04 Fault Calculations
04 Fault Calculations
04 Fault Calculations
P143
SYNCHRONIZING RELAY
PREPARED BY:ENG.GOKULNATH.S
INDEX
CHAPTER 1:
1. INTERFACING PC WITH RELAY
2. EXTRACTING SETTINGS FROM THE RELAY
CHAPTER 2:
1. SETTING VALUES AS PER OUR REQUIREMENT IN
THE RELAY.
2. UPLOADING THE SETTING VALUES TO THE RELAY.
3. MEASUREMENT TEST.
CHAPTER 3:
1. PHASE ANGLE AND UNDER VOLTAGE ELEMENT.
2. DIFFERENTIAL VOLTAGE ELEMENT.
3. SYSTEM SPLIT ELEMENT AND TIMER.
4. VOLTAGE MONITOR.
PREPARED BY:ENG.GOKULNATH.S
CHAPTER 1
INTERFACING PC WITH RELAY
PREPARED BY:ENG.GOKULNATH.S
A. COMMUNICATION WITH RELAY.
CLICK MICOM S1 AS MENTIONED IN BELOW
PICTURE.
PREPARED BY:ENG.GOKULNATH.S
1.NOW WE HAVE TO CREATE NEW SYSTEM HENCE
CLICK NEW SYSTEM AS MENTIONED IN BELOW
PICTURE.
2. ASSIGN NAME FOR NEW SYSTEM AND CLICK OK
PREPARED BY:ENG.GOKULNATH.S
3.NOW SYSTEM IS CREATED AND THEN CLICK QUICK
CONNECT AS SHOWN IN BELOW PICTURE
PREPARED BY:ENG.GOKULNATH.S
4. ENTERING QUICK CONNECT THE PAGE WILL
OPENED AS SHOWN IN BELOW PICTURE.
5. NOW WE NEED TO ENTER THE DEVICE TYPE, AS
PER OUR CONCERN OUR RELAY IS P143 HENCE IT
FALLS IN PX40 SERIES. CLICK PX40 AND THEN OK
PREPARED BY:ENG.GOKULNATH.S
6. NOW WE NEED TO ASSIGN OUR COMMUNICATION
TYPE, HENCE CLICK BELOW OPTION AS PER OUR
REQUIREMENT.
PREPARED BY:ENG.GOKULNATH.S
7. WE NEED TO ENTER THE COMMUNICATION
ADDRESS WHAT WE USED IN OUR PC, THERFORE
ASSIGN AS PER OUR REQUIREMENT AND CLICK
FINISH.
PREPARED BY:ENG.GOKULNATH.S
8.NOW THE COMMUNICATION PROCESS IS
STARTED WHICH IS MENTIONED IN BELOW
PICTURE.
PREPARED BY:ENG.GOKULNATH.S
9.NOW WE NEED TO ENTER THE NAME AND THEN
CLICK FINISH
PREPARED BY:ENG.GOKULNATH.S
10.AFTER THIS NOW WE SUCCESSFULLY COMPLETED
OUR COMMUNICATION AND NOW WE NEED TO
EXTRACT THE SETTINGS FROM RELAY.
11.GO TO EXTRACT AND CLICK EXTRACT SETTINGS.
PREPARED BY:ENG.GOKULNATH.S
12.AFTER EXTRACTING SETTINGS AND PSL IT WILL
SHOW WITH NAME AS 000 AND HENCE WE NEED TO
RENAME AS DEFAULT.
13.FOR OUR TESTING PURPOSE WE SHOULD NOT
DISTURB THE DEFAULT VALUES AND HENCE DO THIS
PROCESS FOR BOTH SETTINGS AND PSL ONCE MORE
AND NAME IT AS TEST.
PREPARED BY:ENG.GOKULNATH.S
14. NOW CLICK TEST AND NEW WINDOW WILL BE
OPENED WITH ALL THE DEFAULT CONFIGURATION
AND SETTING VALUES.
PREPARED BY:ENG.GOKULNATH.S
CHAPTER 2
PREPARED BY:ENG.GOKULNATH.S
1.WE NEED TO CHANGE THE SYSTEM VALUES AS PER
OUR REQUIREMENT AND OUR SCHEMES
PREPARED BY:ENG.GOKULNATH.S
3.AFTER SENDING SAVED VALUES TO THE RELAY, IT
STARTS LOADING PROCESS THEN AT LAST IT WILL
SHOW AS MENTIONED IN BELOW PICTURE.
PREPARED BY:ENG.GOKULNATH.S
CHAPTER 3
PREPARED BY:ENG.GOKULNATH.S
PHASE ANGLE AND UNDER VOLTAGE ELEMENT
PREPARED BY:ENG.GOKULNATH.S
3. WE HAVE TO SELECT THE OUTPUT FOR PHASE
ANGLE ELEMENT IN PSL.
PREPARED BY:ENG.GOKULNATH.S
6. NOW GO TO SYSTEM CHECK, ENABLE CS VOLTAGE
BLOCK AS UNDER VOLTAGE WHICH IS SHOWN IN
BELOW PICTURE.
PREPARED BY:ENG.GOKULNATH.S
8. BELOW PICTURE SHOWS THE OUTPUT ASSIGNED
FOR UNDER VOLTAGE ELEMENT.
PREPARED BY:ENG.GOKULNATH.S
10.NOW GO TO SYSTEM CHECK, ASSIGN THE
DIFFERENTIAL VOLTAGE AS 5.0 V AS SHOWN IN BELOW
PICTURE.
PREPARED BY:ENG.GOKULNATH.S
12. BELOW PICTURE SHOWS THE OUTPUT ENABLE IN
PSL FOR DIFFERENTIAL VOLTAGE.
PREPARED BY:ENG.GOKULNATH.S
14. NOW ENABLE SYSTEM SPLIT ELEMENT AS SHOWN IN
BELOW PICTURE.
PREPARED BY:ENG.GOKULNATH.S
16. BELOW PICTURE SHOWS THE PSL OUTPUT ASSIGNED
FOR SYSTEM SPLIT ELEMENT.
PREPARED BY:ENG.GOKULNATH.S
18. IN ORDER TO CHECK TIMING TEST FOR SYSEM
SPLIT GO TO TIME SETTING AND SET AS 5.O SECONDS
AS SHOWN IN BELOW PICTURE.
PREPARED BY:ENG.GOKULNATH.S
20. TO PERFORM VOLTAGE MONITOR TEST, SET THE
LIVE VOLTAGE AND DEAD VOLTAGE AS SHOWN IN
BELOW PICTURE.
PREPARED BY:ENG.GOKULNATH.S
22. TO PERFORM THIS TEST WE SHOULD TAKE THREE
CONITIONS.
A. DEAD LINE AND LIVE BUS.
B. LIVE LINE AND DEAD BUS.
C. DEAD LINE AND DEAD BUS.
PREPARED BY:ENG.GOKULNATH.S
25. NOW WE WILL TAKE FOR SECOND CONDITION LIVE
LINE AND DEAD BUS AS MENTIONED IN BELOW
PICTURE.
PREPARED BY:ENG.GOKULNATH.S
27. FOR THIRD CONDITION WE NEED TO ASSIGN THE
OUTPUT IN PSL AS DEAD LINE AND DEAD BUS.
CONCLUSION:
THIS CHAPTER DEALS WITH HOW TO
COMMUNICATE RELAY AND HOW TO TEST THE
SYNCHRONISING RELAY.
THANK YOU.
PREPARED BY:ENG.GOKULNATH.S