Details of Measurement (Preliminaries)
Details of Measurement (Preliminaries)
Details of Measurement (Preliminaries)
IPC No. 09
Shelter ID: Z4-896
Al-Helal Academy
Duration: 8th August 2016-19th November 2016
Unit
BOQ
Quantity
Revised
Quantity
Previous
IPC
Quantity to
Date
1.5
L. S
0.08
0.08
0.08
0.08
1.6.1
each
1.00
1.00
1.00
1.00
1.6.2
each
1.00
1.00
1.00
1.00
1.6.3
18.00
18.00
14.00
18.00
1.7
each
1.00
1.00
0.50
0.50
1.9
Progress photographs
month
18.00
18.00
7.00
1.10
each
1.00
1.00
0.50
Remarks
0.50
IPC No. 09
Shelter ID: Z4-896
Al Helal Academy
Duration: 8th August 2016 - 19th November
2016
BOQ
Quantity
Previous
IPC
Quantity to
Date
sqm
573.00
574.00
574.00
Earthwork in excavation
cum
144.00
84.00
84.00
2.1.3
LS
1.00
2.5
2.6.1
2.6.2
A-1.2
2.8
Item No.
Item Description
A-1.1
2.1.1
2.1.2
Remarks
#REF!
117
120
111
cum
685.00
310.50
310.50
115
sqm
491.00
320.81
320.81
122
2.9
cum
9.50
7.17
7.17
108
2.10
sqm
618.00
321.00
321.00
110
A-1.3
Pile Work
2.11.1.1
rm
1660.00
1660.00
1,660.00
120
2.11.1.2
rm
747.00
747.00
747.00
142
2.12
cum
461.79
461.79
461.79
112
2.13
Point welding
61171.00
61171.00
61,171.00
1420
2.14
Welded splice
rm
747.00
498.00
498.00
2.17.1
ton
9.50
9.18
#REF!
2.17.2
ton
39.20
38.55
#REF!
2.18
cum
10.60
10.59
10.59
2.19.1
per test
1.00
1.00
1.00
2.20
Integrity test
per test
1.00
1.00
1.00
A-1.4
1.71
83.00
82.27
82.27
125
118
per point
2.21.1
cum
2.21.3
In Pile cap
cum
2.21.4
cum
11.00
10.43
10.43
2.21.5
cum
24.00
30.00
30.00
2.21.6
cum
49.00
30.53
30.53
2.21.7
cum
10.00
1.60
1.60
2.21.8
cum
2.22.1
cum
ton
13.00
7.50
12.60
4.40
12.60
2.23.1
2.23.2
ton
14.10
12.79
12.79
A-1.5
2.24
cum
11.00
15.00
15.00
2.26.1
A-2
A-2.1
2.29.1(a)
cum
40.00
41.04
41.04
(b)
in 1st floor
cum
25.00
25.65
25.65
(c)
in 2nd floor
cum
25.00
25.65
25.65
(d)
on roof
cum
3.00
2.34
2.34
2.30.1(a)
cum
(b)
in first floor
cum
(c)
in 2nd floor
cum
2.30.2(a)
cum
38.00
25.06
25.07
(b)
in first floor
cum
28.00
27.77
27.77
(c)
in 2nd floor
cum
28.00
25.36
25.63
(d)
on roof
cum
3.00
2.69
2.71
2.30.3(a)
cum
63.00
51.37
51.37
(b)
in 1st floor
cum
in 2nd floor
cum
66.00
71.00
65.42
68.52
65.42
(c)
(d)
on roof slab
cum
6.00
5.94
5.90
2.30.4(a)
Concrete (cornice, railing, drop wall, louver, parapet, window sill, fins) - in GF
cum
7.77
(b)
in first floor
cum
9.88
(c)
in 2nd floor
cum
9.78
(d)
on roof
cum
0.18
2.30.5(a)
cum
(b)
in 1st floor
cum
(c)
in 2nd floor
cum
2.30.6(a)
cum
21.00
24.95
17.97
(b)
in 1st floor
cum
6.00
4.63
5.46
(c)
in 2nd floor
cum
6.00
5.46
5.46
2.30.7.2
cum
11.00
4.50
4.50
2.30.7.3
in wall
cum
14.00
9.25
9.25
2.30.9
Filled Chamfer
rm
730.00
702.60
703.75
2.30.10
rm
2.31.1
ton
42.00
34.89
38.25
2.31.2
ton
46.50
35.91
38.57
A-2.2
2.32.1
cum
2.32.2
cum
28.00
23.66
34.12
2.32.3
cum
4.40
2.75
5.15
68.12
1.13
2.51
48.12
30.62
141.74
2.35.1
B/W(125 mm)-in GF
sqm
2.35.2
sqm
2.35.3
sqm
2.35.4
On roof
sqm
27.82
2.36.2
sqm
101.55
2.36.3
sqm
127.15
A-2.3
2.39.2
sqm
547.00
2.39.3
sqm
1310.00
A-4
Miscellaneous works
2.63.2
sqm
489.00
759.47
559.47
2.65
sqm
105.00
105.00
105.00
48.00
26.16
72.38
143.16
462.18
485.78
541.82
IPC No. 09
Shelter ID: Z4-896
Al Helal Academy
Duration: 8th August 2016 -19th November 2016
Unit
A-1.1
2.1.1
2.1.2
sqm
cum
No. of
Members
1
31
7
83
4
2.1.3
2.6.1
2.6.2
Total=
Pumping and bailing out of water
Site development (FM = 0.20)
Sand filling in plinth, ramp area & entry stair ( FM = 0.80)
2.7.1
Clay lining
2.7.2
A-1.2
2.8
Creating turf
Brickwork, Soling /Mass concrete/ Polythine sheet
One layer brick flat soling
Length
Cumulative
Width (m) Height (m)
(m)
Quantity
24.625
23.325
574.38
1.000
1.000
0.500
0.618
0.618
0.618
47.90
21.24
-10.07
15.73
74.79
0.950
460.44
-30.00
-10.43
-12.60
-15.00
-5.48
386.94
442.39
(-) deduction for grade beam
(-) deduction for bracing beam
(-) deduction for pedestal column
(-) deduction for brickwork
(-) deduction for ramp portion
96.43
0.00
65.87
62.98
79.47
0.00
0.00
16.88
0.00
321.62
LS
cum
22.675
21.375
5
0
5
5
4
0
0
1
0
5.800
5.800
3.962
3.788
5.975
5.975
7.875
9.575
3.875
3.325
1.763
3.325
3.325
3.325
1.762
1.763
1.763
3.762
31
2.500
1.000
0.075
5.81
4.910
1.000
0.075
2.58
PC3
-1.22
sqm
Total =
Mass Concrete
cum
83
0.500
0.075
Total=
2.10
7.17
321.62
109.70
24.90
456.21
Pile Work
Boring for CIS pile (500mm dia) depth up to 20m
Depth exceeding 20 m and not exceeding 30 m
Cast-in-situ pile concreting
Point welding
Welded splice
Breaking of pile head
Static Load test (CIS pile)
Integrity test (CIS pile)
RCC Work
Individual and continuous footing
In pile Cap
PC2
PC3
rm
rm
cum
per point
rm
cum
per test
per set
83
83
83
83
83
83
1
1
20.000
9.000
28.350
737.000
6.000
1.00
0.500
0.500
0.650
cum
cum
Bracing Beam
1660.00
747.00
461.79
61171.00
498.00
10.59
1.00
1.00
1.71
31
7
83
2.500
4.910
1.000
1.000
1.000
0.500
0.750
0.750
0.100
58.13
25.78
-1.63
82.27
3
1
1
1
4
2
19.276
14.875
4.838
1.6158
5.45
7.45
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
5.20
1.34
0.44
0.15
1.96
1.34
Total=
2.21.4
PC2
sqm
Total=
A-1.3
2.11.1.1
2.11.1.2
2.12
2.13
2.14
2.18
2.19.1
2.20
A-1.4
2.21.1
2.21.3
2.500
4.910
1.000
3.875
Total =
2.9
Remarks
cum
4 of 29
Total=
2.21.5
10.43
cum
3
1
1
2
4
4
19.276
17.6158
14.875
18.350
18.350
5.450
0.300
0.300
0.300
0.300
0.300
0.300
0.450
0.450
0.450
0.450
0.450
0.450
7.81
2.38
2.01
4.95
9.91
2.94
30.00
5
2
5
5
0
4
0
5.800
5.800
3.962
3.813
8.075
5.950
5.950
3.325
1.763
3.325
3.325
1.763
3.325
1.763
0.100
0.100
0.100
0.100
0.100
0.100
0.100
9.64
2.05
6.59
6.34
0.00
7.91
0.00
32.53
gridline A-B
gridline A-B-1-2
gridline B-C
gridline C-D
gridline B-D-1-2 & gridline B-D-7-8
gridline D-E
gridline D-E-1-2 & gridline D-E-7-8
9.450
2.013
0.100
1.90
cattle ramp
38
0.650
0.425
1.200
12.60
Total=
2.21.6
cum
Total=
2.21.7
2.21.8
2.22.1
A-1.5
2.24
2.25
2.26.1
A-2.1
2.29.1
2.29.1(a)
2.29.1(b)
2.29.1(c)
2.29.1(d)
2.30.1
2.30.1(a)
2.30.1(b)
cum
15.00
cum
cum
cum
cum
38
38
38
4
0.600
0.600
0.600
0.600
0.375
0.375
0.375
0.375
4.800
3.000
3.000
2.600
41.04
25.65
25.65
2.34
1
1
1
2
3
2
1
1
1
1
4
4
5.500
5.500
5.500
1.825
2.275
2.150
1.937
1.175
1.369
1.225
0.250
1.106
0.250
0.125
0.125
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.150
0.100
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
1.106
0.450
4
4
1
1
1
1
1
3.250
3.250
1.150
1.150
1.000
1.050
2.287
0.200
0.200
0.125
0.125
0.125
0.125
0.125
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.21
0.10
0.10
0.14
0.26
0.16
0.07
0.04
0.05
0.05
0.17
0.20
1.55
0.39
0.39
0.02
0.02
0.02
0.02
0.04
0.90
4.90
4
4
2
2
4
1
1
3
1
1
4
2
1
2
2
3.250
3.250
1.825
5.500
5.500
5.500
5.500
5.500
4.225
3.350
2.275
2.150
1.937
1.825
1.225
0.200
0.200
0.125
0.125
0.450
0.125
0.250
0.450
0.450
0.250
0.250
0.250
0.250
0.250
0.250
0.150
0.150
0.150
0.150
0.100
0.150
0.150
0.100
0.100
0.150
0.150
0.150
0.150
0.150
0.150
cum
gridline D
gridline E
Store
Toilet (female)
General store
Toilet (male)
Total =
2.30.1(c) in 2nd floor
cum
G.line D (4 panel)
G.line E (4 panel)
G.line 2 (2 Side)
G.line 4 (2 Side)
G.line 4 (2 Side)
G.line 6 (2 Side)
G.line 6 (2 Side)
G.line 6 (2 Side)
G.line 8
G.line 8
HW 2
HW 3, 3a
HW 4
HW 5
HW 6
0.39
0.39
0.07
0.21
0.99
0.10
0.21
0.74
0.19
0.13
0.34
0.16
0.07
0.14
0.09
5 of 29
1.175
0.250
0.150
0.04
4.26
3
4
4
3
3
1
1
2
4
1
3
1
1
1
1
1
1
1
9
8
3
19.626
5.500
0.400
7.200
0.400
7.775
0.400
18.550
0.400
14.688
7.775
3.025
1.688
14.125
1.838
13.000
5.500
3.250
1.600
0.250
0.375
0.300
0.300
0.375
0.300
0.375
0.300
0.375
0.300
0.375
0.300
0.300
0.300
0.300
0.225
0.300
0.250
0.300
0.300
0.375
0.160
0.075
0.350
0.350
0.500
0.350
0.500
0.350
0.500
0.350
0.500
0.350
0.350
0.350
0.350
0.300
0.225
0.200
0.350
0.250
0.300
0.200
0.200
6.18
2.31
0.30
2.27
0.23
0.82
0.08
3.90
0.30
1.54
2.45
0.32
0.18
0.95
0.12
0.65
0.58
0.24
1.62
0.06
-0.02
25.07
1
3
6
12
1
2
1
1
2
1
1
18
7
3.775
19.625
18.550
0.400
14.688
7.775
29.250
15.125
7.775
1.688
3.250
0.250
0.375
0.300
0.300
0.300
0.375
0.300
0.300
0.250
0.300
0.300
0.300
0.300
0.160
0.075
0.500
0.350
0.350
0.500
0.350
0.350
0.200
0.350
0.350
0.350
0.300
0.200
0.200
0.57
6.18
11.69
0.90
1.54
1.63
1.46
1.59
1.63
0.18
0.29
0.14
-0.04
27.77
3
6
12
1
1
2
2
1
1
19.624
18.550
0.400
14.688
15.125
7.775
7.775
1.688
3.250
0.300
0.300
0.375
0.300
0.300
0.300
0.300
0.300
0.300
0.350
0.350
0.500
0.350
0.350
0.350
0.350
0.350
0.300
6.18
11.69
0.90
1.54
1.59
1.63
1.63
0.18
0.29
25.63
Total =
2.30.1(d) on Roof
Tee beam, L-beam & rectangular beam
2.30.2
2.30.2(a) In Ground Floor Beam
B1
B2
B2 (outer)
B3
B3 (outer)
B3 (a)
B3 (a)-outer
B5
B5 (outer)
B6
B7
B8
B9
B10
B10(a)
B11
B12
Stair Beam (ground floor)
Ramp Beam
Downward projection for arch beam
cum
Total=
2
2
1
8.175
3.250
3.250
0.300
0.300
0.300
0.350
0.350
0.300
Total=
2.30.3
In Floor & Roof Slab
2.30.3(a) In Ground Floor Slab
Gross area
North side
Cantiliver part (north-west side)
Cantiliver part (north-east side)
Cantiliver part (south-west side)
Cantiliver part (south-east side0
Columns
1.72
0.68
0.29
2.69
SRB-1
SRB-2
SRB-3
cum
1
4
1
1
1
1
1
1
1
1
1
5
25
22.625
3.250
2.435
2.435
2.435
2.435
0.300
5.650
14.200
3.375
5.500
3.250
0.600
20.725
0.300
0.525
0.525
1.125
1.125
0.075
2.435
6.225
2.137
3.250
0.300
0.375
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
70.34
0.59
0.19
0.19
0.41
0.41
0.00
-2.06
-13.26
-1.08
-2.68
-0.73
-0.84
6 of 29
3
1
1
0.375
0.412
0.412
0.300
0.375
0.375
0.150
0.150
0.150
Total=
2.30.3(b) In 1st Floor Slab
column
column
column
51.37
cum
Gross area
4-corner
1
4
2
1
8
2
28
22.625
2.435
3.375
5.800
0.375
0.413
0.600
20.725
0.825
2.137
3.250
0.300
0.375
0.375
0.150
0.150
0.150
0.150
0.150
0.150
0.150
70.34
1.21
-2.16
-2.83
-0.14
-0.05
-0.95
65.42
2-corner
(-) dedcution at grid C (2 sides)
(-) dedcution for stair portion
(-) dedcution for column portion
(-) dedcution for column portion
(-) dedcution for column portion
1
2
2
1
8
4
38
22.625
0.188
2.138
6.625
0.750
0.900
0.600
22.375
0.375
3.375
3.250
0.750
0.900
0.375
0.150
0.150
0.150
0.150
0.150
0.150
0.150
75.94
0.02
-2.16
-3.23
-0.68
-0.49
-1.28
overall area
for column area
(-) for void area
(-) for stair area
(-) for skylight
(-) for opening
(-) for column
Total =
2.30.3(c) In 2nd Floor Slab
cum
Total =
2.30.3(d) on Roof
68.12
cum
1
4
10.125
0.600
4.000
0.375
0.150
0.150
Total =
2.30.4
-0.05
-0.02
-0.02
6.08
-0.14
overall area
for column area
5.94
cum
4
2
2
2
3.250
2.187
2.187
0.250
0.125
0.125
0.125
0.125
0.200
0.200
0.200
0.125
28
8
8
1
1
8
0.200
0.200
0.150
14.125
14.125
0.435
0.150
0.160
0.160
0.200
0.100
0.770
1.350
2.320
2.320
0.180
0.150
0.150
5
5
4
4
2
2
3
3.250
2.187
2.187
3.250
3.143
2.312
1.500
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.200
0.200
0.200
0.200
0.200
0.200
0.150
77
8
8
1
1
8
10
10
1
1
10
0.200
0.200
0.150
14.125
14.125
0.435
0.200
0.150
17.750
17.750
0.435
0.150
0.160
0.160
0.200
0.100
0.770
0.160
0.160
0.200
0.100
0.770
1.350
2.320
2.320
0.180
0.150
0.150
2.320
2.320
0.180
0.150
0.150
1
1
1
1
8
2
95.750
95.750
95.750
27.850
3.600
4.000
0.100
0.125
0.063
0.100
0.150
0.100
Total =
Louver
acrh column
cum
arch beam
Total =
0.325
0.109
0.109
0.008
0.552
1.134
0.594
0.445
0.509
0.212
0.402
2.16
Gride line E
Gride line D
4 to 6
0.41
0.27
0.22
0.33
0.16
0.12
0.08
1.17
3.12
0.594
0.445
0.509
0.212
0.402
0.742
0.557
0.639
0.266
0.502
4.87
Gride line A
Gride line B
Gride line D
Gride line E
8.14
1.20
0.30
0.70
1.30
0.20
parapet wall
parapet wall
parapet wall
pent house railing
upstrand of sky light:
upstrand of water reservoir
cum
Total =
Louver
acrh column
cum
arch beam
acrh column
cum
arch beam
Total =
(d)
on roof
cum
0.850
0.100
0.050
0.250
0.300
0.250
Total =
2.30.5
in sunshade, false ceiling etc.
2.30.5(b) Sunshade & False Ceiling-1st floor
11.83
4
5.500
0.450
0.100
0.99
False slab
7 of 29
cum
2nd Flight
1
1
1
1
2
1
7.5
1
1
1
6.5
1
2.704
1.600
1.831
3.250
0.400
3.250
1.600
1.831
1.600
2.122
1.600
2.500
1.600
1.500
1.600
1.750
0.375
0.750
0.250
1.600
1.500
1.600
0.250
1.600
0.250
0.250
0.250
0.250
0.250
0.175
0.150
0.250
0.250
0.250
0.150
0.200
1
1
1
18.318
14.288
3.575
1.700
1.700
2.388
0.150
0.150
0.225
1
1
2
1
4.5
1
1
4.5
2.704
3.250
0.400
3.250
1.600
2.704
3.250
1.600
1.600
1.750
0.375
0.750
0.250
1.600
2.500
0.250
0.200
0.200
0.200
0.150
0.150
0.200
0.200
0.150
1
1
2
1
4.5
1
1
4.5
2.704
3.250
0.400
3.250
1.600
2.704
3.250
1.600
1.600
1.750
0.375
0.750
0.250
1.600
2.500
0.250
0.200
0.200
0.200
0.150
0.150
0.200
0.200
0.150
2
4
4.800
0.600
2.438
0.375
0.200
0.200
2
2
4
4
2
1
1
4
4.200
3.325
4.200
2.038
2.038
0.525
0.125
0.200
1.650
1.650
0.650
1.000
0.875
0.350
0.350
0.125
0.200
0.200
0.200
0.200
0.125
0.200
0.200
0.225
Total =
Ramp
Total =
Total for Ground Floor (including ramp) =
3rd Flight
4th Flight
2.30.6(b)
6th Flight
2.30.6(c)
2.30.7
In Water Tank
2.30.7.2 in bottom slab
Total =
2.30.7.3
in wall
Total =
2.30.8
2.30.9
4.68
-0.18
4.50
2.77
2.19
2.18
1.63
0.45
0.04
0.01
-0.02
9.25
waist slab
landing
landing (near column)
canopy
steps
waist slab
landing (on 1st floor slab)
steps
waist slab
landing
landing (near column)
canopy
steps
waist slab
landing (on 2nd floor slab)
steps
(-) deduction
rm
(-) deduction
Total=
2.30.10
A-2.2
1.08
0.60
0.73
1.42
0.08
0.43
0.45
0.73
0.60
0.85
0.39
0.80
8.16
4.67
3.64
1.92
10.23
18.39
0.87
1.14
0.06
0.37
0.27
0.87
1.63
0.27
5.46
0.87
1.14
0.06
0.37
0.27
0.87
1.63
0.27
5.46
32
8
6
6
12
16
2
2
2
2
32
32
2
2
8
6
4.300
4.300
4.300
4.800
4.300
7.300
4.300
4.800
4.300
4.800
4.300
4.300
0.225
0.150
0.150
0.150
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
137.60
gridline A (1 to 8)
34.40
gridline B (1 to 2)
25.80
gridline B (3 to 5), inside
28.80
gridline B (3 to 5), outside
51.60
gridline B (6 to 8)
116.80
gridline C (2 to 5)
8.60
gridline C-6, inside
9.60
gridline C-6, outside
8.60
gridline C-7, inside
9.60
gridline C-7, outside
137.60
gridline D (1 to 8)
137.60
gridline E (1 to 8)
-0.45 in ramp 1st flight-gridline C-2 (oneside)
-0.30 in ramp 1st flight-gridline C-2 (otherside)
-1.20 in ramp 1st flight-gridline C-3-4-5-6
-0.90 in ramp 2nd flight-gridline C-3-4-5
703.75
8 of 29
2.32
2.32.2
250 mm brickwork
in 1st floor
2.32.3
in 2nd floor
cum
2
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2
1
2
1
1
1
1
1
1
1
1
1
1
1
0.275
2.425
0.275
2.425
3.675
1.825
1.688
3.350
3.350
2.150
2.275
1.174
0.500
5.000
0.725
0.275
2.425
0.275
2.425
3.675
1.825
2.275
5.500
5.500
3.350
2.150
2.025
2.187
0.375
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.276
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.630
0.630
0.630
0.630
2.500
1.950
1.950
1.950
0.550
1.950
1.950
1.950
1.950
1.950
1.950
0.630
0.630
0.630
0.630
2.500
1.950
1.950
2.100
2.500
2.500
1.950
1.950
1.950
1.950
cum
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3.350
2.275
1.175
1.950
1.950
3.350
2.025
2.187
2.500
1.950
2.025
1.950
2.500
2.500
1.950
2.025
1.950
2.500
2.500
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.550
1.950
1.950
0.750
0.525
0.550
1.950
1.950
0.375
1.825
1.950
1.425
0.750
0.525
1.825
1.950
1.425
0.750
0.525
sqm
4
4
1
1
3.25
2.18
4.48
5.5
0.625
0.625
2.1
2.1
1.000
1.000
1.000
1.000
sqm
3
2
2
1
1
1
1
11
5
1
2
1
5.500
1.000
4.300
1.688
1.688
0.888
1.250
2.962
1.375
6.876
1.000
1.000
1.950
1.950
1.950
2.850
2.500
2.850
2.500
0.625
0.625
0.625
1.950
2.850
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Total =
Total =
2.34
2.34.1
2.34.2
2.35
2.35.1
2.35.2
2.35.3
in 2nd floor
Total=
0.09
0.38
0.09
0.38
2.30
0.89
0.82
1.63
0.46
1.05
1.11
0.57
0.24
2.69
0.35
0.09
0.38
0.09
0.38
2.30
0.89
1.11
2.89
3.44
2.09
1.05
0.99
1.07
0.18
29.99
0.46
1.11
0.57
0.37
0.26
0.46
0.99
1.07
0.23
0.89
0.99
0.69
0.47
0.33
0.89
0.99
0.69
0.47
0.33
12.25
8.13
5.45
9.41
11.55
34.53
32.18
3.90
16.77
4.81
4.22
2.53
3.13
20.36
4.30
4.30
-3.90
-2.85
gridline 8 (A to B)
gridline 8 (D to E)
gridline A-B-1
gridline B-C-1
gridline B-C-1-2
gridline D-E-1
gridline C-D-1
gridline C-1-2
gridline C-D-2
gridline E (2-6)
gridline E (2-6)
gridline 4 (D-E)
gridline 2 (D-E)
9 of 29
2.100
0.750
1.000
-1.58
88.16
sqm
1
6
2
1
1
1
1
1
1
1
2
4
4
3
1
1
1
1
1
1
1
1
1
1
1
1
1
5
1
5
1
2
2
4
2
1
2
2
1
2
1
4
4
20.215
5.500
5.500
20.215
20.215
4.100
3.775
3.250
3.025
3.775
4.100
3.250
3.025
3.775
3.775
2.275
4.100
4.100
2.575
2.275
2.575
4.100
4.100
4.100
4.100
4.100
2.575
3.025
1.688
3.250
1.687
2.275
2.025
3.775
3.775
5.500
1.688
5.500
5.500
1.687
1.688
3.250
3.250
5.500
1.050
0.350
0.350
0.350
3.280
0.350
0.650
0.350
1.050
3.315
0.650
0.350
1.050
0.350
0.650
3.380
3.250
1.837
0.350
1.838
3.280
3.315
3.315
3.380
3.250
1.837
0.650
0.650
0.350
0.650
0.350
0.650
1.050
0.350
1.838
0.350
0.350
1.837
0.350
0.650
0.650
0.350
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
sqm
1
2
1
1
1
4
1
1
1
1
3
1
1
5.500
5.500
5.500
5.500
5.500
3.250
5.500
5.500
5.500
5.500
5.500
5.500
4.100
3.280
3.315
3.380
3.250
1.837
0.350
0.350
1.050
0.350
0.650
1.050
0.350
3.280
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
111.183
34.650
3.850
7.075
7.075
13.448
1.321
2.113
1.059
3.964
27.183
8.450
4.235
11.891
1.321
1.479
13.858
13.325
4.730
0.796
4.733
13.448
13.592
13.592
13.858
13.325
4.730
9.831
1.097
5.688
1.097
1.593
2.633
15.855
2.643
10.109
1.182
3.850
10.104
1.181
1.097
8.450
4.550
431.24
18.040
36.465
18.590
17.875
10.104
4.550
1.925
5.775
1.925
3.575
17.325
1.925
13.448
Total=
2.35.4
2.36
2.36.1
2.36.2
2.36.3
2.36.4
2.37
2.38
2.38.1
2.38.2
2.38.3
2.38.4
2.39
2.39.1
2.39.2
on roof
12mm thick plaster
in ground floor
in 1st floor
in 2nd floor
on roof
12mm plsater with net cement finishing
Dado/skriting including marking groove
in ground floor
in 1st floor
in 2nd floor
on roof
6 mm thick plaster
in ground floor
in 1st floor
2.39.3
in 2nd floor
Total =
10 of 29
1
1
1
1
1
1
2
2
2
2
1
1
2
1
1
1
1
2
1
1
1
1
1
2
2
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =
2.39.4
2.40.2
2.42
2.42.1
2.42.2
2.42.3
2.43
2.44
2.44.2.1
2.44.2.2
2.45
2.45.2
2.45.3
2.46
2.46.2
2.46.3
2.46.4
A-2.5
2.47.1
4.100
4.100
4.100
5.500
5.500
5.500
3.250
3.025
3.250
3.025
3.775
3.775
3.775
3.775
3.250
3.025
4.100
4.100
4.100
4.100
5.500
5.500
5.500
3.025
3.250
3.775
3.775
3.025
3.250
3.025
3.250
3.775
3.775
3.775
5.500
3.250
3.250
5.500
5.500
3.250
3.250
5.500
5.500
5.500
3.250
3.250
5.500
5.500
5.500
3.250
3.250
5.500
5.500
3.315
3.380
3.250
0.350
1.000
0.650
0.650
0.650
0.650
0.650
0.350
1.000
0.350
0.650
0.650
0.650
3.280
3.315
3.380
3.250
0.350
1.000
0.650
0.350
0.350
0.350
0.650
0.350
0.350
0.350
0.350
0.350
1.000
0.350
3.280
0.650
0.350
0.350
3.315
0.650
0.350
0.475
0.650
3.315
0.650
0.350
0.650
0.350
3.380
0.650
0.350
0.350
0.400
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
13.592
13.858
13.325
1.925
5.500
3.575
4.225
3.933
4.225
3.933
1.321
3.775
2.643
2.454
2.113
1.966
13.448
27.183
13.858
13.325
1.925
5.500
3.575
2.118
2.275
1.321
2.454
1.059
1.138
2.118
2.275
1.321
3.775
1.321
18.040
2.113
1.138
1.925
18.233
2.113
1.138
2.613
3.575
18.233
2.113
1.138
3.575
1.925
18.590
2.113
1.138
1.925
2.200
437.70
on roof
Groove/drip course/nosing
Artificial patent stone
in ground floor
in 1st floor
in 2nd floor
Artificial patent stone (in Cattle area)
Screeding on roof
avg. 100 mm thick concrete
12 mm thick lime cement sand plaster
Glazed wall tiles
in 1st floor toilet
in 2nd floor toilet
Unglazed homogeneous floor tiles
in 1st floor toilet
in 2nd floor toilet
on roof for making S-mark
Metal work
Frame for double leaf door
11 of 29
2.47.3
2.48
2.49.1
2.49.3
2.50
2.51.1
2.51.2
2.51.3
2.52
2.53
2.54
A-2.6
2.55
2.56
2.57
2.58
2.59
A-3
2.60
2.61
2.62
2.62.1
A-4
2.63.2
sqm
1
1
1
1
1
1
1
1
1
9.600
15.000
15.000
17.400
9.250
18.500
14.550
9.500
15.300
9.100
8.000
6.000
2.000
5.200
7.500
4.450
6.900
7.200
15.000
7.000
Total =
2.65
2.66
2.68
2.69
2.69.1
2.69.2
sqm
87.36
120.00
90.00
34.80
48.10
138.75
64.75
65.55
110.16
759.47
105.00
12 of 29
Item Description
2.29.1
Bar dia
No. of
Members
No. of
bars
20
24
13.045
2.436
4.576
20
24
13.045
2.436
4.576
10
24
97
1.700
0.615
2.434
C1-stirrup
10
24
97
0.980
0.615
1.403
C1-stirrup
20
10
13.045
2.436
0.636
20
10
12.420
2.436
1.210
25
10
14.195
3.846
2.184
10
10
97
1.700
0.615
1.014
C2-stirrup
10
10
97
1.240
0.615
0.740
C2-stirrup
25
14.195
3.846
1.310
25
14.195
3.846
1.310
10
97
1.700
0.615
0.406
C3-stirrup
10
97
0.980
0.615
0.234
C3-stirrup
20
3.975
2.434
0.116
20
2.900
3.434
0.120
10
21
1.700
0.615
0.044
stirrups
10
21
0.980
0.615
0.025
stirrups
20
3.975
2.434
0.097
20
2.900
2.434
0.071
10
21
1.700
0.615
0.044
stirrups
10
21
1.240
0.615
0.032
stirrups
Length (m)
Unit Wt
Quantity
Remarks
C2
C3
C1 (Pent house)
C2 (Pent house)
Total =
Summary of rebar for COLUMN (above Plinth Level)
2.30.2
22.580
ton
40 grade =
6.376
60 grade =
16.205
16
23.105
1.538
0.213
top bars
16
0.925
1.538
0.013
top bars-lapping
20
22.955
2.436
0.503
bot bars
20
0.675
2.436
0.020
bot bars-lapping
20
4.000
2.436
0.058
ext bot
20
3.688
2.436
0.054
20
3.488
2.436
0.102
20
2.375
2.436
0.069
20
1.975
2.436
0.115
10
161
1.350
0.615
0.401
stirrup
20
7.580
2.436
0.148
top bars
20
7.430
2.436
0.217
bot bars
20
2.640
2.436
0.026
20
2.440
2.436
0.071
20
3.040
2.436
0.030
20
2.840
2.436
0.083
16
6.450
1.538
0.079
ext bot
10
42
1.350
0.615
0.139
stirrup
20
9.290
2.436
0.136
top bars
20
9.215
2.436
0.202
bot bars
20
3.040
2.436
0.022
20
2.840
2.436
0.062
20
2.540
2.436
0.019
20
2.340
2.436
0.051
16
6.700
1.538
0.062
ext bot
10
58
1.350
0.615
0.144
stirrup
20
9.290
2.436
0.045
top bars
20
9.215
2.436
0.067
bot bars
20
3.040
2.436
0.007
20
2.840
2.436
0.021
20
2.840
2.436
0.007
20
2.640
2.436
0.006
10
61
1.350
0.615
0.051
stirrup
20
21.205
2.436
0.207
top bars
20
1.150
2.436
0.011
top bars-lapping
FB3(a) (Gridline 2)
13 of 29
20
21.055
2.436
0.308
bot bars
20
0.850
2.436
0.017
20
3.040
2.436
0.015
20
2.840
2.436
0.042
20
3.040
2.436
0.015
20
2.840
2.436
0.042
20
3.500
2.436
0.017
20
3.100
2.436
0.045
20
3.600
2.436
0.018
20
3.200
2.436
0.047
20
2.675
2.436
0.013
20
2.275
2.436
0.033
16
6.700
1.538
0.041
ext bot
10
130
1.300
0.615
0.208
stirrup
16
21.043
1.538
0.065
top bars
16
0.925
1.538
0.004
top bars-lapping
20
20.893
2.436
0.153
bot bars
20
0.675
2.436
0.005
bot bars-lapping
20
3.678
2.436
0.009
20
3.478
2.436
0.017
20
1.615
2.436
0.004
20
1.415
2.436
0.007
20
2.375
2.436
0.017
20
1.975
2.436
0.029
10
102
1.350
0.615
0.085
stirrup
20
9.155
2.436
0.134
top bars
20
9.055
2.436
0.199
bot bars
20
2.040
2.436
0.015
20
1.840
2.436
0.027
20
4.600
2.436
0.034
20
4.400
2.436
0.064
10
53
1.300
0.615
0.127
stirrup
20
10.105
2.436
0.074
top bars
20
9.955
2.436
0.073
bot bars
10
25
1.350
0.615
0.021
stirrup
20
2.918
2.436
0.021
top bars
20
2.768
2.436
0.020
bot bars
10
13
1.350
0.615
0.011
stirrup
16
15.080
1.538
0.046
top bars
16
0.925
1.538
0.004
top bars-lapping
16
14.930
1.538
0.046
bot bars
16
0.675
1.538
0.002
bot bars-lapping
16
1.290
1.538
0.002
16
1.290
1.538
0.002
16
2.300
1.538
0.011
10
96
1.100
0.615
0.065
stirrup
16
2.718
1.538
0.013
top bars
16
2.568
1.538
0.008
bot bars
10
14
1.100
0.615
0.009
stirrup
16
17.700
1.538
0.054
top bars
16
0.925
1.538
0.004
top bars-lapping
16
17.580
1.538
0.054
bot bars
16
0.675
1.538
0.002
bot bars-lapping
10
88
0.650
0.615
0.035
stirrup
20
7.180
2.436
0.035
top bars
20
7.030
2.436
0.051
bot bars
20
2.040
2.436
0.005
20
1.840
2.436
0.009
20
2.040
2.436
0.010
20
1.840
2.436
0.009
10
34
1.350
0.615
0.028
stirrup
FB6 (Gridline E)
FB8 (Gridline C)
FB9 (Gridline E)
FB12 (Gridline 1)
Total =
6.041
14 of 29
ton
40 grade =
1.35
60 grade =
4.70
20
5.200
2.436
0.025
16
5.050
1.538
0.023
bot bars
20
1.765
2.436
0.004
20
1.565
2.436
0.011
20
1.990
2.436
0.005
20
1.790
2.436
0.013
10
26
1.350
0.615
0.022
stirrup
16
23.105
1.538
0.213
top bars
16
0.925
1.538
0.013
top bars-lapping
20
22.955
2.436
0.503
bot bars
20
0.675
2.436
0.020
bot bars-lapping
20
4.000
2.436
0.058
ext bot
20
3.688
2.436
0.054
20
3.488
2.436
0.102
20
2.375
2.436
0.069
20
1.975
2.436
0.115
10
136
1.350
0.615
0.339
stirrup
20
21.205
2.436
0.620
top bars
20
1.150
2.436
0.034
top bars-lapping
20
21.055
2.436
0.923
bot bars
20
0.850
2.436
0.050
20
3.040
2.436
0.044
20
2.840
2.436
0.125
20
3.040
2.436
0.044
20
2.840
2.436
0.125
20
3.500
2.436
0.051
20
3.100
2.436
0.136
20
3.600
2.436
0.053
20
3.200
2.436
0.140
20
2.675
2.436
0.039
20
2.275
2.436
0.100
16
6.700
1.538
0.124
ext bot
10
130
1.300
0.615
0.624
stirrup
16
21.043
1.538
0.065
top bars
16
0.925
1.538
0.004
top bars-lapping
20
20.893
2.436
0.153
bot bars
20
0.675
2.436
0.005
bot bars-lapping
20
3.678
2.436
0.009
20
3.478
2.436
0.017
20
1.615
2.436
0.004
20
1.415
2.436
0.007
20
2.375
2.436
0.017
20
1.975
2.436
0.029
10
102
1.350
0.615
0.085
stirrup
20
9.155
2.436
0.089
top bars
20
9.055
2.436
0.132
bot bars
20
2.040
2.436
0.010
20
1.840
2.436
0.018
20
4.600
2.436
0.022
20
4.400
2.436
0.043
10
53
1.300
0.615
0.085
stirrup
16
18.780
1.538
0.058
top bars
16
0.925
1.538
0.004
top bars-lapping
16
18.630
1.538
0.057
bot bars
16
0.675
1.538
0.003
bot bars-lapping
10
110
0.650
0.615
0.044
stirrup
16
17.700
1.538
0.054
top bars
16
0.925
1.538
0.004
top bars-lapping
16
17.580
1.538
0.054
bot bars
16
0.675
1.538
0.002
bot bars-lapping
10
88
0.650
0.615
0.035
stirrup
FB15 (Gridline E)
FB16 (Gridline 8)
B17(A)-(Gridline A)
B17(B)-(Gridline E)
15 of 29
FB18 (Gridline C)
16
19.205
1.538
0.059
top bars
16
0.925
1.538
0.004
top bars-lapping
20
19.055
2.436
0.139
bot bars
20
0.675
2.436
0.005
bot bars-lapping
20
1.615
2.436
0.008
20
1.415
2.436
0.014
20
2.375
2.436
0.023
20
1.975
2.436
0.038
10
110
1.35
0.615
0.091
stirrup
20
9.155
2.436
0.089
top bars
20
9.055
2.436
0.132
bot bars
20
2.040
2.436
0.010
20
1.840
2.436
0.018
20
4.600
2.436
0.022
20
4.400
2.436
0.043
10
53
1.300
0.615
0.085
stirrup
20
2.918
2.436
0.021
top bars
20
2.768
2.436
0.020
bot bars
10
13
1.350
0.615
0.011
stirrup
FB19 (Gridline 1)
FB20 (Grideline 8)
6.765
Total =
Summary of rebar for 1ST FLOOR BEAM
ton
40 grade =
1.42
60 grade =
5.35
20
2.775
2.434
0.189
16
2.067
1.538
0.067
12
1.825
0.890
0.023
20
3.775
2.434
0.037
16
2.067
1.538
0.019
12
3.475
2.434
0.017
10
15
1.312
0.615
0.109
ton
40 grade =
0.109
16
23.125
1.538
0.213
top bars
16
0.925
1.538
0.017
top bars-lapping
20
23.045
2.436
0.505
bot bars
20
0.675
2.436
0.030
bot bars-lapping
20
3.688
2.436
0.054
20
3.408
2.436
0.100
20
2.375
2.436
0.069
20
1.975
2.436
0.115
10
158
1.350
0.615
0.394
stirrup
20
22.625
2.436
0.661
top bars
20
1.150
2.436
0.067
top bars-lapping
20
22.545
2.436
0.989
bot bars
20
0.675
2.436
0.059
20
3.050
2.436
0.089
20
2.770
2.436
0.243
20
3.600
2.436
0.053
20
3.200
2.436
0.140
20
2.675
2.436
0.039
20
2.275
2.436
0.100
20
3.500
2.436
0.051
20
3.100
2.436
0.136
20
6.700
2.436
0.392
10
160
1.300
0.615
0.768
16
17.438
1.538
0.054
top bars
16
0.925
1.538
0.003
top bars-lapping
20
17.358
2.436
0.085
bot bars
20
0.850
2.436
0.006
bot bars-lapping
20
3.688
2.436
0.009
20
3.448
2.436
0.017
20
1.625
2.436
0.004
20
1.385
2.436
0.007
20
2.375
2.436
0.017
20
1.975
2.436
0.029
Total =
Summary of rebar for RAMP BEAM
landing beam
0.460
60 grade =
0.351
stirrup
B23 (Gridline E)
16 of 29
10
116
1.350
0.615
0.096
16
19.225
1.538
0.059
top bars
16
0.925
1.538
0.004
top bars-lapping
20
19.145
2.436
0.140
bot bars
20
0.675
2.436
0.005
bot bars-lapping
20
1.850
2.436
0.009
20
1.570
2.436
0.015
20
2.200
2.436
0.043
20
2.600
2.436
0.013
20
2.300
2.436
0.011
10
126
1.350
0.615
0.105
stirrup
20
9.175
2.436
0.089
top bars
20
9.135
2.436
0.134
bot bars
20
2.650
2.436
0.013
20
2.370
2.436
0.023
20
4.625
2.436
0.023
20
4.375
2.436
0.043
10
53
1.300
0.615
0.085
stirrup
20
9.175
2.436
0.089
top bars
20
9.135
2.436
0.134
bot bars
20
2.650
2.436
0.013
20
2.370
2.436
0.035
20
4.625
2.436
0.023
20
4.375
2.436
0.064
10
52
1.300
0.615
0.083
stirrup
20
2.938
2.436
0.021
top bars
20
2.858
2.436
0.021
top bars-lapping
10
14
1.350
0.615
0.012
stirrup
stirrup
FB24 (Gridline C)
FB25 (Gridline 8)
FB26 (Gridline 1)
FB27 (Gridline E)
6.917
Total =
Summary of rebar for 2nd FLOOR BEAM
ton
40 grade =
1.541
60 grade =
5.375
ton
9.875
1.538
0.061
9.795
2.434
0.143
1.000
2.825
2.434
0.014
3.000
2.585
2.434
0.038
1.000
4.700
2.434
0.023
3.000
4.460
2.434
0.065
58.000
1.350
0.615
0.096
10mm stirrup
0.000
2
2.000
4.500
1.538
0.028
3.000
4.420
2.434
0.065
4.000
1.627
2.434
0.032
26.000
1.350
0.615
0.043
10mm stirrup
0.000
1
2.000
4.500
1.538
0.014
4.420
1.538
0.020
26
1.250
0.615
0.020
10mm stirrup
Total =
Summary of rebar for STAIR ROOF BEAM
2.30.3
0.661
ton
40 grade =
0.159
60 grade =
0.501
10
15
22.625
0.615
0.209
ckd
10
14
23.225
0.615
0.200
lapping (top)
10
23
0.300
0.615
0.004
lapping ( bot)
10
21
0.375
0.615
0.005
str
10
14
16.938
0.615
0.146
ckd
10
13
17.458
0.615
0.140
lapping (top)
10
21
0.300
0.615
0.004
lapping ( bot)
10
20
0.375
0.615
0.005
10
6.100
0.615
0.075
10
6.380
0.615
0.063
10
22.625
0.615
0.083
10
23.225
0.615
0.071
17 of 29
lapping (top)
10
0.300
0.615
0.002
lapping ( bot)
10
0.375
0.615
0.002
10
16.925
0.615
0.052
10
17.265
0.615
0.042
lapping (str)
10
0.300
0.615
0.001
lapping (ckd)
10
0.375
0.615
0.001
str (gridline 2 - 6)
10
8.375
0.615
0.103
ckd (gridline 2 - 6)
10
8.635
0.615
0.085
10
44
2.200
0.615
0.238
10
44
3.451
0.615
0.187
gridline 7-8/A-B
10
58
3.451
0.615
0.123
10
44
2.200
0.615
0.179
gridline 6/D-E
10
44
1.350
0.615
0.037
gridline B/6-7
10
20
2.700
0.615
0.033
gridline C/ 6-7
10
20
2.550
0.615
0.031
gridline D/2-6)
10
20
2.450
0.615
0.121
gridline D/6-7
10
20
3.400
0.615
0.042
10
2.275
0.615
0.034
gridline A / 2-7
10
1.550
0.615
0.043
gridline E/ 2-6
10
1.550
0.615
0.034
gridline B-C/7-8
10
11
3.450
0.615
0.023
10
17
1.350
0.615
0.014
gridline B-D/ 6
10
28
1.350
0.615
0.023
gridline B-C/1-2
10
3.450
0.615
0.015
10
13
6.025
0.615
0.048
ckd,(gridline B-C/6-7-8)
10
12
6.305
0.615
0.047
10
17
3.925
0.615
0.041
10
16
4.205
0.615
0.041
gridline 1-2/A-B
10
22
2.438
0.615
0.033
gridline 7-8/A-B
10
34
2.488
0.615
0.052
gridline 1-2/D-E
10
34
2.437
0.615
0.051
gridline 7-8/D-E
10
12
2.487
0.615
0.018
10
22.825
0.615
0.11
10
22.625
0.615
0.11
lapping (top)
10
0.375
0.615
0.00
lapping (bot)
10
0.300
0.615
0.00
10
2.438
0.615
0.04
10
6.300
0.615
0.12
10
6.100
0.615
0.12
top (gridline1 - 2)
10
7.225
0.615
0.03
bot (gridline1 - 2)
10
7.225
0.615
0.03
10
15.215
0.615
0.07
10
15.015
0.615
0.07
lapping (top)
10
0.375
0.615
0.00
lapping (bot)
10
0.300
0.615
0.00
10
17.138
0.615
0.09
10
16.938
0.615
0.09
lapping (top)
10
14
0.300
0.615
0.00
lapping (bot)
10
14
0.375
0.615
0.00
10
22.825
0.615
0.08
10
22.625
0.615
0.08
lapping (top)
10
0.375
0.615
0.00
lapping (bot)
10
0.300
0.615
0.00
10
9.500
0.615
0.12
10
9.500
0.615
0.12
10
8.575
0.615
0.17
10
8.375
0.615
0.16
10
25
4.138
0.615
0.064
10
25
4.038
0.615
0.062
10
10
12
0.600
0.615
0.044
for duct
10
12
1.000
0.615
0.015
10
24
0.800
0.615
0.071
Miscellaneous
Total =
4.724
18 of 29
10
14
22.250
0.615
0.192
10
13
22.850
0.615
0.183
lapping (str)
10
21
0.300
0.615
0.004
lapping (ckd)
10
20
0.375
0.615
0.005
10
14
16.938
0.615
0.146
10
13
17.458
0.615
0.140
lapping (str)
10
21
0.300
0.615
0.004
lapping (ckd)
10
20
0.375
0.615
0.005
10
22.250
0.615
0.109
10
22.850
0.615
0.084
lapping (str)
10
0.300
0.615
0.002
lapping (ckd)
10
0.375
0.615
0.002
10
18.425
0.615
0.045
10
19.025
0.615
0.023
lapping (str)
10
0.300
0.615
0.001
lapping (ckd)
10
0.375
0.615
0.001
10
21.325
0.615
0.262
10
21.845
0.615
0.215
lapping (str)
10
0.300
0.615
0.006
lapping (ckd)
10
0.375
0.615
0.006
10
14.925
0.615
0.046
10
15.365
0.615
0.038
lapping (str)
10
0.300
0.615
0.001
lapping (ckd)
10
0.375
0.615
0.001
10
0.615
gridline B
10
14
3.150
0.615
gridline C
10
14
2.700
0.615
0.116
gridline D
10
14
3.150
0.615
0.108
10
12
3.150
0.615
0.070
10
124
2.200
0.615
0.503
10
82
2.200
0.615
0.111
10
42
1.400
0.615
0.036
10
30
3.638
0.615
0.201
gridine A (line 2 to 7)
10
10
1.350
0.615
0.042
gridline E (2-6)
10
10
1.550
0.615
0.038
gridline C
10
10
1.500
0.615
0.018
gridline D
10
10
3.638
1.615
0.059
10
30
2.488
0.615
0.138
10
10
2.488
0.615
0.015
10
22.250
0.615
0.055
top (grid A 1- 8)
10
22.450
0.615
0.041
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
10
22.250
0.615
0.082
10
22.450
0.615
0.069
lapping (bot)
10
0.300
0.615
0.002
lapping (top)
10
0.375
0.615
0.002
10
22.250
0.615
0.109
10
22.250
0.615
0.082
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
10
15.000
0.615
0.074
10
14.800
0.615
0.073
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
10
22.450
0.615
0.083
10
22.250
0.615
0.068
lapping (bot)
10
0.300
0.615
0.002
lapping (top)
10
0.375
0.615
0.002
10
16.563
0.615
0.041
10
16.763
0.615
0.082
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
10
9.500
0.615
0.187
0.136
19 of 29
10
9.500
0.615
0.164
10
2.438
0.615
0.024
10
2.638
0.615
0.026
bot ( 2-6)
10
21.325
0.615
0.420
top (2-6)
10
21.525
0.615
0.424
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
10
15
0.300
0.615
0.003
10
15
0.375
0.615
0.003
10
14.925
0.615
0.073
10
15.125
0.615
0.074
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
bot
10
44
2.438
0.615
0.066
top
10
44
2.638
0.615
0.071
10
10
12
0.600
0.615
0.044
for duct
10
12
1.000
0.615
0.015
10
24
0.800
0.615
0.071
Miscellaneous
Total =
5.658
10
14
22.250
0.615
0.192
10
13
22.850
0.615
0.183
lapping (str)
10
21
0.300
0.615
0.004
lapping (ckd)
10
20
0.375
0.615
0.005
10
14
16.938
0.615
0.146
10
13
17.458
0.615
0.140
lapping (str)
10
21
0.300
0.615
0.004
lapping (ckd)
10
20
0.375
0.615
0.005
10
22.250
0.615
0.109
10
22.850
0.615
0.084
lapping (str)
10
0.300
0.615
0.002
lapping (ckd)
10
0.375
0.615
0.002
10
18.425
0.615
0.045
10
19.025
0.615
0.023
lapping (str)
10
0.300
0.615
0.001
lapping (ckd)
10
0.375
0.615
0.001
10
22.975
0.615
0.283
10
23.495
0.615
0.231
lapping (str)
10
0.300
0.615
0.006
lapping (ckd)
10
0.375
0.615
0.006
10
17.425
0.615
0.054
10
17.865
0.615
0.044
lapping (str)
10
0.300
0.615
0.001
lapping (ckd)
10
0.375
0.615
0.001
10
0.615
gridline B
10
14
3.150
0.615
gridline C
10
14
2.700
0.615
0.116
gridline D
10
14
3.150
0.615
0.108
0.136
10
12
3.150
0.615
0.070
10
124
2.200
0.615
0.503
gridline 6, A-D
10
82
2.200
0.615
0.111
10
42
1.400
0.615
0.036
10
30
3.638
0.615
0.201
gridine A, line 2 to 7
10
10
1.550
0.615
0.048
gridline E (2-6)
10
10
1.550
0.615
0.038
gridline C
10
10
1.550
0.615
0.019
gridline D (7-8)
10
10
3.638
1.615
0.059
10
30
2.488
0.615
0.138
10
10
2.488
0.615
0.015
10
22.250
0.615
0.096
top (grid A, 1- 8)
10
22.450
0.615
0.083
lapping (bot)
10
11
0.300
0.615
0.002
lapping (top)
10
0.375
0.615
0.002
20 of 29
10
22.250
0.615
0.082
10
22.450
0.615
0.069
lapping (bot)
10
0.300
0.615
0.002
lapping (top)
10
0.375
0.615
0.002
10
22.250
0.615
0.109
10
22.250
0.615
0.082
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
10
15.000
0.615
0.074
10
14.800
0.615
0.073
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
10
22.450
0.615
0.083
10
22.250
0.615
0.068
lapping (bot)
10
0.300
0.615
0.002
lapping (top)
10
0.375
0.615
0.002
10
16.563
0.615
0.071
10
16.763
0.615
0.124
lapping (bot)
10
11
0.300
0.615
0.002
lapping (top)
10
0.375
0.615
0.002
10
9.500
0.615
0.187
10
9.500
0.615
0.164
10
22.975
0.615
0.452
top (2-6)
10
23.175
0.615
0.456
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
10
18.250
0.615
0.090
10
18.450
0.615
0.091
lapping (bot)
10
0.300
0.615
0.001
lapping (top)
10
0.375
0.615
0.001
bot
10
44
2.438
0.615
0.066
top
10
44
2.638
0.615
0.071
10
10
12
0.600
0.615
0.044
for duct
10
12
1.000
0.615
0.015
10
24
0.800
0.615
0.071
skylight area
12
32
2.200
0.890
0.501
12
32
1.960
0.890
0.223
10
10
Miscellaneous
5.915
15
4.000
0.615
0.037
14
4.160
0.615
0.036
4.000
0.615
0.012
4.160
0.615
0.010
10.125
0.615
0.044
10.465
0.615
0.039
10.265
0.615
0.051
10.125
0.615
0.037
4.060
0.615
0.010
4.000
0.615
0.010
13
4.06
0.615
0.032
14
4.000
0.615
0.034
Rebar -c (gridline D)
39
2.500
0.615
0.060
G.line -E.
39
2.630
0.615
0.063
66
1.250
0.615
0.101
D.canti portion.
26
1.150
0.615
0.018
1.100
0.615
0.004
60
1.750
0.615
0.065
4.6
0.615
0.020
0.450
0.615
0.004
Total =
2.30.4
0.687
12
26
3.400
0.890
0.472
12
26
3.200
0.890
0.296
10mm Stimup
10
26
16
0.670
0.615
0.171
10mm Stimup
10
26
16
0.570
0.615
0.146
21 of 29
Total =
Summary of rebar for ARCH COLUMN
1.085
40 grade =
0.32
60 grade =
0.77
10
94
0.710
0.615
0.082
10
1.050
0.615
0.031
10
0.550
0.615
0.016
10
0.425
0.615
0.013
10
0.325
0.615
0.005
10mm Binder
10
3.200
0.615
0.016
10
0.350
0.615
0.003
10
0.250
0.615
0.002
10
0.160
0.615
0.002
10
0.650
0.615
0.006
10
0.350
0.615
0.003
10
0.200
0.615
0.002
10mm Stimup
10
118
0.710
0.615
0.052
10
1.050
0.615
0.019
10
0.550
0.615
0.010
10
0.425
0.615
0.008
10
0.325
0.615
0.006
10mm Binder
10
3.200
0.615
0.010
10
0.350
0.615
0.002
10
0.250
0.615
0.002
10
0.160
0.615
0.001
10
0.650
0.615
0.004
10
0.350
0.615
0.002
10
0.200
0.615
0.001
16 mm H. bar
16
1.480
1.537
0.055
12 mm beam (M)
12
14.275
0.890
0.152
Sub Total =
G.line A (5 panel)
0.298
G. Line E (1st & 2nd floor)
12 mm Capping (Top)
12
0.700
0.890
0.007
12 mm Capping (Bott.)
12
0.525
0.890
0.006
16 mm H. bar
16
1.480
1.537
0.036
12 mm beam (M)
12
17.950
0.890
0.096
12 mm Capping (Top)
12
0.700
0.890
0.004
12 mm Capping (Bott.)
12
0.525
0.890
0.003
40 grade =
0.30
60 grade =
10
98.000
1.560
0.615
0.094
10mm ver
10
6.000
14.420
0.615
0.053
10mm binder
10
6.000
0.300
0.615
0.001
10mm lapping
10
26.000
1.360
0.615
0.022
10mm ver
10
5.000
3.775
0.615
0.012
10mm bin
10
5.000
0.450
0.615
0.003
10mm lapping
10
22.000
1.360
0.615
0.166
10mm ver
10
6.000
3.250
0.615
0.108
10mm bin
10
0.487
0.615
0.016
10mm lapping
10
209.000
1.360
0.615
0.175
10
36.000
1.360
0.615
0.030
Landing R. side
10
25.000
1.360
0.615
0.021
10
143.000
1.560
0.615
0.137
10
31.000
1.360
0.615
0.130
10
31.000
1.560
0.615
0.119
10
6.000
20.595
0.615
0.076
10
6.000
0.300
0.615
0.001
Lapping
10
3.495
0.615
0.013
Landing
10
16.770
0.615
0.062
10
3.050
0.615
0.101
L. side binder
10
2.000
0.615
0.066
10
80
0.550
0.615
0.054
10
31
0.550
0.615
0.021
10
10.05
0.615
0.025
10
3.900
0.615
0.010
10
0.300
0.615
0.001
Total =
Summary of rebar for ARCH BEAM
G. Line A
0.359
0.36
Gride line 6
Total =
1.516
10
3.350
0.615
0.033
10
22
0.600
0.615
0.032
22 of 29
gridline E
10
2.212
0.615
0.022
10
15
0.600
0.615
0.022
10
3.350
0.615
0.041
10
2.212
0.615
0.027
10
2.212
0.615
0.022
10
3.350
0.615
0.033
10
3.093
0.615
0.015
10
2.262
0.615
0.011
10
1.525
0.615
0.011
10
22
0.600
0.615
0.041
10
15
0.600
0.615
0.028
10
15
0.600
0.615
0.022
10
22
0.600
0.615
0.032
10
20
0.600
0.615
0.015
10
15
0.600
0.615
0.011
10
10
0.500
0.615
0.009
Total =
0.319
gridlne A
10
4.000
3.350
0.615
0.041
Ring
10
4.000
2.212
0.615
0.027
10
4.000
0.615
0.000
Main
10
4.000
2.212
0.615
0.022
Ring
10
15.000
0.600
0.615
0.022
Gride line A
10
4.000
3.35
0.615
0.041
Gride line B
10
4.000
2.212
0.615
0.027
Gride line D
10
4.000
2.212
0.615
0.022
Gride line E
10
4.000
3.35
0.615
0.033
10
4.000
3.093
0.615
0.015
10
4.000
2.262
0.615
0.011
10
4.000
1.525
0.615
0.011
Ring, A
10
22.000
0.600
0.615
0.041
Ring, B
10
15.000
0.600
0.615
0.028
Ring, D
10
15.000
0.600
0.615
0.022
Ring, E
10
22.000
0.600
0.615
0.032
10
20.000
0.600
0.615
0.015
10
15.000
0.600
0.615
0.011
10
10.000
0.500
0.615
0.009
Total =
0.431
960
1.425
0.615
0.841
10
96.427
0.615
0.415
10
10
0.3
0.615
0.013
Total =
lapping
1.269
28
1.865
0.890
0.279
12
77
1.865
0.890
0.767
10
28
10
0.65
0.615
0.112
10
77
10
0.65
0.615
0.308
ton
40 grade =
Gride-6
10
45
1.385
0.615
Binder
10
5.800
0.615
0.011
Gride-2
10
45
1.010
0.615
0.028
0.011
Total =
Summary of rebar for LOUVER
2.30.5
1.465
0.42
60 grade =
1.05
Binder
10
5.800
0.615
Gride-4
10
37
0.500
0.615
0.011
Binder
10
5.800
0.615
0.021
Main
10
45
0.975
0.615
0.027
10
23
0.650
0.615
0.074
10
0.500
0.615
0.002
10
0.500
0.615
0.002
10
0.500
0.615
0.002
10
0.500
0.615
0.002
10
15
0.500
0.615
0.005
23 of 29
12
3.350
0.890
0.095
12
1.100
0.890
0.004
12 mm Toillet female
12
1.100
0.890
0.004
12 mm Toillet female
12
0.950
0.890
0.003
12 mm G. store door
12
1.000
0.890
0.004
12 mm Toillet male
12
2.250
0.890
0.008
Total =
0.205
Summary of rebar for 1ST SLAB FALSE SLAB, LINTEL, H/W 40 grade =
0.09
60 grade =
0.12
10
23
0.650
0.615
0.074
10
13
1.385
0.615
0.022
10
36
0.735
0.615
0.033
10
38
0.500
0.615
0.023
10
38
0.500
0.615
0.012
10
45
1.385
0.615
0.038
10
27
1.385
0.615
0.023
10
14
0.750
0.615
0.026
10
14
0.750
0.615
0.013
10
14
0.750
0.615
0.006
10
12
0.750
0.615
0.011
10
0.750
0.615
0.008
10
0.750
0.615
0.004
10
5.800
0.615
0.021
10
5.800
0.615
0.043
10
5.800
0.615
0.021
10
5.800
0.615
0.011
10
4.250
0.615
0.008
10
45
0.975
0.615
0.081
12mm D, E (4-panel)
12
3.35
0.890
0.095
12
1.875
0.890
0.013
12
5.600
0.890
0.040
12
5.600
0.890
0.040
12mm G. Line-8
12
3.375
0.890
0.012
12mm G. Line-8
12
0.375
0.890
0.001
12mm HW 2
12
2.300
0.890
0.033
12mm HW 3, 3a
12
2.175
0.890
0.015
12mm HW 4
12
2.212
0.890
0.008
12mm HW 5
12
1.850
0.890
0.013
12mm HW 6
12
1.420
0.890
0.010
12mm HW 6
12
1.439
0.890
0.005
Ring HW5
10
12
0.750
0.615
0.011
Ring HW 2
10
14
0.750
0.615
0.019
Ring HW 3.3a
10
14
0.750
0.615
0.013
Ring HW 4
10
14
0.750
0.615
0.006
Ring HW 6
10
0.750
0.615
0.004
Ring HW 6
10
0.750
0.615
0.004
Ring HW 6
10
0.750
0.615
0.004
10
0.750
0.615
0.013
12
5.600
0.890
0.020
12
5.600
0.890
0.020
12
5.600
0.890
0.020
12mm bar HW 5
12
1.850
0.890
0.013
12mm bar HW 2
12
2.300
0.890
0.025
12
2.175
0.890
0.015
12mm bar HW 4
12
2.212
0.890
0.008
12mm bar HW 6
12
1.438
0.890
0.005
12mm bar HW 6
12
1.469
0.890
0.005
12mm bar HW 6
12
1.420
0.890
0.005
12
1.056
0.890
0.015
40 grade =
0.55
60 grade =
16
16
4.300
1.538
0.106
16
16
1.700
1.538
0.042
ext bot
16
16
5.080
1.538
0.125
main bar
16
16
2.450
1.538
0.060
ext top
0.478
Sub-Total =
0.286
Sub-Total =
0.075
Sub-Total =
Summary of rebar for 2ND SLAB FALSE SLAB, LINTEL, H/W
2.30.6
0.151
0.44
main bar
24 of 29
2nd Flight
3rd Flight
4th Flight
5th Flight
6th Flight
12
16
2.450
0.890
0.035
ext top
16
16
3.150
1.538
0.078
main (landing)
16
16
2.450
1.538
0.060
main (landing)
16
0.800
1.538
0.010
ext
10
3.150
0.615
0.015
binder landing
10
3.900
0.615
0.012
binder landing
10
3.150
0.615
0.012
binder landing-bot
10
3.900
0.615
0.012
binder landing-bot
10
74
1.520
0.615
0.069
binder
16
16
6.000
1.538
0.148
main bar
16
16
3.150
1.538
0.078
top
16
16
5.700
1.538
0.140
12
16
2.000
0.890
0.028
ext top
16
16
2.250
1.538
0.055
ext top
10
56
1.520
0.615
0.052
binder
12
16
6.500
0.890
0.093
main bar
12
16
1.400
0.890
0.020
ext top
12
16
4.400
0.890
0.063
top to main
12
16
3.000
0.890
0.043
landing bot
12
16
3.650
0.890
0.052
landing top
12
0.900
0.890
0.006
ext top
10
31
1.520
0.615
0.029
binder
10
12
3.150
0.615
0.023
binder
10
3.900
0.615
0.017
binder
12
16
6.000
0.890
0.085
main bar
12
16
3.350
0.890
0.048
ext bot
12
16
1.400
0.890
0.020
ext top
12
16
3.100
0.890
0.044
12
16
4.800
0.890
0.068
10
26
1.520
0.615
0.024
binder
12
16
6.500
0.890
0.093
main bar
12
16
1.400
0.890
0.020
ext top
12
16
4.400
0.890
0.063
top to main
12
16
3.000
0.890
0.043
landing bot
12
16
3.650
0.890
0.052
landing top
12
0.900
0.890
0.006
ext top
10
31
1.520
0.615
0.029
binder
10
12
3.150
0.615
0.023
binder
10
3.900
0.615
0.017
binder
12
16
6.000
0.890
0.085
main bar
12
16
3.350
0.890
0.048
ext bot
12
16
1.400
0.890
0.020
ext top
12
16
3.100
0.890
0.044
12
16
4.800
0.890
0.068
10
26
1.520
0.615
0.024
binder
Total =
Summary of rebar for STAIRCASE
2.408
ton
40 grade =
0.31
60 grade =
2.10
12
20.705
0.890
0.129
str
12
21.205
0.890
0.113
ckd
12
0.700
0.890
0.004
lapping top
12
0.525
0.890
0.003
lapping bot
12
1.050
0.890
0.007
ext top
12
2.625
0.890
0.049
ext top
12
3.470
0.890
0.022
landing
12
7.100
0.890
0.044
landing
12
1.870
0.890
0.008
10
135
1.620
0.615
0.135
binder
10
19
3.475
0.615
0.041
landing binder
12
17.900
0.890
0.112
str
12
18.300
0.890
0.098
ckd
12
0.700
0.890
0.004
lapping top
12
0.525
0.890
0.003
lapping bot
12
3.370
0.890
0.021
12
7.100
0.890
0.044
12
2.625
0.890
0.033
12
2.350
0.890
0.015
10
109
1.620
0.615
0.109
binder
2nd Flight
Total =
Summary of rebar for RAMP
0.992
ton
40 grade =
0.28
60 grade =
0.71
25 of 29
2.30.7
Bottom Slab
Long Wall
Middle Wall
10
25
3.400
0.615
0.105
10
34
3.400
0.615
0.142
10
17
4.700
0.615
0.098
binder
10
34
0.300
0.615
0.013
lapping
10
19
3.400
0.615
0.079
10
26
3.400
0.615
0.109
10
17
3.785
0.615
0.079
binder
10
34
0.300
0.615
0.013
lapping
10
38
2.638
0.615
0.123
bot-main bar
10
5.000
0.615
0.055
bot - binder
10
17
2.338
0.615
0.049
top-main bar
10
4.700
0.615
0.046
top - binder
10
26
1.800
0.615
0.058
outer
10
34
1.800
0.615
0.075
inner
10
2.338
0.615
0.023
binder - outer
10
1.738
0.615
0.009
binder - outer
10
1.800
0.615
0.013
10
1.800
0.615
0.015
10
10
4.700
0.615
0.058
binder - outer
10
10
4.500
0.615
0.055
binder - inner
10
40
0.300
0.615
0.015
lapping
10
20
1.175
0.615
0.029
main
10
2.338
0.615
0.020
binder
Total =
1.281
40 Grade 60 Grade
6.376
16.205
4.467
15.918
#VALUE!
(d) in Cornice, railing, drop wall, louver, parapet, window silll/post etc.
0.306
2.102
1.909
1.059
1.281
1.700
2.31.1
ton
#VALUE!
2.31.2
ton
35.284
26 of 29
#REF!
Item Description
Concealed point wiring
Light/ Exhaust fan point
Fan point
2 pin 5amps Socket point
Unit
each
each
each
4.2
4.2.1
4.2.2
4.3
Normal submain
pump connection
PVC CONDUIT
Minimum
4.3.1
dia
water
inner
Cumulative
Quanity
Remarks
95
25
14
1
1
1
95
25
14
meter
115.00
115.00
meter
90
90.00
meter
meter
20mm&
4.3.2
inner
and
No. of
Mbrs
Quanity
dia
40mm&
9
4.5.1
4.6.1
4.6.2.1
4.6.3.1
Providing
3-pin
15/16A
each
combined switch socket
each
Fan clamp
each
Ceiling Fan
each
250mm Exhaust fan plastic body
7
33
28
1
1
1
1
1
7
33
28
1
4.7.1
40
40
4.7.2
4.7.3
58
4
1
1
58
4
4.8.1
11/13/14/15w,
lamp
4.10
4.10.1
4.10.2
4.10.3
4.10.4
4.10.4.1
Engery
each
100
110
24
1
1
110.00
24.0
0
Rm
Set
6.6m
Lightning
4.10.4.2 earthing
4.10.5
27
saving
protection Set
IPC-14
Z1-061, PK-08
#REF!
Item Description
Supplying fitting fixing long pan
Unit
Each
3.13
3.14
rm
rm
3.15
3.16
3.17
3.19.2
3.19.4
3.21.2
3.22
3.22.2
3.24
3.24.1
3.25
3.25.1
28
Each
No. of
Mbrs
1
Cumulative
Quanity
7
45
44.85
1
1
45
44.85
89.1
17.8
4
20
8
45
7
7
1
1
1
1
1
1
1
1
89.1
17.8
4
20
8
45
7
7
Quanity
7
Variation item
0.9
0.900
-
1.00
0.7
0.700
IPC-14
Remarks
Z1-061, PK-08
#REF!
29
Item Description
Unit
5.1.1
rm
5.1.2
No. of
Mbrs
Quanity
Cumulative
Quanity
Remarks
307.83
307.833
each
2.000
5.2
1.000
5.3
1.00
1.000
5.4
Construction of platform
each
5.5
1.00
IPC-14
1.000
Z1-061, PK-08