Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

CHD-6 22.12.2015

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Ref. No. CHN/POG.

T"tnOtn*1"-Or,
0
EVENT ANALYSIS REPORT
UNIT NO : 6 ITPS: Chandrapur Super Thermal Power Station Unit Capacity: 500 MW
1. *HO Code: Station Code: CSTPS U6 Time- Date- No. of days from last
T11 2A15-16 00:45 Hrs 22lL2l20Ls SynC.:- 9.1
Last Overhaul (COH) synchronisation Date 221071201s t52,9 Days 0.42 Years
2. operating conditions at the time of Event ,r
Load MW Coal Cycles in seruice Oil Suppoft
345 A,C,D, E, F,H AB
3.NatureofEvent:UnittrippedonCondensorPressureve
Pumps failure. (Electrical Problem)

4. Name of Firct Up, Main Protections A p


Turbine tripped on "Condenser Pressure Very High", boiler tripped on RH protection, Generator tripped on reverse
power protection.

5 A) Obseruations :-
Unit was running with 345 MW load. All running CCW pumps tripped due to failure of DC supply & closure of
Butterfly valve of running CCW pumps. Condenser pressure increased & unit tripped on Condenser pressure very
High. CCW DC supply cable checked from both end, found open.
5 B) Remedial Action/work done l-

DC supply source extended from HT switchgear control supply fuse board & supply normalised (BFV Dc control
supply normalised)

6. Root Cause Analysis :-


CCW DC supply cable checked from both end, found open, therefore DC supply of CCW HT switchgear & control
supply to CCW butterfly valve failed causing closure of Butterfly valve of running CCW pumps, Condenser pressure
increased & unit tripped on Condenser Pressure very High
7. Preventive action suggested (Shoft Term) :- Nil

8. Preventive action suggested (Long Term) :-


DC source extention from Unit-6 to Unit-S & vice versa for immediate restoration of DC supply in case of failure of
made available.

9. Similar event occurred last time: Nil U# Time: ---- Date:

9A. Implementation Status of Long Term/Shoft Term measures stated at Sr No 9:-


Short Term: ----
Long Term:----

10. Boiler lighted up Time - 02: 12 Hrs Date- 221L2120I5


11. T-A Set Synchronised Time - 05:41 Hrs Date- 221I2120L5
L2. Remark :- Nil

.:,$Mill
13. Recommendations of Works Section:
1. Procurement/Replacement Plan: .

2. Operational Error:
3. Delay in Maintenance:
4. Delay in bringing back the Unit:
5. Training of Staff:
6. Whether remedial action is completed satisfactory & point is closed :

CEIDy C E (Works)
*HO Code will be given by Works Section.

You might also like