PROJECT INITIATION
TABLE OF CONTENTS
SECTION
PAGE NO.
1.0
2.0
DEFINITIONS.............................................................................................................. 2
3.0
REFERENCES............................................................................................................ 3
4.0
PROCEDURE.............................................................................................................. 4
5.0
RECORDS................................................................................................................... 9
6.0
PEP 200
Page 2 of 9
PROJECT INITIATION
1.0
The purpose of this procedure is to define the activities that generally need to be accomplished during
the project initiation phase of a project.
The fundamental objective of project initiation process is to:
The scope of project initiation phase is defined as the phase of the project that begins with an
authorization to proceed with the work until such time that:
The actual time period will vary based on the size and complexity of the project, but will generally be 1 to
4 months.
2.0
DEFINITIONS
2.1
Written authorization from the Client to the Company to proceed with the project.
2.2
Company form required to be completed in order to obtain a project job number. The form includes
critical Client and project commercial information required to set up and invoice under the contract.
PEP 200
Page 3 of 9
PROJECT INITIATION
2.3
A document that may be prepared by Company Management to the Project Manager providing direction
on the issues important to the success of the project and outlines the expectations for the project team.
The Letter of Instructions provides the formal delegation of responsibility to the Project Manager for the
execution of the work and defines the Project Managers range of authority.
2.5
Kick-Off Meeting
A meeting conducted by the Project Manager communicating to the project team the scope of the work,
the execution plan, critical schedule milestones and key contract information.
2.6
The checklist is a document that identifies all the activities and tasks that need to be accomplished
during the project initiation phase of the project.
2.7
The Project Management Functional Leader is responsible for the maintenance of this procedure and will
review the procedure annually to determine any necessary updates. Should an individual employee
have a suggestion for improvement or modification to this procedure, he or she may mark-up a copy of
the PEP and send to the Project Management Functional Leader for review. The Project Management
Functional Leader will review the recommended changes and respond back to the employee on plans to
address the suggestions. Changes to the procedure will be distributed to other Corporate Department
Managers and Corporate Functional Leads for their concurrence. When the reviews are complete, the
Project Management Functional Leader will consolidate and recommend changes to this PEP to the
Senior Vice President, Project Operations who has the authority to issue revisions to this PEP.
3.0
REFERENCES
3.1
3.2
3.3
PEP 200
Page 4 of 9
PROJECT INITIATION
4.0
PROCEDURE
4.1
PEP 200
Page 5 of 9
PROJECT INITIATION
4.2
Action By
Action
Project Manager/Project
Controls Manager
4. Verifies that
authorization.
the
Company
has
received
proper
contract
Construction
8. Does not start until the contract is signed unless approved in writing
by appropriate Company Management.
Action
Project Manager
PEP 200
Page 6 of 9
PROJECT INITIATION
Action
Project Manager/Legal
Project Manager
Action
1.
Project Manager
2.
E. Insurance Information
Action By
Action
Project Manager/Legal
PEP 200
Page 7 of 9
PROJECT INITIATION
F. Tax Information
Action By
Action
Project Manager/Legal
G. Confidentiality Agreement
Action By
Action
Project Manager
Company Management,
Project Manager, and
Legal Department
Action
Project Manager
I.
Kick-Off Meeting
Action By
Action
Project Manager
PEP 200
Page 8 of 9
PROJECT INITIATION
Action By
Action
g. Advises appropriate management representatives of work force
requirements.
h. Assigns Project Execution Plan
responsible functional groups.
(PXP)
sections to
the
(CAE)
Control
Center
(PDCC)
PEP 200
Page 9 of 9
PROJECT INITIATION
Action By
Action
Project Manager/Legal
Project Manager
J.
Action By
Action
Project Manager
Team Members
Project Manager
5.0
RECORDS
6.2
6.3
6.4
6.5