Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

PT6A 25SBindex CGA PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

CODE:

CGA

NUMERICAL INDEX
OF
ENGINE SERVICE BULLETINS
FOR
ENGINE MODEL(S)
PT6A-25/25A/25C

REISSUED 30 APRIL 2002

PRATT & WHITNEY CANADA


1000 Marie-Victorin, Longueuil, Quebec, Canada J4G 1A1

1998 Pratt & Whitney Canada Corp.


PRINTED IN CANADA

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES

INTRODUCTION

Section 1 of this index provides a numerical listing in ascending order by P&WC SB. No. of all Engine Service
Bulletins issued for the relevant engine models as of the reissue date shown on the title page.

The ATA 100 Chapter Issue Sequence Number is included and, where applicable, the Campaign Change Order
Number or CSPN No. associated with the bulletin. The letter group and number/letter code in the Group/Code
column indicates the Group/Code for the Complance requirements for that bulletin. For convenience, a listing of
Compliance Requirements together with their Group/Code identifiers is included in the this Introduction.
Engine service Bulletins revised or added in this issue are indicated by a black bar in the left-hand margin.
Contact: Pratt & Withney Canada
1000 Marie-Victorin Longueuil
Quebec Canada J4G 1A1
Att: Supervisor, Publications Customer Service (01CA4)
Tel: (450) 647-2705
Fax: (450) 647-2702

Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES

The compliance statements listed below were introduced on P&WC service bulletins issued or
revised after August 08, 1998

Category 1

P&WC SERVICE BULLETIN COMPLIANCE CODES


P&WC recommend to do this service bulletin before the next
flight.

Category 2

P&WC recommend to do this service bulletin the first time the


aircraft is at a line station or maintenance base that can do the
procedures

Category 3*

P&WC recommend to do this service bulletin withinhours or


cycles.

Category 4

P&WC recommend to do this service bulletin the first time the


engine or module is at a maintenance base that can do the
procedures, regardless of the scheduled maintenance action or
reason for engine removal.

Category 5

P&WC recommend to do this service bulletin when the engine is


disassembled and access is available to the necessary subassemblies (i.e. module, accessories, components, or build
groups). Do all spare sub-assemblies.

Category 6

P&WC recommend to do this service bulletin when the subassembly (I.e. module, accessories, components, or build groups)
is disassembled and access is available to the necessary part.
Do all spare sub-assemblies.

Category 7

You can do this service bulletin when the supply of superseded


parts is fully used.

Category 8

This service bulletin is optional and can be done at the decision of


the operator.

Category 9

Spare Parts Information Only. Old and new parts are directly
interchangeable and operators can mix old and new parts.

Category CSU

Operators who participate should include this service bulletin at


the next maintenance or overhaul of the engine.
Page 2
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES

Service Bulletins issued or revised prior to January 01, 1996 contain either the "non-simplified
English" version of the preceding compliance statements or the following GROUP/CODE style
compliance codes and statements:

GROUP/CODE
A

COMPLIANCE STATEMENT
For conditions which could result in an in-flight shutdown,
significant loss of power/thrust or any other similar situation
affecting flight safety

A1A

Recommended - Urgent. P&WC recommends (Alert SBs)


accomplishment prior to next flight. An Airworthiness Directive has
been requested.

A1B

recommended - Most desirable. To be accomplished during next


visit to a facility where specified maintenance action(s)/
modification(s) can be accomplished

A1C

Currently not used.

A1D

Recommend - Highly desirable. To be accomplished prior to part


life expiry or withinhours (orcycles).

A2

Recommend - Highly desirable. P&WC recommends


accomplishment at first shop visit of module/engine/power
section/RGB/accessory regardless of extent of disassembly.

B
For conditions which affect engine life (PERs) and operating costs:
B3A

Recommended - Desirable. P&WC recommends accomplishment


when disassembly of engine/power section/RGB/accessory is
sufficient to affort access to the affected module/subassembly.

B3B
Recommended - Desirable. P&WC recommends accomplishment
when disassembly of engine/power section/RGB/accessory is
sufficient to affort access to the affected part.
B4

Recommended - Incorporation applicable on attrition of prior


configuration parts when supply of such items is depleted

B5

Optional - At the discretion of an operator. P&WC recommends


accomplishment based on operator's experience with prior
configuration parts

Page 3
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES

Service Bulletins issued or revised prior to January 01, 1996 contain either the "non-simplified
English" version of the preceding compliance statements or the following GROUP/CODE style
compliance codes and statements:

GROUP/CODE
A

B6

COMPLIANCE STATEMENT
For conditions which could result in an in-flight shutdown,
significant loss of power/thrust or any other similar situation
affecting flight safety
Informational - For record purposes and/or to provide useful
technical information or to support engine operation/maintenance/
logistics

Page 4
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1001

Comp./
Group
Code
3

1003

NA

28

OPERATING TIME BETWEEN OVERHAULS AND HOT


SECTION INSPECTION FREQUENCY

1148

SEE SB

SILVER - PLATED BOLTS OF REVISED LENGHT - FUEL


MANIFOLD - INTRODUCTION OF

1169

SEE SB

TWO-PIECE PRESSURE OIL TUBE - INTRODUCTION OF

1180

SEE SB

SHIPPING CONTAINER MOUNTING CRADLE (PART NO. PK1322) - MODIFICATION OF

1232

SEE SB

GEARBOX FRONT HOUSING ASSY - INTRODUCTION OF


SHORTER STUDS AND HEXAGON NUTS FOR PROPELLER
GOVERNOR PAD

1240

SEE SB

IMPROVED FIRST-STAGE REDUCTION PLANET FEAR


SHAFTS - INTRODUCTION OF

1243

SEE SB

NEW COATED IMPELLER HOUSING AND ALUMINUM


ACCESSORY GEARBOX FLIGHT COVERS - INTRODUCTION
OF

1244

NA

19

ENGINE FUELS AND ADDITIVES - REQUIREMENTS AND


APPROVED LISTING

1247

SEE SB

IMPROVED OIL FILTER HOUSING CHECK VALVE AND


BYPASS VALVE - INTRODUCTION OF

1248

SEE SB

IMPROVED KEYWASHER FOR FIRST ADN SECOND-STAGE


REDUCTION CARRIER SCREWS - INTRODUCTION OF

1250

SEE SB

NEW OIL TANK DIPSTICK - INTRODUCTION OF

1251

SEE SB

IMPROVED COMPRESSOR BLEED VALVE ASSEMBLY P/N


3029174 - INTRODUCTION OF

1254

SEE SB

IMPROCED TORQUEMETER PISTON - INTRODUCTION OF

1255

SEE SB

FLUOROCARBON OIL SEALS - INTRODUCTION OF

Rev.
Title
No.
23 APPROVED LISTING OF (SYNTHETIC) LUBRICATING OILS

Page 5
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1257

Comp./
Group
Code
SEE SB

1258

SEE SB

SECOND-STAGE REDUCTION PLANET GEAR BEARINGS


WITHOUT CENTER GROOVE AND SHAFTS WITH PRESSURE
FLAT - INTRODUCTION OF

1261

SEE SB

FIRST-STAGE REDUCTION PLANET GEAR PINS


INCORPORATING OIL SEPARATORS - INTRODUCTION OF

1263

SEE SB

SECOND-STAGE REDUCTION PLANET GEAR PINS


INCORPORATING OIL SEPARATORS - INTRODUCTION OF

1270

SEE SB

POWER TURBINE STATOR ASSEMBLY - MODIFICATION OF

1274

SEE SB

REDUCED VOLUME FRONT PROPELLER REDUCTION


GEARBOX HOUSING - INTRODUCTION OF

1275

SEE SB

PROPELLER REDUCTION GEARBOX FRONT HOUSING INTRODUCTION OF LONGER STUDS AT OVERSPEED


GOVERNOR PAD

1276

SEE SB

CORRUGATED STAINLESS STEEL GASKETS AT FUEL


NOZZLE ADAPTER AND COMPRESSOR AIR DELIVERY TUBE
ASSEMBLY - INTRODUCTION OF

1277

SEE SB

CLEANABLE COMPRESSOR DELIVERY AIR FILTER INTRODUCTION OF

1281

SEE SB

DOUBLE TAB KEYWASHERS AT NO. 5 BEARING MOUNTING


BOLTS - INTRODUCTION OF

1285

SEE SB

IMPROVED OIL FILTER HOUSING CHECK VALVE SPRING


COLLAR AND RETAINING PIN - INTRODUCTION OF

1286

SEE SB

IMPROVED SPARK IGNITER - INTRODUCTION OF

1287

SEE SB

POWER TURBINE SHAFT HOUSING AND NO. 3 BEARING


COVER - INTRODUCTION OF ANTIROTATION FEATURE

Rev.
Title
No.
FIRST-STAGE REDUCTION PLANET GEAR BEARINGS
3
WITHOUT CENTER GROOVE AND SHAFTS WITH PRESSURE
FLAT - INTRODUCTION OF

Page 6
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1289

Comp./
Group
Code
SEE SB

1291

SEE SB

OIL TANK BREATHER TUBE ASSEMBLY - INSPECTION OF

1293

SEE SB

IMPROVED REAR STATOR COMPRESSOR AIR SEAL INTRODUCTION OF

1295

SEE SB

BLEED AIR CASE - REMOVAL OF

1297

SEE SB

IMPROVED FIRST-STAGE REDUCTION PLANET GEAR


SHAFTS - INTRODUCTION OF

1299

SEE SB

IMPROVED SECOND-STAGE REDUCTION PLANET GEAR


SHAFTS - INTRODUCTION OF

1300

SEE SB

ACCESSORY GEARBOX DIAPHRAGM OIL TANK CENTER


TUBE LEAD - IN CHAMFER - MODIFICATION OF

1304

SEE SB

IMPROVED OIL-TO-FUEL HEATER - INTRODUCTION OF

1305

SEE SB

SINGLE-PIECE COMPRESSOR TURBINE SHROUD HOUSING


AND HEAT SHIELD - INTRODUCTION OF

1307

SEE SB

LOW OIL PRESSURE VALVE - DEACTIVATION OF

1310

SEE SB

COMBUSTION CHAMBER OUTER EXIT DUCT OF IMPROVED


MATERIAL - INTRODUCTION OF

1311

SEE SB

COMPRESSOR DELIVERY AIR LINE FILTER - INTRODUCTION


OF

1312

SEE SB

LOW OIL PRESSURE VALVE - REPLACEMENT OF


PREFORMED PACKING

1313

B5

DEACTIVATION OF AUTO FEATHER VALVE

1316

SEE SB

IMPROVED ENGINE/FUEL PUMP COUPLING INTRODUCTION OF

1317

SEE SB

FUEL CONTROL THROTTLE LEVER LINK - REMOVAL OF

Rev.
Title
No.
IMPROVED MAIN OIL PRESSURE RELIEF VALVE BODY AND
1
SPRING - INTRODUCTION OF

Page 7
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1318

Comp./
Group
Code
SEE SB

1319

SEE SB

ADDITIONAL SUPPORT FOR COMPRESSOR DELIVERY AIR


HEATED TUBES - INTRODUCTION OF

1320

SEE SB

SINGLE INTERSTAGE SEALING RING - INTRODUCTION OF

1321

SEE SB

IMPROVED FUEL PUMP - INTRODUCTION OF

1322

SEE SB

OIL TANK CAP - MODIFICATION OF

1323

SEE SB

PROPELLER - TURBOPROP GOVERNOR - POSITIVE


RETENTION OF SPEED SETTING STOP ASSEMBLY

1325

SEE SB

IMPROVED OIL-TO-FUEL HEATER - INTRODUCTION OF

1331

SEE SB

FIRST-STAGE REDUCTION PLANET GEARSHAFTS WITH


IMPROVED LUBRICATION CHARACTERISTICS INTRODUCTION OF

1332

SEE SB

SECOND-STAGE REDUCTION PLANET GEAR SHAFTS WITH


IMPROVED LUBRICATION CHARACTERISTICS INTRODUCTION OF

1334

SEE SB

IMPROVED PROPELLER GOVERNOR - INTRODUCTION OF

1338

SEE SB

FIRST-STAGE REDUCTION PLANET GEAR BEARINGS WITH


TIN-RICH OVERLAY - INTRODUCTION OF

1339

SEE SB

SECOND-STAGE REDUCTION PLANET GEAR BEARINGS


WITH TIN-RICH OVERLAY - INTRODUCTION OF

1340

SEE SB

FRONT REDUCTION GEARBOX ASSEMBLY - MODIFICATION


OF

1341

SEE SB

LOW OIL PRESSURE SENSING SWITCH WITH REDUCED


OPERATING PRESSURE - INTRODUCTION OF

1342

SEE SB

FUEL HEATER CHECK VALVE ASSEMBLY - MODIFICATION


OF

Rev.
Title
No.
TORQUEMETER PISTON - MODIFICTION OF
3

Page 8
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1345

Comp./
Group
Code
SEE SB

1346

IMPROVED COMPRESSOR TURBINE BLADE INTRODUCTION OF

1348

SEE SB

COMPRESSOR TURBINE VANE RING OF IMPROVED


MATERIAL - INTRODUCTION OF

1349

SEE SB

REROUTED FRONT FUEL PRESSURE TUBE ASSEMBLY INTRODUCTION OF

1352

SEE SB

IMPROVED OIL-TO-FUEL HEATER - INTRODUCTION OF

1353

FUEL CONTROL UNIT WITH MANUAL OVERRIDE INTRODUCTION OF

1354

SEE SB

IMPROVED LUBRICATION TO THE NO. 6 PAD AIR


CONDITIONING SPLINE DRIVE - INTRODUCTION OF

1357

OIL TANK FILLER CAP AND GAGE ASSEMBLY MODIFICATION OF

1358

SEE SB

MODIFIED TURBINE EXHAUST DUCT ASSEMBLY INTRODUCTION OF

1359

SEE SB

T5 TERMINAL BOLTS - REPLACEMENT OF

1361

SEE SB

MODIFIED REDUCTION GEARBOX REAR HOUSING


ASSEMBLY - INTRODUCTION OF

1362

SEE SB

COMPRESSOR DELIVERY PRESSURE (P3) AIR LINE FILTER INTRODUCTION OF

1363

B4

IMPROVED SMALL EXIT DUCT ASSEMBLY - INTRODUCTION


OF

1365

SEE SB

PROPELLER SHAFT WITHOUT AUTOFEATHERING VALVE


FEATURE - INTRODUCTION OF

Rev.
Title
No.
IMPROVED REDUCTION GEARBOX FRONT HOUSING 2
INTRODUCTION OF

Page 9
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1367

Comp./
Group
Code
SEE SB

1368

SEE SB

FUEL CONTROL UNIT WITH REVISED CALIBRATION INTRODUCTION OF

1369

SEE SB

MODIFIED TURBINE EXHAUST DUCT ASSEMBLY INTRODUCTION OF

1370

SEE SB

IMPROVED COMPRESSOR BLEED VALVE ASSEMBLY INTRODUCTION OF

1372

SEE SB

FUEL NOZZLES REVISED CONFIGURATION INTRODUCTION OF

1373

SEE SB

FUEL CONTROL UNIT WITH MANUAL OVERRIDE INTRODUCTION OF

1375

SEE SB

COMPRESSOR DELIVERY AIR PRESSURE HEATED HOSE


ASSEMBLY - INTRODUCTION OF

1376

SEE SB

TORQUE CONTROLLER WITH REVISED CALIBRATION INTRODUCTION OF

1377

SEE SB

PROPELLER SHAFT OIL SEAL IMPROVED SUPPORT INTRODUCTION OF

1379

SEE SB

OIL FILTER HOUSING CHECK VALVE - INTRODUCTION OF

1381

PROPELLER SHAFT OIL SEAL DUST SEAL - INTRODUCTION


OF/PROPELLER SHAFT OIL SEAL RUNNER - REPLACEMENT
OF

1382

SEE SB

LOW OIL PRESSURE SWITCH - REMOVAL OF

1384

SEE SB

LOW OIL PRESSURE SWITCH - REMOVAL OF

1386

STARTER GENERATOR GEARSHAFT WET SPLINE DRIVE INTRODUCTION OF

Rev.
Title
No.
IMPROVED RETENTION FOR FIRST-STAGE CARRIER
3
BALANGING ASSEMBLY AND SECOND-STAGE SUN GEAR INTRODUCTION OF (POST-SB1124 CONFIGURATION
ENGINES ONLY)

Page 10
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1387

Comp./
Group
Code
SEE SB

1389

SEE SB

POWER TURBINE SHAFT HOUSING AND NO. 3 BEARING


COVER IMPROVED ANTIROTATION FEATURE INTRODUCTION OF

1390

SEE SB

SUPPORT RING - PROPELLER SHAFT OIL SEAL INTRODUCTION OF

1391

SEE SB

PROPELLER GOVERNOR INCORPORATING IMPROVED


BETA VALVE SEALING - INTRODUCTION OF

1393

SEE SB

TWO-PIECE PROPELLER SHAFT OIL TRANSFER HOUSING INTRODUCTION OF

1394

SEE SB

COMPRESSOR TURBINE SHROUD LOCATING RING REMOVAL OF

1395

SEE SB

PROPELLER GOVERNOR INCORPORATING IMPROVED


CONTROL SHAFT BUSHING - INTRODUCTION OF

1396

IMPROVED FUEL NOZZLE ASSEMBLY - INTRODUCTION OF

1397

SEE SB

IMPROVED FILTRATION FOR REDUCTION GEARBOX


PLANET GEAR BEARINGS - INTRODUCTION OF

1402

NA

ROTOR COMPONENTS - SERVICE LIFE

1404

BRONZE PLANET GEAR BEARINGS - INTRODUCTION OF

1407

SEE SB

IMPROVED RETENTION FOR T5 BUS-BAR ASSEMBLY INTRODUCTION OF

1410

AIR COMPRESSOR BLEED VALVE - REPLACEMENT OF

1411

SEE SB

AIR COMPRESSOR BLEED VALVE PISTON - REWORK OF

1416

SEE SB

REVERSING LEVER GUIDE PIN BRACKET ASSEMBLY REPLACEMENT OF

Rev.
Title
No.
COMPRESSOR AIR FILTER HOUSING ASSEMBLY MODIFICATION OF

Page 11
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1418

Comp./
Group
Code
SEE SB

1419

SEE SB

FIRST-STAGE PLANET GEARS AND CARRIER ASSEMBLY INTRODUCTION OF

1420

SEE SB

REDUCTION GEARBOX FRONT HOUSINGS REIDENTIFICATION OF

1424

SEE SB

IMPROVED PROPELLER SHAFT BEARING RETAINING NUT


AND CUP WASHER - INTRODUCTION OF

1425

SEE SB

IMPROVED OIL PRESSURE RELIEF VALVE SPRING INTRODUCTION OF

1426

IMPROVED PROPELLER SHAFT SLEEVE SET AND RUNNER INTRODUCTION OF

1427

SEE SB

POWER TURBINE CONTAINMENT RING - MODIFICATION OF

1430

TURBINE EXHAUST DUCT ASSEMBLY - MODIFICATION OF

1431

SEE SB

IMPROVED PROPELLER SHAFT OIL SEAL RUNNER MODIFICATION OF

1432

SEE SB

PRIMARY FUEL PRESSURE TUBE ASSEMBLY REPLACEMENT OF

1434

COMBUSTION CHAMBER LINER ASSEMBLY AND LARGE


EXIT DUCT - REPLACEMENT/MODIFICATION OF

1435

PY TUBE ASSEMBLY CLAMPING ARRANGEMENT REPLACEMENT OF

1438

SEE SB

Rev.
Title
No.
FIRST-STAGE PLANET GEARS AND CARRIER ASSEMBLY INTRODUCTION OF

ACCESSORY DRIVE SPUR GEARSHAFT - REPLACEMENT OF


1439

SEE SB

NEW COMPRESSOR TURBINE BOLT - INTRODUCTION OF

1440

SEE SB

PRIMARY FUEL PRESSURE TUBE MOUNTING INTRODUCTION OF

Page 12
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1441

Comp./
Group
Code
SEE SB

1442

SEE SB

IMPROVED COMPRESSOR BLEED VALVE ASSEMBLY INTRODUCTION OF

1443

SEE SB

IMPROVED COMPRESSOR BLEED VALVE ASSEMBLY INTRODUCTION OF

1445

SEE SB

Rev.
Title
No.
ENGINE TURBINE/TURBOPROP FIRESEAL MOUNTING RING
2
SPACERS - INTRODUCTION OF

GAS GENERATOR CASE ASSEMBLIES - REPLACEMENT OF


1446

SCAVENGE PUMP HOUSING AND ASSEMBLY SCAVENGE


PUMP SPACER - REPLACEMENT/MODIFICATION OF

1447

TACHOMETER DRIVE BEVEL GEARSHAFT ASSEMBLY MODIFICATION OF

1452

B5

COMPRESSOR BLEED VALVE ASSEMBLY REPLACEMENT/MODIFICATION OF

1454

POWER TURBINE STATOR ASSEMBLY - MODIFICATION OF

1455

COMPRESSOR TURBINE BLADE - REPLACEMENT OF

1457

T5 THERMOCOUPLE WIRING HARNESS ASSEMBLY REPLACEMENT OF

1459

POWER TURBINE RETAINING BOLT - REPLACEMENT OF

1465

PROPELLER SHAFT OIL SEAL - REPLACEMENT OF

1466

AIR INLET SCREEN - REPLACEMENT OF

1469

TURBOPROP FUEL CONTROL UNIT REPLACEMENT/MODIFICATION OF

1470

PROPELLER GOVERNOR - REPLACEMENT/MODIFICATION


OF

1472

MANUAL OVERRIDE FUEL CONTROL UNIT REPLACEMENT/MODIFICATION OF


Page 13
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.

Comp./
Group
Code

Rev.
No.

1473

1474

Title
GASKETS CONTAINING ASBESTOS FIBERS - REPLACEMENT
OF

SCAVENGE OIL ADAPTER ASSEMBLY - REPLACEMENT OF


1476

PROPELLER GOVERNOR MOUNTING GASKET REPLACEMENT OF

1477

COMPRESSOR BLEED VALVE ASSEMBLY PREFORMED


PACKING - REPLACEMENT OF

1478

COMPRESSOR BLEED VALVE ASSEMBLY PREFORMED


PACKING - REPLACEMENT OF

1479

T5 THERMOCOUPLE WIRING-HARNESS ASSEMBLY REPLACEMENT/MODIFICATION OF

1481

ASBESTOS FIBER GASKETS - REPLACEMENT OF

1484

FIRST-STAGE REDUCTION CARRIER BALANCING


ASSEMBLY PLAIN NUT - MODIFICATION OF

1486

FUEL-CONTROL ACTUATING LEVER AND CONTROL-LEVER


MOUNTING BRACKET - REPLACEMENT OF

1487

ASBESTOS FIBER GASKETS - REPLACEMENT OF

1488

ASBESTOS FIBER GASKETS - REPLACEMENT OF

1489

ASBESTOS FIBER GASKET - REPLACEMENT OF

1490

ASBESTOS FIBER GASKETS - REPLACEMENT OF

1492

FUEL-CONTROL ACTUATING LEVER - REPLACEMENTS OF

1493

ASBESTOS FIBER INSULATION - REPLACEMENT OF

1495

P3 AIR FILTER DRAIN ADAPTER - INTRODUCTION OF

Page 14
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1497

Comp./
Group
Code
8

1498

IGNITION CABLE ASSEMBLY - REPLACEMENT OF

1500

SCAVENGE PUMP HOUSING - REPLACEMENT OF

1501

COMPRESSOR INLET-CASE ASSEMBLY STUDS REPLACEMENT OF

1503

T5 THERMOCOUPLE SCREWS - REPLACEMENT OF

1504

VANE-RING DAMPING-STRAP ASSEMBLY OF INTRODUCTION OF

1505

THIRD-STAGE COMPRESSOR-STATOR ASSEMBLY REPLACEMENT/MODIFICATION OF

1507

GAS-GENERATOR-CASE ASSEMBLY WITH BLEED-AIR-CASE


ASSEMBLY - INTRODUCTION OF

1508

MAIN SCAVENGE-PUMP SCREEN ASSEMBLY REPLACEMENT OF

1510

THIRD-STAGE COMPRESSOR-STATOR ASSEMBLY REPLACEMENT OF; IMPELLER HOUSING COMPRESSOR


BLEED-VALVE ASSEMBLY - MODIFICATION/REPLACEMENT
OF

1513

NO. 2 BEARING HOUSING-COVER FLANGE BOLTS REPLACEMENT OF

1516

COMPRESSOR DELIVERY INSULATED AIR PRESSURE TUBE


ASSEMBLY - REPLACEMENT OF

1517

CONVERSION OF A DEVELOPMENT XPT6A-25C TO A


PRODUCTION PT6A-25C ENGINE MODEL

1518

T5 THERMOCOUPLE BOLTS - REPLACEMENT OF

1519

FUEL NOZZLE SHEATHS - REPLACEMENT OF

Rev.
Title
No.
TURBINE INTERSTAGE BAFFLE ASSEMBLY - REPLACEMENT
1
OF

Page 15
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1521

Comp./
Group
Code
8

1522

NO. 3 BEARING OIL PRESSURE TUBE - REPLACEMENT OF

1523

FUEL CONTROL LEVER - REPLACEMENT OF

1524

NO. 3 BEARING OIL PRESSURE TUBE ASSEMBLY REPLACEMENT OF

1528

BRACKET - REPLACEMENT OF

1531

TORQUE CONTROLLER OIL BLEED TUBE - REPLACEMENT


OF

1533

REDUCTION GEARBOX FIRST STAGE CARRIER AND PLAIN


BEARING - INSPECTION OF

1534

FIRST STAGE CARRIER AND SLEEVE - REPLACEMENT OF

1536

SEE SB

1ST STAGE REDUCTION CARRIER BALANCING ASSEMBLY REPLACEMENT OF

1537

GAS GENERATOR CASE ASSEMBLY REPLACEMENT/MODIFICATION OF

1538

BLEED OFF VALVE (BOV) COVER INSPECTION/REPLACEMENT OF

1540

IDENTIFICATION SUPPORT PLATE - REPLACEMENT OF

1541

TURBINE DISK - REPLACEMENT OF

1542

FIRST STAGE CARRIER BALANCING ASSEMBLY REPLACEMENT OF

1543

NO. 2 BEARING HOUSING COVER BOLTS -REPLACEMENT


OF

1544

REAR PUSH - PULL CONTROL WIRE ROPE TERMINAL REPLACEMENT/MODIFICATION OF

Rev.
Title
No.
COMPRESSOR TURBINE DISK BALANCING ASSEMBLY AND
3
BLADES - REPLACEMENT/MODIFICATION OF

Page 16
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.
1547

Comp./
Group
Code
8

1550

THINNER ADJUSTMENT SPACERS FOR OIL PRESSURE


RELIEF VALVE - INTRODUCTION OF

1552

FIRST STAGE CARRIER BALANCING ASSEMBLY REPLACEMENT/MODIFICATION OF

1553

REDUCTION GEARBOX HOUSING - REPLACEMENT OF

1554

SECOND STAGE REDUCTION PLANET GEAR ASSEMBLY REPLACEMENT OF

1555

FUEL NOZZLES AND MANIFOLD ADAPTERS


INSPECTION/REPLACEMENT OF

1556

COMBUSTION CHAMBER LINER ASSEMBLY REPLACEMENT/MODIFICATION OF

1558

FUEL NOZZLES AND MANIFOLD ADAPTERS


INSPECTION/REPLACEMENT OF

1561

FUEL CONTROL UNIT - MODIFICATION/REPLACEMENT OF

1562

NO.2 BEARING SCAVENGE-TUBE SEAL-RETAINING-PLATE REPLACEMENT OF

1563

PROPELLER SHAFT - ON WING REPAIR OF

1564

Rev.
Title
No.
FUEL CONTROL UNIT - REPLACEMENT OF
-

SCAVENGE PUMP HOUSING ASSEMBLY - MODIFICATION OF


1565

FIRST STAGE CARRIER - IN-SITU MONITORING OF

1567

PROPELLER SHAFT - MODIFICATION/REPLACEMENT OF

1568

FUEL CONTROL UNIT - MODIFICATION/REPLACEMENT OF

1571

PROPELLER SHAFT ASSEMBLY - MODIFICATION OF

1574

BLEED OFF VALVE (BOV) COVER AND DIAPHRAGM


ASSEMBLY - INSPECTION OF
Page 17
Apr 30/2002

PRATT & WHITNEY CANADA


SERVICE BULLETIN INDEX
APPLICABLE TO PT6A-25/25A/25C ENGINES
SECTION 1 - NUMERICAL INDEX OF ENGINE SERVICE BULLETINS

P&WC
SB No.

Comp./
Group
Code

Rev.
No.

1579

SEE SB

COMPRESSOR BLEED OFF VALVE - REPLACEMENT OF

1580

PT6A-25C BS 800 TO BS 1105 - CONVERSION OF

1583

COMPRESSOR-AIR-FILTER BRACKET - REPLACEMENT OF

1586

GOVERNOR AIR PRESSURE TUBE ASSEMBLY REPLACEMENT OF

1589

COMPRESSOR BLEED OFF VALVE - REPLACEMENT OF

1591

COMPRESSOR STATORS - REPLACEMENT/MODIFICATION


OF

1596

FLOW DIVIDER AND PURGE VALVE REPLACEMENT/MODIFICATION OF

1598

PROPELLER SHAFT SET - INTRODUCTION OF

1608

NEW TORQUE CONTROLLER - INTRODUCTION OF

1610

TURBINE EXHAUST DUCT - INSPECTION OF

1613

PROTECTIVE CAPS AND PLUGS - REPLACEMENT OF

Title

Page 18
Apr 30/2002

You might also like