A1-10 Curtain Walls
A1-10 Curtain Walls
A1-10 Curtain Walls
1
Version 1.0
NPQS
A2-10 Metal Roofs
CONTENTS Page
1. GENERAL 3
1.1 Scope 3
1.2 Related Sections 3
1.3 Standards 3
1.4 Trade Preambles 4
1.5 Abbreviations / Definitions 5
2. PERFORMANCE REQUIREMENTS 6
2.1 Contractors Brief 6
4. WORKMANSHIP 13
4.1 General Workmanship Requirements 13
4.2 Supporting Members 13
4.3 Underlayment and Insulation System 14
4.4 Installation of Metal Roof Sheeting 14
4.5 Skylights 16
4.6 Installation of Rainwater Goods 16
4.7 Protection 16
2
Version 1.0
NPQS
A2-10 Metal Roofs
1. GENERAL
Read with the General Requirements section, and all other contract documents.
1.1 Scope
This section covers the requirements for the construction of common metal roofing
systems including metal sheets, finishes and insulation. The following types of metal
sheets are covered:
a. Profiled Metal Sheets
b. Standing Seams
c. Composite Panels
1.3 Standards
Unless otherwise agreed by the SO, ensure all of the Works comply with the relevant
requirements of the Standards and Codes listed below or referenced in the body of
the Specification. Alternative Standards and Codes may be submitted to the SO,
provided it can be demonstrated that the alternative Standards and Codes comply
with the requirements of the standards specified. All Standards and Codes quoted
are the current version, unless specific year references are noted.
Singapore Standards
SS CP 1 Use of Timber in Buildings
SS CP 7 Structural Use of Timber
SS CP 26 Drainage of Roofs
SS CP 33 Lightning Protection
SS CP 89 The Design and Installation of Metal Roofing
SS 72 Treatment of Timber and Plywood with Copper/Chrome/Arsenic
Wood Preservatives
SS 141 Unplasticized PVC pipe for cold water services and industrial uses
SS 370 Specification for Metal Roofing
Other Standards
BS EN 363 Personal protective equipment against falls from a height Fall
Arrest Systems.
BS EN 1316 Thermal Insulation Products for Buildings Factory Made Mineral
3
Version 1.0
NPQS
A2-10 Metal Roofs
4
Version 1.0
NPQS
A2-10 Metal Roofs
1.4.5 Warranty
Refer to the PSD for warranty requirements.
5
Version 1.0
NPQS
A2-10 Metal Roofs
2. PERFORMANCE REQUIREMENTS
2.1.1 Structural
6
Version 1.0
NPQS
A2-10 Metal Roofs
2.1.3 Functional
2.1.4 Environmental
2.1.4.3 Watertightness
The completed roof shall be in-penetrable to water and not give rise to any
observable dampness on visible surfaces under the normal environmental conditions
expected.
2.1.5 Maintenance
2.1.5.1 The roof system shall be maintainable and replaceable in parts or whole
from the outside.
7
Version 1.0
NPQS
A2-10 Metal Roofs
8
Version 1.0
NPQS
A2-10 Metal Roofs
3.3.4.1 PVF2
a. XPD
b. XPD Pearlescent Steel
3.3.4.2 Polyester
a. XRW
b. XRW Ultra
3.5 Skylights
Refer to section A2-40 for general requirement of materials for skylights.
3.6 Accessories
9
Version 1.0
NPQS
A2-10 Metal Roofs
3.7 Purlins
Use the following materials:
a. Galvanised steel sections in accordance with structural specifications.
b. Structural timber in accordance with SS CP 1, SS CP 7 and SS 72.
10
Version 1.0
NPQS
A2-10 Metal Roofs
3.9.1 Flashing
All flashings and capping shall have a minimum BMT of 0.55 mm, with the same
coating system and profile as the selected metal sheeting, and comply with SS CP
89.
11
Version 1.0
NPQS
A2-10 Metal Roofs
12
Version 1.0
NPQS
A2-10 Metal Roofs
4. WORKMANSHIP
4.1.4.1 Fabrication
Linear dimensions 2mm
Squareness (diagonal) 3mm
Flatness 0.5mm in 300mm
Joint widths shall not vary by more than 2mm or 10%. Adjacent flush surfaces
separated by hair line joints shall not step by more than 0.5mm.
4.1.4.2 Installation
Linear dimensions 2mm
Level 2mm
Position at floor or ceiling 2mm from grid
Verticality H/500 or < 5mm between floors and ceiling
Steps in plane 2mm
Steps out of plane 1mm
13
Version 1.0
NPQS
A2-10 Metal Roofs
4.4.3 Projections
Provide adequate flashings to accepted detail for any projections through roofs such
as pipes, ducts and conduits.
14
Version 1.0
NPQS
A2-10 Metal Roofs
4.4.7.1 Planning
Plan and lay metal roof sheeting to minimise end and side laps. Avoid formation of
laps at roof protrusions and attachments.
15
Version 1.0
NPQS
A2-10 Metal Roofs
4.5 Skylights
Install skylight(s) in accordance with section A2-40, clause 4.0 and comply with SS
CP 89.
4.6.1 Flashing
Flash and cap all parts of the roof to prevent water penetration and dampness into
the inner parts of the building, including areas around vent pipes, skylights, ducts,
and other penetrations, ridges, verges, and along roof slopes that abuts walls.
4.6.2 Gutters
a. Install to required fall, space gutter support at 600 mm centres
b. Box gutters to be continuously supported
c. Fix stop ends to match gutters profile and colour
d. Lap all gutters in the direction of flow and seal all joints
4.7 Protection
Ensure that from completion of the roof until Practical Completion:
a. The roof is not used as a working platform unless fully protected to the
satisfaction of the SO.
b. Do not allow solvents or other harmful chemical to come into contact with the roof
surface.
c. Protect the finished roof areas from damage by subsequent building operations.
16
Version 1.0
NPQS
A2-10 Metal Roofs
5.1 Submissions
5.1.1 Submissions
Include in construction program, event for submission of the following information:
a. Name of the metal roof manufacturer and inclusion of copies of technical data
relating to system proposal.
b. Composition of the roof system and associated components.
c. Name of Sub-Contractor (if sub-contracted).
d. Information of current or completed similar jobs during the previous 5 years and
details of Quality Control Procedures adopted.
17
Version 1.0
NPQS
A2-10 Metal Roofs
5.1.7 Warranty
Submit the warranty upon completion of the works.
5.2.1 Samples
For each system type specified provide samples of each component to permit
approval of material quality, thickness, finishes and profile.
18
Version 1.0
NPQS
A2-10 Metal Roofs
5.2.2 Mock-Ups
Within timeframe as directed, provide mock-up panel of sufficient size to permit
approval of the intended construction. Also include the following elements where
applicable:
a. Eaves
b. Ridge
c. Edge/gutter
d. Upstand
e. Vent pipes / other building services protrusions
If approved, this sample mock-up panel may form part of the works.
Refer to the PSD for additional requirements of mock-up panels if any.
19
Version 1.0