ContractorSMP - Template-OH&S Management Plan
ContractorSMP - Template-OH&S Management Plan
ContractorSMP - Template-OH&S Management Plan
Project Name:-
1. Contract Details
Contractor name:
Contractor ABN:
Contract description:
Location of works:
Table of contents
1. Contract Details.....................................................................................................................................1
2. Safety Policy..........................................................................................................................................2
3. Responsibilities......................................................................................................................................2
4. Scope and Construction Activity Details...............................................................................................2
5. Safe Work Method Statements...............................................................................................................2
6. Hazard & Risk control register..............................................................................................................2
7. First Aid and Injury Management..........................................................................................................2
8. Emergency Procedures...........................................................................................................................2
9. Public Protection....................................................................................................................................2
10. Site Rules...........................................................................................................................................2
11. Incident reporting and investigation..................................................................................................2
12. Specialised Work or Licensing..........................................................................................................2
13. Training and Induction Requirements................................................................................................3
14. Plant and Equipment Register............................................................................................................3
15. Chemical Management......................................................................................................................3
16. Safety Monitoring..............................................................................................................................3
17. Subcontractor Management...............................................................................................................3
18. Sign Off..............................................................................................................................................3
3. Responsibilities
State what responsibilities persons have when working on site
.
.
It must be stated who is responsible for the safety on site, if a safety Officer is appointed and also if a
committee is required.
Attached any Safe Work method statements that are required under current legislation for the works that
are being conducted and how works will be trained in them.
List the hazards of the works, what the risks are associated with those Hazards and what control measure
will be put into place to reduce the risks, this should be done using the Hierarchy of Control.
Describe any specific Injury Management processes for this contract, including
reporting to WHS Division when required (Legislation reasons) and also reporting
to P&F / PM of serious incidents.
8. Emergency Procedures
Identify emergency procedures
9. Public Protection
Describe the plans / controls to protect the pubic and student for work activities
List below some site rules which all persons working on site must abide by
Describe how incidents will be reported, recorded and investigated and how you will report it to P&F.
You also must describe how you will advise PF if a Workplace Health and safety Inspector has visited
your worksite.
Inductions for contractors are to be completed in accordance with the P&F UQ Contractor Safety
Induction process. List any relevant communication or training methods used during the works in
relation to safety, for example weekly toolbox meetings or safe procedure training.
Plus explain how all works will undergo a job site safety induction.
ALL WORKERS MUST HAVE UNDERGONE THE OHS CONSTRUCTION SAFETY INDUCTION (BLUE
CARD) BEFORE WORKING ONSITE
If you will be using any subcontractors, they must be supervised and understand UQ polices and
procedures.
Attached Subcontractor List detailing the subcontractors to be used and the details of the subcontractor
management
List methods of Sub-contractor site specific inductions and also Sub-contractors SWMS requirements.