Air System Sizing Summary For AHU-1

This document summarizes the air system sizing for AHU-1 in Colombo, Sri Lanka. It was prepared on 07/14/2016 for a 1-zone air handling unit serving a 30.3 square meter floor area. Key specifications include a central cooling coil load of 6.8 kW requiring 427 L/s of air at peak conditions in February. The outdoor air ventilation rate was designed for 17 L/s. Fan power was calculated at 0 kW given the 472 L/s maximum airflow requirement.

Uploaded by

jeevan
Copyright
© © All Rights Reserved
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

Air System Sizing Summary For AHU-1

This document summarizes the air system sizing for AHU-1 in Colombo, Sri Lanka. It was prepared on 07/14/2016 for a 1-zone air handling unit serving a 30.3 square meter floor area. Key specifications include a central cooling coil load of 6.8 kW requiring 427 L/s of air at peak conditions in February. The outdoor air ventilation rate was designed for 17 L/s. Fan power was calculated at 0 kW given the 472 L/s maximum airflow requirement.

Uploaded by

jeevan
Copyright
© © All Rights Reserved
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 1

Air System Sizing Summary for AHU-1

Project Name: cecb project 1


07/14/2016
Prepared by: sanjeev
03:58PM

Air System Information


Air System Name ............................................... AHU-1
Equipment Class ......................................... SPLT AHU
Air System Type ............................................ 1FDDVAV

Number of zones ............................................................. 1


Floor Area ................................................................... 30.3 m
Location ........................................... Colombo, Sri Lanka

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s ............................... Peak zone sensible load
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ............................................................ 6.8
Sensible coil load ..................................................... 6.3
Coil L/s at Feb 1600 ................................................ 427
Max block L/s at Feb 1600 ...................................... 472
Sum of peak zone L/s ............................................. 472
Sensible heat ratio ............................................... 0.919
m/kW ....................................................................... 4.4
W/m ..................................................................... 225.9
Water flow @ 5.6 K rise ......................................... N/A

kW
kW
L/s
L/s
L/s

Load occurs at ................................................... Feb 1600


OA DB / WB ...................................................... 34.8 / 26.6
Entering DB / WB ............................................. 25.0 / 17.1
Leaving DB / WB .............................................. 12.8 / 12.0
Coil ADP ..................................................................... 11.4
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 44
Design supply temp. ................................................... 12.8
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ............................................................ 0.2 kW
Coil L/s at Des Htg ...................................................... 6 L/s
Max coil L/s ................................................................. 6 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ..................................................... Des Htg


W/m ............................................................................. 5.4
Ent. DB / Lvg DB .............................................. 21.3 / 43.3 C

Preheat Coil Sizing Data


No heating coil loads occurred during this calculation.

Supply Fan Sizing Data


Actual max L/s at Feb 1600 .................................... 472 L/s
Standard L/s ............................................................ 472 L/s
Actual max L/(s-m) .............................................. 15.59 L/(s-m)

Outdoor Ventilation Air Data


Design airflow L/s ...................................................... 17 L/s
L/(s-m) ................................................................... 0.55 L/(s-m)

Hourly Analysis Program v.4.4

Fan motor BHP ........................................................... 0.00 BHP


Fan motor kW ............................................................. 0.00 kW
Fan static ......................................................................... 0 Pa
L/s/person ................................................................... 5.53
............................................................................L/s/person

Page 1 of 1