Installation Checklist: Project Title Prject No. Client Report No. Pipe Manufacturer Date Location Drawing No

You are on page 1of 1

INSTALLATION CHECKLIST

OVERLAY LAMINATION & BARCOL HARDNESS INSPECTION

Project Title Prject No.

Client Report No.

Pipe Manufacturer Date

Location Drawing No.

S.No. Inspection Activities Joint Joint Joint Joint Joint Joint

1 System

2 Pipe Dia

3 Joint No.

4 Jointer ID No.

5 Pipe / Fitting

6 Pipe / Fitting

7 Bond Length Marked

8 Bond Length Grinded

9 Pipe End Tapered

10 Pipe Ends Aligned

11 Fit Layer Provided

12 Fit Layer Cured

13 Reinforcement Thickness

14 Bonding Length

15 Joint Cured with Heating Blanket

16 Force Curing Start Time

17 Force Curing Finish Time

18 Total Curing Time

19 Joint Marked for Identification

20 Barcol Hardness

Work Completed Satisfactory Yes ¨ No ¨

Contractor Company

Name

Signature

Date