Egina
Egina
Project Overview
Egina Pole consists of Egina-1, Egina-2, and Egina-South. The field has
reserves of 550 million barrels of light crude and is located to the
southwest of Akpo and expected to reach a plateau production of
200,000b/d of oil. The project start-up is expected to be at the end of 2017.
End user: Total