50t Rope Drum Hoist
50t Rope Drum Hoist
50t Rope Drum Hoist
50 Tonne Hoist1
GREY HOUND ENGINEERS
Shear stress without keyway = 0.3 X Y.P 979kg/cm2
50 Tonne Hoist2
GREY HOUND ENGINEERS
Eqt. Bending / Torsional 1958 kg/cm2 stress with
keyway
50 Tonne Hoist3
GREY HOUND ENGINEERS
Make : Bharat Bijlee or EQT
% of POT / FLT = 320% % of STG.T / FLT = 230%
4.3 Brake :
Braking torque required = [{(71620 X 15) / 935} X 1.5] = 1723kgcm.
Proposed 250 A.C Electromagnetic solenoid operated single phase brake
100% coil rating class F insulation working on 400/440 V A.C having braking
capacity 19.3kg.m 1 No. Make : Sterling / EMC
4.4 Rope Drum :
Wire rope : 32mm
Proposed 2 drums with each 4 falls
Material : Cast steel IS 1030 Grade 280 520 W
Min. drum : 20 X 32 = 640mm
Proposed 1000mm PCD. Circumference = 3.1416M
Lift : 20M
No.of grooves required / drum =(20 X 4 / 3.1416)+3 = 28.464grooves 29 grooves
z Pitch of the grooves = 32 + 3 = 35mm
Depth of grooves = 0.35d = 0.35 X 32 = 11.0mm
Radius of the groove = 0.53d = 0.53 X 32 = 16.96 17mm
Length of the drum = 170 + (29 X 35) + 50 = 1235mm
Groove Details :
30 50 29X35 = 1015
32
R 17
5
28 11
1150
1
1080 PCD
912
Design of Shell :
Proposed shell thickness = 28mm
Compressive stress = C = (K X P) / (p X t)
Where K = Coefficient for single layer wind = 1
P = Max. Rope tension =6739 kg
p = pitch = 3.5cm
t = Thickness of shell = 2.8cm
C= (1 X 6739) / (3.5 X 2.8) = 688kg/cm2 < 1060kg/cm2
50 Tonne Hoist4
GREY HOUND ENGINEERS
1255
1235
50 29x35 = 1015 70 100
100
66
1000
1150
1080
990
912
40 20
30
120
90
Check for bending :
50 Tonne Hoist5
GREY HOUND ENGINEERS
50 Tonne Hoist6
GREY HOUND ENGINEERS
Worm reducer:
Proposed worm reducer 70 : 1 Type U, size 10 input H.P 16.3 input speed
1000 rpm output torque 620kgm, output shaft extended on either side with self
locking gear box 1 No. Make : Shanti / Elecon / Premium.
4.7 Checking up of Wire Rope, drum and Gears for Motor Break down torque
condition of motor i.e. 320 % of Motor Torque :
Motor provided = 15 HP 935rpm POT / FLT = 2.75
275 % of motor torque = ((71620 X 15) / 935) X 2.75 = 3159 kg cm
Starting efficiency of system up to drum = 0.933 X 0.44 = 0.354
Torque on each drum = X 3159 X 0.354 X 70 X 21.159 = 828163 kgcm
Rope tension = 828163 / 50 = 16563 kgs
Rope tension in BDT : ( 0.93)
P1 = 16563kg P2 = 15484g P3 = 14325kg P4 = 13322kg
Note : No check is required for bending stress since the crushing stress is on
very much on lower side than permissible
4.7.3 Checking the Gear wheels and Pinion under BDT condition :
Tooth load on W 1P1 = (16563 X 100) / (159.6 X 0.93) = 11159 kg
Tooth load on W 2P2 = (11159 X 28.8) / (67.2 X 0.93) = 5142kg
50 Tonne Hoist7
GREY HOUND ENGINEERS
5.0 Design of Shafts : Gear Box Assembly
626
5
72
452
14
72
942
1326
310
90
123
W1
874
300
548
W2 P2
112
130 130
8
30 120
95
825
10 3
320 260
380 320
525
400
400
380
50
20 345 310
100
200
180
425
1255
910
810
300
1600
300
300
590
2500
690
100
303
1135
1000
424
90
173
100
720
50 Tonne Hoist8
GREY HOUND ENGINEERS
PtVW1
PtW
1
Pr
PrVW1
W
P1 1
300 PrHP1
PrVP1
PrP1 PrHW1
PrW1
PrP
1
PtVP1
Pt
P1
Rt
Pt
W 1
PtHP1
Normal condition :
Fw1 (V) = - 4235 491 = - 4726kg Fw1 (H) = + 1542 1349 = + 193kg
FP1 (V) = + 4235 + 491 = +4726kg FP1 (H) = - 1542 + 1349 = - 193kg
BDT Condition :
Fw1 (V) = - 11865kg Fw1 (H) = + 484kg
FP1 (V) = +11865kg FP1 (H) = - 484kg
50 Tonne Hoist9
GREY HOUND ENGINEERS
BDT Condition :
PrP2
PtP2 (V) = - 5142kg PrP2 (H) = - 1872kg
Prw2
PtW 2 (V) = + 5142kg PrW 2 (H) = + 1872kg
50 Tonne Hoist10
GREY HOUND ENGINEERS
Bearing :
Gear wheel W1 side:
Proposed bush bearing Al. bronze IS 305 Grade AB1
Permissible stress : 0.04 X 500 X 10.2 = 204kg/cm2
Size ID : 90 OD : 120 150 long
Bearing Stress = 3222 / 9 X 15 = 24kg/cm2 < 204kg/cm2
Non gear wheel side (Drum Hub side) :
Proposed bush bearing Al. bronze IS 305 Grade AB1
Size ID : 90 OD : 120 90 long
Bearing stress = 7352 / 9 X 9 = 109kg/cm2 < 204kg/cm2
50 Tonne Hoist11
GREY HOUND ENGINEERS
50 Tonne Hoist12
GREY HOUND ENGINEERS
50 Tonne Hoist13
GREY HOUND ENGINEERS
50 Tonne Hoist14
GREY HOUND ENGINEERS
Horizontal reaction :
RHC = + 1093kg
RHD = + 295kg 5252kg 11943kg
1872kg P1 -484kg
RC = (7693)2 + 10932 = 7770kg c W2 d
C D
RD = 95012 + 2952 = 9505kg 15 15
46
16
BM = 9505 X 16 = 152080kgcm
Torque transmitted = 11865 X 14.4 = 170856kgcm
Eqt. Twisting moment = 1520802 + 1708562 = 234506kgcm
Eqt bending = (234506 + 152080) = 190408kgcm
Proposed : 11 shaft ZXX = 131cm3 ZPP = 262cm3
Bending stress = 152080 / 131 = 1161kg/cm2 < 1958kg/cm2
Twisting stress = 170856 / 262 = 652kg/cm2 < 1958kg/cm2
Combined stress = 11612 + 3(652)2 = kg/cm2 < 1958kg/cm2
Eqt. Bending stress = 190408 / 131 = 1620kg/cm2 < 1958kg/cm2
Eqt. Twisting stress = 234506 / 262 = 873kg/cm2 < 1958kg/cm2
Horizontal reaction :
RE = - 492kg RF = - 238kg
Resultant reaction :
RE = - 13912 + 4922 = -1424kg
RF = - 6472 + 2382 = - 689kg
Max. BM = 1424 X 15 = 21360kgcm
50 Tonne Hoist15
GREY HOUND ENGINEERS
Torque transmitted = 2005 X 8.8 = 17644kgcm
Proposed : shaft 8cm at key way and 7.5cm at bearing
ZXX = 50cm3 ZPP = 100cm3
Bending stress = 21360 / 50 = 427kg/cm2 < 949kg/cm2
Twisting stress = 17644 / 100 = 176kg/cm2 < 734kg/cm2
Combined stress = 4272 + 3(176)2 = 525kg/cm2 < 1518kg/cm2
Eqt. Torque = 213602 + 176442 = 27705kgcm
Eqt. Bending = (27705 + 17644) = 22674kgcm
Eqt. Bending stress = 22674 / 50 = 453kg/cm2 < 1138kg/cm2
Eqt. Twisting stress = 27705 / 100 = 277kg/cm2 < 881kg/cm2
Bearing :
Proposed Plummer block SNA 517 TC to suit 75 shaft with 22217EK
bearing and H317 adopter sleeve having dynamic capacity 285KN, static
capacity 325KN.
B. BDT Condition :
Vertical load in kgs: Material Forged steel 45 C 8 IS 2004 or En 8
Tooth load of P2 - 5142
Weight of P2 + 22
- 5120
Horizontal load in kgs:
Tooth load of P2 - 1872
Vertical reaction :
RE = - 3450kg
RF = - 1670kg
Horizontal reaction : - 5120 kg
- 1872 kg
RE = - 1262kg
RF = - 610kg E
15 31
F
Resultant reaction : 46
50 Tonne Hoist16
GREY HOUND ENGINEERS
Bending stress = 55110 / 50 = 1102kg/cm2 < 1958kg/cm2
Twisting stress =45250 / 100 = 453kg/cm2 < 1958kg/cm2
Combined stress = 11022 + 3(453)2 = 1353kg/cm2 < 1958kg/cm2
Eqt. Torque = 551102 +452502 = 71307kgcm
Eqt. Bending = (71307 + 55110) = 63209kgcm
Eqt. Bending stress = 63209 / 50 = 1264kg/cm2 < 1958kg/cm2
Eqt. Twisting stress = 71307 / 100 = 713kg/cm2 < 1958kg/cm2
C. Checking of Plummer Block Vertical load for fixing bolts :
Max. Vertcal load in tension : -1391kg
Proposed bolt M20 Material quality Cl. 4.6 of IS 1367 Yp : 240 MPa UTS : 400MPa
Permissible stress : 0.2 X 400 X 10.2 = 816kg/cm2
Area of each bolt : 2.45cm 2 ( Appendix A of IS 1367 Part 114)
Tensile stress : 1391 / (2 X 2.45) = 273kg/cm2 < 960kg/cm2
Clutch
SP2
Motor
50 Tonne Hoist17
GREY HOUND ENGINEERS
61 41
8
SP2
No. of revolutions made by P1w2 shaft
100
50
25 60
150
= 25.4647 X (133 / 24) = 141.11 revolutions
185
Proposed 12 = 1.0 50
75 25 40
extended 180mm on either side.
125
SP1
Utilised ratio of worm gear box
= 3,560
A provided = 57 / 16 = 3.563
SP1 16 (1 / 2) 65.10mm
SP2 57 (1 / 2) 230.54mm
50 Tonne Hoist18
GREY HOUND ENGINEERS
4925
1120 3200 605
98
1080
1080
1923 1277
? OF GUIDE ? OF DRUM
1081 842 810 467
1215
1543
328
527
1627
135
2127
20 20
280 12.01
1600
320
500
9250
9500
500
1600
2127
1627
527
328
1543
1215
830
3200
50 Tonne Hoist19
GREY HOUND ENGINEERS
7.0.2 Material :
Structural Steel IS 2062 2006 Grade E 250 quality B
A. Normal Condition :
Bending stress in tension or compression
= 0.66 Yp = 0.66 X 2448 = 1615 / 1.1 = 1468kg/cm2
Average shear stress = 0.4 X 2448 = 979 / 1.1 = 890kg/cm2
Bearing stress = 0.75 Yp = 0.75 X 2448 = 1836 / 1.1 = 1669kg/cm2
B. BDT Condition :
Permissible stress under BDT condition 0.8 Yp
= 0.8 X 2448 = 1958kg/cm2
50 Tonne Hoist20
GREY HOUND ENGINEERS
212.7
Design of Weld : 25
= 35 X 4 = 140cm length.
350
Weld strength required
25
Proposed 6mm fillet weld having strength of 0.7 X 0.6 X 890 = 373kg/cm length.
50 Tonne Hoist21
GREY HOUND ENGINEERS
BDT Condition :
The load at pulley 1 = Rope tensions of P2 + P3 + Self wt. of pulley, pin etc
= 15484 + 14325 + 150 = 29959 kg
The load at pulley 2 = Rope tensions of P4 + Self wt. of pulley
= 13322 + 150 = 13472kg
The load at a = load at pulley 1 + pulley2 = 29959 + 13472 = 43431 kg
128.3
Max. BM at a = 46802.6kgcm
Area = 28.5cm2
0.62
IXX = 1830cm4
20 17.72
ZXX = 181cm3
50 Tonne Hoist22
GREY HOUND ENGINEERS
Check for Deflection :
Permissible deflection = 0.160cm
Actual Deflection = 0.009cm < 0.16cm
Max. BM = 39 kgcm
Proposed ISMC 200mm X 75mm channel
1.14
Area = 28.5cm2
0.62
20 17.72
IXX = 1830cm4
ZXX = 181cm3
7.50
BDT Condition :
No need in checking as stresses coming in normal conditions are very less.
50 Tonne Hoist23
GREY HOUND ENGINEERS
1.72
18
Proposed ISMB 500 X 180 girder
Area = 111cm2
1.02
IXX = 45200cm4
46.56
50
ZXX = 1810cm3
Max. BM = 3113115kgcm
50 Tonne Hoist24
GREY HOUND ENGINEERS
fbending = 3113115 / 1810 = 1719kg/cm2 < 1958kg/cm2
fshear = 22251 / (50 X 1.02) = 437 kg/cm2 < 1958kg/cm2
1.72
18
Area = 111cm2
1.02
IXX = 45200cm4 46.56
50
ZXX = 1810cm3 and web thick is 1.02cm
320
50 Tonne Hoist25
GREY HOUND ENGINEERS
3100kg
B9 A9
RB5 = 6516kg
950
RA5 = 6039 kg
Max. BM = 906800 kgcm
f bending = 906800 / 1810 = 500 kg/cm2 < 1958kg/cm2
f shear = 6516 / (50 X 1.02) = 128 kg/cm2 < 1958kg/cm2
1.2
Area = 156cm2
60
IXX = 110200cm4
ZXX = 3060cm3
24
BDT Condition ;
391kg 391kg
20505kg 6039kg 20505kg 4733kg
RB6 = 26924 kg A9 A2 A5 A2 A2
RA6 = 25634kg B6 A6
204.5 32.8 212.7 212.7 32.8 229.5
925
50 Tonne Hoist26
GREY HOUND ENGINEERS
Max. BM = 7141754 kgcm
fbending = 7141754 / 3060 = 2333 kg/cm2 < 1958kg/cm2 ( Additional Plate of 20 mm at centre will be
Provided)
BM = 182949 kgcm
Proposed ISMB 500 X 180 girder for rigidity :
Area = 111cm2
IXX = 45200cm4
IYY = 1810cm4
fbending = 183949 / 1810 = 101 kg/cm2 < 1530kg/cm2
fshear = 17594 / (50 X 1.2) = 293 kg/cm2 < 927kg/cm2
50 Tonne Hoist27
GREY HOUND ENGINEERS
Wind Load :
700
224kg
a) Load due to wind on hoist & hoist girder
= Area X form factor X wind pressure 350
ZYY = 1942cm3
2.35 2.35
rXX = 13.58cm 17.65 17.65
38
30
30
rYY = 15.18cm
Proposed bracings on RXX direction
Effective length = 700 cm
38
Slenderness ratio = 700 / 13.58 = 51.5 40
50 Tonne Hoist28
GREY HOUND ENGINEERS
Permissible bending stress = 1530kg/cm 2
Bending stress = 1305600 / 1942 = 672 kg/cm2 < 1530kg/cm2
Compressive stress = 37738 / 168.6 = 224 kg/cm2 < 1306kg/cm2
Check for unity = (672 / 1530) + (224 / 1306) = 0.61 < 1
The columns are provided with box sections and hence no bracings are required.
however the bracings are provided to arrest vibration.
8.2 Design of Base Plate :
Bearing plate area = 60 X 52 = 3120cm2
Bearing pressure on concrete P =37738 / 3120 = 12 kg/cm2 < 42kg/cm2
5 15 10 10 15 5 5
21
52
21
5
60
50 Tonne Hoist29
GREY HOUND ENGINEERS
8.3 Design of Anchor Bolts :
******
50 Tonne Hoist30