Project Execution and Operation of The World's First FDPSO - Azurite
Project Execution and Operation of The World's First FDPSO - Azurite
Project Execution and Operation of The World's First FDPSO - Azurite
Content
Introduction
Project overview
FDPSO specifics
Project execution
Operations
Lessons learned
The future
Summary
Company Profile
Two FSOs
Global Presence
- Vessels
- Offices
Amsterdam
FSO ENDEAVOR
(India)
Cyprus
Houston
Mumbai
Abidjan
Lagos
Singapore
Pointe Noire
Vittoria
Rio de Janeiro
FPSO UMUROA
(New Zealand)
Perth
FPSO POLVO
(Brazil)
New Plymouth
FPSO ABO
(Nigeria)
FDPSO AZURITE
(Congo)
1,6
1,4
1,2
0,8
0,6
0,4
0,2
2006
2007
2008
2009
FDPSO Specifics
Oil Production:
40,000 BOPD
Gas production:
75 mmscfd
Water injection:
60,000 BWPD
Oil storage:
1.4 mmbbls
Accommodation:
136 POB
Murphy Oil
Experience
Nabors Drilling
Innovation
Cooperation
Well
intervention
Production
&
Drilling
Integrated
FDPSO
Concept
Nabors Drilling
- Modular drilling equipment set + drilling services
Kencana, Malaysia
- Provision of topside modules
Field Layout
12
Simultaneous Operations
13
Lessons Learned
integration work
FPSO - Demand
134
141
143
Jul-08
Nov-08
156
160
Mar-09
Jul-09
119
Nov-07
Mar-08
Nov-09
Source: IMA
15
Leading Indicators
Brent oil price high for several years
Deepwater drilling
activity is set to remain
high for several years
to come
Available
160
Contracted
140
50
120
Rig years
100
97
110
132
80
60
81
40
97
112
101
89
74
62
20
40
0
2009
2010
2011
2012
2013
2014
2015
16
FDPSO Drivers
Implications
Main Challenges
Deep
waters
Increased
exploration
in difficult
areas
FDPSO Benefits?
Yes
Lack of infrastructure
Remote
areas
Marginal
fields
Yes
Yes
Marginal
fields
Needs for early production and extended life of fields are important drivers
17
18
18
Accelerated production
450,000
Dayrate in USD per day
500,000
400,000
350,000
300,000
FDPSO
250,000
200,000
150,000
100,000
50,000
0
Arrival of FPSO
60,000
50,000
Time
Completion of drilling
40,000
30,000
FDPSO
Drilling Unit + FPSO
20,000
10,000
0
0
20
40
60
Months
80
19
100
19
FDPSO Competitiveness
Benefits from fast tracking the field development
Availability and cost of drilling rigs
The length of the drilling program, and need for future wells
The number of wells that can be drilled with active spread mooring
The complexity of the wells and need for future well intervention
Benefits from simultaneous drilling and production
Simultaneous operations
- Including drilling and well services
Summary
A unique FDPSO successfully delivered
23