BOQ Excel
BOQ Excel
BOQ Excel
Bill of Quantities
CONTRACT ID: MPW/JPN/NRAP/WEST/GOR/001/C2/002 Location: Ghor Province Road Category: Secondary Road Length : 2750 m Item Unit rate Total Cost Work description Unit Quantity No. in USD. in USD. BILL NO. 1 : PRIMARILY AND GENERAL REQUIREMENT Mobilization at site is for the cost of establishing security, plant, equipment, facilities and personnel upon the site. 12/1 Lump sum 1.00 Provision and installation of two (2) subproject sign boards as directed by the Engineer. Demobilization from site shall be compensation in full for the costs of 12/3 Lump sum removing plant, equipment, facilities, personnel, and restoration of site. Setting out the horizontal alignment and elevation levels, placement of ranging rods and profile boards to determine the 15/1 exact alignment of the road. All the structure will be as per design level & alignment provided by the UNOPS.
1.00
2,750.00
Cum
214.00
Road way embankment (as per field required) consist of the construction of embankment (each layer 200 mm 27/1 compacted), including pre-loaded embankment, and berms and furnishing, placing, compacting and shaping material obtained from approved sources, to the Sub-grade preparation will consist of the preparation of the top of the existing road surface (95% compaction) to 28/1 accommodate the placement of the pavement structure, shoulder and other cross section futures in accordance with these specifications and in
Cum
6,900.00
Sqm
52,250.00
9,350.00
Cum
7,425.00
100 mm thick grouted stone pitching in culvert floor and apron, the furnishing of materials and construction of a protective 51/2 covering in stone pitching-Grouted (a) pitching. The spaces between the stones shall be filled with cement mortar composed of one part Stone masonry walls constructed with stones set in cement mortar (1:4) as indicated on the drawings, specified or 51/6 ordered. The minimum mass of stone shall be 10 Kg. The rate shall include full compensation for furnishing all materials, trimming of areas, Concrete Kerb Type- A including casting 52/3 and placing as per specification drawing and direction of engineer in charge Concrete Kerb Type - B including casting 52/4 and placing as per specification drawing and direction of the engineer in charge
Sqm
22.00
Cum
775.00
Lin M
5,500.00
Lin M
2,750.00
Tonne
86.00
Blinding concrete 15 Mpa (Mix. ratio 75/9 min. 1:2:4) for side drain, culvert. Cum 273.00 (a) Retaining wall and top of Stone masonry wall. Construction of reinforced cement concrete excluding the reinforcing steel bars Concrete in Culverts/Side drain /Apron 75/10 slab, etc. (25 Mpa or mix ratio 1:1.5:3) as Cum 2,046.00 per drawings.
Bill No. 1 2 3 4 5 7 A
Descriptions
PRELIMINARY AND GENERAL REQUIREMENT CLEARING AND EARTH WORKS SOIL AGGREGATE PAVEMENTS BITUMINOUS PAVEMENT WORKS MISCELLANEOUS WORKS CONCRETE WORKS
Amount in USD