BS-655/MAR: Optical Smoke Detector
BS-655/MAR: Optical Smoke Detector
BS-655/MAR: Optical Smoke Detector
BS-655/MAR
OPERATION VOLTAGE
START UP POWER CONSUMPTION
STAND BY POWER CONSUMPTION
ALARM POWER CONSUMPTION
SENSITIVITY
INDICATORS
OUTPUT
DEGREES OF COVER PROTECTION
PRODUCED IN ACCORDANCE WITH
OPERATION TEMPERATURE RANGE
RELATIVE HUMIDITY
EXTERNAL DIMENSIONS
TYPICAL WEIGHT
GUARANTEE
18-30V DC
150A for 50 sec
50A
20-30mA
0.120dB/m
Alarm LED
To panel / to external LED driver
IP 44
EN 54-7, IEC 60092-504, IEC 60533
o
-10 to 60 C
Up to 95%
103 (diam.) x 48 (height) mm
160gr.
2 years
OPERATION CHECK
The operation check can be done by spraying a
small amount of smoke into the detectors
chamber. You can use the special smoke device
A-752 of our company, or a similar device.
It is advised to conduct a good operation test
every 6 months and every time the detector
position is changed.
It is essential to have good air circulation inside
the detector. Therefore care must be taken so
that the vents of the detector are not covered.
NOTE
The detectors must be placed in the ceiling on
visible areas with no side obstacles and away
from sides with no air circulation or strong air
currents and vapors. Each detector covers
almost 50 m2 and the distance between two
Page 1 from 2
921655003_23_001
Installation procedure
fasten
-L
+R
+L
IN-
UT
O
OU
Indication marks
Mounting base
Figure 2
OU
-R
-R
+L
IN-
-L
Te r
m
res inal
ist
or
+R
+L
IN-
-L
UT
O
+R
OU
Figure 1.
UT
O
From zone
of the panel
-R
unfasten
Indication
LED
Connection
with external
LED
Connection
You can connect up to 30 detectors BS-655/MAR on each zone.
If the power of the detectors is turned off, wait for 3-5 seconds before you turn the power on again.
1. Detach the detector from its base by turning it anticlockwise until the side marks are aligned.
2. Install the base with the included mounting parts (point 5).
3. Connect the power cables (respect to polarity) according to the installation requirements (figure
1,2).
4. Place carefully the detector, so as to align the side marks and turn it clockwise all the way.
Power the device and after 3-5 seconds will be ready to operate.
CONNECTION
1. IN-OUT -L : It is connected to the zone of the panel or to the (IN-OUT -L) contact of the
previous detector.
2. OUT +R : It is connected to the next detector (IN +L) or if it is the last one to the terminal resistor.
3. OUT +R and -R : It is connected with the external LED.
4. IN +L : It is connected to the zone of the panel or to the (OUT +R) contact of the previous
detector.
Page 2 from 2
921655003_23_001