Boq

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8
At a glance
Powered by AI
The document discusses cost estimates for different items for steel structure works including Y-columns, portal frames, beams and decking panels.

The different types of steel structures mentioned include Y-columns, portal frames, moment frames, secondary beams, and roof structures.

The standards referenced for steel structures include ANSI_AISC 341-10, ANSI_AISC 360-10, BS EN 7668: 2004, BS EN 10210: 2006, BS EN 10025: 2004 and BS EN 10029: 1991.

Unit Rate (BDT)

Material Fabrication Errection &


Item No. Description of Items Quantity Unit
s cost cost installation cost

1 2 3 4 5 6 7

5.2.3 Prefabricated Steel Structure Works


All exposed prefabricated steel members and accessories should be Fire NOTE
protected as per BNBC. Intrumescent paint Vermicullite spray. Anti corrosion
coating as per specification of the manufacturer. Anti corrosion paint should
support fire protection coating

Supplying & Fabrication of Prefabricated Built-up sections including


Columns, Beams, Secondary beam etc. along with attaching fasteners as
per design and in accordance with ANSI_AISC 341-10 & ANSI_AISC 36010
Standard Specification including surface cleaning and necessary painting
according to specification documents and also with required preinstalled
formwork and supply , carriage and erection of all materials, labors, tools,
incidentals, etc. all complete as per drawing, specification and direction of the
Engineer-in-charge. Minimum strength of supplied steel shall be 355
N/sq. mm. Material specification BS EN 7668: 2004, BS EN 10210: 2006,
BS EN 10025: 2004 & BS EN 10029: 1991, unless noted otherwise

5.2.3.1 Y-Columns and Related Connections 4,578.00 m.ton

5.2.3.2 Portal Frame for MPH Transfer Structure 892.00 m.ton

5.2.3.3 Steel Structure Moment Frames & Secondary Beams for 4th Floor 2,948.00 m.ton

5.2.3.4 Angle for Slab drop at 4th Floor 2.00 m.ton

5.2.3.5 Steel Structure Moment Frames & Secondary Beams for 5th Floor 2,751.00 m.ton
Unit Rate (BDT)

Material Fabrication Errection &


Item No. Description of Items Quantity Unit
s cost cost installation cost

1 2 3 4 5 6 7

5.2.3.6 Upper Roof Level Structure (Hangers & Jogging Track) 118.00 m.ton

5.2.3.7 PV Roof Structure 345.00 m.ton


Unit Rate (BDT)

Material Fabrication Errection &


Item No. Description of Items Quantity Unit
s cost cost installation cost

1 2 3 4 5 6 7
5.2.4 Supplying & fabrication of Base plate, End plate, Connection plate, 582.00 m.ton
Template, Cleat etc. as per design and in accordance with ANSI_AISC 341-
10 & ANSI_AISC 360-10 Standard Specification including surface cleaning
andnecessary painting according to specification documents and also with
required pre-installed formwork and supply and carriage of all materials,
labors, tools, incidentals, etc. all complete as per drawing, specification and
direction of the Engineer-in-charge. Minimum strength of supplied steel
shall be 355 N/sq. mm.

5.2.5 Supplying & fittings of Grade 8.8 Black Bolts, Sherardized, Galvanized 225.00 m.ton
and/or Stainless Steel nutbolts and washers for connections with
necessary accessories as per design and in accordance with ANSI_AISC
341-10 & ANSI_AISC 360-10 Standard Specification and also with required
pre-installed formwork and supply and carriage of all materials, labors, tools,
incidentals, etc. all complete as per drawing, specification and direction of the
Engineer-in-charge.

5.2.6 Supplying and fabrication of 1.00 mm thick Decking Panel with necessary 288.00 m.ton
anchoring accessories as per design and in accordance with ANSI_AISC
341-10 & ANSI_AISC 360-10 Standard Specification and also with required
pre-installed formwork and supply and carriage of all materials, labors, tools,
incidentals, etc. all complete as per drawing, specification and direction of the
Engineer-in-charge. Material specification BS EN 10143: 2006 with Standard
Coating Z275 (275 gm/sq.m)
Unit Rate (BDT)

Material Fabrication Errection &


Item No. Description of Items Quantity Unit
s cost cost installation cost

1 2 3 4 5 6 7
5.2.7 Supply and installation of Headed Shear Stud. Minimum characteristic Yield 35.00 m.ton
Strength shall be 350 N/sq. mm and Minimum Ultimate Tensile Strength shall
be 450 N/sq. mm.

Total= 12764.00 m.ton


Total Unit
Amount (BDT) Remarks
Rate (BDT)

8=5+6+7 9=3x8 10

- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Unit
Amount (BDT) Remarks
Rate (BDT)

8=5+6+7 9=3x8 10
- -
- -
- -
- -
Total Unit
Amount (BDT) Remarks
Rate (BDT)

8=5+6+7 9=3x8 10

- -

- -

- -

- -

- -

- -
Total Unit
Amount (BDT) Remarks
Rate (BDT)

8=5+6+7 9=3x8 10

- -