.1
0.44
6
0.892
0.69
34.5
240
4.8
0.50
4
0.84
0.75
37.5
215
4.3
0.45
2
0.904
0.46
2
0.924
0.95
47.5
165
3.3
FULLER'S FORMULA
Let:
C = 55 / (c+s+g)
S = 0.028*C*s
G = 0.028*C*g
Class A (1:2:4) = for beams, slabs, columns, all members subjected to bending
Class B (1:2.5:5) = member not reinforced for bending stress
Class C (1:3:6) = for footing (not under water)
Note: We use here 94 lbs Portland Cement per cubic meter of concrete
Example 1:
Determine the number of bags of cement, sand, and gravel of a proposed concrete pavement whose width and
length are 100 m x 200 m. The thickness is 100 cm.
Length = 200 m
Thickness = 0.1 m
Solution:
Softwood
Minimum 60p per metre
Planed / Tanalised +10%
Lengths less than 1m 50% discount
Hardwood CSA(inches) (22 per cubic foot)
Minimum 60p per metre
Size
11
12
14
16
22
23
24
25
26
27
28
29
210
33
34
44
Sheet Materials
Type
PLY Normal / Shuttering
OSB
OSB
OSB
Hardboard
Faced Hardboard
MDF
MDF
MDF
Scaffold Boards
Type
Recycled Boards
New Boards
Pallets
EURO
UK Standard
Double
Other sizes
Pallet Slats
Type
c.75mm Boards
c.95mm Boards
c.125mm Boards
Cutting
We can cut clean timber up to 50mm x 250mm (2x10) in size for 50p per cut usually
while-you-wait
We can cut clean sheet material for 1 per cut usually takes a couple of days
You are of course welcome to borrow a hand saw for free, once you have paid for your
wood to cut up the timber to fit into your car!
PAINTING SCHEDULE:
1st Coat: BOYSEN Permacoat Flat Latex #701
Putty: BOYSEN Masonry Putty #7311
Topcoat: BOYSEN Permacoat Latex (flat, semi-gloss, gloss)
Note: Interior use only. For exterior, use BOYSEN Acrytex Cast #1711
P 439.60