B Band Fault
B Band Fault
B Band Fault
** ON A/C ALL
TASK 46-41-00-040-801-A
Deactivation of the Connectivity System
C. Referenced Information
REFERENCE DESIGNATION
(Ref. 24-41-00-861-801-A). Energize the Aircraft Electrical Circuits from the External Power A
(Ref. 24-41-00-861-801-A-01). Energize the Aircraft Electrical Circuits from the APU (APU Started
with APU BAT)
(Ref. 24-41-00-861-801-A-03). Energize the Aircraft Electrical Circuits from the External Power A and
B
(Ref. 24-41-00-861-801-A-04). Energize the Aircraft Electrical Circuits from the APU (APU started with
External power A)
(Ref. 24-41-00-861-801-A-05). Energize the Aircraft Electrical Circuits from the External Power B
(Ref. 24-41-00-862-801-A). De-energize the Aircraft Electrical Circuits from the External Power A
(Ref. 24-41-00-862-801-A-01). De-energize the Aircraft Electrical Circuits from the APU
(Ref. 24-41-00-862-801-A-03). De-energize the Aircraft Electrical Circuits from the External Power A
and B
(Ref. 24-41-00-862-801-A-04). De-energize the Aircraft Electrical Circuits from the External Power B
3. Job Set-up
Subtask 46-41-00-860-147-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-801) .
4. Procedure
Subtask 46-41-00-865-127-A
A. Get access to the applicable 5000VE-series panel(s). Then open, safety and tag this(these) circuit
breaker(s):
** ON A/C 001-050
POST SB 44-3013 for A/C 051-054
** ON A/C 001-050
POST SB 44-3013 for A/C 051-054
POST SB 44-3035 for A/C 112-115
** ON A/C
POST SB 44-3030 for A/C 101-111
ALNA V2 RACK 7RF3 A15
ALNA V2 OBCE 7RF2 A14
ALNA V2 HESU 7RF1 A13
ALNA DC 9RF G08
** ON A/C
POST SB 44-3035 for A/C 112-115
5001VE ALNA DC 9RF G08
5001VR ALNA/OBCE 7RF2 A14
** ON A/C 001-100
Subtask 46-41-00-040-051-A
B. Deactivation of the Connectivity System
(1) Install a SAFETY CLIP - CIRCUIT BREAKER on each circuit breaker.
(2) On the overhead panel, on the CONTROL panel 272VU, install an LABEL - ADHESIVE, INOP
adjacent to the PAX BBAND pushbutton switch.
** ON A/C 101-150
Subtask 46-41-00-040-051-B
B. Deactivation of the Connectivity System
(1) On the C/B panel 5001VE, open the circuit breakers 7RF1, 7RF2, 7RF3, 9RF and 17RF and install a
SAFETY CLIP - CIRCUIT BREAKER on each opened circuit breaker.
(2) On the overhead panel, on the CONTROL panel 272VU:
Set the PAX BBAND and the PAX SYS switches to the OFF position.
Install a LABEL - ADHESIVE, INOP adjacent to the PAX BBAND and the PAX SYS switches.
(3) On the overhead panel, on the RESET panel 262VU:
** ON A/C ALL
5. Close-up
Subtask 46-41-00-860-148-A
A. Aircraft Maintenance Configuration
(1) Make an applicable entry in the log book.
(2) Make sure that the work area is clean and clear of tool(s) and other items.
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-801) .
End of document