Installation Checklist Adhesive Bonding

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

INSTALLATION CHECKLIST

Adhesive Bonding

Project Title

Client / Contractor Report no

Sub-contractor Date

Pipe Manufacturer Location

Drawing No. Rev.

Status Of Inspection / Test (Acc/Rej)


SN Inspection Activity
Joint Joint Joint Joint Joint

1 System
2 Pipe Diameter
3 Joint NO.
4 Jointer ID No.
5 Pipe Bell Cleaned
6 Pipe End Tapered
7 Angle of Taper
8 Shaving Length SA
9 OD at tip (S1)
10 Bell length up to stopper (BA)
11 Cemet kit Expiration date
12 Joint Cured With Heating Blanket
13 Force Curing Start Time
14 Force Curing Finish Time
15 Total Curing Time
16 Joint Marked for Identification
Remarks:

Site Supervisor Site Engineer Contractor Representative Client Representative

Signature Signature Signature Signature

Name: Name: Name: Name:

Date: Date: Date: Date: