6 Station: Ref - No.cHN/Poc - Rripping/c-4"00
6 Station: Ref - No.cHN/Poc - Rripping/c-4"00
Last Overhaul (AOH) synchronisation Date 2310812012 861 .5 Days 2.36 Years
2. Operating conditions at the time of Event a-
r
4. Name of First Up, Main Protections & protection on which GCB tripped:
Boiler hand tripped, Turbine tripped on interlock, Generator tripped on reverse power protection,
5 A) Obseruations :-
Unit was running at 360 MW load with coal mill A,B,D,F,H. CEP- A & B, in service. At 18:23 Hrs Heavy jerk noticed
causing tripping of Unit board-6A on under voltage. Due to this auxilliaries on Unit board-6A such as FD-6A, BCW-
6A, CEP-6A & 68, Coal Mill 6A & 6E tripped. Due to this load variation observed and unit withdrawn by Boiler manual
tripping.
I
i
i
CEIDy C E (Works)
*HO Code will be given by Works Section.