Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Details of Measurement (Preliminaries)

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 30

FAEL KHAIR PROGRAM

Construction of School cum Cyclone Shelter


Contract No: BD1-0033 (Package-14)
Contractor-MBPL

IPC No. 09
Shelter ID: Z4-896
Al-Helal Academy
Duration: 8th August 2016-19th November 2016

DETAILS OF MEASUREMENT (PRELIMINARIES)


Item No. Item Description

Unit

BOQ
Quantity

Revised
Quantity

Previous
IPC

Quantity to
Date

1.5

Provide all required pnsurance policies

L. S

0.08

0.08

0.08

0.08

1.6.1

Construction of site office

each

1.00

1.00

1.00

1.00

1.6.2

Office furnishings including office


furniture as per specification and
consumable etc.

each

1.00

1.00

1.00

1.00

1.6.3

Operation and maintenance of site office each/month

18.00

18.00

14.00

18.00

1.7

Project profile signboards

each

1.00

1.00

0.50

0.50

1.9

Progress photographs

month

18.00

18.00

7.00

1.10

Mobilization and clearing site before


commencing and demobilization after
completion

each

1.00

1.00

0.50

Remarks

from January 2015 - June 2016

11.00 from January 2016 - November 2016

0.50

IPC No. 09
Shelter ID: Z4-896
Al Helal Academy
Duration: 8th August 2016 - 19th November
2016

Fael KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Mahabub Brothers (Pvt.) Ltd.
SUMMARY SHEET for BILL NO-2 (CIVIL WORK)

This IPC Previous IPC


Unit

BOQ
Quantity

Previous
IPC

Quantity to
Date

Lay out and marking for earthwork

sqm

573.00

574.00

574.00

Earthwork in excavation

cum

144.00

84.00

84.00

2.1.3

Pumping and bailing out of water

LS

1.00

2.5

Earth filling in foundation trances

2.6.1

Site development/improvement by carted/dredged

2.6.2

Sand filling in plinth ramp area and entre stair ( Fm 0.8)

A-1.2

B/W, soling, mass conc, poly. Sheet

2.8

Item No.

Item Description

A-1.1

Excavation, Palisading, Filling, Site Development and Turfing

2.1.1
2.1.2

Remarks

#REF!

117
120
111

cum

685.00

310.50

310.50

115

One layer brick flat soling

sqm

491.00

320.81

320.81

122

2.9

Mass/Plain cement concrete

cum

9.50

7.17

7.17

108

2.10

Double layer of polythene sheet

sqm

618.00

321.00

321.00

110

A-1.3

Pile Work

2.11.1.1

Boring CIS pile: 500mm dia.- depth up to 20m

rm

1660.00

1660.00

1,660.00

120

2.11.1.2

Boring CIS pile: 500 mm dia.- depth >20m up to 30m

rm

747.00

747.00

747.00

142

2.12

Cast -in-situ pile with Class I concrete

cum

461.79

461.79

461.79

112

2.13

Point welding

61171.00

61171.00

61,171.00

1420

2.14

Welded splice

rm

747.00

498.00

498.00

2.17.1

40 grade ribbed or deformed bar

ton

9.50

9.18

#REF!

2.17.2

60 grade ribbed or deformed bar

ton

39.20

38.55

#REF!

2.18

Breaking head of piles

cum

10.60

10.59

10.59

2.19.1

Static load test (Cast-in-situ pile)

per test

1.00

1.00

1.00

2.20

Integrity test

per test

1.00

1.00

1.00

A-1.4

Reinforced Cement Concrete (RCC) Works


1.71

1.71

83.00

82.27

82.27

125

118

per point

2.21.1

Individual and continuous footing

cum

2.21.3

In Pile cap

cum

2.21.4

Bracing beam etc. below PL.

cum

11.00

10.43

10.43

2.21.5

Grade beam at plinth level

cum

24.00

30.00

30.00

2.21.6

Ground floor slab at PL

cum

49.00

30.53

30.53

2.21.7

Staircase slab, steps & ramp below PL

cum

10.00

1.60

1.60

2.21.8

Ramp Wall & Railing

cum

2.22.1

Pedestals, column, column capitals etc. below PL

cum

40 grade ribbed or deformed bar

ton

13.00
7.50

12.60
4.40

12.60

2.23.1
2.23.2

60 grade ribbed or deformed bar

ton

14.10

12.79

12.79

A-1.5

B/W, Paving Brick, Plaster, Patent Stone

2.24

250mm brick work

cum

11.00

15.00

15.00

2.26.1

38mm artificial patent stone in ground floor at PL

A-2

Super Structure (Above PL)

A-2.1

Reinforced Cement Concrete (RCC) Works

2.29.1(a)

Pedestal,column,column capitals - in ground floor

cum

40.00

41.04

41.04

(b)

in 1st floor

cum

25.00

25.65

25.65

(c)

in 2nd floor

cum

25.00

25.65

25.65

(d)

on roof

cum

3.00

2.34

2.34

2.30.1(a)

Tie beam and lintels - in ground floor

cum

(b)

in first floor

cum

(c)

in 2nd floor

cum

2.30.2(a)

T-beam, L-Beam & Rectangular beams etc. - in ground floor

cum

38.00

25.06

25.07

(b)

in first floor

cum

28.00

27.77

27.77

(c)

in 2nd floor

cum

28.00

25.36

25.63

(d)

on roof

cum

3.00

2.69

2.71

2.30.3(a)

In Floor and Roof slab - in ground floor

cum

63.00

51.37

51.37

(b)

in 1st floor

cum

in 2nd floor

cum

66.00
71.00

65.42
68.52

65.42

(c)
(d)

on roof slab

cum

6.00

5.94

5.90

2.30.4(a)

Concrete (cornice, railing, drop wall, louver, parapet, window sill, fins) - in GF

cum

7.77

(b)

in first floor

cum

9.88

(c)

in 2nd floor

cum

9.78

(d)

on roof

cum

0.18

2.30.5(a)

Concrete (sunshade,false ceiling) - in GF

cum

(b)

in 1st floor

cum

(c)

in 2nd floor

cum

2.30.6(a)

Staircase slab,steps,ramp etc - in ground floor

cum

21.00

24.95

17.97

(b)

in 1st floor

cum

6.00

4.63

5.46

(c)

in 2nd floor

cum

6.00

5.46

5.46

2.30.7.2

In water Tank-bottom slab

cum

11.00

4.50

4.50

2.30.7.3

in wall

cum

14.00

9.25

9.25

2.30.9

Filled Chamfer

rm

730.00

702.60

703.75

2.30.10

Groove on plaster 25x8mm for Fair Face

rm

2.31.1

40 grade ribbed or deformed bar

ton

42.00

34.89

38.25

2.31.2

60 grade ribbed or deformed bar

ton

46.50

35.91

38.57

A-2.2

B/W, facing bricks, fancy screen block work

2.32.1

B/W (250 mm)-in ground floor

cum

2.32.2

B/W (250 mm)-in 1st floor

cum

28.00

23.66

34.12

2.32.3

B/W (250 mm)-in 2nd floor

cum

4.40

2.75
5.15

68.12

1.13
2.51

48.12

30.62

141.74

2.35.1

B/W(125 mm)-in GF

sqm

2.35.2

B/W (125 mm)-in 1st floor

sqm

2.35.3

B/W (125 mm) -in 2nd floor

sqm

2.35.4

On roof

sqm

27.82

2.36.2

12 mm cement sand plaster - first floor

sqm

101.55

2.36.3

12mm cement sand plaster - second floor

sqm

127.15

A-2.3

Cement Plaster & Pre-cast ventilator

2.39.2

6 mm thick plaster-in 1st floor

sqm

547.00

2.39.3

6 mm thick plaster-in 2nd floor

sqm

1310.00

A-4

Miscellaneous works

2.63.2

Dismantling existing semi-pucca/kacha structure

sqm

489.00

759.47

559.47

2.65

Temporary school accommodation

sqm

105.00

105.00

105.00

48.00

26.16

72.38
143.16

462.18

485.78
541.82

Fael KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Mahabub Brothers (Pvt.) Ltd.

IPC No. 09
Shelter ID: Z4-896
Al Helal Academy
Duration: 8th August 2016 -19th November 2016

DETAILS OF MEASUREMENT (CIVIL WORK)


Item No. Item Description

Unit

A-1.1
2.1.1
2.1.2

sqm
cum

Excvn, Palisading, Filling, Site Dev., Turfing


Lay out and marking for earthwork
Earth work in excavation

No. of
Members
1
31
7
83
4

2.1.3
2.6.1
2.6.2

Total=
Pumping and bailing out of water
Site development (FM = 0.20)
Sand filling in plinth, ramp area & entry stair ( FM = 0.80)

2.7.1

Clay lining

2.7.2
A-1.2
2.8

Creating turf
Brickwork, Soling /Mass concrete/ Polythine sheet
One layer brick flat soling

Length
Cumulative
Width (m) Height (m)
(m)
Quantity
24.625

23.325

574.38

1.000
1.000
0.500

0.618
0.618
0.618

47.90
21.24
-10.07
15.73
74.79

0.950

460.44
-30.00
-10.43
-12.60
-15.00
-5.48
386.94

442.39
(-) deduction for grade beam
(-) deduction for bracing beam
(-) deduction for pedestal column
(-) deduction for brickwork
(-) deduction for ramp portion

96.43
0.00
65.87
62.98
79.47
0.00
0.00
16.88
0.00
321.62

grid A-B (GF panel slab)


grid A-B (GF panel slab)
Grid B-C (GF panel slab)
Grid C-D (GF panel slab)
Grid D-E (GF panel slab)
Grid D-E (GF panel slab)
Grid B-D-1-2 -7-8) (GF panel slab)
cattle ramp (grid A-B-7-8))
entry stair

LS

cum

22.675

21.375

5
0
5
5
4
0
0
1
0

5.800
5.800
3.962
3.788
5.975
5.975
7.875
9.575
3.875

3.325
1.763
3.325
3.325
3.325
1.762
1.763
1.763
3.762

31

2.500

1.000

0.075

5.81

4.910

1.000

0.075

2.58

PC3

-1.22

(-) deduction for pile

sqm

Total =
Mass Concrete

cum

83

0.500

0.075

Total=
2.10

Double Layer polythene sheet

7.17
321.62
109.70
24.90
456.21

Pile Work
Boring for CIS pile (500mm dia) depth up to 20m
Depth exceeding 20 m and not exceeding 30 m
Cast-in-situ pile concreting
Point welding
Welded splice
Breaking of pile head
Static Load test (CIS pile)
Integrity test (CIS pile)
RCC Work
Individual and continuous footing
In pile Cap
PC2
PC3

rm
rm
cum
per point
rm
cum
per test
per set

83
83
83
83
83
83
1
1

20.000
9.000
28.350
737.000
6.000
1.00

0.500

0.500

0.650

cum
cum

Bracing Beam

Qty. same as BFS


for pile cap
for stair area

1660.00
747.00
461.79
61171.00
498.00
10.59
1.00
1.00
1.71

31
7
83

2.500
4.910
1.000

1.000
1.000
0.500

0.750
0.750
0.100

58.13
25.78
-1.63
82.27

3
1
1
1
4
2

19.276
14.875
4.838
1.6158
5.45
7.45

0.300
0.300
0.300
0.300
0.300
0.300

0.300
0.300
0.300
0.300
0.300
0.300

5.20
1.34
0.44
0.15
1.96
1.34

Total=
2.21.4

PC2

sqm

Total=
A-1.3
2.11.1.1
2.11.1.2
2.12
2.13
2.14
2.18
2.19.1
2.20
A-1.4
2.21.1
2.21.3

PL=6.90, AGL=5.70, EGL=5.493


PC2
PC3
(-) dedution for pile
in entry stair, cattle ramp etc.

2.500
4.910
1.000
3.875

Total =

2.9

Remarks

(-) deduction for pile

cum

4 of 30

Total=
2.21.5

Ground Floor Beam at Plinth (Grade Beam)

10.43
cum
3
1
1
2
4
4

19.276
17.6158
14.875
18.350
18.350
5.450

0.300
0.300
0.300
0.300
0.300
0.300

0.450
0.450
0.450
0.450
0.450
0.450

7.81
2.38
2.01
4.95
9.91
2.94
30.00

5
2
5
5
0
4
0

5.800
5.800
3.962
3.813
8.075
5.950
5.950

3.325
1.763
3.325
3.325
1.763
3.325
1.763

0.100
0.100
0.100
0.100
0.100
0.100
0.100

9.64
2.05
6.59
6.34
0.00
7.91
0.00
32.53

gridline A-B
gridline A-B-1-2
gridline B-C
gridline C-D
gridline B-D-1-2 & gridline B-D-7-8
gridline D-E
gridline D-E-1-2 & gridline D-E-7-8

9.450

2.013

0.100

1.90

cattle ramp

38

0.650

0.425

1.200

12.60

Total=
2.21.6

Ground Floor Slab at Plinth

cum

Total=
2.21.7

Staircas slab & steps, ramp below plinth level

2.21.8
2.22.1
A-1.5
2.24
2.25
2.26.1
A-2.1
2.29.1
2.29.1(a)
2.29.1(b)
2.29.1(c)
2.29.1(d)
2.30.1
2.30.1(a)
2.30.1(b)

Ramp wall & railing


Pedestals, column, column capitals (below PL)
B/W, Paving Brick, Plaster, Patent Stone
250mm brick work
125mm brick work
38mm artificial patent stone in ground floor at PL
RCC Work (Superstructure above Plinth)
Pedestals, column, column capital etc.
In ground floor
In first floor
In 2nd floor
on Roof
Tie beams & lintes
in ground floor
in 1st floor
Lintel (6)
Lintel (4)
Lintel (2)
HW 5
HW 2
HW 3, 3a
HW 4
HW 6

cum

15.00

cum
cum
cum
cum

38
38
38
4

0.600
0.600
0.600
0.600

0.375
0.375
0.375
0.375

4.800
3.000
3.000
2.600

41.04
25.65
25.65
2.34

1
1
1
2
3
2
1
1
1
1
4
4

5.500
5.500
5.500
1.825
2.275
2.150
1.937
1.175
1.369
1.225
0.250
1.106

0.250
0.125
0.125
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.150
0.100

0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
1.106
0.450

4
4
1
1
1
1
1

3.250
3.250
1.150
1.150
1.000
1.050
2.287

0.200
0.200
0.125
0.125
0.125
0.125
0.125

0.150
0.150
0.150
0.150
0.150
0.150
0.150

0.21
0.10
0.10
0.14
0.26
0.16
0.07
0.04
0.05
0.05
0.17
0.20
1.55
0.39
0.39
0.02
0.02
0.02
0.02
0.04
0.90
4.90

4
4
2
2
4
1
1
3
1
1
4
2
1
2
2

3.250
3.250
1.825
5.500
5.500
5.500
5.500
5.500
4.225
3.350
2.275
2.150
1.937
1.825
1.225

0.200
0.200
0.125
0.125
0.450
0.125
0.250
0.450
0.450
0.250
0.250
0.250
0.250
0.250
0.250

0.150
0.150
0.150
0.150
0.100
0.150
0.150
0.100
0.100
0.150
0.150
0.150
0.150
0.150
0.150

cum

gridline D
gridline E
Store
Toilet (female)
General store
Toilet (male)
Total =
2.30.1(c) in 2nd floor

cum
G.line D (4 panel)
G.line E (4 panel)
G.line 2 (2 Side)
G.line 4 (2 Side)
G.line 4 (2 Side)
G.line 6 (2 Side)
G.line 6 (2 Side)
G.line 6 (2 Side)
G.line 8
G.line 8
HW 2
HW 3, 3a
HW 4
HW 5
HW 6

0.39
0.39
0.07
0.21
0.99
0.10
0.21
0.74
0.19
0.13
0.34
0.16
0.07
0.14
0.09

5 of 30

1.175

0.250

0.150

0.04
4.26

3
4
4
3
3
1
1
2
4
1
3
1
1
1
1
1
1
1
9
8
3

19.626
5.500
0.400
7.200
0.400
7.775
0.400
18.550
0.400
14.688
7.775
3.025
1.688
14.125
1.838
13.000
5.500
3.250
1.600
0.250
0.375

0.300
0.300
0.375
0.300
0.375
0.300
0.375
0.300
0.375
0.300
0.300
0.300
0.300
0.225
0.300
0.250
0.300
0.300
0.375
0.160
0.075

0.350
0.350
0.500
0.350
0.500
0.350
0.500
0.350
0.500
0.350
0.350
0.350
0.350
0.300
0.225
0.200
0.350
0.250
0.300
0.200
0.200

6.18
2.31
0.30
2.27
0.23
0.82
0.08
3.90
0.30
1.54
2.45
0.32
0.18
0.95
0.12
0.65
0.58
0.24
1.62
0.06
-0.02
25.07

1
3
6
12
1
2
1
1
2
1
1
18
7

3.775
19.625
18.550
0.400
14.688
7.775
29.250
15.125
7.775
1.688
3.250
0.250
0.375

0.300
0.300
0.300
0.375
0.300
0.300
0.250
0.300
0.300
0.300
0.300
0.160
0.075

0.500
0.350
0.350
0.500
0.350
0.350
0.200
0.350
0.350
0.350
0.300
0.200
0.200

0.57
6.18
11.69
0.90
1.54
1.63
1.46
1.59
1.63
0.18
0.29
0.14
-0.04
27.77

3
6
12
1
1
2
2
1
1

19.624
18.550
0.400
14.688
15.125
7.775
7.775
1.688
3.250

0.300
0.300
0.375
0.300
0.300
0.300
0.300
0.300
0.300

0.350
0.350
0.500
0.350
0.350
0.350
0.350
0.350
0.300

6.18
11.69
0.90
1.54
1.59
1.63
1.63
0.18
0.29
25.63

Total =
2.30.1(d) on Roof
Tee beam, L-beam & rectangular beam
2.30.2
2.30.2(a) In Ground Floor Beam
B1
B2
B2 (outer)
B3
B3 (outer)
B3 (a)
B3 (a)-outer
B5
B5 (outer)
B6
B7
B8
B9
B10
B10(a)
B11
B12
Stair Beam (ground floor)
Ramp Beam
Downward projection for arch beam

cum

Total=

(-) deduct for B11

2.30.2(b) In 1st Floor Beam


B4
B13
B14
B14 (outer)
B15
B16
B17
B18
B19
B20
Stair Beam (1st Floor)
Downward projection for arch beam
Total=

(-) deduct for B14

2.30.2(c) In 2nd Floor Beam


B21
B22
B22 (outer)
B23
B24
B25
B26
B27
Stair beam (2nd floor)
Total=
2.30.2(d) on Roof
Pent house roof

2
2
1

8.175
3.250
3.250

0.300
0.300
0.300

0.350
0.350
0.300

Total=
2.30.3
In Floor & Roof Slab
2.30.3(a) In Ground Floor Slab
Gross area
North side
Cantiliver part (north-west side)
Cantiliver part (north-east side)
Cantiliver part (south-west side)
Cantiliver part (south-east side0
Columns

1.72
0.68
0.29
2.69

SRB-1
SRB-2
SRB-3

cum
1
4
1
1
1
1
1
1
1
1
1
5
25

22.625
3.250
2.435
2.435
2.435
2.435
0.300
5.650
14.200
3.375
5.500
3.250
0.600

20.725
0.300
0.525
0.525
1.125
1.125
0.075
2.435
6.225
2.137
3.250
0.300
0.375

0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150

70.34
0.59
0.19
0.19
0.41
0.41
0.00
-2.06
-13.26
-1.08
-2.68
-0.73
-0.84

near ramp (west side)


ramp
void (east side)
stair area
north side
column

6 of 30

3
1
1

0.375
0.412
0.412

0.300
0.375
0.375

0.150
0.150
0.150

Total=
2.30.3(b) In 1st Floor Slab

column
column
column

51.37
cum

Gross area
4-corner

1
4
2
1
8
2
28

22.625
2.435
3.375
5.800
0.375
0.413
0.600

20.725
0.825
2.137
3.250
0.300
0.375
0.375

0.150
0.150
0.150
0.150
0.150
0.150
0.150

70.34
1.21
-2.16
-2.83
-0.14
-0.05
-0.95
65.42

2-corner
(-) dedcution at grid C (2 sides)
(-) dedcution for stair portion
(-) dedcution for column portion
(-) dedcution for column portion
(-) dedcution for column portion

1
2
2
1
8
4
38

22.625
0.188
2.138
6.625
0.750
0.900
0.600

22.375
0.375
3.375
3.250
0.750
0.900
0.375

0.150
0.150
0.150
0.150
0.150
0.150
0.150

75.94
0.02
-2.16
-3.23
-0.68
-0.49
-1.28

overall area
for column area
(-) for void area
(-) for stair area
(-) for skylight
(-) for opening
(-) for column

Total =
2.30.3(c) In 2nd Floor Slab

cum

Total =
2.30.3(d) on Roof

68.12
cum
1
4

10.125
0.600

4.000
0.375

0.150
0.150

Total =
2.30.4

-0.05
-0.02
-0.02

6.08
-0.14

overall area
for column area

5.94

in cornice railing, drop wall, louver, fins, parapet, window


sill & frames etc

2.30.4(a) in ground floor


2.30.4(b) in 1st floor
window sill

cum

4
2
2
2

3.250
2.187
2.187
0.250

0.125
0.125
0.125
0.125

0.200
0.200
0.200
0.125

28
8
8
1
1
8

0.200
0.200
0.150
14.125
14.125
0.435

0.150
0.160
0.160
0.200
0.100
0.770

1.350
2.320
2.320
0.180
0.150
0.150

5
5
4
4
2
2
3

3.250
2.187
2.187
3.250
3.143
2.312
1.500

0.125
0.125
0.125
0.125
0.125
0.125
0.125

0.200
0.200
0.200
0.200
0.200
0.200
0.150

77
8
8
1
1
8
10
10
1
1
10

0.200
0.200
0.150
14.125
14.125
0.435
0.200
0.150
17.750
17.750
0.435

0.150
0.160
0.160
0.200
0.100
0.770
0.160
0.160
0.200
0.100
0.770

1.350
2.320
2.320
0.180
0.150
0.150
2.320
2.320
0.180
0.150
0.150

1
1
1
1
8
2

95.750
95.750
95.750
27.850
3.600
4.000

0.100
0.125
0.063
0.100
0.150
0.100

Total =
Louver
acrh column

cum

arch beam

Total =

0.325
0.109
0.109
0.008
0.552
1.134
0.594
0.445
0.509
0.212
0.402
2.16

Gride line E
Gride line D
4 to 6

0.41
0.27
0.22
0.33
0.16
0.12
0.08
1.17
3.12
0.594
0.445
0.509
0.212
0.402
0.742
0.557
0.639
0.266
0.502
4.87

Gride line A
Gride line B
Gride line D
Gride line E

8.14
1.20
0.30
0.70
1.30
0.20

parapet wall
parapet wall
parapet wall
pent house railing
upstrand of sky light:
upstrand of water reservoir

2.30.4(c) in 2nd floor


Window sill

cum

Head master room

Total =
Louver
acrh column

cum

arch beam

acrh column

cum

arch beam

Total =
(d)

on roof
cum

0.850
0.100
0.050
0.250
0.300
0.250

Total =
2.30.5
in sunshade, false ceiling etc.
2.30.5(b) Sunshade & False Ceiling-1st floor

11.83
4

5.500

0.450

0.100

0.99

False slab

7 of 30

2.30.5(c) Sunshade & False Ceiling-2nd floor


2.30.6
Concrete (staircase slab,steps,ramp)
2.30.6(a) In Ground Floor
1st Flight

cum

2nd Flight

1
1
1
1
2
1
7.5
1
1
1
6.5
1

2.704
1.600
1.831
3.250
0.400
3.250
1.600
1.831
1.600
2.122
1.600
2.500

1.600
1.500
1.600
1.750
0.375
0.750
0.250
1.600
1.500
1.600
0.250
1.600

0.250
0.250
0.250
0.250
0.250
0.175
0.150
0.250
0.250
0.250
0.150
0.200

1
1
1

18.318
14.288
3.575

1.700
1.700
2.388

0.150
0.150
0.225

1
1
2
1
4.5
1
1
4.5

2.704
3.250
0.400
3.250
1.600
2.704
3.250
1.600

1.600
1.750
0.375
0.750
0.250
1.600
2.500
0.250

0.200
0.200
0.200
0.150
0.150
0.200
0.200
0.150

1
1
2
1
4.5
1
1
4.5

2.704
3.250
0.400
3.250
1.600
2.704
3.250
1.600

1.600
1.750
0.375
0.750
0.250
1.600
2.500
0.250

0.200
0.200
0.200
0.150
0.150
0.200
0.200
0.150

2
4

4.800
0.600

2.438
0.375

0.200
0.200

2
2
4
4
2
1
1
4

4.200
3.325
4.200
2.038
2.038
0.525
0.125
0.200

1.650
1.650
0.650
1.000
0.875
0.350
0.350
0.125

0.200
0.200
0.200
0.200
0.125
0.200
0.200
0.225

Total =
Ramp

Total =
Total for Ground Floor (including ramp) =
3rd Flight

4th Flight

2.30.6(b)

Total for 1st Floor =


5th Flight

6th Flight

2.30.6(c)
2.30.7
In Water Tank
2.30.7.2 in bottom slab

Total for 2nd Floor =

Total =
2.30.7.3

in wall

Total =
2.30.8
2.30.9

Fair face finish


Filled Chamfer (Stilt-2)

4.68
-0.18
4.50
2.77
2.19
2.18
1.63
0.45
0.04
0.01
-0.02
9.25

waist slab-1st half


intermediate landing
waist slab-2nd half
main landing
landing (near column)
canopy
steps
waist slab-1st half
intermediate landing
waist slab-2nd half
steps
landing (on ground floor slab)
waist slab 1st flight
waist slab 2nd flight
landing

waist slab
landing
landing (near column)
canopy
steps
waist slab
landing (on 1st floor slab)
steps
waist slab
landing
landing (near column)
canopy
steps
waist slab
landing (on 2nd floor slab)
steps

(-) dedcution for column


long wall
stroe wall
water resrevoir wall
side wall
partition wall

(-) deduction

rm

(-) deduction

Total=
2.30.10
A-2.2

1.08
0.60
0.73
1.42
0.08
0.43
0.45
0.73
0.60
0.85
0.39
0.80
8.16
4.67
3.64
1.92
10.23
18.39
0.87
1.14
0.06
0.37
0.27
0.87
1.63
0.27
5.46
0.87
1.14
0.06
0.37
0.27
0.87
1.63
0.27
5.46

32
8
6
6
12
16
2
2
2
2
32
32
2
2
8
6

4.300
4.300
4.300
4.800
4.300
7.300
4.300
4.800
4.300
4.800
4.300
4.300
0.225
0.150
0.150
0.150

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

137.60
gridline A (1 to 8)
34.40
gridline B (1 to 2)
25.80
gridline B (3 to 5), inside
28.80
gridline B (3 to 5), outside
51.60
gridline B (6 to 8)
116.80
gridline C (2 to 5)
8.60
gridline C-6, inside
9.60
gridline C-6, outside
8.60
gridline C-7, inside
9.60
gridline C-7, outside
137.60
gridline D (1 to 8)
137.60
gridline E (1 to 8)
-0.45 in ramp 1st flight-gridline C-2 (oneside)
-0.30 in ramp 1st flight-gridline C-2 (otherside)
-1.20 in ramp 1st flight-gridline C-3-4-5-6
-0.90 in ramp 2nd flight-gridline C-3-4-5
703.75

25mm x 8mm Grove in plaster


B/W, facing bricks, fancy screen block work

8 of 30

2.32
2.32.2

250 mm brickwork
in 1st floor

2.32.3

in 2nd floor

cum

2
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2
1
2
1
1
1
1
1
1
1
1
1
1
1

0.275
2.425
0.275
2.425
3.675
1.825
1.688
3.350
3.350
2.150
2.275
1.174
0.500
5.000
0.725
0.275
2.425
0.275
2.425
3.675
1.825
2.275
5.500
5.500
3.350
2.150
2.025
2.187
0.375

0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.276
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250

0.630
0.630
0.630
0.630
2.500
1.950
1.950
1.950
0.550
1.950
1.950
1.950
1.950
1.950
1.950
0.630
0.630
0.630
0.630
2.500
1.950
1.950
2.100
2.500
2.500
1.950
1.950
1.950
1.950

cum

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

3.350
2.275
1.175
1.950
1.950
3.350
2.025
2.187
2.500
1.950
2.025
1.950
2.500
2.500
1.950
2.025
1.950
2.500
2.500

0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250

0.550
1.950
1.950
0.750
0.525
0.550
1.950
1.950
0.375
1.825
1.950
1.425
0.750
0.525
1.825
1.950
1.425
0.750
0.525

sqm

4
4
1
1

3.25
2.18
4.48
5.5

0.625
0.625
2.1
2.1

1.000
1.000
1.000
1.000

sqm

3
2
2
1
1
1
1
11
5
1
2
1

5.500
1.000
4.300
1.688
1.688
0.888
1.250
2.962
1.375
6.876
1.000
1.000

1.950
1.950
1.950
2.850
2.500
2.850
2.500
0.625
0.625
0.625
1.950
2.850

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

Total =

Total =
2.34
2.34.1
2.34.2
2.35
2.35.1
2.35.2

Fancy Screen Work


in 1st floor
in 2nd floor
125 mm brickwork
in GF
in 1st floor

2.35.3

in 2nd floor

Total=

0.09
0.38
0.09
0.38
2.30
0.89
0.82
1.63
0.46
1.05
1.11
0.57
0.24
2.69
0.35
0.09
0.38
0.09
0.38
2.30
0.89
1.11
2.89
3.44
2.09
1.05
0.99
1.07
0.18
29.99
0.46
1.11
0.57
0.37
0.26
0.46
0.99
1.07
0.23
0.89
0.99
0.69
0.47
0.33
0.89
0.99
0.69
0.47
0.33
12.25

8.13
5.45
9.41
11.55
34.53
32.18
3.90
16.77
4.81
4.22
2.53
3.13
20.36
4.30
4.30
-3.90
-2.85

gridline 8 (A to B)

gridline 8 (D to E)

gridline A-B-1
gridline B-C-1
gridline B-C-1-2

gridline D-E-1
gridline C-D-1
gridline C-1-2
gridline C-D-2

gridline E (2-6)
gridline E (2-6)
gridline 4 (D-E)
gridline 2 (D-E)

9 of 30

2.100

0.750

1.000

-1.58
88.16

sqm

1
6
2
1
1
1
1
1
1
1
2
4
4
3
1
1
1
1
1
1
1
1
1
1
1
1
1
5
1
5
1
2
2
4
2
1
2
2
1
2
1
4
4

20.215
5.500
5.500
20.215
20.215
4.100
3.775
3.250
3.025
3.775
4.100
3.250
3.025
3.775
3.775
2.275
4.100
4.100
2.575
2.275
2.575
4.100
4.100
4.100
4.100
4.100
2.575
3.025
1.688
3.250
1.687
2.275
2.025
3.775
3.775
5.500
1.688
5.500
5.500
1.687
1.688
3.250
3.250

5.500
1.050
0.350
0.350
0.350
3.280
0.350
0.650
0.350
1.050
3.315
0.650
0.350
1.050
0.350
0.650
3.380
3.250
1.837
0.350
1.838
3.280
3.315
3.315
3.380
3.250
1.837
0.650
0.650
0.350
0.650
0.350
0.650
1.050
0.350
1.838
0.350
0.350
1.837
0.350
0.650
0.650
0.350

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

sqm

1
2
1
1
1
4
1
1
1
1
3
1
1

5.500
5.500
5.500
5.500
5.500
3.250
5.500
5.500
5.500
5.500
5.500
5.500
4.100

3.280
3.315
3.380
3.250
1.837
0.350
0.350
1.050
0.350
0.650
1.050
0.350
3.280

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

111.183
34.650
3.850
7.075
7.075
13.448
1.321
2.113
1.059
3.964
27.183
8.450
4.235
11.891
1.321
1.479
13.858
13.325
4.730
0.796
4.733
13.448
13.592
13.592
13.858
13.325
4.730
9.831
1.097
5.688
1.097
1.593
2.633
15.855
2.643
10.109
1.182
3.850
10.104
1.181
1.097
8.450
4.550
431.24
18.040
36.465
18.590
17.875
10.104
4.550
1.925
5.775
1.925
3.575
17.325
1.925
13.448

Total=
2.35.4
2.36
2.36.1
2.36.2
2.36.3
2.36.4
2.37
2.38
2.38.1
2.38.2
2.38.3
2.38.4
2.39
2.39.1
2.39.2

on roof
12mm thick plaster
in ground floor
in 1st floor
in 2nd floor
on roof
12mm plsater with net cement finishing
Dado/skriting including marking groove
in ground floor
in 1st floor
in 2nd floor
on roof
6 mm thick plaster
in ground floor
in 1st floor

2.39.3

in 2nd floor

Total =

10 of 30

1
1
1
1
1
1
2
2
2
2
1
1
2
1
1
1
1
2
1
1
1
1
1
2
2
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =
2.39.4
2.40.2
2.42
2.42.1
2.42.2
2.42.3
2.43
2.44
2.44.2.1
2.44.2.2
2.45
2.45.2
2.45.3
2.46
2.46.2
2.46.3
2.46.4
A-2.5
2.47.1

4.100
4.100
4.100
5.500
5.500
5.500
3.250
3.025
3.250
3.025
3.775
3.775
3.775
3.775
3.250
3.025
4.100
4.100
4.100
4.100
5.500
5.500
5.500
3.025
3.250
3.775
3.775
3.025
3.250
3.025
3.250
3.775
3.775
3.775
5.500
3.250
3.250
5.500
5.500
3.250
3.250
5.500
5.500
5.500
3.250
3.250
5.500
5.500
5.500
3.250
3.250
5.500
5.500

3.315
3.380
3.250
0.350
1.000
0.650
0.650
0.650
0.650
0.650
0.350
1.000
0.350
0.650
0.650
0.650
3.280
3.315
3.380
3.250
0.350
1.000
0.650
0.350
0.350
0.350
0.650
0.350
0.350
0.350
0.350
0.350
1.000
0.350
3.280
0.650
0.350
0.350
3.315
0.650
0.350
0.475
0.650
3.315
0.650
0.350
0.650
0.350
3.380
0.650
0.350
0.350
0.400

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

13.592
13.858
13.325
1.925
5.500
3.575
4.225
3.933
4.225
3.933
1.321
3.775
2.643
2.454
2.113
1.966
13.448
27.183
13.858
13.325
1.925
5.500
3.575
2.118
2.275
1.321
2.454
1.059
1.138
2.118
2.275
1.321
3.775
1.321
18.040
2.113
1.138
1.925
18.233
2.113
1.138
2.613
3.575
18.233
2.113
1.138
3.575
1.925
18.590
2.113
1.138
1.925
2.200
437.70

on roof
Groove/drip course/nosing
Artificial patent stone
in ground floor
in 1st floor
in 2nd floor
Artificial patent stone (in Cattle area)
Screeding on roof
avg. 100 mm thick concrete
12 mm thick lime cement sand plaster
Glazed wall tiles
in 1st floor toilet
in 2nd floor toilet
Unglazed homogeneous floor tiles
in 1st floor toilet
in 2nd floor toilet
on roof for making S-mark
Metal work
Frame for double leaf door

11 of 30

2.47.3
2.48
2.49.1
2.49.3
2.50
2.51.1
2.51.2
2.51.3
2.52
2.53
2.54
A-2.6
2.55
2.56
2.57
2.58
2.59
A-3
2.60
2.61
2.62
2.62.1
A-4
2.63.2

Frame for grill door


Frame for single leaf door
Door shutter for single and double leaf
Grill door shutter
Steel glazed window shutter
Window grills
Grills over door and windows lintel
Security grill over railing
Collapsible gate
Pad lock
40mm dia GI ladder
Painting Work
Synthetic polyvinyl distemper
Plastic paint
Weather coat paint
Silicon based water repellent
Synthetic enamel paint
Notic board, Black board and Sign board
Notic board
Black board
Sign board
Marble name plate
Miscellaneous works
Dismantling of existing structure (semi pacca/kacha)

sqm
1
1
1
1
1
1
1
1
1

9.600
15.000
15.000
17.400
9.250
18.500
14.550
9.500
15.300

9.100
8.000
6.000
2.000
5.200
7.500
4.450
6.900
7.200

15.000

7.000

Total =
2.65
2.66
2.68
2.69
2.69.1
2.69.2

Temporary school accommodation


50mm dia GI pipe
Construction of toilet for temporary school
Door sill
125mm x 25mm
75mm x 25mm

sqm

87.36
120.00
90.00
34.80
48.10
138.75
64.75
65.55
110.16
759.47
105.00

12 of 30

DETAILS OF MEASUREMENT (REINFORCEMENT)


Item No. Item Description
2.29.1

Bar dia

No. of
No. of bars Length (m) Unit Wt Quantity
Members

Pedestals, column, column capital etc above PL


Rebar calculation for COLUMN (above Plinth Level)
C1

C2

C3

C1 (Pent house)

C2 (Pent house)

20

24

13.045

2.436

4.576

20
10

24
24

6
97

13.045
1.700

2.436
0.615

4.576
2.434

10
20

24
10

97
2

0.980
13.045

0.615
2.436

1.403
0.636

20

10

12.420

2.436

1.210

25

10

14.195

3.846

2.184

10

10

97

1.700

0.615

1.014

C2-stirrup

10

10

97

1.240

0.615

0.740

C2-stirrup

25

14.195

3.846

1.310

25

14.195

3.846

1.310

10

97

1.700

0.615

0.406

C3-stirrup

10
20

4
2

97
6

0.980
3.975

0.615
2.434

0.234
0.116

C3-stirrup

20
10

2
2

6
21

2.900
1.700

3.434
0.615

0.120
0.044

10
20

2
2

21
5

0.980
3.975

0.615
2.434

0.025
0.097

20

2.900

2.434

0.071

10

21

1.700

0.615

0.044

stirrups

10

21

1.240

0.615

0.032

stirrups

Total =
2.30.2

Remarks

Summary of rebar for COLUMN (above Plinth Level)


T-beam, L-beam and rectangular beams

C1-stirrup
C1-stirrup

stirrups
stirrups

22.580
ton

40 grade =

6.376

60 grade = 16.205

16
16
20

3
3
3

2
3
3

20
20
20

3
3
3

4
2
2

20
20

3
3

4
4

3.488

20
10

3
3

20
20
20
20
20
20
16
10

Rebar calculation for GROUND FLOOR BEAM


FB1 (Gridline A, B & D)
23.105
0.925

1.538
1.538
2.436

0.213
0.013
0.503

top bars
top bars-lapping

2.436
2.436
2.436

0.020
0.058
0.054

bot bars-lapping

2.375

2.436
2.436

0.102
0.069

8
161

1.975
1.350

2.436
0.615

0.115
0.401

4
4
4
4
4
4
4
4

2
3
1
3
1
3
2
42

7.580
7.430
2.640
2.440
3.040
2.840
6.450
1.350

2.436
2.436
2.436
2.436
2.436
2.436
1.538
0.615

0.148
0.217
0.026
0.071
0.030
0.083
0.079
0.139

top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line
ext bot
stirrup

20
20
20
20
20
20
16
10

3
3
3
3
3
3
3
3

2
3
1
3
1
3
2
58

9.290
9.215
3.040
2.840
2.540
2.340
6.700
1.350

2.436
2.436
2.436
2.436
2.436
2.436
1.538
0.615

0.136
0.202
0.022
0.062
0.019
0.051
0.062
0.144

top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line
ext bot
stirrup

20
20
20
20
20
20

1
1
1
1
1
1

2
3
1
3
1
1

9.290
9.215
3.040
2.840
2.840
2.640

2.436
2.436
2.436
2.436
2.436
2.436

0.045
0.067
0.007
0.021
0.007
0.006

top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line

22.955
0.675
4.000
3.688

bot bars
ext bot
ext top (both ends)
ext top (both ends)-2nd line
ext top (mid section)
ext top (mid section) -2nd line
stirrup

FB2 (Gridline 2, 3, 4 & 5)

FB3 (Gridline 3, 4 & 5)

FB3(a) (Gridline 2)

13 of 30

10

61

1.350

0.615

0.051

20

21.205

2.436

0.207

top bars

20
20

2
2

2
3

1.150

2.436
2.436

0.011
0.308

top bars-lapping
bot bars

20
20

2
2

4
1

2.436
2.436

0.017
0.015

bot bar- lapping

20
20

2
2

3
1

0.042
0.015

ext top (left)-2nd line

3.040

2.436
2.436

20

2.840

2.436

0.042

ext top (right)-2nd line

20

3.500

2.436

0.017

20
20

2
2

3
1

3.100

2.436
2.436

20
20

2
2

3
1

3.200

20
16

2
2

3
2

2.275

10

16
16

stirrup

FB5 (Gridline 6 & 7)

21.055
0.850
3.040
2.840

ext top (left)


ext top (right)

2.436
2.436

ext top (mid of grid D)


0.045 ext top (mid of grid D)-2nd line
0.018
ext top (mid of grid B)
0.047 ext top (mid of grid B)-2nd line
0.013
ext top (mid of grid C)

6.700

2.436
1.538

0.033 ext top (mid of grid C)-2nd line


0.041
ext bot

130

1.300

0.615

0.208

0.065

top bars

21.043
0.925

1.538

1.538

0.004

top bars-lapping

20

0.153

bot bars

20.893
0.675

2.436

20

2.436

0.005

20

3.678

2.436

0.009

bot bars-lapping
ext top (left)

20

3.478

2.436

0.017

20
20
20

1
1
1

1
2
3

1.615
1.415

2.436
2.436
2.436

0.004
0.007
0.017

20
10

1
1

6
102

20

20

20

20
20

3
3

2
1

20
10

3
3

2
53

20
20

1
1

3
3

10

25

20
20
10

1
1
1

3
3
13

2.918
2.768

16
16

1
1

2
3

16
16

1
1

2
2

15.080
0.925
14.930

16
16
16

1
1
1

1
1
3

10

96

16
16
10

1
1
1

3
2
14

2.718
2.568

16
16

1
1

2
3

16
16

1
1

2
2

17.700
0.925
17.580

10

88

3.600
2.675

stirrup

FB6 (Gridline E)

ext top (left)-2nd line


ext top (right)

1.350

2.436
0.615

ext top (right)-2nd line


extra top (mid section)
0.029 extra top (mid section)-2nd line
0.085
stirrup

9.155

2.436

0.134

9.055
2.040

2.436

0.199

2.436

0.015

1.840
4.600
4.400

2.436
2.436

0.027
0.034

2.436
0.615

0.064
0.127

2.436
2.436

0.074
0.073

0.615

0.021

2.436
2.436
0.615

0.021
0.020
0.011

top bars

1.538
1.538

0.046
0.004

top bars
top bars-lapping

1.538
1.538

0.046
0.002

1.538
1.538
1.538

0.002
0.002
0.011

bot bars
bot bars-lapping
ext top (left)

0.615

0.065

1.538
1.538
0.615

0.013
0.008
0.009

top bars

1.538
1.538

0.054
0.004

top bars
top bars-lapping

1.538
1.538

0.054
0.002

0.615

0.035

bot bars
bot bars-lapping
stirrup

2.375
1.975

FB7 (Gridline 1 & 8)

1.300

top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line
stirrup

FB8 (Gridline C)
10.105
9.955
1.350

top bars
bot bars
stirrup

FB9 (Gridline E)

1.350

bot bars
stirrup

FB10 (Between Gridline C-D)

0.675
1.290
1.290
2.300
1.100

ext top (right)


ext top (mid section)
stirrup

FB10(a) (Between Gridline C-D)

1.100

bot bars
stirrup

FB11 (Outerside of Gridline E)

0.675
0.650

14 of 30

FB12 (Gridline 1)
20

7.180

2.436

0.035

20

7.030

2.436

0.051

bot bars

20

2.040

2.436

0.005

ext top (Left)

20
20

1
1

2
2

1.840

2.436
2.436

0.009
0.010

ext top (left)-2nd line

20
10

1
1

2
34

1.840

2.436
0.615

0.009
0.028

2.040
1.350

Total =
Summary of rebar for GROUND FLOOR BEAM

top bars

ext top (right)


ext top right (2nd line)
stirrup

6.041
ton

40 grade =

1.35

60 grade =

4.70

20
16
20
20
20
20

1
1
1
1
1
1

2
3
1
3
1
3

5.200
5.050
1.765
1.565
1.990
1.790

2.436
1.538
2.436
2.436
2.436
2.436

0.025
0.023
0.004
0.011
0.005
0.013

10

26

1.350

0.615

0.022

16

0.213

3
3

3
3

23.105
0.925

1.538

16
20

0.013
0.503

20

22.955
0.675

1.538
2.436
2.436

0.020

20

4.000

2.436

0.058

ext bot

20

2.436

0.054

20

3.688
3.488

2.436

0.102

ext top (both ends)


ext top (both ends)-2nd line

20
20
10

3
3
3

4
8
136

2.375
1.975
1.350

2.436
2.436
0.615

0.069
0.115
0.339

ext top (mid section)


ext top (mid section) -2nd line
stirrup

20

21.205

2.436

0.620

20

2.436

0.034

20

1.150
21.055

2.436

0.923

top bars
top bars-lapping
bot bars

20
20

6
6

4
1

2.436
2.436

0.050
0.044

bot bar- lapping


ext top (left)

20
20

6
6

3
1

0.850
3.040
2.840

2.436
2.436

0.125
0.044

20
20
20

6
6
6

3
1
3

2.436
2.436
2.436

ext top (left)-2nd line


ext top (right)
ext top (right)-2nd line

20
20

6
6

1
3

2.436
2.436

0.125
0.051
ext top (mid of grid D)
0.136 ext top (mid of grid D)-2nd line
0.053
ext top (mid of grid B)
0.140 ext top (mid of grid B)-2nd line

20
20
16

6
6
6

1
3
2

2.436
2.436
1.538

0.039
ext top (mid of grid C)
0.100 ext top (mid of grid C)-2nd line
0.124
ext bot

10

130

0.615

0.624

16

1.538

0.065

top bars

16
20

1
1

3
3

1.538
2.436

0.004
0.153

20
20
20

1
1
1

3
1
2

2.436
2.436
2.436

0.005
0.009
0.017

top bars-lapping
bot bars
bot bars-lapping

20
20

1
1

1
2

2.436
2.436

0.004
0.007

20
20
10

1
1
1

3
6
102

2.436
2.436
0.615

0.017
0.029 extra top (mid section)-2nd line
0.085
stirrup

20

2.436

0.089

20
20
20

2
2
2

3
1
2

2.436
2.436
2.436

0.132
0.010
0.018

20

2.436

0.022

Rebar calculation for 1ST FLOOR BEAM


FB4 (Gridline 2)
top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line
stirrup

FB13 (Gridline A,B & D)


top bars
top bars-lapping
bot bars
bot bars-lapping

FB14 (Gridline 2,3,4,5,6 & 7)

3.040
2.840
3.500
3.100
3.600
3.200
2.675
2.275
6.700
1.300

stirrup

FB15 (Gridline E)
21.043
0.925
20.893
0.675
3.678
3.478
1.615
1.415
2.375
1.975
1.350

ext top (left)


ext top (left)-2nd line
ext top (right)
ext top (right)-2nd line
extra top (mid section)

FB16 (Gridline 8)
9.155
9.055
2.040
1.840
4.600

top bars
bot bars
ext top (left)
ext top (left)-2nd line
ext top (right)
15 of 30

20

4.400

2.436

0.043

ext top (right)-2nd line

10

53

1.300

0.615

0.085

stirrup

16

18.780

1.538

0.058

top bars

16
16

1
1

3
2

0.925

1.538
1.538

0.004
0.057

top bars-lapping

16
10

1
1

3
110

0.675
0.650

1.538
0.615

0.003
0.044

16

17.700

1.538

0.054

16

1.538

0.004

16

0.925
17.580

1.538

0.054

bot bars

16

1.538

0.002

bot bars-lapping

10

88

0.675
0.650

0.615

0.035

stirrup

16

19.205

1.538

0.059

16

0.925

1.538

0.004

top bars
top bars-lapping

20
20

1
1

3
3

19.055

2.436
2.436

0.139
0.005

bot bars
bot bars-lapping

20
20

1
1

2
4

2.436
2.436

0.008
0.014

ext top (both ends)


ext top (both ends)-2nd line

20
20

1
1

4
8

2.436
2.436

0.023
0.038

ext top (mid section)-2nd line

10

110

0.615

0.091

stirrup

20

2.436

0.089

20

2.436

0.132

top bars
bot bars

20
20

2
2

1
2

2.436
2.436

0.010
0.018

20
20

2
2

1
2

2.436
2.436

0.022
0.043

10

53

0.615

0.085

ext top (right)-2nd line


stirrup

20

2.436

0.021

top bars

20
10

1
1

3
13

0.020
0.011
6.765

bot bars

1.350

2.436
0.615

ton

40 grade =

1.42

60 grade =

5.35

20
16
12

7
7
7

4
3
2

2.775
2.067
1.825

2.434
1.538
0.890

0.189
0.067
0.023

20
16

1
1

4
6

3.775
2.067

2.434
1.538

0.037
0.019

12
10

1
9

2
15

3.475
1.312

2.434
0.615

0.017
0.109
0.460

ton

40 grade =

0.109

60 grade =

0.351

16

0.213

3
3

4
3

23.125
0.925

1.538

16
20

1.538
2.436

0.017
0.505

20
20
20

3
3
3

6
2
4

2.436
2.436
2.436

0.030
0.054
0.100

ext top (both ends)


ext top (both ends)-2nd line

20
20
10

3
3
3

4
8
158

2.436
2.436
0.615

0.069
0.115
0.394

ext top (mid section)


ext top (mid section) -2nd line
stirrup

20
20
20

6
6
6

2
4
3

2.436
2.436
2.436

0.661
0.067
0.989

top bars-lapping
bot bars

20
20

6
6

6
2

2.436
2.436

0.059
0.089

20

2.436

0.243

B17(A)-(Gridline A)

18.630

bot bars
bot bars-lapping
stirrup

B17(B)-(Gridline E)
top bars
top bars-lapping

FB18 (Gridline C)

0.675
1.615
1.415
2.375
1.975
1.35

ext top (mid section)

FB19 (Gridline 1)
9.155
9.055
2.040
1.840
4.600
4.400
1.300

ext top (left)


ext top (left)-2nd line
ext top (right)

FB20 (Grideline 8)
2.918
2.768

Total =
Summary of rebar for 1ST FLOOR BEAM
Rebar calculation for RAMP BEAM

Total =
Summary of rebar for RAMP BEAM

stirrup

landing beam

Rebar calculation for 2ND FLOOR BEAM


FB21 (Gridline A,B & D)

23.045
0.675
3.688
3.408
2.375
1.975
1.350

top bars
top bars-lapping
bot bars
bot bars-lapping

FB22 (Gridline 2,3,4,5,6 & 7)


22.625
1.150
22.545
0.675
3.050
2.770

top bars

bot bar- lapping

16 of 30

20

3.600

2.436

0.053

20

3.200

2.436

0.140

20

2.675

2.436

0.039

20

2.275

2.436

0.100

20
20

6
6

1
3

3.500

2.436
2.436

0.051
0.136

20
10

6
6

4
160

6.700
1.300

2.436
0.615

0.392
0.768

16

17.438

1.538

0.054

16

1.538

0.003

20

0.925
17.358

2.436

0.085

bot bars

20

2.436

0.006

bot bars-lapping

20

0.850
3.688

2.436

0.009

20

3.448

2.436

0.017

20

1.625

2.436

0.004

20

1.385

2.436

0.007

20
20

1
1

3
6

2.375

2.436
2.436

0.017
0.029

10

116

0.615

0.096

stirrup

16
16

1
1

2
3

1.538
1.538

0.059
0.004

top bars-lapping

20

0.925
19.145

2.436

0.140

bot bars

20

0.675

2.436

0.005

bot bars-lapping

20

0.009

2.436

0.015

ext top (both ends)


ext top (both ends)-2nd line

20
20

1
1

8
2

1.850
1.570
2.200

2.436

20

2.436
2.436

0.043
0.013

20
10

1
1

2
126

2.436
0.615

0.011
0.105

20
20

2
2

2
3

2.436
2.436

0.089
0.134

top bars
bot bars

20
20
20

2
2
2

1
2
1

2.436
2.436
2.436

0.013
0.023
0.023

ext top (left)-2nd line

20
10

2
2

2
53

4.375

2.436
0.615

0.043
0.085

ext top (right)-2nd line

20
20

2
2

2
3

2.436
2.436

0.089
0.134

20
20

2
2

1
3

9.175
9.135
2.650

2.436
2.436

0.013
0.035

top bars
bot bars
ext top (left)

20
20
10

2
2
2

1
3
52

2.436
2.436
0.615

0.023
0.064
0.083

ext top (right)-2nd line


stirrup

20
20

1
1

3
3

2.436
2.436

0.021
0.021

top bars
top bars-lapping

10

14

2.938
2.858
1.350

0.615

0.012
6.917

stirrup

ton

40 grade =

1.541

60 grade =

5.375

ton

2
2

2
3

9.875
9.795

1.538
2.434

0.061
0.143

16mm main st (T)


20mm main st (B)

2
2
2

1.000
3.000
1.000

2.825
2.585
4.700

2.434
2.434
2.434

0.014
0.038
0.023

20mm ext top E


20mm ext top E
20mm ext top D

2
2

3.000
58.000

4.460
1.350

2.434
0.615

0.065
0.096

20mm ext top D


10mm stirrup

2
2

2.000
3.000

4.500
4.420

1.538
2.434

0.000
0.028
0.065

16mm main st (T)


20mm main st (B)

3.100

stirrup

B23 (Gridline E)

1.975
1.350

top bars
top bars-lapping

FB24 (Gridline C)
19.225

2.600
2.300
1.350

top bars

ext top (mid section)


ext top (mid section)-2nd line
ext top (mid section)-2nd line
stirrup

FB25 (Gridline 8)
9.175
9.135
2.650
2.370
4.625
1.300

ext top (left)


ext top (right)
stirrup

FB26 (Gridline 1)

2.370
4.625
4.375
1.300

ext top (left)-2nd line


ext top (right)

FB27 (Gridline E)

Total =
Summary of rebar for 2nd FLOOR BEAM
Rebar calculation for STAIR ROOF BEAM
Beam SRB 1=02 nos. G.line-6&7.

Beam SRB 2=02 nos. G.line-D&E.

17 of 30

4.000

1.627

2.434

0.032

20mm ext top (E)

26.000

1.350

0.615

0.043

10mm stirrup

Beam SRB-3=01 nos.canti


1

2.000

4.500

1.538

0.014

16mm main st (T)

1
1

3
26

4.420
1.250

1.538
0.615

0.020
0.020

16mm main st (B)


10mm stirrup

ton

40 grade =

0.159

60 grade =

0.501

a (str)
a (ckd)

10
10

1
1

15
14

22.625

0.615
0.615

0.209

gridline A-B (E-W)

23.225

0.200

gridline A-B (E-W)

a lapping (top)

10

23

0.300

0.615

0.004

gridline A-B (E-W)

a lapping (bot)
a (str)

10
10

1
1

21
14

0.375
16.938

0.615
0.615

0.005

gridline A-B (E-W)


gridline D-E (E-W)

a (ckd)

10

13

17.458

0.615

0.146
0.140

a (str)-lapping
a (ckd)-lapping

10
10

1
1

21
20

0.300

0.615
0.615

0.004
0.005

6.100
6.380

0.615

0.090
0.078

Total =
Summary of rebar for STAIR ROOF BEAM
2.30.3

0.000

0.661

in Floor & Roof slabs


Rebar calculation for GROUND FLOOR SLAB
REBAR "a" 10mm @ 125mm c/c alt ckd

REBAR "b" 10mm @ 200mm c/c alt ckd


b (str, gridline A-B)

0.375

10

b ckd (gridline A-B)


b (str, gridline C-D)

10
10

4
1

5
6

22.625

0.615
0.615

b ckd (gridline C-D)

10

23.225

0.615

0.071

a lapping (top)

10

0.300

0.615

0.002

a lapping (bot)
b (str, gridline 6-7)

10
10

1
1

8
5

0.615
0.615

0.002
0.052

b (ckd, gridline 6-7)


b - lapping (str)

10
10

1
1

4
8

0.375
16.925
17.265

0.615
0.615

b (ckd)-lapping
b (str, line 2 to 6)

10
10

1
4

6
5

0.042
0.001
0.001

b (ckd, line 2 to 6)

10

REBAR "c" 2-10mm ext top in between ckd


c (line 3, 4, 5. 6/A-B)

0.300
0.375
8.375
8.635
2.200
3.451

10

46

c (line 1-2/A-B & D-E)


c (gridline 7-8/A-B)
c (gridline 3, 4 & 5/D-E)

10
10
10

2
1
3

44
58
44

c (gridline 6/D-E)
c (gridline B, line 6-7)

10
10

1
1

44
20

1.350

c (gridline C, line 6-7)


c (gridline D, line 2-6)
c (gridline D, line 6-7)

10
10
10

1
4
1

20
20
20

2.550

2.275
1.550
1.550

REBAR "d" 1-10mm ext top in between ckd


d (gridline A & E / line 1,2 & 7-8)

10

d (gridline A / line 2-7)


d (gridline E/ line 2-6)
d (gridline B-C, line 7-8)

10
10
10

5
4
1

9
9
11

d (gridline B-D, line void area)


d (gridline B-D, line 6)
d (gridline B-C/ line 1-2)

10
10
10

1
1
1

17
28
7

REBAR "e" 10mm @ 100mm c/c alt ckd


e (str, gridline B-C/6-7-8)

10

13

e (ckd, gridline B-C/6-7-8)


(e str, gridline B-C/6-7)
(e ckd, gridline B-C/6,7)

10
10
10

1
1
1

12
17
16

REBAR "f" 1-10mm ext top in between str


f - gridline 1-2/A-B

10

22

10
10
10

1
1
1

34
34
12

10

10
10
10

2
1
1

4
4
4

f - gridline 7-8/A-B
f - gridline 1-2/D-E
f - gridline 7-8/D-E

3.451
2.200
2.700
2.450
3.400

3.450
1.350
1.350
3.450
6.025
6.305
3.925
4.205
2.438
2.488
2.437
2.487

0.615
0.615

0.083

0.615

0.103
0.085

0.615

0.249

0.615
0.615
0.615

0.187

0.615
0.615

0.037

0.615
0.615
0.615
0.615
0.615
0.615
0.615
0.615
0.615
1.615
0.615
0.615
0.615
0.615
0.615
0.615
1.615
0.615

0.123
0.179
0.033
0.031
0.121
0.042
0.034
0.043
0.034
0.023
0.014
0.023
0.039
0.048
0.047
0.041
0.041
0.033
0.052
0.134
0.018

REBAR "g" 10mm @ 250mm at top & bot as binder


22.625
22.625
0.300
0.375

0.615

0.111

0.615
0.615
0.615

0.111
0.001
0.001
18 of 30

REBAR "h" 10mm @ 100mm at top & bot as binder


h (top)-gridline 6-8

10

10

6.100

0.615

10

10

6.100

0.615

0.113

10

7.225

0.615

0.036

10

7.225

0.615

0.036

10
10

1
1

5
5

6.020

0.615
0.615

0.019
0.019

10
10

1
18

9
8

3.880

0.615
0.615

0.021
0.344

1
1

9
8

16.938

0.615
0.615

0.094
0.083

0.083

22.625
22.625

0.615

0.615

0.070

0.615

0.001

17

2.400
2.400

0.615

0.025

2.400

0.615

0.012

17

0.300

0.615

0.003

11

0.375

0.615

0.003

3
3

8
8

8.400

0.615
0.615

0.124
0.124

1
1

7
8

0.615
0.615

0.041
0.047

1
1

8
6

2.450

0.615
0.615

0.020
0.009

6.020
3.880
16.938

8.400
9.500
9.500
4.120

0.113

10

25

4.138

0.615

0.064

h (tbot)-gridline 6-8

10

25

4.038

0.615

0.062

for floor punch


for duct

10
10

10
2

12
12

0.600

0.615
0.615

10

24

0.044
0.015
0.071
4.867

10
10

1
1

14
21

a(ckd)
a(ckd)-lapping
g (bot) at grid A

10
10
10

1
1
1

13
20
4

g (top) at grid A
g (bot) at grid B

10
10

1
1

3
6

22.825

g (top) at grid B
b str at grid B-D
b str at grid B-D-lapping

10
10
10

1
2
2

6
4
6

22.825

b ckd at grid B-D


b ckd at grid B-D-lapping

10
10

2
2

3
5

b str
b str -lapping
b( ckd)

10
10
10

2
2
2

2
3
1

b( ckd)-lapping
g (bot)
g (bot)-lapping

10
10
10

2
2
2

2
4
6

g (top)
g (top)-lapping

10
10

2
2

4
6

g (bot)
g (bot)-lapping
g (top)

10
10
10

2
2
2

4
6
4

g (top)-lapping
grid DE a str

10
10

2
1

6
13

grid DE a str-lapping
grid DE a ckd
grid DE a ckd-lapping

10
10
10

1
1
1

20
12
18

g at grid D bot
g at grid D bot-lapping

10
10

1
1

6
9

g at grid D-top
g at grid D-top-lapping
g at grid E bot

10
10
10

1
1
1

6
9
4

Miscellaneous

corner bar (top & bot)

1.000
0.800

0.615

Total =
Rebar calculation for 1ST FLOOR SLAB
a(str)
a(str)-lappinng

22.625
0.300
23.265
0.375
22.625
22.625
22.625
0.300
23.265
0.375
18.425
0.300
19.025
0.375
22.625
0.300
22.825
0.375
18.425
0.300
18.625
0.375
22.625
0.300
23.265
0.375
22.625
0.300
22.825
0.375
22.625

0.615
0.615

0.195
0.004

0.615
0.615
0.615

0.186
0.005
0.056

0.615
0.615

0.042
0.083

0.615
0.615
0.615

0.084
0.111
0.002

0.615
0.615

0.086
0.002

0.615
0.615
0.615

0.045
0.001
0.023

0.615
0.615
0.615

0.001
0.111
0.002

0.615
0.615

0.112
0.003

0.615
0.615
0.615

0.091
0.002
0.092

0.615
0.615

0.003
0.181

0.615
0.615
0.615

0.004
0.172
0.004

0.615
0.615

0.083
0.002

0.615
0.615
0.615

0.084
0.002
0.056
19 of 30

g at grid E bot-lapping

10

0.300

0.615

0.001

g at grid E-top

10

22.825

0.615

0.056

g at grid E-top-lapping

10

0.375

0.615

0.001

g at 4-corners (top & bot)

10

2.438

0.615

0.048

f at grid A-B, C-D, 1-2 & 2-3) cantiliver


f at grid 7-8 (D-2) cantiliver

10
10

3
1

30
8

2.438

0.615
0.615

0.135
0.012

d grid A-B (1-2 & 7-8) + D-E (7-8)


d grid A & D (line 1-2 & 7-8)

10
10

3
1

32
7

3.438

0.615
0.615

0.203
0.009

d grid A, line 2-7


d grid E (2-6)

10
10

5
4

12
12

1.350

0.615
0.615

0.050
0.046

1.350
6.063

0.615

0.020

0.615

0.063

6.063
2.638

0.615

0.119

0.615

0.039
0.036

2.438
2.175
1.550

d grid C (jali)

10

12

h at grid DE(6-8)-top

10

17

h at grid DE(6-8)-bot

10

16

h at stair side-top

10

24

h at stair side-bot

10

24

2.438

0.615

b grid B-D str

10

22.625

0.615

0.111

b grid B-D ckd

10

23.225

0.615

0.114

b grid B-D str-2-7


b grid B-D ckd-2-8

10
10

2
2

2
1

18.425

0.615
0.615

0.045
0.023

b lapping top
b lapping bot

10
10

1
1

18
15

0.615
0.615

0.004
0.003

g (1-7) bot
g (1-7) top

10
10

2
2

4
4

0.615
0.615

0.012
0.011

g bot

10

2.265
18.500

0.615

0.091

g top

10

18.700

0.615

0.092

lapping-bot (B-D)

10

12

0.615

0.002

lapping-top

10

12

0.615

0.003

a,str, grid D-E


a,ckd, grid D-E

10
10

1
1

12
13

0.300
0.375
16.938

0.615
0.615

0.125
0.140

a, bot lapping
a, top lapping

10
10

1
1

20
18

0.615
0.615

0.005
0.003

g, grid D, stair portion, bot


g, grid D, stair portion, top
g bot, grid E,

10
10
10

1
1
1

4
4
6

0.615
0.615
0.615

0.056
0.056
0.063

g top, grid E,
g, lapping, bot
g, lapping, top

10
10
10

1
1
1

6
15
15

0.615
0.615
0.615

0.063
0.003
0.003

b, str, grid A-E, line 2-6


b, ckd grid A-E, line 2-6

10
10

4
4

5
4

21.325

0.615
0.615

0.262
0.215

b, str, lapping
b, ckd, lapping
g, bot, grid A-E, line 2-6

10
10
10

4
4
4

8
6
8

0.300

0.615
0.615
0.615

0.006
0.006
0.420

g, top, grid A-E, line 2-7


b, str, lapping

10
10

4
4

8
6

0.615
0.615

0.424
0.004

b, ckd, lapping
b, str, grid A-D, line 6-7
b, ckd, grid A-D, line 6-7

10
10
10

4
1
1

6
5
4

0.615
0.615
0.615

0.006
0.047
0.039

g, bot, grid A-D, line6-7


g, top, grid A-D, line 6-7
g, str, lapping

10
10
10

1
1
1

8
8
12

0.615
0.615
0.615

0.075
0.076
0.002

g, ckd, lapping
g, bot, 4-corners, line 1-2 & 7-8

10
10

1
4

12
7

0.615
0.615

0.003
0.164

g, top, 4-corners, line 1-2 & 7-8


for floor punch
for duct

10
10
10

4
14
3

7
12
12

0.615
0.615
0.615

0.167
0.062
0.022
5.796

10
10

1
1

14
13

0.615
0.615

0.195
0.187

main str
main ckd

10
10

2
2

14
13

0.615
0.615

0.005
0.006

lapping bot
lapping top

10
10
10

1
1
1

13
12
13

0.615
0.615
0.615

0.135
0.130
0.002

main str
main ckd
lapping bot

19.025
0.375
0.300
2.465

17.458
0.375
0.300
22.625
22.825
16.938
17.138
0.300
0.375
21.845
0.375
21.325
21.525
0.300
0.375
15.225
15.665
15.225
15.425
0.300
0.375
9.500
9.700
0.600
1.000

Total =
Rebar calculation for 2ND FLOOR SLAB
Rebar(a) - gridline A to B/1 to 8

G.line - D to E/1 to 6

22.625
23.345
0.300
0.375
16.938
17.558
0.300

20 of 30

10

12

0.375

0.615

10

22.625

10

18.500

10
10

2
2

4
1

23.345

10
10

2
2

12
10

0.300

10

10

10

10

10

10

0.003

lapping top

0.615

0.111

main str

0.615

0.046

main str

0.615
0.615

0.115
0.024

main ckd
main ckd

0.615
0.615

0.004
0.005

lapping bot
lapping top

0.615

0.000
0.000

20.725

0.615

0.255

main str

0.615

0.210

main ckd

10

21.345
0.300

0.615

0.007

lapping bot

0.375

0.615

0.007

lapping top

17.425

0.615

0.054

main str

10

17.795

0.615

0.044

main ckd

10
10

1
1

4
5

0.375

0.615
0.615

0.001
0.001

lapping top
lapping bot

10
10

1
1

5
6

0.615
0.615

0.029
0.036

main str
main ckd

10

0.011

11

1.000
1.000

0.615

10

0.615

0.014

10

0.375

0.615

0.001

10

0.615

0.008

10

0.900
0.900

0.615

0.010

10

0.126

top binder

1
2

9
9

22.845
22.625

0.615

10
10

0.615
0.615

0.125
0.004

bot binder
lapping top

10
10
10

2
2
2

9
4
4

0.615
0.615
0.615

0.003
0.112
0.111

lapping bot
top binder
bot binder

10
10
10

2
2
1

4
4
24

0.615
0.615
0.615

0.092
0.091
0.006

top binder
bot binder
lapping top

10
10

1
1

24
10

0.615
0.615

0.004
0.106

lapping bot
top binder

10
10
10

1
1
1

10
10
10

0.615
0.615
0.615

0.104
0.002
0.002

bot binder
lapping top
lapping bot

G.line-D to E / 7 to 8
G.line - 6 to 8 with stair

10
10

1
1

6
9

0.615
0.615

0.015
0.035

ext top binder


top binder

G.line - D to E canti / 7 to 8

10
10
10

1
1
1

10
17
18

0.615
0.615
0.615

0.037
0.027
0.027

bot binder
top binder
bot binder

10
10

4
4

4
6

0.615
0.615

0.206
0.306

top binder
bot binder

10
10

4
4

16
12

0.615
0.615

0.015
0.009

lapping top
lapping bot

10
10
10

2
1
1

4
6
8

0.615
0.615
0.615

0.086
0.064
0.002

top binder
bot binder
lapping top

10
10

1
2

6
7

0.615
0.615

0.001
0.082

lapping bot
top binder

10
10
10

2
1
1

8
7
8

0.615
0.615
0.615

0.093
0.041
0.047

bot binder
10 mm top bin
10 mm bott bin

10
10

2
2

2
3

0.615
0.615

0.006
0.009

10 mm top bin
10 mm bott bin

10
10

1
1

3
3

0.615
0.615

0.005
0.004

10 mm top bin
10 mm bott bin

Rebar (b)
G.line-B to C & C to D/1 to 8

19.220
0.375

Rebar (b)
G.line -A to E/2 to 6 = 04 panel

G.line - A to E/6 to 7= 01 panel

G.line - D canti to E/7 to 8 = 01 panel


Corner bar
Column side A/8 & E / 6

Column side A / 1 & E / 1

0.300
9.500
9.690

Rebar (g) - gridline A to B/1 to 8

G.line-B to C & C to D/1 to 8

G.line- D to E/1 to 6

0.375
0.300
22.845
22.625
18.645
18.425
0.375
0.300
17.158
16.938
0.375
0.300
4.150
6.263
6.063
2.616
2.437

Rebar (g) - gridline - A to E/2 to 6

G.line - A to D / 6 to 7

G.line - 1 to 2 / A to B canti & E to D canti


G.line - 7 to 8 / A to B canti
G.line -E . Gap(1 to 2 & 7 to 8) out portion
G.line - E Gap (1 to 2) out portion

20.945
20.725
0.375
0.300
17.495
17.425
0.375
0.300
9.560
9.500
9.560
9.500
2.498
2.437
2.498
2.437

Rebar (c)
21 of 30

G.line - 3 gap A to E

10

140

2.200

0.615

0.189

ext top

G.line - 4 / A to E

10

140

2.200

0.615

0.189

ext top

G.line - 5 / A to E

10

144

2.200

0.615

0.195

ext top

G.line - 6 / A to D

10

96

2.200

0.615

0.130

ext top

G.line - 6 / D to E
G.line - B / 1 to 8

10
10

46
132

1.385
3.100

0.615
0.615

0.039
0.252

ext top
ext top

G.line - D / 1 to 6
G.line - C / 2 to 7

10
10

1
1

94
100

3.100
2.700

0.615
0.615

0.179
0.166

ext top
ext top

Rebar (f)
G.line - A to B canti & E to D canti / 1 to 2

10

30

2.437

0.615

0.000
0.090

ext bot

G.line - A to B canti / 7 to 8

10

30

2.437

0.615

0.045

ext bot

G.line - D canti / 7 to 8

10

2.437

0.615

0.012

ext bot

G.line - A / 1 to 2 & 7 to 8

10

2.305

0.615

0.023

ext top

G.line - A / 2 to 7

10

11

1.350

0.615

0.046

ext top

G.line - E / 1 to 2

10

2.305

0.615

0.011

ext top

G.line - E / 2 to 6

10

11

1.550

0.615

0.042

ext top

G.line E 7 to 8
G.line - A to B canti & E to D canti / 1 to 2

10
10

1
2

5
31

2.455
3.488

0.615
0.615

0.008
0.133

ext top
ext top

G.line - A to B canti / 7 to 8
G.line - D canti / 7 to 8

10
10

1
1

31
8

3.488
3.488

0.615
0.615

0.066
0.017

ext top
ext top

G.line - D canti / 7 to 8
G.line - 2 & 7 arch portion

10
10

1
2

5
12

4.495
1.350

0.615
0.615

0.014
0.020

ext top
ext top

Floor punch (14 nos)

10

12

16

0.650

0.615

0.077

top & bot

10

0.650

0.615

0.003

ext

Duct ( 03 nos)

10

18

0.850

0.615

0.028

top & bot

Sky light

10

0.900

0.615

0.035

10mm q bar bar binder

10

0.300

0.615

0.001
5.673

10mm bar lapping

15

4.000

0.615

0.037

10mm main st

1
1
1

14
5
4

4.160
4.000
4.160

0.615
0.615
0.615

0.036
0.012
0.010

10mm main ckd


10mm main st
10mm main ckd

Rebar-e (gridline 6/7 & D-cantiliver/E cantiliver)

1
1
2

7
6
4

10.125
10.465
10.265

0.615
0.615
0.615

0.044
0.039
0.051

10mm main st
10mm main ck
10mm top bin

Rebar-b.gap (D canti portion)

2
1

3
4

10.125
4.060

0.615
0.615

0.037
0.010

10mm bott bin


10mm top bar

Re-bar -a.gap (D to E canti)

1
1
1

4
13
14

4.000
4.06
4.000

0.615
0.615
0.615

0.010
0.032
0.034

10mm bott bar


10mm top bar
10mm bott bar

Rebar -c (gridline D)
G.line -E.

1
1

39
39

2.500
2.630

0.615
0.615

0.060
0.063

10mm ext top


10mm ext top

Re -bar -D (gridline 6/7)


D.canti portion.

2
1
2

66
26
3

1.250
1.150
1.100

0.615
0.615
0.615

0.101
0.018
0.004

10mm ext top


10mm ext top
10mm ext to(canti E)

Drop wall portion

1
1
2

60
7
7

1.750
4.6
0.450

0.615
0.615
0.615

0.065
0.020
0.004

10mm main (V)


10mm binder
10mm lapping

Rebar (d)

Total =
Rebar Calculation for STAIR ROOF SLAB
Rebar -a (gridline 6/7 & D/E)
Rebar -b (gridline 6/7 & D/cantiliver)
Rebar-b (gridline 6/7 & D-cantiliver/E cantiliver)

2.30.4

Total =
in cornice, arch, railing, louver, parapet, window sill/post etc.
Rebar calcualtion for ARCH COLUMN (1st & 2nd floor)
12mm Main (V)
12mm Main (V)
10mm Stimup
10mm Stimup

0.687

12
12

26
26

6
4

3.400
3.200

0.890
0.890

0.472
0.296

10
10

26
26

16
16

0.670
0.570

0.615
0.615

0.171
0.146

Total =
Summary of rebar for ARCH COLUMN
40 grade =
Rebar calcualtion for ARCH BEAM (1st & 2nd Floor)

1.085
0.32

60 grade =

0.77

10mm Stimup
10mm Drop panel

10
10

2
8

94
6

0.710
1.050

0.615
0.615

0.082
0.031

10mm Drop panel


10mm Drop panel
10mm Drop panel

10
10
10

8
8
8

6
6
3

0.550
0.425
0.325

0.615
0.615
0.615

0.016
0.013
0.005

G.line (E-gape 2 -6)

22 of 30

10mm Binder

10

3.200

0.615

0.016

10mm Binder Side

10

0.350

0.615

0.003

10mm Binder Side

10

0.250

0.615

0.002

10mm Binder Side

10

0.160

0.615

0.002

10mm Binder Mid


10mm Binder Mid

10
10

8
8

2
2

0.650
0.350

0.615
0.615

0.006
0.003

10mm Binder Mid


10mm Stimup

10
10

8
1

2
118

0.200
0.710

0.615
0.615

0.002
0.052

10mm Drop panel


10mm Drop panel

10
10

5
5

6
6

1.050
0.550

0.615
0.615

0.019
0.010

10mm Drop panel

10

0.425

0.615

0.008

10mm Drop panel

10

0.325

0.615

0.006

10mm Binder

10

3.200

0.615

0.010

10mm Binder Side

10

0.350

0.615

0.002

10mm Binder Side

10

0.250

0.615

0.002

10mm Binder Side

10

0.160

0.615

0.001

10mm Binder Mid

10

0.650

0.615

0.004

10mm Binder Mid


10mm Binder Mid

10
10

5
5

2
2

0.350
0.200

0.615
0.615

0.002
0.001

16 mm H. bar

16

1.480

1.537

0.298
0.055

12 mm beam (M)
12 mm Capping (Top)

12
12

2
4

6
3

14.275
0.700

0.890
0.890

0.152
0.007

12 mm Capping (Bott.)

12

0.525

0.890

0.006

16 mm H. bar

16

1.480

1.537

0.036

12 mm beam (M)

12

17.950

0.890

0.096

12 mm Capping (Top)

12

0.700

0.890

0.004

12 mm Capping (Bott.)

12

0.525

0.890

0.003
0.359

40 grade =

0.30

60 grade =

0.36

10
10

1
1

98.000
6.000

1.560
14.420

0.615
0.615

0.094
0.053

10mm ver
10mm binder

10
10
10

1
1
1

6.000
26.000
5.000

0.300
1.360
3.775

0.615
0.615
0.615

0.001
0.022
0.012

10mm lapping
10mm ver
10mm bin

Gride line (A,B):

10
10

2
9

5.000
22.000

0.450
1.360

0.615
0.615

0.003
0.166

10mm lapping
10mm ver

Ramp railing:(ver) 10mm q bar:

10
10
10

9
9
1

6.000
6
209.000

3.250
0.487
1.360

0.615
0.615
0.615

0.108
0.016
0.175

10mm bin
10mm lapping
1st flight R. side

10
10

1
1

36.000
25.000

1.360
1.360

0.615
0.615

0.030
0.021

Landing R. side
2nd flight R. side

10
10
10

1
5
4

143.000
31.000
31.000

1.560
1.360
1.560

0.615
0.615
0.615

0.137
0.130
0.119

2nd flight R. side


1st flight L. side
2nd flight L. side

10
10
10

1
1
1

6.000
6.000
6

20.595
0.300
3.495

0.615
0.615
0.615

0.076
0.001
0.013

Lapping
Landing

10
10

1
9

6
6

16.770
3.050

0.615
0.615

0.062
0.101

2nd flight bin


L. side binder

10
10
10

9
2
2

6
80
31

2.000
0.550
0.550

0.615
0.615
0.615

0.066
0.054
0.021

L. side binder lapping


10mm q bar main(v) long
10mm q bar main(v) short

10
10

2
2

2
2

10.05
3.900

0.615
0.615

0.025
0.010

10mm q bar bin long


10mm q bar bin short

10

0.300

0.615

0.001
1.516

10mm q bar lapping

gridline D

10
10

4
4

4
22

3.350
0.600

0.615
0.615

0.033
0.032

gridline E

10
10

4
4

4
15

2.212
0.600

0.615
0.615

0.022
0.022

Sub Total =

Total =
Summary of rebar for ARCH BEAM
Rebar calculation for RAILING
1st floor railing re-bar
Corridor side,

Gride line (6):

Ramp R. side 1st flight bin

Pent house railing:

Total =

G.line A (5 panel)

G. Line E (1st & 2nd floor)

G. Line A

Rebar calcualtion of WINDOW SIILL (1st FLOOR)

23 of 30

Rebar calcualtion of WINDOW SIILL 2ND FLOOR)


gridline D
gridline E

10

3.350

0.615

0.041

10

2.212

0.615

0.027

10

2.212

0.615

0.022

10
10

4
2

4
4

3.350
3.093

0.615
0.615

0.033
0.015

10
10

2
3

4
4

2.262
1.525

0.615
0.615

0.011
0.011

10
10

5
5

22
15

0.600
0.600

0.615
0.615

0.041
0.028

10

15

0.600

0.615

0.022

10

22

0.600

0.615

0.032

10

20

0.600

0.615

0.015

10

15

0.600

0.615

0.011

10

10

0.500

0.615

0.009

Total =

0.319

gridlne A

10
10

4.000

3.350

0.615

0.041

Ring
Gride line E (40 grade)

10
10

5
4

4.000
4.000

2.212

0.615
0.615

0.027
0.000

Main
Ring

10
10

4
4

4.000
15.000

2.212
0.600

0.615
0.615

0.022
0.022

Gride line A

10

4.000

3.35

0.615

0.041

Gride line B

10

4.000

2.212

0.615

0.027

Gride line D

10

4.000

2.212

0.615

0.022

Gride line E

10

4.000

3.35

0.615

0.033

Head master room

10
10

2
2

4.000
4.000

3.093
2.262

0.615
0.615

0.015
0.011

Ring, A

10
10

3
5

4.000
22.000

1.525
0.600

0.615
0.615

0.011
0.041

Ring, B
Ring, D
Ring, E

10
10
10

5
4
4

15.000
15.000
22.000

0.600
0.600
0.600

0.615
0.615
0.615

0.028
0.022
0.032

Head master Room

10
10
10

2
2
3

20.000
15.000
10.000

0.600
0.600
0.500

0.615
0.615
0.615

0.015
0.011
0.009

Total =

0.431

Rebar calculation of PARAPET WALL


10
10
10

1
1
10

960
7
7

1.425
96.427
0.3

0.615
0.615
0.615

Total =

0.841
0.415
0.013

lapping

1.269

Rebar calculation of LOUVER (1st & 2nd Floor)


12
12
10

28
77
28

6
6
10

1.865
1.865
0.65

0.890
0.890
0.615

0.279
0.767
0.112

10

77

10

0.65

0.615

0.308
1.465

ton

40 grade =

10
10

1
1

45
3

1.385
5.800

0.615
0.615

0.038
0.011

Gride-2
Binder

10
10

1
1

45
3

1.010
5.800

0.615
0.615

0.028
0.011

Gride-4
Binder
Main

10
10
10

1
2
1

37
3
45

0.500
5.800
0.975

0.615
0.615
0.615

0.011
0.021
0.027

10

23

0.650

0.615

0.074

10
10
10

1
1
1

7
7
7

0.500
0.500
0.500

0.615
0.615
0.615

0.002
0.002
0.002

Total =
Summary of rebar for LOUVER
2.30.5

0.42

60 grade =

1.05

in Sunshade, False ceiling


Rebar calculation of 1ST FLOOR FALSE SLAB & LINTEL
Gride-6
Binder

1st floor lintel Rebar fabricaiton work


10 mm Gride Line ( D,E) ring.
10 mm Food store ( D,E) ring.
10 mm Toillet (female) ( D,E) ring.
10mm Toillet (female) ( D,E) ring.

24 of 30

10mm G. store door ( D,E) ring.


10mm Toillet (male) ( D,E) ring.

10

0.500

0.615

0.002

10

15

0.500

0.615

0.005

12 mm Gride Line ( D,E)


12mm Food store

12

3.350

0.890

0.095

12

1.100

0.890

0.004

12 mm Toillet (female)

12
12

1
1

4
4

1.100
0.950

0.890
0.890

0.004
0.003

12
12

1
1

4
4

1.000
2.250

0.890
0.890

0.004
0.008

12 mm Toillet (female)
12 mm G. store door
12 mm Toillet (male )

Total =
Summary of rebar for 1ST SLAB FALSE SLAB, LINTEL, H/W 40 grade =

0.205
0.09

60 grade =

0.12

Rebar calculation of 2ND FLOOR FALSE SLAB & LINTEL, H/W


10 mm lintel ring G. Line ( D,E)

10

23

0.650

0.615

0.074

10 mm lintel ring G. Line-2

10

13

1.385

0.615

0.022

10 mm lintel ring G. Line-2


10mm lintel ring G. Line-4

10

36

0.735

0.615

0.033

10

38

0.500

0.615

0.023

10mm lintel ring G. Line-6


10mm lintel ring G. Line-6

10

38

0.500

0.615

0.012

10

45

1.385

0.615

0.038

10mm lintel ring G. Line-8


10mm lintel HW2

10
10

1
4

27
14

1.385
0.750

0.615
0.615

0.023
0.026

10mm lintel HW3, 3a


10mm lintel HW4

10
10

2
1

14
14

0.750
0.750

0.615
0.615

0.013
0.006

10mm lintel HW5


10mm lintel HW6

10
10

2
2

12
9

0.750
0.750

0.615
0.615

0.011
0.008

10mm lintel HW6


10mm G. line-2 false slab (Binder)

10

0.750

0.615

0.004

10

5.800

0.615

0.021

10mm G. line-4 Binder


10mm G. line-6 Binder
10mm G. line-6 Binder

10

5.800

0.615

0.043

10

5.800

0.615

0.021

10
10

3
3

1
1

5.800
4.250

0.615
0.615

0.011
0.008

10

45

0.975

0.615

0.081
0.478

12mm D, E (4-panel)
12mm G. Line-2 (2 Side)
12mm G. Line-4 (2 Side)

12
12
12

8
2
2

4
4
4

3.35
1.875
5.600

0.890
0.890
0.890

0.095
0.013
0.040

12mm G. Line-6 (2 Side)


12mm G. Line-8
12mm G. Line-8

12
12
12

2
1
1

4
4
4

5.600
3.375
0.375

0.890
0.890
0.890

0.040
0.012
0.001

12mm HW 2
12mm HW 3, 3a

12
12

4
2

4
4

2.300
2.175

0.890
0.890

0.033
0.015

12mm HW 4
12mm HW 5
12mm HW 6

12
12
12

1
2
2

4
4
4

2.212
1.850
1.420

0.890
0.890
0.890

0.008
0.013
0.010

12

1.439

0.890

0.005

Ring HW5
Ring HW 2
Ring HW 3.3a

10
10
10

2
3
2

12
14
14

0.750
0.750
0.750

0.615
0.615
0.615

0.011
0.019
0.013

Ring HW 4
Ring HW 6
Ring HW 6

10
10
10

1
1
1

14
9
9

0.750
0.750
0.750

0.615
0.615
0.615

0.006
0.004
0.004

Ring HW 6
Lintel & Sunsed

10
10

1
4

9
7

0.750
0.750

0.615
0.615

0.004
0.013

12mm bar lintel (6)


12mm bar lintel (4)

12
12

1
1

4
4

5.600
5.600

0.890
0.890

0.075
0.020
0.020

12mm bar lintel (2)


12mm bar HW 5

12
12

1
2

4
4

5.600
1.850

0.890
0.890

0.020
0.013

12mm bar HW 2
12mm bar HW 3.3a
12mm bar HW 4

12
12
12

3
2
1

4
4
4

2.300
2.175
2.212

0.890
0.890
0.890

0.025
0.015
0.008

12mm bar HW 6
12mm bar HW 6

12
12

1
1

4
4

1.438
1.469

0.890
0.890

0.005
0.005

12mm bar HW 6
12mm bar lintel & sunsed

12
12

1
4

4
4

1.420
1.056

0.890
0.890

0.005
0.015

10mm G. line-8 Binder


10mm G. line-4,6 Binder
Sub-Total =

12mm HW 6
Sub-Total =

0.286

Sub-Total =

25 of 30

Sub-Total =

0.151

Summary of rebar for 2ND SLAB FALSE SLAB, LINTEL, H/ 40 grade =


2.30.6

0.55

60 grade =

0.44

16
16

1
1

16
16

4.300
1.700

1.538
1.538

0.106
0.042

main bar
ext bot

16
16

1
1

16
16

5.080
2.450

1.538
1.538

0.125
0.060

main bar
ext top

12
16

1
1

16
16

2.450
3.150

0.890
1.538

0.035
0.078

ext top
main (landing)

16

16

2.450

1.538

0.060

main (landing)

16

0.800

1.538

0.010

ext

10

3.150

0.615

0.015

binder landing

10

3.900

0.615

0.012

binder landing

10

3.150

0.615

0.012

binder landing-bot

10

3.900

0.615

0.012

binder landing-bot

10

74

1.520

0.615

0.069

binder

16
16

1
1

16
16

6.000
3.150

1.538
1.538

0.148
0.078

main bar
top

16
12

1
1

16
16

5.700
2.000

1.538
0.890

0.140
0.028

main mid landing


ext top

16
10

1
1

16
56

2.250
1.520

1.538
0.615

0.055
0.052

ext top
binder

12

16

6.500

0.890

0.093

main bar

12

16

1.400

0.890

0.020

ext top

12

16

4.400

0.890

0.063

top to main

12

16

3.000

0.890

0.043

landing bot

12
12

1
2

16
4

3.650
0.900

0.890
0.890

0.052
0.006

landing top
ext top

10
10

1
1

31
12

1.520
3.150

0.615
0.615

0.029
0.023

binder
binder

10
12
12

1
1
1

7
16
16

3.900
6.000
3.350

0.615
0.890
0.890

0.017
0.085
0.048

binder
main bar
ext bot

12
12
12

1
1
1

16
16
16

1.400
3.100
4.800

0.890
0.890
0.890

0.020
0.044
0.068

ext top
main bar with slab
main bar with slab

10
12

1
1

26
16

1.520
6.500

0.615
0.890

0.024
0.093

binder
main bar

12
12
12

1
1
1

16
16
16

1.400
4.400
3.000

0.890
0.890
0.890

0.020
0.063
0.043

ext top
top to main
landing bot

12
12

1
2

16
4

3.650
0.900

0.890
0.890

0.052
0.006

landing top
ext top

10
10
10

1
1
1

31
12
7

1.520
3.150
3.900

0.615
0.615
0.615

0.029
0.023
0.017

binder
binder
binder

12
12
12

1
1
1

16
16
16

6.000
3.350
1.400

0.890
0.890
0.890

0.085
0.048
0.020

main bar
ext bot
ext top

12
12

1
1

16
16

3.100
4.800

0.890
0.890

0.044
0.068

main bar with slab


main bar with slab

10

26

1.520

0.615

0.024
2.408

binder

Summary of rebar for STAIRCASE

ton

40 grade =

0.31

60 grade =

2.10

Rebar calculation for RAMP


1st Flight

12

20.705

0.890

0.129

str

12
12
12

1
1
1

6
6
7

21.205
0.700
0.525

0.890
0.890
0.890

0.113
0.004
0.003

ckd
lapping top
lapping bot

12
12

1
3

7
7

1.050
2.625

0.890
0.890

0.007
0.049

ext top
ext top

12
12
12

1
1
1

7
7
5

3.470
7.100
1.870

0.890
0.890
0.890

0.022
0.044
0.008

landing
landing
landing (near column)

Staircase, steps, ramp


Rebar calculation for STAIRCASE
1st Flight

2nd Flight

3rd Flight

4th Flight

5th Flight

6th Flight

Total =

26 of 30

2nd Flight

10

135

1.620

0.615

0.135

binder

10

19

3.475

0.615

0.041

landing binder

12

17.900

0.890

0.112

str

12

18.300

0.890

0.098

ckd

12
12

1
1

6
7

0.700
0.525

0.890
0.890

0.004
0.003

lapping top
lapping bot

12
12

1
1

7
7

3.370
7.100

0.890
0.890

0.021
0.044

ext top (landing)


ext top (C-2 & C-3)

12
12

2
1

7
7

2.625
2.350

0.890
0.890

0.033
0.015

C-4 & C-5


ext top (1st floor)

10

109

1.620

0.615

0.109

binder

Total =
Summary of rebar for RAMP
2.30.7

0.992
ton

40 grade =

0.28

60 grade =

0.71

10

10

25

3.400

0.615

0.105

outer wall-outer side

34

3.400

0.615

0.142

10

outer wall-inner side

17

4.700

0.615

0.098

binder

10
10

2
2

34
19

0.300

0.615
0.615

0.013
0.079

10
10

2
2

26
17

0.615
0.615

0.109
0.079

lapping
inner wall-outer side
inner wall-inner side

10
10

2
2

34
38

0.013
0.123

10

2.638
5.000

0.615
0.615
0.615

0.055

lapping
bot-main bar
bot - binder

10

17

2.338

0.615

0.049

top-main bar

10

0.615

0.046

10

26

0.615

0.058

10
10

2
2

34
8

4.700
1.800
1.800

0.615
0.615

0.075
0.023

top - binder
outer
inner

10
10

2
2

4
6

0.615
0.615

0.009
0.013

Long Wall

10
10
10

2
2
2

7
10
10

0.615
0.615
0.615

0.015
0.058
0.055

Middle Wall

10
10
10

2
2
2

40
20
7

0.615
0.615
0.615

0.015
0.029
0.020

Rebar calculation for WATER RESERVOIR


Vertical Wall (gridline-1)

Vertical Wall (gridline-2)

Bottom Slab

Short Wall (up to Bottom Slab)

Total =

3.400
3.400
3.785
0.300

2.338
1.738
1.800
1.800
4.700
4.500
0.300
1.175
2.338

binder

binder - outer
binder - outer
outer (above door)
inner (above door)
binder - outer
binder - inner
lapping
main
binder

1.281

Summary of REBAR for Supersturcture Member


(a) in Column (above Plinth Level)
(b) in Tie beams & lintels
(c) in Floor Slab
(d) in Cornice, railing, drop wall, louver, parapet, window silll/post etc.
(e) in Sunshade & false ceiling
(f) in Stair, steps & ramp
(g) in Water Reservoir
2.31.1
2.31.2

40 grade ribbed or deformed bar


60 grade ribbed or deformed bar

40 Grade
6.376
4.467

60 Grade
16.205
15.918

17.023
0.306

2.102

1.909
1.281
1.700
ton
ton

1.059

33.062
35.284

27 of 30

FAEL KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Contractor-MBPL
#REF!
Measurement Sheet
#REF!

#REF!

2. Name of Project : FAEL Khair Program


#REF!
#REF!
5. Details of Measurment sheet for Bill No.4: Electrical works
Item No.
4.1
4.1.1
4.1.2
4.1.3

Item Description
Concealed point wiring
Light/ Exhaust fan point
Fan point
2 pin 5amps Socket point

Unit
each
each
each

4.2
4.2.1

CONCEALED CONDUIT WIRING


Solar power submain wiring

4.2.2
4.3

Normal submain
pump connection
PVC CONDUIT
Minimum

4.3.1

dia

water

inner

Cumulative
Quanity

Remarks

95
25
14

1
1
1

95
25
14

meter

115.00

115.00

meter

90

90.00

meter

meter

20mm&

minimum wall thichness 1.5mm


Minimum

4.3.2

inner

and

No. of
Mbrs

Quanity

dia

40mm&
9

4.5.1
4.6.1
4.6.2.1
4.6.3.1

Providing
3-pin
15/16A
each
combined switch socket
each
Fan clamp
each
Ceiling Fan
each
250mm Exhaust fan plastic body

7
33
28
1

1
1
1
1

7
33
28
1

4.7.1

1x13Watt ceiling mounted light


each
fixture

40

40

4.7.2
4.7.3

1x11w, ceiling mounted saucer


each
light fixture
each
1x11w, water tight light fitting

58
4

1
1

58
4

4.8.1

11/13/14/15w,
lamp

4.10

Lightning protection and earthing


sustem

4.10.1
4.10.2
4.10.3
4.10.4
4.10.4.1

minimum wall thichness 1.9mm

Engery

each

100

25.4mm dia 457mm long solid Each


copper rod

110
24

1
1

110.00
24.0
0

20x3mmcopper roof conductor Rm


complete
HDBC copper wire

Rm

12m Electrical system earthing

Set

6.6m
Lightning
4.10.4.2 earthing
4.10.5

28

saving

protection Set

Construction of earth inspection Set


pit

IPC-14

Z1-061, PK-08

FAEL KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Contractor-MBPL
#REF!
Measurement Sheet
#REF!

#REF!

2. Name of Project : FAEL Khair Program


#REF!
#REF!
5. Details of Measurment sheet for Bill No. 3: Plumbing And Sanitary Works
Item No.
3.2.1

Item Description
Supplying fitting fixing long pan

Unit
Each

3.13
3.14

groove cutting in wall , rcc


100 mm dia rain water down pipe

rm
rm

3.15
3.16
3.17
3.19.2
3.19.4
3.21.2
3.22
3.22.2
3.24
3.24.1
3.25

100mm dia uPVC soil and waste


pipe
rm
50mm dia uPVC vent pipe
rm
100mm dia uPvc floor trap
no
19mm dia water supply pipe
rm
32mm dia water pipe
rm
150 mm dia pressure soil pipe
rm
Construction of masonry inspection pi no
Pit cover
no
SepTic Tank
Each
Septic Tank 5400x1250x2100 mm
Soak Well
each

3.25.1

29

Inner Dia 1500 mm And Depth


6000mm

Each

No. of
Mbrs
1

Cumulative
Quanity
7

45
44.85

1
1

45
44.85

89.1
17.8
4
20
8
45
7
7

1
1
1
1
1
1
1
1

89.1
17.8
4
20
8
45
7
7

Quanity
7

(3/4'' pipe 37 rm &


1.25'' -8 rm)

Variation item

0.9

0.900
-

1.00

0.7

0.700

IPC-14

Remarks

Z1-061, PK-08

FAEL KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Contractor-MBPL
#REF!
Measurement Sheet
#REF!

#REF!

2. Name of Project : FAEL Khair Program


#REF!
#REF!
5. Details of Measurment sheet for Bill No. 5: Hand Operated Deep Tube Well
Item No.

30

Item Description

Unit

5.1.1

40 mm dia water grade uPVC pipe


having wall thickness 2.5 mm to 3
mm

rm

5.1.2

40 mm dia Five Star uPVC strainer


3.0 m long

No. of
Mbrs

Quanity

Cumulative
Quanity

Remarks

307.83

307.833

each

2.000

5.2

Supplying, fitting and fixing deep set


tube well pump (Hand set)
each

1.000

5.3

Complete development of the tube


well to obtain sand and turbidity free
water at satisfactory yield, etc. all
complete as per direction of the
each
Engineer.

1.00

1.000

5.4

Construction of platform

each

5.5

After completion of development of


tube well, collection of water sample
to test the water
each

1.00

IPC-14

1.000

Z1-061, PK-08

You might also like