Kinder Morgan will utilize this form for tracking all incidents/accidents.
A. INCIDENT SUMMARY REPORT Information gathered from the CSM-001 report can be entered into this tab. This tab is a summary of the
incident. In addition it will track the number and types of injuries that a contractor and subcontractor have during a project. The general
contractor also must include incidents or injuries for any subcontractors being utilized.
4 Column E - Enter the IMPACT Incident number for incident. This confirms incident has been uploaded into KM IMPACT Database.
6 Column G - In "Incident Type," select from the drop down the type of incident that occurred.
7 Column H - If the type of incident was an injury and resulted in Days Away With Restricted Time or the injury has Lost Time associated (DART),
click on yes. Click NO if this does not apply.
B. CURRENT PROJECT TOTALS Total Recordable Incident Rate (TRIR) and "Days Away/Restricted/Transfer" (DART).
CSM-007
Instructions
01/13
Contractor Incident Reporting Log
Project Name:
Project Manager:
Chief Inspector:
Project Status Total Recordable Incident Rate (TRIR) Days Away/Restricted Time (DART)
Monthly Man Hours Project Total Man
Project START # OSHA
Contractor Company Name (General/Prime/Sub) (Current Month Hours Hours (Project Start
Date Recordable
Active Inactive ONLY) thru Project to Date) Select KM Business Incidents KM # Incidents with Days KM
Unit (Project to Date) Current TRIR Benchmark Difference Away or Restricted Time Current DART Benchmark Difference
CSM-007B
01/13
0.00 0.00 0.00 0.00
CSM-007B
01/13