Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

SAP APO DP Automation of IBP Ops Forecast Alignment Using

Disaggregation

Change Name SAP APO DP Automation of IBP Ops Initiator Andrew Elleray
Forecast Alignment Using
Disaggregation
Workflow Stage Create Specification and Estimate Site Rugby
Date Created 21/07/2012 15:44:43 Division
Workflow ID AELY-8WEKAZ Company
Service Desk Ref Office Phone na
No
Third Party Ref No
Priority Low

Comments
Last Comment Trevor, please can you review and advise if this should go to Wipro, thanks
(See all
comments)
Budget Year 2012

ADR Description USER REQUIREMENTS SPECIFICATION (all sections to be completed before submitting ADR for
authorisation)

1. ADR Objectives:To use SAP APO DP to calculate the gap between the IBP BPC Forecast and the
Operational Forecast and then aligne by plans by adding in the difference in APO DP using the
Unconfirmed Base Key Figure in APO DP.
It is to be detemined between the Operational Forecasting Team and the ADR Development Team how the
process will be delivered.
It is envisaged by the ADR initiator as follows:
Timing: to be performed as part of any Forecast Release.
The Unconfirmed Base Key Figure must be zeroed for all periods before the onset of this process.
A full forecast recalculation is required before the Disaggregation Process begins.
The system will require a method of using the correct IBP BPC version (especially at Budget Planning
Times).
The system will use a Monthly APO DP Planning Book to select a given set of CVC's (listings), with Key
Figures in Tonnes of Final Base, Unconfirmed Base & Final Forecast & IBP BPC equivalent category
Forecast Numbers. e.g. for the Category Tesco Bisto Standard Gravy, the planning book would select all
Live Tesco Bisto Standard Gravy Listings, and would also select the IBP Equivalent Plan.
The system would then calculate the difference between the Ops Forecast and the IBP and load this
number into the Unconfirmed Base Figure, this would be disaggregated using the Confirmed Base Key
Figures.
This step must be repeated for each of the IBP BPC Categories that are extant. There are currently over
2700.
At the end of this process a full recalculation of the Forecast must be performed before the forecast is
released.

2. Scope and Exclusions of ADR:Calculations would compare the IBP BPC and Ops Forecast in Tonnes.
This would only be performed on Ambient Grocery and Cake Areas. Hovis Areas are outside scope.
An ability to exclude certain business areas from Disaggregation (e.g. Cake) is essential. This would need
to be able to be edited and controlled by the Ops Forecasting Team.

3. ADR Deliverables: Removal of business risk and the ability to create more accurate and regularly
updated alignment of the IBP BPC to the Ops Forecast.

4. Training Requirements:None, the system will operate outside of normal planining operations and be
performed by system based operations.

5. Known Constraints:None

6. ADR Assumptions:That IBP Plan Numbers are correctly controlled and maintained and available. It is
also essential that this process happens before any Forecast release and can be completed within all
normal APO DP Processes and updates. This process must be fitted in and the timing of other processes
may need to be changed to ensure this can be accommodated.
Reason for Change Time Is it absolutely
essential for
Legal /
Accreditation /
Customer
reasons ?
Benefits A Business Critical Process would be brought into controlled ISC operations, and no longer be dependent
Description on one single Premier Foods person, would allow weekly recalculatioins which would provide a far better
service to the business than currently available.

Consequence of The Current Process provides incorrect and incomplete numbes, is flakey (using a Spreadsheet System)
not doing change and causes Business Risk as the source data can only be completed by one user. At some state the
business process will create incorrect numbers which cause major Planning Issues.

Skills

Estimated Estimated UAT


Development Start Start Date
Date

Financial Impact

Resource Est Man Est. Man Expected Estimate Actual Actual Actual Actual Variance
Days Days Rates () d Days Days Rate () Cost () ()
(Spec) (Other) Costs () (Spec) (Other)

<Please Select> 0 0 0 0

Other External 0 0 0 0
Service Delivery 0 0 0 0

Additional Costs Estimate


Description d Cost ()

<None> 0

Totals 0 0 0
Progress History

---------------
Wipro do not have the resources to progress this ADR. Trevor has been asked if Deepak can provide any help. (18/12/2012
16:02:23 - Rachel Greenwood)
---------------
SEnt to Wipro for s&e on 3/8/12 (31/10/2012 16:14:09 - Rachel Greenwood)
---------------
We do not have a viable way to delivered this at present. There is thought to be a BPM dependency, as well as a lack of BPC skills
within wipro, (BPC hasnot yet be transitioned to wipro). (31/10/2012 16:13:59 - Rachel Greenwood)
---------------
Sent to revor for review on 3/8 (03/08/2012 09:43:06 - Rachel Greenwood)
---------------

Customer Updates (details emailed)

Andrew Last Rachel Last


Created 21/07/2012 18/12/2012
Created By Elleray/RHM Modified By Greenwood/ Modified
Date 15:44 16:02:26
UK/RHM RHMUK/RHM Date

Attachment(s)

Audit Trail

You might also like