Consistence of The Concrete. Generally Speaking, This Time Shall Be Taken As 2 HR in Cold
Consistence of The Concrete. Generally Speaking, This Time Shall Be Taken As 2 HR in Cold
Consistence of The Concrete. Generally Speaking, This Time Shall Be Taken As 2 HR in Cold
TEMPERATURE, THE AMBIENT TEMPERATURE, WIND SPEED, CEMENT TYPE, MIX PROPORTIONS, THE
USE OF ADMIXTURES WITH SET RETARDING PROPERTIES, THE TIME IT TAKES TO BE COMPACTED AND
CONSISTENCE OF THE CONCRETE. GENERALLY SPEAKING, THIS TIME SHALL BE TAKEN AS 2 Hr IN COLD
WEATHER AND 1 TO 1.5 Hr IN HOT WEATHER. TO AVOID COLD JOINTS, PLACING SHOULD BE RESUMED
BEFORE THE SURFACE HARDENS. FOR UNUSUALLY LONG DELAYS DURING CONCRETING, THE CONCRETE
SHOULD BE KEPT LIVE BY PERIODICALLY RE-VIBRATING IT. CONCRETE SHOULD BE VIBRATED AT
APPROXIMATELY 15-MINUTE INTERVALS OR LESS DEPENDING UPON JOB CONDITIONS. HOWEVER,
CONCRETE SHOULD NOT BE OVERVIBRATED TO THE POINT OF CAUSING SEGREGATION. FURTHERMORE,
SHOULD THE CONCRETE APPROACH TIME OF INITIAL SETTING, VIBRATION SHOULD BE DISCONTINUED
AND THE CONCRETE SHOULD BE ALLOWED TO HARDEN WHERE A COLD JOINT WILL RESULT. COLD JOINT
SHALL BE AVOIDED TO THE POSSIBLE EXTENTE. IF, HOWEVER, A COLD JOINT IS FORMED DUE TO
UNAVOIDABLE REASONS, THE BELOW PROCEDURE SHALL BE ADOPTED IN TREATING COLD JOINTS