INSPECTION AND TEST PLAN (For Field Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Action
Activity Document Verification
SNo Survey ,Test or Inspection requirements Contractor Remarks
Description References Documents CSC PM
MHSI/Alabalgh
TES System
Inspection of Tank Foundation Insulation;
Tank Foundation
Drawing +
1.1 Designers Material & Installation.
See Note 1. W W S
Inspection
Recommendation
WIR + Shop
Receiving Inspection at
Welding Electrodes/Consumables;
2.2 Correlation of ID Physical/Visual, Dimensional Examination & Review of MTR/MTC. WIR + Delivery W W S
Advice/Transfer
markings and Slip and/or
DA/PO. Abrasives, Paints & Thinners; MRIR.
2.3 Physical/Visual Examination & Review of MTR. W W S
WIR + Applicable
3.1 AWWA D100-11. Laying & Fit-up VDI, before welding. Drawing. W S S
Ref. Drawing +
AWWA D100-11, Annular Plate, Butt Welded Joints;
3.2 Sec. 11.4.2& Post Welding VDI, prior to RT. And Selection of RT Spot Location.
WIR + WVIR W S S
14.4.4.
Correlation with Each Course, Laying & Fit-up VDI, before welding.
WIR + Applicable
Ref. Drawing + Drawing.
AWWA D100-11 Shell Plates Horizontal Joints;
4.2 Each Course, Laying & Fit-up VDI, before welding. R S S
Ref. Drawing + Air Shell Plates Nozzles/Manholes; Each Nozzle/Manhole RF Pads Air Test,
4.8 Test Procedure. before NDT. WIR + ATR W W S
Al Wakrah Stadium and Precinct
INSPECTION AND TEST PLAN (For Field Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Action
Activity Document Verification
SNo Survey ,Test or Inspection requirements Contractor Remarks
Description References Documents CSC PM
MHSI/Alabalgh
Welding Inspection/Testing of Tank Fixed In-Process Erection & Welding Inspection/Testing
Ref. Drawing + Roof Support Structure (Column and Column Base Plate); WIR + Applicable
5.3 AWWA D100-11. Laying & Fit-up VDI, before welding. Drawing.
W S S
Ref. Drawing + Roof Support Structure (Column and Column Base Plate);
5.4 AWWA D100-11. Each Joint, Post Welding VDI, WIR + WVIR W S S
Roof
In-Process Erection & Welding Inspection/Testing of Tank Fixed Al Wakrah Stadium and Precinct
INSPECTION AND TEST PLAN (For Field Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Action
Activity Document Verification
SNo Survey ,Test or Inspection requirements Contractor Remarks
Description References Documents CSC PM
MHSI/Alabalgh
Roof
AWWA D100-11. + Roof Support Structure (Column and Column Base Plate); WIR + RT
5.5 RT Procedure R S S
RT of butt joints, Progressively, Before Installation / painting, Reports & Films.
Nozzles, Manholes;
In-Process Erection &
Inspection/Testing of
Ref. Drawing +
5.1 AWWA D100-11. Each Nozzle/Manhole Orientation& Location Marking VDI, before WIR + NOIR. W S S
Tank Fixed Roof
Pre-Blast Checks;
Painting a) Abrasive Type, Performance and Storage.
Specification & b) Solvent or Detergent Cleaning before Abrasive Blast (If required). WIR + Tank Release
6.1. Mfr.s Product Data c) Temperature & Dew Point. for Painting Report W S S
Sheet. d) Surface condition.
e) Ensure all welding works are complete & Tank Released for Painting.
Equipment;
Painting a) Compressed Air Supply Blotter Test. (Minimum Frequency = start of each 8
6.2 Specification shift).
Painting Log. S S S
b) Operational Dead-man Remote Control Used.
Painting/Coating
Painting Post Blast Examination; Cleaning- Spent Abrasive Removal. Examine Surface
6.3 Specification Cleanliness & Profile.
PIR W S S
Pre-Painting Checks;
Painting Paint/Thinner Storage, Mfr. Date, Can Leak. Weather Conditions & Substrate Painting Log +
6.4 Specification Conditions. Paints mixing and Stripe coating (if required). Recoating Intervals PIR S S S
Adhered To. (If applicable).
Painting/Coating
Al Wakrah Stadium and Precinct
INSPECTION AND TEST PLAN (For Field Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Action
Activity Document Verification
SNo Survey ,Test or Inspection requirements Contractor Remarks
Description References Documents CSC PM
MHSI/Alabalgh
Painting During Painting Checks; Continuous Agitation During Coating Process. Wet
6.5 Specification Film Coating Thickness Readings.
Painting Log S S S
Ref. Drawing +
6.7 ASTM A123. Visual Examination of Galvanized Parts Touch-up (As applicable). WIR R R S
Legend
W Witness(attendance expected,Signature on Check sheet) WIR Work Inspection Request KEO Project Management
H Hold Point IFC Issued for Construction CSC Construction Supervision Consult
S Sureveillance(random Surveillance,no signature Required) DA Delivery Advice MC Main Contractor
R Review Record PO Purchase Order MHSI Metscco Heavy Steel Ind. Co. Ltd.
R* Witness for First Fitup, review for rest. VDI Visual and Dimensional Inspection
VB Vacuum Box
PT Liquid Penetrant Testing
MT Magnetic Particle Testing
RT Radiographic Testing
AWWA D100Consstruction Code for Welded Carbon Steel Tanks for Water Storage
Forms
MRIR Material Receiving Inspection Report.
NOIR Nozzles Orientation Inspection Report.
JFR Joint Fit-up Report.
WIR Welding Inspection Report.
VBTR Vacuum Box Test Report
POTR Penetrating Oil Test Report
ATR Air Test Report.
PIR Painting Inspection Report.
FIR Final Inspection Report (Handover).
NCR Non Conformance Report.
Notes
Al Wakrah Stadium and Precinct
INSPECTION AND TEST PLAN (For Field Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Action
Activity Document Verification
SNo Survey ,Test or Inspection requirements Contractor Remarks
Description References Documents CSC PM
MHSI/Alabalgh
Remarks
adium and Precinct
d Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Remarks
adium and Precinct
d Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Remarks
adium and Precinct
d Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Remarks
adium and Precinct
d Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Remarks
adium and Precinct
d Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Remarks
adium and Precinct
d Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Remarks
adium and Precinct
d Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Remarks
adium and Precinct
d Works of Tank, ITP # ITP/1612/F01 Rev. 2)
Remarks