Details of Measurement (Preliminaries)
Details of Measurement (Preliminaries)
Details of Measurement (Preliminaries)
IPC No. 09
Shelter ID: Z4-896
Al-Helal Academy
Duration: 8th August 2016-19th November 2016
Unit
BOQ
Quantity
Revised
Quantity
Previous
IPC
Quantity to
Date
1.5
L. S
0.08
0.08
0.08
0.08
1.6.1
each
1.00
1.00
1.00
1.00
1.6.2
each
1.00
1.00
1.00
1.00
1.6.3
18.00
18.00
14.00
18.00
1.7
each
1.00
1.00
0.50
0.50
1.9
Progress photographs
month
18.00
18.00
7.00
1.10
each
1.00
1.00
0.50
Remarks
0.50
IPC No. 09
Shelter ID: Z4-896
Al Helal Academy
Duration: 8th August 2016 - 19th November
2016
BOQ
Quantity
Previous
IPC
Quantity to
Date
sqm
573.00
574.00
574.00
Earthwork in excavation
cum
144.00
84.00
84.00
2.1.3
LS
1.00
2.5
2.6.1
2.6.2
A-1.2
2.8
Item No.
Item Description
A-1.1
2.1.1
2.1.2
Remarks
#REF!
117
120
111
cum
685.00
310.50
310.50
115
sqm
491.00
320.81
320.81
122
2.9
cum
9.50
7.17
7.17
108
2.10
sqm
618.00
321.00
321.00
110
A-1.3
Pile Work
2.11.1.1
rm
1660.00
1660.00
1,660.00
120
2.11.1.2
rm
747.00
747.00
747.00
142
2.12
cum
461.79
461.79
461.79
112
2.13
Point welding
61171.00
61171.00
61,171.00
1420
2.14
Welded splice
rm
747.00
498.00
498.00
2.17.1
ton
9.50
9.18
#REF!
2.17.2
ton
39.20
38.55
#REF!
2.18
cum
10.60
10.59
10.59
2.19.1
per test
1.00
1.00
1.00
2.20
Integrity test
per test
1.00
1.00
1.00
A-1.4
1.71
83.00
82.27
82.27
125
118
per point
2.21.1
cum
2.21.3
In Pile cap
cum
2.21.4
cum
11.00
10.43
10.43
2.21.5
cum
24.00
30.00
30.00
2.21.6
cum
49.00
30.53
30.53
2.21.7
cum
10.00
1.60
1.60
2.21.8
cum
2.22.1
cum
ton
13.00
7.50
12.60
4.40
12.60
2.23.1
2.23.2
ton
14.10
12.79
12.79
A-1.5
2.24
cum
11.00
15.00
15.00
2.26.1
A-2
A-2.1
2.29.1(a)
cum
40.00
41.04
41.04
(b)
in 1st floor
cum
25.00
25.65
25.65
(c)
in 2nd floor
cum
25.00
25.65
25.65
(d)
on roof
cum
3.00
2.34
2.34
2.30.1(a)
cum
(b)
in first floor
cum
(c)
in 2nd floor
cum
2.30.2(a)
cum
38.00
25.06
25.07
(b)
in first floor
cum
28.00
27.77
27.77
(c)
in 2nd floor
cum
28.00
25.36
25.63
(d)
on roof
cum
3.00
2.69
2.71
2.30.3(a)
cum
63.00
51.37
51.37
(b)
in 1st floor
cum
in 2nd floor
cum
66.00
71.00
65.42
68.52
65.42
(c)
(d)
on roof slab
cum
6.00
5.94
5.90
2.30.4(a)
Concrete (cornice, railing, drop wall, louver, parapet, window sill, fins) - in GF
cum
7.77
(b)
in first floor
cum
9.88
(c)
in 2nd floor
cum
9.78
(d)
on roof
cum
0.18
2.30.5(a)
cum
(b)
in 1st floor
cum
(c)
in 2nd floor
cum
2.30.6(a)
cum
21.00
24.95
17.97
(b)
in 1st floor
cum
6.00
4.63
5.46
(c)
in 2nd floor
cum
6.00
5.46
5.46
2.30.7.2
cum
11.00
4.50
4.50
2.30.7.3
in wall
cum
14.00
9.25
9.25
2.30.9
Filled Chamfer
rm
730.00
702.60
703.75
2.30.10
rm
2.31.1
ton
42.00
34.89
38.25
2.31.2
ton
46.50
35.91
38.57
A-2.2
2.32.1
cum
2.32.2
cum
28.00
23.66
34.12
2.32.3
cum
4.40
2.75
5.15
68.12
1.13
2.51
48.12
30.62
141.74
2.35.1
B/W(125 mm)-in GF
sqm
2.35.2
sqm
2.35.3
sqm
2.35.4
On roof
sqm
27.82
2.36.2
sqm
101.55
2.36.3
sqm
127.15
A-2.3
2.39.2
sqm
547.00
2.39.3
sqm
1310.00
A-4
Miscellaneous works
2.63.2
sqm
489.00
759.47
559.47
2.65
sqm
105.00
105.00
105.00
48.00
26.16
72.38
143.16
462.18
485.78
541.82
IPC No. 09
Shelter ID: Z4-896
Al Helal Academy
Duration: 8th August 2016 -19th November 2016
Unit
A-1.1
2.1.1
2.1.2
sqm
cum
No. of
Members
1
31
7
83
4
2.1.3
2.6.1
2.6.2
Total=
Pumping and bailing out of water
Site development (FM = 0.20)
Sand filling in plinth, ramp area & entry stair ( FM = 0.80)
2.7.1
Clay lining
2.7.2
A-1.2
2.8
Creating turf
Brickwork, Soling /Mass concrete/ Polythine sheet
One layer brick flat soling
Length
Cumulative
Width (m) Height (m)
(m)
Quantity
24.625
23.325
574.38
1.000
1.000
0.500
0.618
0.618
0.618
47.90
21.24
-10.07
15.73
74.79
0.950
460.44
-30.00
-10.43
-12.60
-15.00
-5.48
386.94
442.39
(-) deduction for grade beam
(-) deduction for bracing beam
(-) deduction for pedestal column
(-) deduction for brickwork
(-) deduction for ramp portion
96.43
0.00
65.87
62.98
79.47
0.00
0.00
16.88
0.00
321.62
LS
cum
22.675
21.375
5
0
5
5
4
0
0
1
0
5.800
5.800
3.962
3.788
5.975
5.975
7.875
9.575
3.875
3.325
1.763
3.325
3.325
3.325
1.762
1.763
1.763
3.762
31
2.500
1.000
0.075
5.81
4.910
1.000
0.075
2.58
PC3
-1.22
sqm
Total =
Mass Concrete
cum
83
0.500
0.075
Total=
2.10
7.17
321.62
109.70
24.90
456.21
Pile Work
Boring for CIS pile (500mm dia) depth up to 20m
Depth exceeding 20 m and not exceeding 30 m
Cast-in-situ pile concreting
Point welding
Welded splice
Breaking of pile head
Static Load test (CIS pile)
Integrity test (CIS pile)
RCC Work
Individual and continuous footing
In pile Cap
PC2
PC3
rm
rm
cum
per point
rm
cum
per test
per set
83
83
83
83
83
83
1
1
20.000
9.000
28.350
737.000
6.000
1.00
0.500
0.500
0.650
cum
cum
Bracing Beam
1660.00
747.00
461.79
61171.00
498.00
10.59
1.00
1.00
1.71
31
7
83
2.500
4.910
1.000
1.000
1.000
0.500
0.750
0.750
0.100
58.13
25.78
-1.63
82.27
3
1
1
1
4
2
19.276
14.875
4.838
1.6158
5.45
7.45
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
5.20
1.34
0.44
0.15
1.96
1.34
Total=
2.21.4
PC2
sqm
Total=
A-1.3
2.11.1.1
2.11.1.2
2.12
2.13
2.14
2.18
2.19.1
2.20
A-1.4
2.21.1
2.21.3
2.500
4.910
1.000
3.875
Total =
2.9
Remarks
cum
4 of 30
Total=
2.21.5
10.43
cum
3
1
1
2
4
4
19.276
17.6158
14.875
18.350
18.350
5.450
0.300
0.300
0.300
0.300
0.300
0.300
0.450
0.450
0.450
0.450
0.450
0.450
7.81
2.38
2.01
4.95
9.91
2.94
30.00
5
2
5
5
0
4
0
5.800
5.800
3.962
3.813
8.075
5.950
5.950
3.325
1.763
3.325
3.325
1.763
3.325
1.763
0.100
0.100
0.100
0.100
0.100
0.100
0.100
9.64
2.05
6.59
6.34
0.00
7.91
0.00
32.53
gridline A-B
gridline A-B-1-2
gridline B-C
gridline C-D
gridline B-D-1-2 & gridline B-D-7-8
gridline D-E
gridline D-E-1-2 & gridline D-E-7-8
9.450
2.013
0.100
1.90
cattle ramp
38
0.650
0.425
1.200
12.60
Total=
2.21.6
cum
Total=
2.21.7
2.21.8
2.22.1
A-1.5
2.24
2.25
2.26.1
A-2.1
2.29.1
2.29.1(a)
2.29.1(b)
2.29.1(c)
2.29.1(d)
2.30.1
2.30.1(a)
2.30.1(b)
cum
15.00
cum
cum
cum
cum
38
38
38
4
0.600
0.600
0.600
0.600
0.375
0.375
0.375
0.375
4.800
3.000
3.000
2.600
41.04
25.65
25.65
2.34
1
1
1
2
3
2
1
1
1
1
4
4
5.500
5.500
5.500
1.825
2.275
2.150
1.937
1.175
1.369
1.225
0.250
1.106
0.250
0.125
0.125
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.150
0.100
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
1.106
0.450
4
4
1
1
1
1
1
3.250
3.250
1.150
1.150
1.000
1.050
2.287
0.200
0.200
0.125
0.125
0.125
0.125
0.125
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.21
0.10
0.10
0.14
0.26
0.16
0.07
0.04
0.05
0.05
0.17
0.20
1.55
0.39
0.39
0.02
0.02
0.02
0.02
0.04
0.90
4.90
4
4
2
2
4
1
1
3
1
1
4
2
1
2
2
3.250
3.250
1.825
5.500
5.500
5.500
5.500
5.500
4.225
3.350
2.275
2.150
1.937
1.825
1.225
0.200
0.200
0.125
0.125
0.450
0.125
0.250
0.450
0.450
0.250
0.250
0.250
0.250
0.250
0.250
0.150
0.150
0.150
0.150
0.100
0.150
0.150
0.100
0.100
0.150
0.150
0.150
0.150
0.150
0.150
cum
gridline D
gridline E
Store
Toilet (female)
General store
Toilet (male)
Total =
2.30.1(c) in 2nd floor
cum
G.line D (4 panel)
G.line E (4 panel)
G.line 2 (2 Side)
G.line 4 (2 Side)
G.line 4 (2 Side)
G.line 6 (2 Side)
G.line 6 (2 Side)
G.line 6 (2 Side)
G.line 8
G.line 8
HW 2
HW 3, 3a
HW 4
HW 5
HW 6
0.39
0.39
0.07
0.21
0.99
0.10
0.21
0.74
0.19
0.13
0.34
0.16
0.07
0.14
0.09
5 of 30
1.175
0.250
0.150
0.04
4.26
3
4
4
3
3
1
1
2
4
1
3
1
1
1
1
1
1
1
9
8
3
19.626
5.500
0.400
7.200
0.400
7.775
0.400
18.550
0.400
14.688
7.775
3.025
1.688
14.125
1.838
13.000
5.500
3.250
1.600
0.250
0.375
0.300
0.300
0.375
0.300
0.375
0.300
0.375
0.300
0.375
0.300
0.300
0.300
0.300
0.225
0.300
0.250
0.300
0.300
0.375
0.160
0.075
0.350
0.350
0.500
0.350
0.500
0.350
0.500
0.350
0.500
0.350
0.350
0.350
0.350
0.300
0.225
0.200
0.350
0.250
0.300
0.200
0.200
6.18
2.31
0.30
2.27
0.23
0.82
0.08
3.90
0.30
1.54
2.45
0.32
0.18
0.95
0.12
0.65
0.58
0.24
1.62
0.06
-0.02
25.07
1
3
6
12
1
2
1
1
2
1
1
18
7
3.775
19.625
18.550
0.400
14.688
7.775
29.250
15.125
7.775
1.688
3.250
0.250
0.375
0.300
0.300
0.300
0.375
0.300
0.300
0.250
0.300
0.300
0.300
0.300
0.160
0.075
0.500
0.350
0.350
0.500
0.350
0.350
0.200
0.350
0.350
0.350
0.300
0.200
0.200
0.57
6.18
11.69
0.90
1.54
1.63
1.46
1.59
1.63
0.18
0.29
0.14
-0.04
27.77
3
6
12
1
1
2
2
1
1
19.624
18.550
0.400
14.688
15.125
7.775
7.775
1.688
3.250
0.300
0.300
0.375
0.300
0.300
0.300
0.300
0.300
0.300
0.350
0.350
0.500
0.350
0.350
0.350
0.350
0.350
0.300
6.18
11.69
0.90
1.54
1.59
1.63
1.63
0.18
0.29
25.63
Total =
2.30.1(d) on Roof
Tee beam, L-beam & rectangular beam
2.30.2
2.30.2(a) In Ground Floor Beam
B1
B2
B2 (outer)
B3
B3 (outer)
B3 (a)
B3 (a)-outer
B5
B5 (outer)
B6
B7
B8
B9
B10
B10(a)
B11
B12
Stair Beam (ground floor)
Ramp Beam
Downward projection for arch beam
cum
Total=
2
2
1
8.175
3.250
3.250
0.300
0.300
0.300
0.350
0.350
0.300
Total=
2.30.3
In Floor & Roof Slab
2.30.3(a) In Ground Floor Slab
Gross area
North side
Cantiliver part (north-west side)
Cantiliver part (north-east side)
Cantiliver part (south-west side)
Cantiliver part (south-east side0
Columns
1.72
0.68
0.29
2.69
SRB-1
SRB-2
SRB-3
cum
1
4
1
1
1
1
1
1
1
1
1
5
25
22.625
3.250
2.435
2.435
2.435
2.435
0.300
5.650
14.200
3.375
5.500
3.250
0.600
20.725
0.300
0.525
0.525
1.125
1.125
0.075
2.435
6.225
2.137
3.250
0.300
0.375
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
70.34
0.59
0.19
0.19
0.41
0.41
0.00
-2.06
-13.26
-1.08
-2.68
-0.73
-0.84
6 of 30
3
1
1
0.375
0.412
0.412
0.300
0.375
0.375
0.150
0.150
0.150
Total=
2.30.3(b) In 1st Floor Slab
column
column
column
51.37
cum
Gross area
4-corner
1
4
2
1
8
2
28
22.625
2.435
3.375
5.800
0.375
0.413
0.600
20.725
0.825
2.137
3.250
0.300
0.375
0.375
0.150
0.150
0.150
0.150
0.150
0.150
0.150
70.34
1.21
-2.16
-2.83
-0.14
-0.05
-0.95
65.42
2-corner
(-) dedcution at grid C (2 sides)
(-) dedcution for stair portion
(-) dedcution for column portion
(-) dedcution for column portion
(-) dedcution for column portion
1
2
2
1
8
4
38
22.625
0.188
2.138
6.625
0.750
0.900
0.600
22.375
0.375
3.375
3.250
0.750
0.900
0.375
0.150
0.150
0.150
0.150
0.150
0.150
0.150
75.94
0.02
-2.16
-3.23
-0.68
-0.49
-1.28
overall area
for column area
(-) for void area
(-) for stair area
(-) for skylight
(-) for opening
(-) for column
Total =
2.30.3(c) In 2nd Floor Slab
cum
Total =
2.30.3(d) on Roof
68.12
cum
1
4
10.125
0.600
4.000
0.375
0.150
0.150
Total =
2.30.4
-0.05
-0.02
-0.02
6.08
-0.14
overall area
for column area
5.94
cum
4
2
2
2
3.250
2.187
2.187
0.250
0.125
0.125
0.125
0.125
0.200
0.200
0.200
0.125
28
8
8
1
1
8
0.200
0.200
0.150
14.125
14.125
0.435
0.150
0.160
0.160
0.200
0.100
0.770
1.350
2.320
2.320
0.180
0.150
0.150
5
5
4
4
2
2
3
3.250
2.187
2.187
3.250
3.143
2.312
1.500
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.200
0.200
0.200
0.200
0.200
0.200
0.150
77
8
8
1
1
8
10
10
1
1
10
0.200
0.200
0.150
14.125
14.125
0.435
0.200
0.150
17.750
17.750
0.435
0.150
0.160
0.160
0.200
0.100
0.770
0.160
0.160
0.200
0.100
0.770
1.350
2.320
2.320
0.180
0.150
0.150
2.320
2.320
0.180
0.150
0.150
1
1
1
1
8
2
95.750
95.750
95.750
27.850
3.600
4.000
0.100
0.125
0.063
0.100
0.150
0.100
Total =
Louver
acrh column
cum
arch beam
Total =
0.325
0.109
0.109
0.008
0.552
1.134
0.594
0.445
0.509
0.212
0.402
2.16
Gride line E
Gride line D
4 to 6
0.41
0.27
0.22
0.33
0.16
0.12
0.08
1.17
3.12
0.594
0.445
0.509
0.212
0.402
0.742
0.557
0.639
0.266
0.502
4.87
Gride line A
Gride line B
Gride line D
Gride line E
8.14
1.20
0.30
0.70
1.30
0.20
parapet wall
parapet wall
parapet wall
pent house railing
upstrand of sky light:
upstrand of water reservoir
cum
Total =
Louver
acrh column
cum
arch beam
acrh column
cum
arch beam
Total =
(d)
on roof
cum
0.850
0.100
0.050
0.250
0.300
0.250
Total =
2.30.5
in sunshade, false ceiling etc.
2.30.5(b) Sunshade & False Ceiling-1st floor
11.83
4
5.500
0.450
0.100
0.99
False slab
7 of 30
cum
2nd Flight
1
1
1
1
2
1
7.5
1
1
1
6.5
1
2.704
1.600
1.831
3.250
0.400
3.250
1.600
1.831
1.600
2.122
1.600
2.500
1.600
1.500
1.600
1.750
0.375
0.750
0.250
1.600
1.500
1.600
0.250
1.600
0.250
0.250
0.250
0.250
0.250
0.175
0.150
0.250
0.250
0.250
0.150
0.200
1
1
1
18.318
14.288
3.575
1.700
1.700
2.388
0.150
0.150
0.225
1
1
2
1
4.5
1
1
4.5
2.704
3.250
0.400
3.250
1.600
2.704
3.250
1.600
1.600
1.750
0.375
0.750
0.250
1.600
2.500
0.250
0.200
0.200
0.200
0.150
0.150
0.200
0.200
0.150
1
1
2
1
4.5
1
1
4.5
2.704
3.250
0.400
3.250
1.600
2.704
3.250
1.600
1.600
1.750
0.375
0.750
0.250
1.600
2.500
0.250
0.200
0.200
0.200
0.150
0.150
0.200
0.200
0.150
2
4
4.800
0.600
2.438
0.375
0.200
0.200
2
2
4
4
2
1
1
4
4.200
3.325
4.200
2.038
2.038
0.525
0.125
0.200
1.650
1.650
0.650
1.000
0.875
0.350
0.350
0.125
0.200
0.200
0.200
0.200
0.125
0.200
0.200
0.225
Total =
Ramp
Total =
Total for Ground Floor (including ramp) =
3rd Flight
4th Flight
2.30.6(b)
6th Flight
2.30.6(c)
2.30.7
In Water Tank
2.30.7.2 in bottom slab
Total =
2.30.7.3
in wall
Total =
2.30.8
2.30.9
4.68
-0.18
4.50
2.77
2.19
2.18
1.63
0.45
0.04
0.01
-0.02
9.25
waist slab
landing
landing (near column)
canopy
steps
waist slab
landing (on 1st floor slab)
steps
waist slab
landing
landing (near column)
canopy
steps
waist slab
landing (on 2nd floor slab)
steps
(-) deduction
rm
(-) deduction
Total=
2.30.10
A-2.2
1.08
0.60
0.73
1.42
0.08
0.43
0.45
0.73
0.60
0.85
0.39
0.80
8.16
4.67
3.64
1.92
10.23
18.39
0.87
1.14
0.06
0.37
0.27
0.87
1.63
0.27
5.46
0.87
1.14
0.06
0.37
0.27
0.87
1.63
0.27
5.46
32
8
6
6
12
16
2
2
2
2
32
32
2
2
8
6
4.300
4.300
4.300
4.800
4.300
7.300
4.300
4.800
4.300
4.800
4.300
4.300
0.225
0.150
0.150
0.150
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
137.60
gridline A (1 to 8)
34.40
gridline B (1 to 2)
25.80
gridline B (3 to 5), inside
28.80
gridline B (3 to 5), outside
51.60
gridline B (6 to 8)
116.80
gridline C (2 to 5)
8.60
gridline C-6, inside
9.60
gridline C-6, outside
8.60
gridline C-7, inside
9.60
gridline C-7, outside
137.60
gridline D (1 to 8)
137.60
gridline E (1 to 8)
-0.45 in ramp 1st flight-gridline C-2 (oneside)
-0.30 in ramp 1st flight-gridline C-2 (otherside)
-1.20 in ramp 1st flight-gridline C-3-4-5-6
-0.90 in ramp 2nd flight-gridline C-3-4-5
703.75
8 of 30
2.32
2.32.2
250 mm brickwork
in 1st floor
2.32.3
in 2nd floor
cum
2
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2
1
2
1
1
1
1
1
1
1
1
1
1
1
0.275
2.425
0.275
2.425
3.675
1.825
1.688
3.350
3.350
2.150
2.275
1.174
0.500
5.000
0.725
0.275
2.425
0.275
2.425
3.675
1.825
2.275
5.500
5.500
3.350
2.150
2.025
2.187
0.375
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.276
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.630
0.630
0.630
0.630
2.500
1.950
1.950
1.950
0.550
1.950
1.950
1.950
1.950
1.950
1.950
0.630
0.630
0.630
0.630
2.500
1.950
1.950
2.100
2.500
2.500
1.950
1.950
1.950
1.950
cum
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3.350
2.275
1.175
1.950
1.950
3.350
2.025
2.187
2.500
1.950
2.025
1.950
2.500
2.500
1.950
2.025
1.950
2.500
2.500
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.550
1.950
1.950
0.750
0.525
0.550
1.950
1.950
0.375
1.825
1.950
1.425
0.750
0.525
1.825
1.950
1.425
0.750
0.525
sqm
4
4
1
1
3.25
2.18
4.48
5.5
0.625
0.625
2.1
2.1
1.000
1.000
1.000
1.000
sqm
3
2
2
1
1
1
1
11
5
1
2
1
5.500
1.000
4.300
1.688
1.688
0.888
1.250
2.962
1.375
6.876
1.000
1.000
1.950
1.950
1.950
2.850
2.500
2.850
2.500
0.625
0.625
0.625
1.950
2.850
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Total =
Total =
2.34
2.34.1
2.34.2
2.35
2.35.1
2.35.2
2.35.3
in 2nd floor
Total=
0.09
0.38
0.09
0.38
2.30
0.89
0.82
1.63
0.46
1.05
1.11
0.57
0.24
2.69
0.35
0.09
0.38
0.09
0.38
2.30
0.89
1.11
2.89
3.44
2.09
1.05
0.99
1.07
0.18
29.99
0.46
1.11
0.57
0.37
0.26
0.46
0.99
1.07
0.23
0.89
0.99
0.69
0.47
0.33
0.89
0.99
0.69
0.47
0.33
12.25
8.13
5.45
9.41
11.55
34.53
32.18
3.90
16.77
4.81
4.22
2.53
3.13
20.36
4.30
4.30
-3.90
-2.85
gridline 8 (A to B)
gridline 8 (D to E)
gridline A-B-1
gridline B-C-1
gridline B-C-1-2
gridline D-E-1
gridline C-D-1
gridline C-1-2
gridline C-D-2
gridline E (2-6)
gridline E (2-6)
gridline 4 (D-E)
gridline 2 (D-E)
9 of 30
2.100
0.750
1.000
-1.58
88.16
sqm
1
6
2
1
1
1
1
1
1
1
2
4
4
3
1
1
1
1
1
1
1
1
1
1
1
1
1
5
1
5
1
2
2
4
2
1
2
2
1
2
1
4
4
20.215
5.500
5.500
20.215
20.215
4.100
3.775
3.250
3.025
3.775
4.100
3.250
3.025
3.775
3.775
2.275
4.100
4.100
2.575
2.275
2.575
4.100
4.100
4.100
4.100
4.100
2.575
3.025
1.688
3.250
1.687
2.275
2.025
3.775
3.775
5.500
1.688
5.500
5.500
1.687
1.688
3.250
3.250
5.500
1.050
0.350
0.350
0.350
3.280
0.350
0.650
0.350
1.050
3.315
0.650
0.350
1.050
0.350
0.650
3.380
3.250
1.837
0.350
1.838
3.280
3.315
3.315
3.380
3.250
1.837
0.650
0.650
0.350
0.650
0.350
0.650
1.050
0.350
1.838
0.350
0.350
1.837
0.350
0.650
0.650
0.350
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
sqm
1
2
1
1
1
4
1
1
1
1
3
1
1
5.500
5.500
5.500
5.500
5.500
3.250
5.500
5.500
5.500
5.500
5.500
5.500
4.100
3.280
3.315
3.380
3.250
1.837
0.350
0.350
1.050
0.350
0.650
1.050
0.350
3.280
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
111.183
34.650
3.850
7.075
7.075
13.448
1.321
2.113
1.059
3.964
27.183
8.450
4.235
11.891
1.321
1.479
13.858
13.325
4.730
0.796
4.733
13.448
13.592
13.592
13.858
13.325
4.730
9.831
1.097
5.688
1.097
1.593
2.633
15.855
2.643
10.109
1.182
3.850
10.104
1.181
1.097
8.450
4.550
431.24
18.040
36.465
18.590
17.875
10.104
4.550
1.925
5.775
1.925
3.575
17.325
1.925
13.448
Total=
2.35.4
2.36
2.36.1
2.36.2
2.36.3
2.36.4
2.37
2.38
2.38.1
2.38.2
2.38.3
2.38.4
2.39
2.39.1
2.39.2
on roof
12mm thick plaster
in ground floor
in 1st floor
in 2nd floor
on roof
12mm plsater with net cement finishing
Dado/skriting including marking groove
in ground floor
in 1st floor
in 2nd floor
on roof
6 mm thick plaster
in ground floor
in 1st floor
2.39.3
in 2nd floor
Total =
10 of 30
1
1
1
1
1
1
2
2
2
2
1
1
2
1
1
1
1
2
1
1
1
1
1
2
2
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =
2.39.4
2.40.2
2.42
2.42.1
2.42.2
2.42.3
2.43
2.44
2.44.2.1
2.44.2.2
2.45
2.45.2
2.45.3
2.46
2.46.2
2.46.3
2.46.4
A-2.5
2.47.1
4.100
4.100
4.100
5.500
5.500
5.500
3.250
3.025
3.250
3.025
3.775
3.775
3.775
3.775
3.250
3.025
4.100
4.100
4.100
4.100
5.500
5.500
5.500
3.025
3.250
3.775
3.775
3.025
3.250
3.025
3.250
3.775
3.775
3.775
5.500
3.250
3.250
5.500
5.500
3.250
3.250
5.500
5.500
5.500
3.250
3.250
5.500
5.500
5.500
3.250
3.250
5.500
5.500
3.315
3.380
3.250
0.350
1.000
0.650
0.650
0.650
0.650
0.650
0.350
1.000
0.350
0.650
0.650
0.650
3.280
3.315
3.380
3.250
0.350
1.000
0.650
0.350
0.350
0.350
0.650
0.350
0.350
0.350
0.350
0.350
1.000
0.350
3.280
0.650
0.350
0.350
3.315
0.650
0.350
0.475
0.650
3.315
0.650
0.350
0.650
0.350
3.380
0.650
0.350
0.350
0.400
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
13.592
13.858
13.325
1.925
5.500
3.575
4.225
3.933
4.225
3.933
1.321
3.775
2.643
2.454
2.113
1.966
13.448
27.183
13.858
13.325
1.925
5.500
3.575
2.118
2.275
1.321
2.454
1.059
1.138
2.118
2.275
1.321
3.775
1.321
18.040
2.113
1.138
1.925
18.233
2.113
1.138
2.613
3.575
18.233
2.113
1.138
3.575
1.925
18.590
2.113
1.138
1.925
2.200
437.70
on roof
Groove/drip course/nosing
Artificial patent stone
in ground floor
in 1st floor
in 2nd floor
Artificial patent stone (in Cattle area)
Screeding on roof
avg. 100 mm thick concrete
12 mm thick lime cement sand plaster
Glazed wall tiles
in 1st floor toilet
in 2nd floor toilet
Unglazed homogeneous floor tiles
in 1st floor toilet
in 2nd floor toilet
on roof for making S-mark
Metal work
Frame for double leaf door
11 of 30
2.47.3
2.48
2.49.1
2.49.3
2.50
2.51.1
2.51.2
2.51.3
2.52
2.53
2.54
A-2.6
2.55
2.56
2.57
2.58
2.59
A-3
2.60
2.61
2.62
2.62.1
A-4
2.63.2
sqm
1
1
1
1
1
1
1
1
1
9.600
15.000
15.000
17.400
9.250
18.500
14.550
9.500
15.300
9.100
8.000
6.000
2.000
5.200
7.500
4.450
6.900
7.200
15.000
7.000
Total =
2.65
2.66
2.68
2.69
2.69.1
2.69.2
sqm
87.36
120.00
90.00
34.80
48.10
138.75
64.75
65.55
110.16
759.47
105.00
12 of 30
Bar dia
No. of
No. of bars Length (m) Unit Wt Quantity
Members
C2
C3
C1 (Pent house)
C2 (Pent house)
20
24
13.045
2.436
4.576
20
10
24
24
6
97
13.045
1.700
2.436
0.615
4.576
2.434
10
20
24
10
97
2
0.980
13.045
0.615
2.436
1.403
0.636
20
10
12.420
2.436
1.210
25
10
14.195
3.846
2.184
10
10
97
1.700
0.615
1.014
C2-stirrup
10
10
97
1.240
0.615
0.740
C2-stirrup
25
14.195
3.846
1.310
25
14.195
3.846
1.310
10
97
1.700
0.615
0.406
C3-stirrup
10
20
4
2
97
6
0.980
3.975
0.615
2.434
0.234
0.116
C3-stirrup
20
10
2
2
6
21
2.900
1.700
3.434
0.615
0.120
0.044
10
20
2
2
21
5
0.980
3.975
0.615
2.434
0.025
0.097
20
2.900
2.434
0.071
10
21
1.700
0.615
0.044
stirrups
10
21
1.240
0.615
0.032
stirrups
Total =
2.30.2
Remarks
C1-stirrup
C1-stirrup
stirrups
stirrups
22.580
ton
40 grade =
6.376
60 grade = 16.205
16
16
20
3
3
3
2
3
3
20
20
20
3
3
3
4
2
2
20
20
3
3
4
4
3.488
20
10
3
3
20
20
20
20
20
20
16
10
1.538
1.538
2.436
0.213
0.013
0.503
top bars
top bars-lapping
2.436
2.436
2.436
0.020
0.058
0.054
bot bars-lapping
2.375
2.436
2.436
0.102
0.069
8
161
1.975
1.350
2.436
0.615
0.115
0.401
4
4
4
4
4
4
4
4
2
3
1
3
1
3
2
42
7.580
7.430
2.640
2.440
3.040
2.840
6.450
1.350
2.436
2.436
2.436
2.436
2.436
2.436
1.538
0.615
0.148
0.217
0.026
0.071
0.030
0.083
0.079
0.139
top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line
ext bot
stirrup
20
20
20
20
20
20
16
10
3
3
3
3
3
3
3
3
2
3
1
3
1
3
2
58
9.290
9.215
3.040
2.840
2.540
2.340
6.700
1.350
2.436
2.436
2.436
2.436
2.436
2.436
1.538
0.615
0.136
0.202
0.022
0.062
0.019
0.051
0.062
0.144
top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line
ext bot
stirrup
20
20
20
20
20
20
1
1
1
1
1
1
2
3
1
3
1
1
9.290
9.215
3.040
2.840
2.840
2.640
2.436
2.436
2.436
2.436
2.436
2.436
0.045
0.067
0.007
0.021
0.007
0.006
top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line
22.955
0.675
4.000
3.688
bot bars
ext bot
ext top (both ends)
ext top (both ends)-2nd line
ext top (mid section)
ext top (mid section) -2nd line
stirrup
FB3(a) (Gridline 2)
13 of 30
10
61
1.350
0.615
0.051
20
21.205
2.436
0.207
top bars
20
20
2
2
2
3
1.150
2.436
2.436
0.011
0.308
top bars-lapping
bot bars
20
20
2
2
4
1
2.436
2.436
0.017
0.015
20
20
2
2
3
1
0.042
0.015
3.040
2.436
2.436
20
2.840
2.436
0.042
20
3.500
2.436
0.017
20
20
2
2
3
1
3.100
2.436
2.436
20
20
2
2
3
1
3.200
20
16
2
2
3
2
2.275
10
16
16
stirrup
21.055
0.850
3.040
2.840
2.436
2.436
6.700
2.436
1.538
130
1.300
0.615
0.208
0.065
top bars
21.043
0.925
1.538
1.538
0.004
top bars-lapping
20
0.153
bot bars
20.893
0.675
2.436
20
2.436
0.005
20
3.678
2.436
0.009
bot bars-lapping
ext top (left)
20
3.478
2.436
0.017
20
20
20
1
1
1
1
2
3
1.615
1.415
2.436
2.436
2.436
0.004
0.007
0.017
20
10
1
1
6
102
20
20
20
20
20
3
3
2
1
20
10
3
3
2
53
20
20
1
1
3
3
10
25
20
20
10
1
1
1
3
3
13
2.918
2.768
16
16
1
1
2
3
16
16
1
1
2
2
15.080
0.925
14.930
16
16
16
1
1
1
1
1
3
10
96
16
16
10
1
1
1
3
2
14
2.718
2.568
16
16
1
1
2
3
16
16
1
1
2
2
17.700
0.925
17.580
10
88
3.600
2.675
stirrup
FB6 (Gridline E)
1.350
2.436
0.615
9.155
2.436
0.134
9.055
2.040
2.436
0.199
2.436
0.015
1.840
4.600
4.400
2.436
2.436
0.027
0.034
2.436
0.615
0.064
0.127
2.436
2.436
0.074
0.073
0.615
0.021
2.436
2.436
0.615
0.021
0.020
0.011
top bars
1.538
1.538
0.046
0.004
top bars
top bars-lapping
1.538
1.538
0.046
0.002
1.538
1.538
1.538
0.002
0.002
0.011
bot bars
bot bars-lapping
ext top (left)
0.615
0.065
1.538
1.538
0.615
0.013
0.008
0.009
top bars
1.538
1.538
0.054
0.004
top bars
top bars-lapping
1.538
1.538
0.054
0.002
0.615
0.035
bot bars
bot bars-lapping
stirrup
2.375
1.975
1.300
top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line
stirrup
FB8 (Gridline C)
10.105
9.955
1.350
top bars
bot bars
stirrup
FB9 (Gridline E)
1.350
bot bars
stirrup
0.675
1.290
1.290
2.300
1.100
1.100
bot bars
stirrup
0.675
0.650
14 of 30
FB12 (Gridline 1)
20
7.180
2.436
0.035
20
7.030
2.436
0.051
bot bars
20
2.040
2.436
0.005
20
20
1
1
2
2
1.840
2.436
2.436
0.009
0.010
20
10
1
1
2
34
1.840
2.436
0.615
0.009
0.028
2.040
1.350
Total =
Summary of rebar for GROUND FLOOR BEAM
top bars
6.041
ton
40 grade =
1.35
60 grade =
4.70
20
16
20
20
20
20
1
1
1
1
1
1
2
3
1
3
1
3
5.200
5.050
1.765
1.565
1.990
1.790
2.436
1.538
2.436
2.436
2.436
2.436
0.025
0.023
0.004
0.011
0.005
0.013
10
26
1.350
0.615
0.022
16
0.213
3
3
3
3
23.105
0.925
1.538
16
20
0.013
0.503
20
22.955
0.675
1.538
2.436
2.436
0.020
20
4.000
2.436
0.058
ext bot
20
2.436
0.054
20
3.688
3.488
2.436
0.102
20
20
10
3
3
3
4
8
136
2.375
1.975
1.350
2.436
2.436
0.615
0.069
0.115
0.339
20
21.205
2.436
0.620
20
2.436
0.034
20
1.150
21.055
2.436
0.923
top bars
top bars-lapping
bot bars
20
20
6
6
4
1
2.436
2.436
0.050
0.044
20
20
6
6
3
1
0.850
3.040
2.840
2.436
2.436
0.125
0.044
20
20
20
6
6
6
3
1
3
2.436
2.436
2.436
20
20
6
6
1
3
2.436
2.436
0.125
0.051
ext top (mid of grid D)
0.136 ext top (mid of grid D)-2nd line
0.053
ext top (mid of grid B)
0.140 ext top (mid of grid B)-2nd line
20
20
16
6
6
6
1
3
2
2.436
2.436
1.538
0.039
ext top (mid of grid C)
0.100 ext top (mid of grid C)-2nd line
0.124
ext bot
10
130
0.615
0.624
16
1.538
0.065
top bars
16
20
1
1
3
3
1.538
2.436
0.004
0.153
20
20
20
1
1
1
3
1
2
2.436
2.436
2.436
0.005
0.009
0.017
top bars-lapping
bot bars
bot bars-lapping
20
20
1
1
1
2
2.436
2.436
0.004
0.007
20
20
10
1
1
1
3
6
102
2.436
2.436
0.615
0.017
0.029 extra top (mid section)-2nd line
0.085
stirrup
20
2.436
0.089
20
20
20
2
2
2
3
1
2
2.436
2.436
2.436
0.132
0.010
0.018
20
2.436
0.022
3.040
2.840
3.500
3.100
3.600
3.200
2.675
2.275
6.700
1.300
stirrup
FB15 (Gridline E)
21.043
0.925
20.893
0.675
3.678
3.478
1.615
1.415
2.375
1.975
1.350
FB16 (Gridline 8)
9.155
9.055
2.040
1.840
4.600
top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
15 of 30
20
4.400
2.436
0.043
10
53
1.300
0.615
0.085
stirrup
16
18.780
1.538
0.058
top bars
16
16
1
1
3
2
0.925
1.538
1.538
0.004
0.057
top bars-lapping
16
10
1
1
3
110
0.675
0.650
1.538
0.615
0.003
0.044
16
17.700
1.538
0.054
16
1.538
0.004
16
0.925
17.580
1.538
0.054
bot bars
16
1.538
0.002
bot bars-lapping
10
88
0.675
0.650
0.615
0.035
stirrup
16
19.205
1.538
0.059
16
0.925
1.538
0.004
top bars
top bars-lapping
20
20
1
1
3
3
19.055
2.436
2.436
0.139
0.005
bot bars
bot bars-lapping
20
20
1
1
2
4
2.436
2.436
0.008
0.014
20
20
1
1
4
8
2.436
2.436
0.023
0.038
10
110
0.615
0.091
stirrup
20
2.436
0.089
20
2.436
0.132
top bars
bot bars
20
20
2
2
1
2
2.436
2.436
0.010
0.018
20
20
2
2
1
2
2.436
2.436
0.022
0.043
10
53
0.615
0.085
20
2.436
0.021
top bars
20
10
1
1
3
13
0.020
0.011
6.765
bot bars
1.350
2.436
0.615
ton
40 grade =
1.42
60 grade =
5.35
20
16
12
7
7
7
4
3
2
2.775
2.067
1.825
2.434
1.538
0.890
0.189
0.067
0.023
20
16
1
1
4
6
3.775
2.067
2.434
1.538
0.037
0.019
12
10
1
9
2
15
3.475
1.312
2.434
0.615
0.017
0.109
0.460
ton
40 grade =
0.109
60 grade =
0.351
16
0.213
3
3
4
3
23.125
0.925
1.538
16
20
1.538
2.436
0.017
0.505
20
20
20
3
3
3
6
2
4
2.436
2.436
2.436
0.030
0.054
0.100
20
20
10
3
3
3
4
8
158
2.436
2.436
0.615
0.069
0.115
0.394
20
20
20
6
6
6
2
4
3
2.436
2.436
2.436
0.661
0.067
0.989
top bars-lapping
bot bars
20
20
6
6
6
2
2.436
2.436
0.059
0.089
20
2.436
0.243
B17(A)-(Gridline A)
18.630
bot bars
bot bars-lapping
stirrup
B17(B)-(Gridline E)
top bars
top bars-lapping
FB18 (Gridline C)
0.675
1.615
1.415
2.375
1.975
1.35
FB19 (Gridline 1)
9.155
9.055
2.040
1.840
4.600
4.400
1.300
FB20 (Grideline 8)
2.918
2.768
Total =
Summary of rebar for 1ST FLOOR BEAM
Rebar calculation for RAMP BEAM
Total =
Summary of rebar for RAMP BEAM
stirrup
landing beam
23.045
0.675
3.688
3.408
2.375
1.975
1.350
top bars
top bars-lapping
bot bars
bot bars-lapping
top bars
16 of 30
20
3.600
2.436
0.053
20
3.200
2.436
0.140
20
2.675
2.436
0.039
20
2.275
2.436
0.100
20
20
6
6
1
3
3.500
2.436
2.436
0.051
0.136
20
10
6
6
4
160
6.700
1.300
2.436
0.615
0.392
0.768
16
17.438
1.538
0.054
16
1.538
0.003
20
0.925
17.358
2.436
0.085
bot bars
20
2.436
0.006
bot bars-lapping
20
0.850
3.688
2.436
0.009
20
3.448
2.436
0.017
20
1.625
2.436
0.004
20
1.385
2.436
0.007
20
20
1
1
3
6
2.375
2.436
2.436
0.017
0.029
10
116
0.615
0.096
stirrup
16
16
1
1
2
3
1.538
1.538
0.059
0.004
top bars-lapping
20
0.925
19.145
2.436
0.140
bot bars
20
0.675
2.436
0.005
bot bars-lapping
20
0.009
2.436
0.015
20
20
1
1
8
2
1.850
1.570
2.200
2.436
20
2.436
2.436
0.043
0.013
20
10
1
1
2
126
2.436
0.615
0.011
0.105
20
20
2
2
2
3
2.436
2.436
0.089
0.134
top bars
bot bars
20
20
20
2
2
2
1
2
1
2.436
2.436
2.436
0.013
0.023
0.023
20
10
2
2
2
53
4.375
2.436
0.615
0.043
0.085
20
20
2
2
2
3
2.436
2.436
0.089
0.134
20
20
2
2
1
3
9.175
9.135
2.650
2.436
2.436
0.013
0.035
top bars
bot bars
ext top (left)
20
20
10
2
2
2
1
3
52
2.436
2.436
0.615
0.023
0.064
0.083
20
20
1
1
3
3
2.436
2.436
0.021
0.021
top bars
top bars-lapping
10
14
2.938
2.858
1.350
0.615
0.012
6.917
stirrup
ton
40 grade =
1.541
60 grade =
5.375
ton
2
2
2
3
9.875
9.795
1.538
2.434
0.061
0.143
2
2
2
1.000
3.000
1.000
2.825
2.585
4.700
2.434
2.434
2.434
0.014
0.038
0.023
2
2
3.000
58.000
4.460
1.350
2.434
0.615
0.065
0.096
2
2
2.000
3.000
4.500
4.420
1.538
2.434
0.000
0.028
0.065
3.100
stirrup
B23 (Gridline E)
1.975
1.350
top bars
top bars-lapping
FB24 (Gridline C)
19.225
2.600
2.300
1.350
top bars
FB25 (Gridline 8)
9.175
9.135
2.650
2.370
4.625
1.300
FB26 (Gridline 1)
2.370
4.625
4.375
1.300
FB27 (Gridline E)
Total =
Summary of rebar for 2nd FLOOR BEAM
Rebar calculation for STAIR ROOF BEAM
Beam SRB 1=02 nos. G.line-6&7.
17 of 30
4.000
1.627
2.434
0.032
26.000
1.350
0.615
0.043
10mm stirrup
2.000
4.500
1.538
0.014
1
1
3
26
4.420
1.250
1.538
0.615
0.020
0.020
ton
40 grade =
0.159
60 grade =
0.501
a (str)
a (ckd)
10
10
1
1
15
14
22.625
0.615
0.615
0.209
23.225
0.200
a lapping (top)
10
23
0.300
0.615
0.004
a lapping (bot)
a (str)
10
10
1
1
21
14
0.375
16.938
0.615
0.615
0.005
a (ckd)
10
13
17.458
0.615
0.146
0.140
a (str)-lapping
a (ckd)-lapping
10
10
1
1
21
20
0.300
0.615
0.615
0.004
0.005
6.100
6.380
0.615
0.090
0.078
Total =
Summary of rebar for STAIR ROOF BEAM
2.30.3
0.000
0.661
0.375
10
10
10
4
1
5
6
22.625
0.615
0.615
10
23.225
0.615
0.071
a lapping (top)
10
0.300
0.615
0.002
a lapping (bot)
b (str, gridline 6-7)
10
10
1
1
8
5
0.615
0.615
0.002
0.052
10
10
1
1
4
8
0.375
16.925
17.265
0.615
0.615
b (ckd)-lapping
b (str, line 2 to 6)
10
10
1
4
6
5
0.042
0.001
0.001
b (ckd, line 2 to 6)
10
0.300
0.375
8.375
8.635
2.200
3.451
10
46
10
10
10
2
1
3
44
58
44
c (gridline 6/D-E)
c (gridline B, line 6-7)
10
10
1
1
44
20
1.350
10
10
10
1
4
1
20
20
20
2.550
2.275
1.550
1.550
10
10
10
10
5
4
1
9
9
11
10
10
10
1
1
1
17
28
7
10
13
10
10
10
1
1
1
12
17
16
10
22
10
10
10
1
1
1
34
34
12
10
10
10
10
2
1
1
4
4
4
f - gridline 7-8/A-B
f - gridline 1-2/D-E
f - gridline 7-8/D-E
3.451
2.200
2.700
2.450
3.400
3.450
1.350
1.350
3.450
6.025
6.305
3.925
4.205
2.438
2.488
2.437
2.487
0.615
0.615
0.083
0.615
0.103
0.085
0.615
0.249
0.615
0.615
0.615
0.187
0.615
0.615
0.037
0.615
0.615
0.615
0.615
0.615
0.615
0.615
0.615
0.615
1.615
0.615
0.615
0.615
0.615
0.615
0.615
1.615
0.615
0.123
0.179
0.033
0.031
0.121
0.042
0.034
0.043
0.034
0.023
0.014
0.023
0.039
0.048
0.047
0.041
0.041
0.033
0.052
0.134
0.018
0.615
0.111
0.615
0.615
0.615
0.111
0.001
0.001
18 of 30
10
10
6.100
0.615
10
10
6.100
0.615
0.113
10
7.225
0.615
0.036
10
7.225
0.615
0.036
10
10
1
1
5
5
6.020
0.615
0.615
0.019
0.019
10
10
1
18
9
8
3.880
0.615
0.615
0.021
0.344
1
1
9
8
16.938
0.615
0.615
0.094
0.083
0.083
22.625
22.625
0.615
0.615
0.070
0.615
0.001
17
2.400
2.400
0.615
0.025
2.400
0.615
0.012
17
0.300
0.615
0.003
11
0.375
0.615
0.003
3
3
8
8
8.400
0.615
0.615
0.124
0.124
1
1
7
8
0.615
0.615
0.041
0.047
1
1
8
6
2.450
0.615
0.615
0.020
0.009
6.020
3.880
16.938
8.400
9.500
9.500
4.120
0.113
10
25
4.138
0.615
0.064
h (tbot)-gridline 6-8
10
25
4.038
0.615
0.062
10
10
10
2
12
12
0.600
0.615
0.615
10
24
0.044
0.015
0.071
4.867
10
10
1
1
14
21
a(ckd)
a(ckd)-lapping
g (bot) at grid A
10
10
10
1
1
1
13
20
4
g (top) at grid A
g (bot) at grid B
10
10
1
1
3
6
22.825
g (top) at grid B
b str at grid B-D
b str at grid B-D-lapping
10
10
10
1
2
2
6
4
6
22.825
10
10
2
2
3
5
b str
b str -lapping
b( ckd)
10
10
10
2
2
2
2
3
1
b( ckd)-lapping
g (bot)
g (bot)-lapping
10
10
10
2
2
2
2
4
6
g (top)
g (top)-lapping
10
10
2
2
4
6
g (bot)
g (bot)-lapping
g (top)
10
10
10
2
2
2
4
6
4
g (top)-lapping
grid DE a str
10
10
2
1
6
13
grid DE a str-lapping
grid DE a ckd
grid DE a ckd-lapping
10
10
10
1
1
1
20
12
18
g at grid D bot
g at grid D bot-lapping
10
10
1
1
6
9
g at grid D-top
g at grid D-top-lapping
g at grid E bot
10
10
10
1
1
1
6
9
4
Miscellaneous
1.000
0.800
0.615
Total =
Rebar calculation for 1ST FLOOR SLAB
a(str)
a(str)-lappinng
22.625
0.300
23.265
0.375
22.625
22.625
22.625
0.300
23.265
0.375
18.425
0.300
19.025
0.375
22.625
0.300
22.825
0.375
18.425
0.300
18.625
0.375
22.625
0.300
23.265
0.375
22.625
0.300
22.825
0.375
22.625
0.615
0.615
0.195
0.004
0.615
0.615
0.615
0.186
0.005
0.056
0.615
0.615
0.042
0.083
0.615
0.615
0.615
0.084
0.111
0.002
0.615
0.615
0.086
0.002
0.615
0.615
0.615
0.045
0.001
0.023
0.615
0.615
0.615
0.001
0.111
0.002
0.615
0.615
0.112
0.003
0.615
0.615
0.615
0.091
0.002
0.092
0.615
0.615
0.003
0.181
0.615
0.615
0.615
0.004
0.172
0.004
0.615
0.615
0.083
0.002
0.615
0.615
0.615
0.084
0.002
0.056
19 of 30
g at grid E bot-lapping
10
0.300
0.615
0.001
g at grid E-top
10
22.825
0.615
0.056
g at grid E-top-lapping
10
0.375
0.615
0.001
10
2.438
0.615
0.048
10
10
3
1
30
8
2.438
0.615
0.615
0.135
0.012
10
10
3
1
32
7
3.438
0.615
0.615
0.203
0.009
10
10
5
4
12
12
1.350
0.615
0.615
0.050
0.046
1.350
6.063
0.615
0.020
0.615
0.063
6.063
2.638
0.615
0.119
0.615
0.039
0.036
2.438
2.175
1.550
d grid C (jali)
10
12
h at grid DE(6-8)-top
10
17
h at grid DE(6-8)-bot
10
16
h at stair side-top
10
24
h at stair side-bot
10
24
2.438
0.615
10
22.625
0.615
0.111
10
23.225
0.615
0.114
10
10
2
2
2
1
18.425
0.615
0.615
0.045
0.023
b lapping top
b lapping bot
10
10
1
1
18
15
0.615
0.615
0.004
0.003
g (1-7) bot
g (1-7) top
10
10
2
2
4
4
0.615
0.615
0.012
0.011
g bot
10
2.265
18.500
0.615
0.091
g top
10
18.700
0.615
0.092
lapping-bot (B-D)
10
12
0.615
0.002
lapping-top
10
12
0.615
0.003
10
10
1
1
12
13
0.300
0.375
16.938
0.615
0.615
0.125
0.140
a, bot lapping
a, top lapping
10
10
1
1
20
18
0.615
0.615
0.005
0.003
10
10
10
1
1
1
4
4
6
0.615
0.615
0.615
0.056
0.056
0.063
g top, grid E,
g, lapping, bot
g, lapping, top
10
10
10
1
1
1
6
15
15
0.615
0.615
0.615
0.063
0.003
0.003
10
10
4
4
5
4
21.325
0.615
0.615
0.262
0.215
b, str, lapping
b, ckd, lapping
g, bot, grid A-E, line 2-6
10
10
10
4
4
4
8
6
8
0.300
0.615
0.615
0.615
0.006
0.006
0.420
10
10
4
4
8
6
0.615
0.615
0.424
0.004
b, ckd, lapping
b, str, grid A-D, line 6-7
b, ckd, grid A-D, line 6-7
10
10
10
4
1
1
6
5
4
0.615
0.615
0.615
0.006
0.047
0.039
10
10
10
1
1
1
8
8
12
0.615
0.615
0.615
0.075
0.076
0.002
g, ckd, lapping
g, bot, 4-corners, line 1-2 & 7-8
10
10
1
4
12
7
0.615
0.615
0.003
0.164
10
10
10
4
14
3
7
12
12
0.615
0.615
0.615
0.167
0.062
0.022
5.796
10
10
1
1
14
13
0.615
0.615
0.195
0.187
main str
main ckd
10
10
2
2
14
13
0.615
0.615
0.005
0.006
lapping bot
lapping top
10
10
10
1
1
1
13
12
13
0.615
0.615
0.615
0.135
0.130
0.002
main str
main ckd
lapping bot
19.025
0.375
0.300
2.465
17.458
0.375
0.300
22.625
22.825
16.938
17.138
0.300
0.375
21.845
0.375
21.325
21.525
0.300
0.375
15.225
15.665
15.225
15.425
0.300
0.375
9.500
9.700
0.600
1.000
Total =
Rebar calculation for 2ND FLOOR SLAB
Rebar(a) - gridline A to B/1 to 8
G.line - D to E/1 to 6
22.625
23.345
0.300
0.375
16.938
17.558
0.300
20 of 30
10
12
0.375
0.615
10
22.625
10
18.500
10
10
2
2
4
1
23.345
10
10
2
2
12
10
0.300
10
10
10
10
10
10
0.003
lapping top
0.615
0.111
main str
0.615
0.046
main str
0.615
0.615
0.115
0.024
main ckd
main ckd
0.615
0.615
0.004
0.005
lapping bot
lapping top
0.615
0.000
0.000
20.725
0.615
0.255
main str
0.615
0.210
main ckd
10
21.345
0.300
0.615
0.007
lapping bot
0.375
0.615
0.007
lapping top
17.425
0.615
0.054
main str
10
17.795
0.615
0.044
main ckd
10
10
1
1
4
5
0.375
0.615
0.615
0.001
0.001
lapping top
lapping bot
10
10
1
1
5
6
0.615
0.615
0.029
0.036
main str
main ckd
10
0.011
11
1.000
1.000
0.615
10
0.615
0.014
10
0.375
0.615
0.001
10
0.615
0.008
10
0.900
0.900
0.615
0.010
10
0.126
top binder
1
2
9
9
22.845
22.625
0.615
10
10
0.615
0.615
0.125
0.004
bot binder
lapping top
10
10
10
2
2
2
9
4
4
0.615
0.615
0.615
0.003
0.112
0.111
lapping bot
top binder
bot binder
10
10
10
2
2
1
4
4
24
0.615
0.615
0.615
0.092
0.091
0.006
top binder
bot binder
lapping top
10
10
1
1
24
10
0.615
0.615
0.004
0.106
lapping bot
top binder
10
10
10
1
1
1
10
10
10
0.615
0.615
0.615
0.104
0.002
0.002
bot binder
lapping top
lapping bot
G.line-D to E / 7 to 8
G.line - 6 to 8 with stair
10
10
1
1
6
9
0.615
0.615
0.015
0.035
G.line - D to E canti / 7 to 8
10
10
10
1
1
1
10
17
18
0.615
0.615
0.615
0.037
0.027
0.027
bot binder
top binder
bot binder
10
10
4
4
4
6
0.615
0.615
0.206
0.306
top binder
bot binder
10
10
4
4
16
12
0.615
0.615
0.015
0.009
lapping top
lapping bot
10
10
10
2
1
1
4
6
8
0.615
0.615
0.615
0.086
0.064
0.002
top binder
bot binder
lapping top
10
10
1
2
6
7
0.615
0.615
0.001
0.082
lapping bot
top binder
10
10
10
2
1
1
8
7
8
0.615
0.615
0.615
0.093
0.041
0.047
bot binder
10 mm top bin
10 mm bott bin
10
10
2
2
2
3
0.615
0.615
0.006
0.009
10 mm top bin
10 mm bott bin
10
10
1
1
3
3
0.615
0.615
0.005
0.004
10 mm top bin
10 mm bott bin
Rebar (b)
G.line-B to C & C to D/1 to 8
19.220
0.375
Rebar (b)
G.line -A to E/2 to 6 = 04 panel
0.300
9.500
9.690
G.line- D to E/1 to 6
0.375
0.300
22.845
22.625
18.645
18.425
0.375
0.300
17.158
16.938
0.375
0.300
4.150
6.263
6.063
2.616
2.437
G.line - A to D / 6 to 7
20.945
20.725
0.375
0.300
17.495
17.425
0.375
0.300
9.560
9.500
9.560
9.500
2.498
2.437
2.498
2.437
Rebar (c)
21 of 30
G.line - 3 gap A to E
10
140
2.200
0.615
0.189
ext top
G.line - 4 / A to E
10
140
2.200
0.615
0.189
ext top
G.line - 5 / A to E
10
144
2.200
0.615
0.195
ext top
G.line - 6 / A to D
10
96
2.200
0.615
0.130
ext top
G.line - 6 / D to E
G.line - B / 1 to 8
10
10
46
132
1.385
3.100
0.615
0.615
0.039
0.252
ext top
ext top
G.line - D / 1 to 6
G.line - C / 2 to 7
10
10
1
1
94
100
3.100
2.700
0.615
0.615
0.179
0.166
ext top
ext top
Rebar (f)
G.line - A to B canti & E to D canti / 1 to 2
10
30
2.437
0.615
0.000
0.090
ext bot
G.line - A to B canti / 7 to 8
10
30
2.437
0.615
0.045
ext bot
G.line - D canti / 7 to 8
10
2.437
0.615
0.012
ext bot
G.line - A / 1 to 2 & 7 to 8
10
2.305
0.615
0.023
ext top
G.line - A / 2 to 7
10
11
1.350
0.615
0.046
ext top
G.line - E / 1 to 2
10
2.305
0.615
0.011
ext top
G.line - E / 2 to 6
10
11
1.550
0.615
0.042
ext top
G.line E 7 to 8
G.line - A to B canti & E to D canti / 1 to 2
10
10
1
2
5
31
2.455
3.488
0.615
0.615
0.008
0.133
ext top
ext top
G.line - A to B canti / 7 to 8
G.line - D canti / 7 to 8
10
10
1
1
31
8
3.488
3.488
0.615
0.615
0.066
0.017
ext top
ext top
G.line - D canti / 7 to 8
G.line - 2 & 7 arch portion
10
10
1
2
5
12
4.495
1.350
0.615
0.615
0.014
0.020
ext top
ext top
10
12
16
0.650
0.615
0.077
10
0.650
0.615
0.003
ext
Duct ( 03 nos)
10
18
0.850
0.615
0.028
Sky light
10
0.900
0.615
0.035
10
0.300
0.615
0.001
5.673
15
4.000
0.615
0.037
10mm main st
1
1
1
14
5
4
4.160
4.000
4.160
0.615
0.615
0.615
0.036
0.012
0.010
1
1
2
7
6
4
10.125
10.465
10.265
0.615
0.615
0.615
0.044
0.039
0.051
10mm main st
10mm main ck
10mm top bin
2
1
3
4
10.125
4.060
0.615
0.615
0.037
0.010
1
1
1
4
13
14
4.000
4.06
4.000
0.615
0.615
0.615
0.010
0.032
0.034
Rebar -c (gridline D)
G.line -E.
1
1
39
39
2.500
2.630
0.615
0.615
0.060
0.063
2
1
2
66
26
3
1.250
1.150
1.100
0.615
0.615
0.615
0.101
0.018
0.004
1
1
2
60
7
7
1.750
4.6
0.450
0.615
0.615
0.615
0.065
0.020
0.004
Rebar (d)
Total =
Rebar Calculation for STAIR ROOF SLAB
Rebar -a (gridline 6/7 & D/E)
Rebar -b (gridline 6/7 & D/cantiliver)
Rebar-b (gridline 6/7 & D-cantiliver/E cantiliver)
2.30.4
Total =
in cornice, arch, railing, louver, parapet, window sill/post etc.
Rebar calcualtion for ARCH COLUMN (1st & 2nd floor)
12mm Main (V)
12mm Main (V)
10mm Stimup
10mm Stimup
0.687
12
12
26
26
6
4
3.400
3.200
0.890
0.890
0.472
0.296
10
10
26
26
16
16
0.670
0.570
0.615
0.615
0.171
0.146
Total =
Summary of rebar for ARCH COLUMN
40 grade =
Rebar calcualtion for ARCH BEAM (1st & 2nd Floor)
1.085
0.32
60 grade =
0.77
10mm Stimup
10mm Drop panel
10
10
2
8
94
6
0.710
1.050
0.615
0.615
0.082
0.031
10
10
10
8
8
8
6
6
3
0.550
0.425
0.325
0.615
0.615
0.615
0.016
0.013
0.005
22 of 30
10mm Binder
10
3.200
0.615
0.016
10
0.350
0.615
0.003
10
0.250
0.615
0.002
10
0.160
0.615
0.002
10
10
8
8
2
2
0.650
0.350
0.615
0.615
0.006
0.003
10
10
8
1
2
118
0.200
0.710
0.615
0.615
0.002
0.052
10
10
5
5
6
6
1.050
0.550
0.615
0.615
0.019
0.010
10
0.425
0.615
0.008
10
0.325
0.615
0.006
10mm Binder
10
3.200
0.615
0.010
10
0.350
0.615
0.002
10
0.250
0.615
0.002
10
0.160
0.615
0.001
10
0.650
0.615
0.004
10
10
5
5
2
2
0.350
0.200
0.615
0.615
0.002
0.001
16 mm H. bar
16
1.480
1.537
0.298
0.055
12 mm beam (M)
12 mm Capping (Top)
12
12
2
4
6
3
14.275
0.700
0.890
0.890
0.152
0.007
12 mm Capping (Bott.)
12
0.525
0.890
0.006
16 mm H. bar
16
1.480
1.537
0.036
12 mm beam (M)
12
17.950
0.890
0.096
12 mm Capping (Top)
12
0.700
0.890
0.004
12 mm Capping (Bott.)
12
0.525
0.890
0.003
0.359
40 grade =
0.30
60 grade =
0.36
10
10
1
1
98.000
6.000
1.560
14.420
0.615
0.615
0.094
0.053
10mm ver
10mm binder
10
10
10
1
1
1
6.000
26.000
5.000
0.300
1.360
3.775
0.615
0.615
0.615
0.001
0.022
0.012
10mm lapping
10mm ver
10mm bin
10
10
2
9
5.000
22.000
0.450
1.360
0.615
0.615
0.003
0.166
10mm lapping
10mm ver
10
10
10
9
9
1
6.000
6
209.000
3.250
0.487
1.360
0.615
0.615
0.615
0.108
0.016
0.175
10mm bin
10mm lapping
1st flight R. side
10
10
1
1
36.000
25.000
1.360
1.360
0.615
0.615
0.030
0.021
Landing R. side
2nd flight R. side
10
10
10
1
5
4
143.000
31.000
31.000
1.560
1.360
1.560
0.615
0.615
0.615
0.137
0.130
0.119
10
10
10
1
1
1
6.000
6.000
6
20.595
0.300
3.495
0.615
0.615
0.615
0.076
0.001
0.013
Lapping
Landing
10
10
1
9
6
6
16.770
3.050
0.615
0.615
0.062
0.101
10
10
10
9
2
2
6
80
31
2.000
0.550
0.550
0.615
0.615
0.615
0.066
0.054
0.021
10
10
2
2
2
2
10.05
3.900
0.615
0.615
0.025
0.010
10
0.300
0.615
0.001
1.516
gridline D
10
10
4
4
4
22
3.350
0.600
0.615
0.615
0.033
0.032
gridline E
10
10
4
4
4
15
2.212
0.600
0.615
0.615
0.022
0.022
Sub Total =
Total =
Summary of rebar for ARCH BEAM
Rebar calculation for RAILING
1st floor railing re-bar
Corridor side,
Total =
G.line A (5 panel)
G. Line A
23 of 30
10
3.350
0.615
0.041
10
2.212
0.615
0.027
10
2.212
0.615
0.022
10
10
4
2
4
4
3.350
3.093
0.615
0.615
0.033
0.015
10
10
2
3
4
4
2.262
1.525
0.615
0.615
0.011
0.011
10
10
5
5
22
15
0.600
0.600
0.615
0.615
0.041
0.028
10
15
0.600
0.615
0.022
10
22
0.600
0.615
0.032
10
20
0.600
0.615
0.015
10
15
0.600
0.615
0.011
10
10
0.500
0.615
0.009
Total =
0.319
gridlne A
10
10
4.000
3.350
0.615
0.041
Ring
Gride line E (40 grade)
10
10
5
4
4.000
4.000
2.212
0.615
0.615
0.027
0.000
Main
Ring
10
10
4
4
4.000
15.000
2.212
0.600
0.615
0.615
0.022
0.022
Gride line A
10
4.000
3.35
0.615
0.041
Gride line B
10
4.000
2.212
0.615
0.027
Gride line D
10
4.000
2.212
0.615
0.022
Gride line E
10
4.000
3.35
0.615
0.033
10
10
2
2
4.000
4.000
3.093
2.262
0.615
0.615
0.015
0.011
Ring, A
10
10
3
5
4.000
22.000
1.525
0.600
0.615
0.615
0.011
0.041
Ring, B
Ring, D
Ring, E
10
10
10
5
4
4
15.000
15.000
22.000
0.600
0.600
0.600
0.615
0.615
0.615
0.028
0.022
0.032
10
10
10
2
2
3
20.000
15.000
10.000
0.600
0.600
0.500
0.615
0.615
0.615
0.015
0.011
0.009
Total =
0.431
1
1
10
960
7
7
1.425
96.427
0.3
0.615
0.615
0.615
Total =
0.841
0.415
0.013
lapping
1.269
28
77
28
6
6
10
1.865
1.865
0.65
0.890
0.890
0.615
0.279
0.767
0.112
10
77
10
0.65
0.615
0.308
1.465
ton
40 grade =
10
10
1
1
45
3
1.385
5.800
0.615
0.615
0.038
0.011
Gride-2
Binder
10
10
1
1
45
3
1.010
5.800
0.615
0.615
0.028
0.011
Gride-4
Binder
Main
10
10
10
1
2
1
37
3
45
0.500
5.800
0.975
0.615
0.615
0.615
0.011
0.021
0.027
10
23
0.650
0.615
0.074
10
10
10
1
1
1
7
7
7
0.500
0.500
0.500
0.615
0.615
0.615
0.002
0.002
0.002
Total =
Summary of rebar for LOUVER
2.30.5
0.42
60 grade =
1.05
24 of 30
10
0.500
0.615
0.002
10
15
0.500
0.615
0.005
12
3.350
0.890
0.095
12
1.100
0.890
0.004
12 mm Toillet (female)
12
12
1
1
4
4
1.100
0.950
0.890
0.890
0.004
0.003
12
12
1
1
4
4
1.000
2.250
0.890
0.890
0.004
0.008
12 mm Toillet (female)
12 mm G. store door
12 mm Toillet (male )
Total =
Summary of rebar for 1ST SLAB FALSE SLAB, LINTEL, H/W 40 grade =
0.205
0.09
60 grade =
0.12
10
23
0.650
0.615
0.074
10
13
1.385
0.615
0.022
10
36
0.735
0.615
0.033
10
38
0.500
0.615
0.023
10
38
0.500
0.615
0.012
10
45
1.385
0.615
0.038
10
10
1
4
27
14
1.385
0.750
0.615
0.615
0.023
0.026
10
10
2
1
14
14
0.750
0.750
0.615
0.615
0.013
0.006
10
10
2
2
12
9
0.750
0.750
0.615
0.615
0.011
0.008
10
0.750
0.615
0.004
10
5.800
0.615
0.021
10
5.800
0.615
0.043
10
5.800
0.615
0.021
10
10
3
3
1
1
5.800
4.250
0.615
0.615
0.011
0.008
10
45
0.975
0.615
0.081
0.478
12mm D, E (4-panel)
12mm G. Line-2 (2 Side)
12mm G. Line-4 (2 Side)
12
12
12
8
2
2
4
4
4
3.35
1.875
5.600
0.890
0.890
0.890
0.095
0.013
0.040
12
12
12
2
1
1
4
4
4
5.600
3.375
0.375
0.890
0.890
0.890
0.040
0.012
0.001
12mm HW 2
12mm HW 3, 3a
12
12
4
2
4
4
2.300
2.175
0.890
0.890
0.033
0.015
12mm HW 4
12mm HW 5
12mm HW 6
12
12
12
1
2
2
4
4
4
2.212
1.850
1.420
0.890
0.890
0.890
0.008
0.013
0.010
12
1.439
0.890
0.005
Ring HW5
Ring HW 2
Ring HW 3.3a
10
10
10
2
3
2
12
14
14
0.750
0.750
0.750
0.615
0.615
0.615
0.011
0.019
0.013
Ring HW 4
Ring HW 6
Ring HW 6
10
10
10
1
1
1
14
9
9
0.750
0.750
0.750
0.615
0.615
0.615
0.006
0.004
0.004
Ring HW 6
Lintel & Sunsed
10
10
1
4
9
7
0.750
0.750
0.615
0.615
0.004
0.013
12
12
1
1
4
4
5.600
5.600
0.890
0.890
0.075
0.020
0.020
12
12
1
2
4
4
5.600
1.850
0.890
0.890
0.020
0.013
12mm bar HW 2
12mm bar HW 3.3a
12mm bar HW 4
12
12
12
3
2
1
4
4
4
2.300
2.175
2.212
0.890
0.890
0.890
0.025
0.015
0.008
12mm bar HW 6
12mm bar HW 6
12
12
1
1
4
4
1.438
1.469
0.890
0.890
0.005
0.005
12mm bar HW 6
12mm bar lintel & sunsed
12
12
1
4
4
4
1.420
1.056
0.890
0.890
0.005
0.015
12mm HW 6
Sub-Total =
0.286
Sub-Total =
25 of 30
Sub-Total =
0.151
0.55
60 grade =
0.44
16
16
1
1
16
16
4.300
1.700
1.538
1.538
0.106
0.042
main bar
ext bot
16
16
1
1
16
16
5.080
2.450
1.538
1.538
0.125
0.060
main bar
ext top
12
16
1
1
16
16
2.450
3.150
0.890
1.538
0.035
0.078
ext top
main (landing)
16
16
2.450
1.538
0.060
main (landing)
16
0.800
1.538
0.010
ext
10
3.150
0.615
0.015
binder landing
10
3.900
0.615
0.012
binder landing
10
3.150
0.615
0.012
binder landing-bot
10
3.900
0.615
0.012
binder landing-bot
10
74
1.520
0.615
0.069
binder
16
16
1
1
16
16
6.000
3.150
1.538
1.538
0.148
0.078
main bar
top
16
12
1
1
16
16
5.700
2.000
1.538
0.890
0.140
0.028
16
10
1
1
16
56
2.250
1.520
1.538
0.615
0.055
0.052
ext top
binder
12
16
6.500
0.890
0.093
main bar
12
16
1.400
0.890
0.020
ext top
12
16
4.400
0.890
0.063
top to main
12
16
3.000
0.890
0.043
landing bot
12
12
1
2
16
4
3.650
0.900
0.890
0.890
0.052
0.006
landing top
ext top
10
10
1
1
31
12
1.520
3.150
0.615
0.615
0.029
0.023
binder
binder
10
12
12
1
1
1
7
16
16
3.900
6.000
3.350
0.615
0.890
0.890
0.017
0.085
0.048
binder
main bar
ext bot
12
12
12
1
1
1
16
16
16
1.400
3.100
4.800
0.890
0.890
0.890
0.020
0.044
0.068
ext top
main bar with slab
main bar with slab
10
12
1
1
26
16
1.520
6.500
0.615
0.890
0.024
0.093
binder
main bar
12
12
12
1
1
1
16
16
16
1.400
4.400
3.000
0.890
0.890
0.890
0.020
0.063
0.043
ext top
top to main
landing bot
12
12
1
2
16
4
3.650
0.900
0.890
0.890
0.052
0.006
landing top
ext top
10
10
10
1
1
1
31
12
7
1.520
3.150
3.900
0.615
0.615
0.615
0.029
0.023
0.017
binder
binder
binder
12
12
12
1
1
1
16
16
16
6.000
3.350
1.400
0.890
0.890
0.890
0.085
0.048
0.020
main bar
ext bot
ext top
12
12
1
1
16
16
3.100
4.800
0.890
0.890
0.044
0.068
10
26
1.520
0.615
0.024
2.408
binder
ton
40 grade =
0.31
60 grade =
2.10
12
20.705
0.890
0.129
str
12
12
12
1
1
1
6
6
7
21.205
0.700
0.525
0.890
0.890
0.890
0.113
0.004
0.003
ckd
lapping top
lapping bot
12
12
1
3
7
7
1.050
2.625
0.890
0.890
0.007
0.049
ext top
ext top
12
12
12
1
1
1
7
7
5
3.470
7.100
1.870
0.890
0.890
0.890
0.022
0.044
0.008
landing
landing
landing (near column)
2nd Flight
3rd Flight
4th Flight
5th Flight
6th Flight
Total =
26 of 30
2nd Flight
10
135
1.620
0.615
0.135
binder
10
19
3.475
0.615
0.041
landing binder
12
17.900
0.890
0.112
str
12
18.300
0.890
0.098
ckd
12
12
1
1
6
7
0.700
0.525
0.890
0.890
0.004
0.003
lapping top
lapping bot
12
12
1
1
7
7
3.370
7.100
0.890
0.890
0.021
0.044
12
12
2
1
7
7
2.625
2.350
0.890
0.890
0.033
0.015
10
109
1.620
0.615
0.109
binder
Total =
Summary of rebar for RAMP
2.30.7
0.992
ton
40 grade =
0.28
60 grade =
0.71
10
10
25
3.400
0.615
0.105
34
3.400
0.615
0.142
10
17
4.700
0.615
0.098
binder
10
10
2
2
34
19
0.300
0.615
0.615
0.013
0.079
10
10
2
2
26
17
0.615
0.615
0.109
0.079
lapping
inner wall-outer side
inner wall-inner side
10
10
2
2
34
38
0.013
0.123
10
2.638
5.000
0.615
0.615
0.615
0.055
lapping
bot-main bar
bot - binder
10
17
2.338
0.615
0.049
top-main bar
10
0.615
0.046
10
26
0.615
0.058
10
10
2
2
34
8
4.700
1.800
1.800
0.615
0.615
0.075
0.023
top - binder
outer
inner
10
10
2
2
4
6
0.615
0.615
0.009
0.013
Long Wall
10
10
10
2
2
2
7
10
10
0.615
0.615
0.615
0.015
0.058
0.055
Middle Wall
10
10
10
2
2
2
40
20
7
0.615
0.615
0.615
0.015
0.029
0.020
Bottom Slab
Total =
3.400
3.400
3.785
0.300
2.338
1.738
1.800
1.800
4.700
4.500
0.300
1.175
2.338
binder
binder - outer
binder - outer
outer (above door)
inner (above door)
binder - outer
binder - inner
lapping
main
binder
1.281
40 Grade
6.376
4.467
60 Grade
16.205
15.918
17.023
0.306
2.102
1.909
1.281
1.700
ton
ton
1.059
33.062
35.284
27 of 30
#REF!
Item Description
Concealed point wiring
Light/ Exhaust fan point
Fan point
2 pin 5amps Socket point
Unit
each
each
each
4.2
4.2.1
4.2.2
4.3
Normal submain
pump connection
PVC CONDUIT
Minimum
4.3.1
dia
water
inner
Cumulative
Quanity
Remarks
95
25
14
1
1
1
95
25
14
meter
115.00
115.00
meter
90
90.00
meter
meter
20mm&
4.3.2
inner
and
No. of
Mbrs
Quanity
dia
40mm&
9
4.5.1
4.6.1
4.6.2.1
4.6.3.1
Providing
3-pin
15/16A
each
combined switch socket
each
Fan clamp
each
Ceiling Fan
each
250mm Exhaust fan plastic body
7
33
28
1
1
1
1
1
7
33
28
1
4.7.1
40
40
4.7.2
4.7.3
58
4
1
1
58
4
4.8.1
11/13/14/15w,
lamp
4.10
4.10.1
4.10.2
4.10.3
4.10.4
4.10.4.1
Engery
each
100
110
24
1
1
110.00
24.0
0
Rm
Set
6.6m
Lightning
4.10.4.2 earthing
4.10.5
28
saving
protection Set
IPC-14
Z1-061, PK-08
#REF!
Item Description
Supplying fitting fixing long pan
Unit
Each
3.13
3.14
rm
rm
3.15
3.16
3.17
3.19.2
3.19.4
3.21.2
3.22
3.22.2
3.24
3.24.1
3.25
3.25.1
29
Each
No. of
Mbrs
1
Cumulative
Quanity
7
45
44.85
1
1
45
44.85
89.1
17.8
4
20
8
45
7
7
1
1
1
1
1
1
1
1
89.1
17.8
4
20
8
45
7
7
Quanity
7
Variation item
0.9
0.900
-
1.00
0.7
0.700
IPC-14
Remarks
Z1-061, PK-08
#REF!
30
Item Description
Unit
5.1.1
rm
5.1.2
No. of
Mbrs
Quanity
Cumulative
Quanity
Remarks
307.83
307.833
each
2.000
5.2
1.000
5.3
1.00
1.000
5.4
Construction of platform
each
5.5
1.00
IPC-14
1.000
Z1-061, PK-08