Psoc PDF
Psoc PDF
Psoc PDF
PART - A
UNIT - 1
CONTROL CENTER OPERATION OF POWER SYSTEMS:
Power system control and operating states, control center, digital computer configuration,
automatic generation control, area control error, operation without central computers, expression
for tie-line flow and frequency deviation, parallel operation of generators, area lumped dynamic
model. 8 Hours
UNIT -2 & 3
AUTOMATIC VOLTAGE REGULATOR: Basic generator control loops, Cross-coupling
between control loops, Exciter types, Exciter modeling, Generator modeling, Static performance
of AVR loop.
AUTOMATIC LOAD FREQUENCY CONTROL:
Automatic Load frequency control of single area systems, Speed governing system, Hydraulic
valve actuator, Turbine generator response, Static performance of speed governor, Closing of
ALFC loop, Concept of control area, Static response of primary ALFC loop, Integral control,
ALFC of multi-control area systems (POOL operation),The Two-Area system, Modeling the
Tie-Line, Block Diagram representation of Two-Area system, Static response of Two-Area
system and Tie-Line Bias control.
12 Hours
UNIT -4
CONTROL OF VOLTAGE AND REACTIVE POWER: Introduction, generation and
absorption of reactive power, relation between voltage, power and reactive power at a node,
single machine infinite bus systems, methods of voltage control, sub synchronous resonance,
voltage stability, voltage collapse.
6 Hours
PART - B
UNIT -5
OPTIMAL SYSTEM OPERATION AND UNIT COMMITMENT: Introduction , Optimal
operation of generators on a bus bar, Statement of the Unit Commitment problem, need and
importance of unit commitment, Constraint in Unit Commitment, Unit Commitment solution
methods-Priority lists method, Forward Dynamic Programming method( excluding problem),
Spinning reserve. 6 Hours
UNIT -6
POWER SYSTEM SECURITY: Introduction, factors affecting power system security,
Security analysis, Contingency Selection, Techniques for contingency evaluation-D.C. load flow
and fast decoupled load flow. 6 Hours
UNIT 7
SYSTEM MONITORING AND CONTROL: Introduction , Energy management system, the
basis of power system state estimation(PSSE), mathematical description of PSSE process,
minimization technique for PSSE, Least Square estimation, Error and detection in PSSE, System
security and emergency control.
6 Hours
UNIT-8
POWER SYSTEM RELIABILITY: Introduction, Modes of failures of a system, Generating
system and its performance, derivation of reliability index, reliability measure for N-unit system,
cumulative probability outages-Recursive Relation, Loss of load probability, Frequency and
duration of a state.
8 Hours
TEXT BOOKS:
1. Modern Power System Analysis-I J Nagarath and D P Kothari, TMH, 3rd Edition, 2003
2. Electrical Energy Systems Theory, O.J Elgerd, TMH,2008.
3. Power generation, operation and control-Allen J Wood & Woollenberg. John Wiley and
Sons ,Second Edition, 2009.
4. Electric Power Systems-B.M.Weedy and B.J. Cory, Wiley student edition, 1999
5. Computer Aided Power System Operation and Analysis-R.N. Dhar, Tata McGraw-Hill,
1987.
REFERENCE:
CONTENTS
3 40
UNIT- 4 CONTROL OF VOLTAGE AND REACTIVE POWER
6 131
UNIT- 7 SYSTEM MONITORING AND CONTROL
7 135
UNIT- 8 POWER SYSTEM RELIABILITY
PART - A
UNIT - 1
Power system control and operating states, control center, digital computer configuration,
automatic generation control, area control error, operation without central computers, expression
for tie-line flow and frequency deviation, parallel operation of generators, area lumped dynamic
model. 8 Hours
General
Electrical Technology was founded on the remarkable discovery by Faraday that a changing
magnetic flux creates an electric field. Out of that discovery, grew the largest and most complex
engineering achievement of man: the electric power system. Indeed, life without electricity is
now unimaginable. Electric power systems form the basic infrastructure of a country. Even as we
read this, electrical energy is being produced at rates in excess of hundreds of giga-watts (1 GW
= 1,000,000,000 W). Giant rotors spinning at speeds up to 3000 rotations per minute bring us the
energy stored in the potential energy of water, or in fossil fuels. Yet we notice electricity only
when the lights go out!
While the basic features of the electrical power system have remained practically unchanged in
the past century, but there are some significant milestones in the evolution of electrical power
systems.
Topics to be studied
Introduction
Electrical energy is an essential ingredient for the industrial and all round development of
any country. It is generated centrally in bulk and transmitted economically over long
distances.
Electrical energy is conserved at every step in the process of Generation, Transmission,
Distribution and utilization of electrical energy. The electrical utility industry is probably the
largest and most complex industry in the world and hence very complex and challenging
problems to be handled by power engineering particularly, in designing future power system
to deliver increasing amounts of electrical energy. This calls for perfect understanding,
analysis and decision making of the system. This power system operation and its control play
a very important task in the world of Electrical Power Engineering.
Power Quality
Power quality is characterized by –
= Stable AC voltages at near nominal values and at near rated frequency subject to
acceptable minor variations, free from annoying voltage flicker, voltage sags and
frequency fluctuations.
= Near sinusoidal current and voltage wave forms free from higher order harmonics
All electrical equipments are rated to operate at near rated voltage and rated frequency.
• Monitor electrical parameters at various places to assess the operating conditions in terms of
power quality.
• Detailed studies using a computer model. The accuracy of computer model is first built to
the degree where the observed simulation values matches with those of the field
measurement values. This provides us with a reliable computer model using which we
workout remedial measures.
• For the purpose of the analysis we may use load flow studies, dynamic simulations,
EMTP simulations, harmonic analysis depending on the objectives of the studies.
• We also evaluate the effectiveness of harmonic filters through the computer model built,
paying due attention to any reactive power compensation that these filters may provide at
fundamental frequency for normal system operating conditions.
• The equipment ratings will also be addressed to account for harmonic current flows
and consequent overheating.
As power systems increased in size, so did the number of lines, substations, transformers,
switchgear etc. Their operation and interactions became more complex and hence it is necessary
to monitor this information simultaneously for the total system at a focal point called as Energy
Control Centre. The fundamental design feature is increase in system reliability and economic
feasibility.
The function of energy load centre is to control the function of coordinating the response
in both normal and emergency conditions. Digital Computers are very effectively used
for the purpose. Their function is to process the data, detect abnormalities, alarm the
human operator by lights, buzzers, screens etc., depending on the severity of the
problem.
One of key processes of SCADA is the ability to monitor an entire system in real time. This is
facilitated by data acquisitions including meter reading, checking statuses of sensors, etc that are
communicated at regular intervals depending on the system.
A well planned and implemented SCADA system not only helps utilities deliver power reliably
and safely to their customers but it also helps to lower the costs and achieve higher customer
satisfaction and retention.
SCADA – Why do we need it?
• If we did not have SCADA, we would have very inefficient use of human
resources and this would cost us (Rs,Rs,Rs)
SCADA - Architecture
• Basic elements are sensors which measure the desired quantities
SCADA - Process
• Master unit scan RTUs for reports, if reports exist, RTU sends back the data and the
master computer places it in memory
• In some new substation architectures there could be significant local processing of data
which could then be sent to the control center.
• The data is then displayed on CRTs and printed
SCADA - Logging
SCADA as a System
There are many parts of a working SCADA system. A SCADA system usually includes signal
hardware (input and output), controllers, networks, user interface (HMI), communications
equipment and software. All together, the term SCADA refers to the entire central system. The
central system usually monitors data from various sensors that are either in close proximity or off
site (sometimes miles away).
For the most part, the brains of a SCADA system are performed by the Remote Terminal Units
(sometimes referred to as the RTU). The Remote Terminal Units consists
of a programmable logic converter. The RTU are usually set to specific requirements, however,
most RTU allow human intervention, for instance, in a factory setting, the RTU might control the
setting of a conveyer belt, and the speed can be changed or overridden at any time by human
intervention. In addition, any changes or errors are usually automatically logged for and/or
displayed. Most often, a SCADA system will monitor and make slight changes to function
optimally; SCADA systems are considered closed loop systems and run with relatively little
human intervention.
SCADA can be seen as a system with many data elements called points. Usually each point is a
monitor or sensor. Usually points can be either hard or soft. A hard data point can be an actual
monitor; a soft point can be seen as an application or software calculation. Data elements from
hard and soft points are usually always recorded and logged to create a time stamp or history
A SCADA system includes a user interface, usually called Human Machine Interface (HMI).
The HMI of a SCADA system is where data is processed and presented to be viewed and
monitored by a human operator. This interface usually includes controls where the individual can
interface with the SCADA system.
HMI's are an easy way to standardize the facilitation of monitoring multiple RTU's or PLC's
(programmable logic controllers). Usually RTU's or PLC's will run a pre programmed process,
but monitoring each of them individually can be difficult, usually because they are spread out
over the system. Because RTU's and PLC's historically had no standardized method to display or
present data to an operator, the SCADA system communicates with PLC's throughout the system
network and processes information that is easily disseminated by the HMI.
HMI's can also be linked to a database, which can use data gathered from PLC's or RTU's to
provide graphs on trends, logistic info, schematics for a specific sensor or
Machine or even make troubleshooting guides accessible. In the last decade, practically all
SCADA systems include an integrated HMI and PLC device making it extremely easy to run and
monitor a SCADA system.
Today’s SCADA systems, in response to changing business needs, have added new
functionalities and are aiding strategic advancements towards interactive, self healing smart grids
of the future. A modern SCADA system is also a strategic investment which is a must-have for
utilities of all sizes facing the challenges of the competitive market and increased levels of real
time data exchange that comes with it (Independent Market Operator, Regional Transmission
Operator, Major C&I establishments etc). A well planned and implemented SCADA system not
only helps utilities deliver power reliably and safely to their customers but it also helps to lower
the costs and achieve higher customer satisfaction and retention. Modern SCADA systems are
already contributing and playing a key role at many utilities towards achieving :
• New levels in electric grid reliability – increased revenue.
• Proactive problem detection and resolution – higher reliability.
Modern SCADA systems are already contributing and playing a key role at many utilities
towards achieving :
• - New levels in electric grid reliability – increased revenue.
The digital computers are usually employed in a fixed-cycle operating mode with priority
interrupts wherein the computer periodically performs a list of operation. The most critical
functions have the fastest scan cycle. Typically the following categoties are scanned every 2
seconds :
• All status points such as switchgear position (open or closed), substation loads and
voltages, transformer tap positions, and capacitor banks etc.,
• Tie line flows and interchange schedules
• Generator loads, voltage, operating limits and boiler capacity
• Telemetry verificationto detect failures and errors in the bilateral communication links
between the digital computer and the remote equipment.
On-line Computer Control that maintains overall system frequency and net tie-line load
exchange through interconnection
- Economic Load Dispatch
On-line computer control to supply load demand using all interconnected
system’s power in the most economical manner
AGC is the name given to a control system having three major objectives :
a. To hold system frequency at or very close to a specified nominal value (50 or 60Hz)
b. To maintain the correct value of interchange power between control areas
c. To maintain each unit’s generation at the most economic value.
Usually, neighboring power companies are interconnected by one or more transmission lines
called Tie Lines. The objective is to buy or sell power with neighboring systems whose
operating costs make such transactions profitable. Also, even if no power is being transmitted
over ties to neighboring system, if one system has a sudden loss of a generating unit, the units
throught all the interconnection will experience a frequency change and can help in restoring
frequency.
• Proper management required – EMS and it must be automated – Economic load dispatch
- Base load and Peak Load
For the purpose of analysis, a control area can be reduced to a single speed governor, turbo
generator and load system
Functions
- Exchange or sale of power
- Disturbed areas taking other area’s help
- Long distance sale and transfer of power
To maintain a net interchange of power with its area neighbors, an AGC uses real power flow
measurements of all tie linesa emanating from the area and subtracts the scheduled interchange
to calculate an error value. The net power interchange, together with a gain, B (MW/0.1Hz),
called the frequency bias, as a multiplier on the frequency deviation is called the Area Control
Error (ACE) given by,
The real power summation of ACE loses information as to the flow of individual tie lines but is
concerned with area net generation. The tie lines transfer power through the area from one
neighbor to the next, called ‘Wheeling Power’. The wheeling power cancels algebraically in the
ACE. Thus one area purchases or sells blocks of power (MWh) with non-neighbor utilities.
Power Sale from A to C
• Power export starts until its AGC forces ACE to become zero
• Area C introduces ‘-p’ into its ACE
• Power flows in to area C until its ACE becomes zero
• Areas B & C must be aware of the power exchange as they are also
interconnected
The minimum requirements of AGC on controlling the interchange of power and frequency have
been established by NERC – North American Electric Reliability Council, which is comprised of
representatives of the major operating power pools. This committee specifies the following
criteria as minimum performance expected by AGC. A. Normal System Conditions
- ACE = 0 at least once in 10 min period
The allowable limit, Ld of the average deviation on power systems (averaged over 10
minutes) is :
Ld = 0.025ΔL + 5.0 MW
ΔL = ΔP/ Δt MW/hr
The value of ΔL is determined annually and is taken from the daily load cycle. A power
system is said to be in a disturbance condition if the ACE signal exceeds 3Ld.
Power Systems are capable of functioning even without Central Computer and/or AGC
- Due to a result of Turbine Generator speed controls in the generating station and
natural load regulation
- Thus generators within an area are forced to share load and cause
interconnected areas to share load
The area connected load is defined by the curve LL as shown. As there is increase in load the
rotating machinery in the area is forced to increase the speed.
Basic Equations
GA = G0 +10β1 (fact – f0) MW LA = L0 +10β2 (fact – f0) MW
GA = Total Generation, G0 = Base generation
LA = Total Load, L0 = Base load, fact = System frequency, f0 = Base frequency
β1 = Cotangent of generation-frequency characteristic,
MW/0.1 Hz < 0
β2 = Cotangent of load-frequency characteristic, MW/0.1 Hz > 0
1.7.2 Isolated Operation in A – response to load change
For Steady State Frequency – Total generation = Total effective load This is
defined by the intersection of GG and LL curves as shown – Io.
Combined characteristic of GG and LL is CC. The composite generation load frequency
characteristics is given by,
GA = G0 +10β1 (fact – f0), LA = L0 +10β2 (fact – f0)
GA - LA = G0 +10β1 (fact – f0) - L0 -10β2 (fact – f0)
Increase in load in ‘A’ moves the load frequency curve to position L’L’. The new system
frequency will now be defined by the intersection labeled as I1 at 49.9Hz.Then it is desired to
return the system frequency to 50.0Hz i.e., point I2.
Setting AGC in ‘A’- shifting of GG to G’G’ takes place to meet frequency demand of
50.0Hz – I2
Resulting combined characteristic is C’C’ In terms of increments,
A = GA - G0 + L0 - LA = 10β1 (fact – f0) -10β2 (fact – f0)
= 10BA XA Δf MW
A = GA - G0 + L0 - LA = 10β1 (fact – f0) -10β2 (fact – f0)
= 10BA XA Δf MW
BA - Natural regulation characteristic - % gen for 0.1Hz
XA – Generating Capacity of A, MW
Frequency deviation = Δf = A/ 10BA XA Hz
Considering Tie line flow, Frequency deviation
Δf = (ΔA + ΔTL ) / (10BA XA) Hz
A+ ΔTL - Net Megawatt change
ΔTL = ΔGA - ΔLA
Let two areas A and B are interconnected through a Tie Line. Thus both Generation and Load
frequency are equal to 50.0 Hz. There is no initial Tie Line Power Flow.
- Difference between I1 and I2 – difference between generation and load – net excess
power in the area – flows out of A towards B
- Contributory effects in A are decrease in load power ΔL and increase in
generation ΔG
- Tie Line Flow from A to B = ΔTL = (ΔGA - ΔLA ) MW
- If area A has AGC, tie line flows increases – ΔTL’ and ΔTL’’ representing increased
amounts of bias due to AGC.
Frequency change due to disturbance B for a tie line power flow from A to B is Δf = B -
ΔTL / (10BB XB) Hz
Example
The generator characteristic is such that it is loaded to 50% of its capacity when
paralleled to the bus.
Therefore, Unit speed regulation = R = Δf(pu)/ΔP(pu)
If it is desired to increase the load on the generator, the prime mover torque is increased, which
results in a shift of the speed-droop curve as shown below. The real power flow is given by, P =
V1V2 sin(θ1 - θ2) / X , where X = synchronous reactance
Load
∆L = ∆P1 + ∆P2 =
Equivalent System Regulation = ∆f / ∆L =
The model discussed so far is one macroscopic behavior because there is no effort made to
indicate instantaneous power flow within the system due to a tie line disturbance, magnitudes of
the internal line flows, the time history of generator phase angles and so on. The power system
macro model may be described by means of a block diagram as shown in the block diagram.
Hence,
UNIT -2 & 3
12 Hours
2.1 Introduction
The main objective of power system operation and control is to maintain continuous
supply of power with an acceptable quality, to all the consumers in the system. The
system will be in equilibrium, when there is a balance between the power demand and the
power generated. As the power in AC form has real and reactive components: the real
power balance; as well as the reactive power balance is to be achieved.
There are two basic control mechanisms used to achieve reactive power balance
(acceptable voltage profile) and real power balance (acceptable frequency values). The
former is called the automatic voltage regulator (AVR) and the latter is called the
automatic load frequency control (ALFC) or automatic generation control (AGC).
The voltage of the generator is proportional to the speed and excitation (flux) of the
generator. The speed being constant, the excitation is used to control the voltage.
Therefore, the voltage control system is also called as excitation control system or
automatic voltage regulator (AVR).
For the alternators, the excitation is provided by a device (another machine or a static
device) called exciter. For a large alternator the exciter may be required to supply a field
current of as large as 6500A at 500V and hence the exciter is a fairly large machine.
Depending on the way the dc supply is given to the field winding of the alternator (which
is on the rotor), the exciters are classified as: i) DC Exciters; ii) AC Exciters; and iii)
Static Exciters. Accordingly, several standard block diagrams are developed by the IEEE
working group to represent the excitation system. A schematic of an excitation control
system is shown in Fig2.1.
The stabilizing compensator shown in the diagram is used to improve the dynamic
response of the exciter. The input to this block is the exciter voltage and the output is a
stabilizing feedback signal to reduce the excessive overshoot.
The purpose of the AVR loop is to maintain the generator terminal voltage with in
acceptable values. A static accuracy limit in percentage is specified for the AVR, so that
the terminal voltage is maintained within that value. For example, if the accuracy limit is
4%, then the terminal voltage must be maintained with in 4% of the base voltage.
The performance of the AVR loop is measured by its ability to regulate the terminal
voltage of the generator within prescribed static accuracy limit with an acceptable speed
of response. Suppose the static accuracy limit is denoted by Ac in percentage with
reference to the nominal value. The error voltage is to be less than (Ac/100)Δ|V|ref.
From the block diagram, for a steady state error voltage Δ e;
Example1: Find the open loop gain of an AVR loop if the static accuracy required is
3%.
Solution: Given Ac = 3%. K > { 100 - 1}= K > { 100 - 1} = 32.33. Thus,
if the
Ac 3
open loop gain of the AVR loop is greater than 32.33, then the terminal voltage will be
within 3% of the base voltage.
The ALFC is to control the frequency deviation by maintaining the real power balance in
the system. The main functions of the ALFC are to i) to maintain the steady frequency; ii)
control the tie-line flows; and iii) distribute the load among the participating generating
units. The control (input) signals are the tie-line deviation ΔPtie (measured from the tie-
line flows), and the frequency deviation Δf (obtained by measuring the angle deviation
Δδ). These error signals Δf and ΔPtie are amplified, mixed and transformed to a real
power signal, which then controls the valve position. Depending on the valve position,
the turbine (prime mover) changes its output power to establish the real power balance.
The complete control schematic is shown in Fig2.3
characteristic of the load (also called as damping constant) expressed in percent change in
load for 1% change in frequency. If D=1.5%, then a 1% change in frequency causes 1.5%
change in load. The combined generator and the load (constituting the power system) can
then be represented as shown in Fig2.5
The turbine can be modeled as a first order lag as shown in the Fig2.6
Gt(s) is the TF of the turbine; Δ PV(s) is the change in valve output (due to
action). Δ Pm(s) is the change in the turbine output
The governor can similarly modeled as shown in Fig2.7. The output of the
governor is by
where Δ Pref is the reference set power, and Δ ω/R is the power given R
by governor speed characteristic. The hydraulic amplifier transforms this signal Δ Pg into
valve/gate position corresponding to a power Δ PV. Thus Δ PV(s) = ( Kg/(1+sTg)) Δ Pg(s).
All the individual blocks can now be connected to represent the complete ALFC loop as
shown in Fig2.8
In the steady state, the ALFC is in ‘open’ state, and the output is obtained by substituting
s→0 in the TF.
With s→0, Gg(s) and Gt(s) become unity, then, (note that Δ Pm = Δ PT = Δ PG = Δ Pe = Δ
PD ; That is turbine output = generator/electrical output = load demand)
Δ Pm = ΔPref – (1/R) Δ ω or Pm = Δ Pref – (1/R) Δ f
When the generator is connected to infinite bus (f = 0, and Δ V = 0), then Δ Pm = Δ Pref .
If the network is finite, for a fixed speed changer setting (Δ Pref = 0), then
Δ Pm = – (1/R) Δ f or Δ f = -R Δ Pm.
If the frequency dependent load is present, then
Δ Pm = Δ Pref – (1/R +D) Δ − Pm
f or Δ =
D 1/ R
If there are more than one generator present in the system, then
Δ Pm. eq = Δ Pref.eq – (D + 1/Req) Δ f
where, Δ Pm. eq = Δ Pm1 + Δ Pm2 + Δ Pm.3 +….
Δ Pref. eq = VPref1 + Δ Pref2 + VPref3 +…..
1/Req = (1/R1 +1/R2 +1/R2 +….)
The quantity β = (D + 1/Req) is called the area frequency (bias) characteristic (response)
or simply the stiffness of the system.
The ALFC loop shown in Fig2.8, is called the primary ALFC loop. It achieves the
primary goal of real power balance by adjusting the turbine output Δ Pm to match the
change in load demand Δ PD. All the participating generating units contribute to the
change in generation. But a change in load results in a steady state frequency deviation
Δ f. The restoration of the frequency to the nominal value requires an additional control
loop called the supplementary loop. This objective is met by using integral controller
which makes the frequency deviation zero. The ALFC with the supplementary loop is
generally called the AGC. The block diagram of an AGC is shown in Fig2.9. The main
objectives of AGC are i) to regulate the frequency (using both primary and
supplementary controls); ii) and to maintain the scheduled tie-line flows. A secondary
objective of the AGC is to distribute the required change in generation among the
connected generating units economically (to obtain least operating costs).
In a single area system, there is no tie-line schedule to be maintained. Thus the function
of the AGC is only to bring the frequency to the nominal value. This will be achieved
using the supplementary loop (as shown in Fig.2.9) which uses the integral controller to
change the reference power setting so as to change the speed set point. The integral
controller gain KI needs to be adjusted for satisfactory response (in terms of overshoot,
settling time) of the system. Although each generator will be having a separate speed
governor, all the generators in the control area are replaced by a single equivalent
generator, and the ALFC for the area corresponds to this equivalent generator.
In an interconnected (multi area) system, there will be one ALFC loop for each control
area (located at the ECC of that area). They are combined as shown in Fig2.10 for the
interconnected system operation. For a total change in load of Δ PD, the steady state
Consider a change in load Δ PD1 in area1. The steady state frequency deviation Δ f is the same for
both the areas. That is Δ f = Δ f1 = Δ f2. Thus, for area1, we have
where, β1 and β2 are the composite frequency response characteristic of Area1 and Area 2 respectively.
An increase of load in area1 by Δ PD1 results in a frequency reduction in both areas and a tie-line flow
of Δ P12. A positive Δ P12 is indicative of flow from Area1 to Area 2 while a negative Δ P12 means flow
from Area 2 to Area1. Similarly, for a change in Area Frequency bias tie line control
The tie line deviation reflects the contribution of regulation characteristic of one area to another. The
basic objective of supplementary control is to restore balance between each area load generation.
This objective is met when the control action maintains
Frequency at the scheduled value
Net interchange power (tie line flow) with neighboring areas at the scheduled values
The supplementary control should ideally correct only for changes in that area. In other words, if
here is a change in Area1 load, there should be supplementary control only in Area1 and not in
Area 2. For this purpose the area control error (ACE) is used (Fig2.9). The ACE of the two areas
are given by
An important secondary function of the AGC is to allocate generation so that each generating unit is
loaded economically. That is, each generating unit is to generate that amount to meet the present demand
in such a way that the operating cost is the minimum. This function is called Economic Load
Dispatch (ELD).
The method described for the frequency bias control for two area system is applicable to multi-area
system also.
Examples:
Ex 1. A 500 MVA, 50 Hz, generating unit has a regulation constant R of 0.05 p.u. on its own rating.
If the frequency of the system increases by 0.01 Hz in the steady state, what is the decrease in the
turbine output? Assume fixed reference power setting.
Solution: In p.u. Δ f = 0.01/50 = 0.0002 p.u.
With Δ pref = 0, Δ pm = -1/R(Δ f) = - 0.004 p.u. Hence, Δ pm = -
0.004 Sbase = - 2 MW.
Ex. 2. An interconnected 60 Hz power system consists of one area with three generating units rated
500, 750, and 1000 MVA respectively. The regulation constant of each unit is R= 0.05 per unit on its
own rating. Each unit is initially operating at one half of its rating, when the system load suddenly
increases by 200MW. Determine (i) the area frequency response characteristic on a 1000 MVA system
base, (ii) the steady state frequency deviation of the area, and (iii) the increase in turbine power output.
Regulation constants on common system base are (Rpu new = R pu old ( Sbase new/Sbase old): R1 = 0.1;
R2 = 0.0667; and R3 = 0.05.
Hence β = (1/R1 + 1/R2 + 1/R3) = 45 per unit.
Neglecting losses and frequency dependence of the load, the steady state frequency deviation is
Δ f = (-1/β) Δ pm = -4.444 x10 -3 per unit = (-4.444 x10 -3 )60 = - 0.2667 Hz.
UNIT -4
CONTROL OF VOLTAGE AND REACTIVE POWER: Introduction, Generation And
Absorption Of Reactive Power, Relation Between Voltage, Power And Reactive Power At A Node,
Single Machine Infinite Bus Systems, Methods Of Voltage Control, Sub Synchronous Resonance,
Reactive power is an odd topic in AC (Alternating Current) power systems, and it's usually explained
with vector mathematics or phase-shift sine wave graphs. However, a non-math verbal explanation
is possible.
Note that Reactive power only becomes important when an "electrical load" or a home appliance
contains coils or capacitors. If the electrical load behaves purely as a resistor, (such as a
heater or incandescent bulb for example,) then the device consumes "real power" only. Reactive power
and "power factor" can be ignored, and it can be analysed using an AC version of Ohm's law.
Reactive power is simply this: when a coil or capacitor is connected to an AC power supply, the
coil or capacitor stores electrical energy during one-fourth of an AC cycle. But then during the next
quarter-cycle, the coil or capacitor dumps all the stored energy back into the distant AC power supply.
Ideal coils and capacitors consume no electrical energy, yet they create a significant electric current.
This is very different from a resistor which genuinely consumes electrical energy, and where the
electrical energy flows continuously in one direction; moving from source to load.
In other words, if your electrical appliance contains inductance or capacitance, then electrical energy
will periodically return to the power plant, and it will flow back and forth across the power lines. This
leads to an extra current in the power lines, a current which heats the power lines, but which isn't
used to provide energy to the appliance. The coil or capacitor causes electrical energy to begin "
sloshing" back and forth between the appliance and the distant AC generator. Electric companies
must install heavier wires to tolerate the excess current, and they will charge extra for this "unused"
energy.
This undesired "energy sloshing" effect can be eliminated. If an electrical load contains both a
coil and capacitor, and if their resonant frequency is adjusted to exactly 60Hz, then the coil and
capacitor like magic will begin to behave like a pure resistor. The "energy sloshing" still occurs, but
now it's all happening between the coil and capacitor, and not in the AC power lines. So, if your appliance
contains a large coil induction motor, you can make the motor behave as a pure resistor, and
reduce the current in the power lines by connecting the right value of capacitance across the motor coil.
Why is reactive power so confusing? Well, the math is daunting if not entirely obscure.
And the concept of "imaginary power" puts many people off. But this is not the only problem.
Unfortunately most of us are taught in grade school that an electric current is a flow of energy,
and that energy flows back and forth in AC power lines. This is completely wrong. In fact the
energy flows constantly forward, going from source to load. It's only the charges of the
metal wires which flow back and forth.
Imagine that we connect a battery to a light bulb. Electric charges already present inside the wires
will begin to flow in the circle, and then electrical energy moves almost instantly to the light bulb.
The charge flow is circular like a belt, but the energy flow is one-way. Now imagine that we
suddenly reverse the connections to the battery. The voltage and current will reverse... but the
energy still flows in the same direction as before. It still goes from battery to bulb. If we keep
reversing the battery connections over and over, we'd have an AC system. So, in an AC system,
only the voltage and current are "alternating," while the electrical energy flows one-way, going
from source to load. Where AC resistive loads are concerned, electrical energy does not "alternate."
To understand energy flow in AC systems, it's critically important that we understand the difference
between charge flow (current, amperes) and energy flow (power, watts.)
What is imaginary power? Simple: it's the unused power which flows backwards and forwards
in the power lines, going back and forth between the load's coil or capacitor and the distant
AC generator. If your appliance was a pure capacitor or inductor, then it would consume no
electrical energy at all, but instead all the flowing energy would take the form of "sloshing energy,"
and we'd call it "imaginary power." Of course it's not actually imaginary. Instead it's reflected by the
load.
What is real power? Even more simple: it's the energy flow which goes continuously from
the AC generator and into the appliance, without any of it returning back to the distant generator.
Finally, what is "reactive" power? It's just the combination of the above two ideas: it is the continuous-
forward-moving or "real" energy flow, combined with the sloshing or "imaginary" energy flow.
ACTIVE POWER
Z = R (purely resistive)
P = VI = I R = V /R (Watt)
REACTIVE POWER
Z = jX L (inductive)
Reactive (VAR)
ZC = – jX (capacitive)
Note:
To distinguish between inductive reactive power (QL) and capacitive reactive power (QC), we use two
different signs (+ or –) depending on our reference (i or v), for example jQL and – jQC or otherwise.
Note that Reactive power only becomes important when an "electrical load" or a home appliance
contains coils or capacitors. If the electrical load behaves purely as a resistor, (such as a heater or
incandescent bulb for example,) then the device consumes "real power" only. Reactive power and
"power factor" can be ignored,
Reactive power is simply this: when a coil or capacitor is connected to an AC power supply, the coil
or capacitor stores electrical energy during one-fourth of an AC cycle. But then during the next
quarter-cycle, the coil or capacitor dumps all the stored energy back into the distant AC power
supply. Ideal coils and capacitors consume no electrical energy, yet they create a significant electric
current. This is very different from a resistor which genuinely consumes electrical energy, and where
the electrical energy flows continuously in one direction; moving from source to load.
Determine the total PT and QT for the circuit. Sketch the series equivalent circuit.
APPARENT POWER
For load consisting of series resistance and reactance, Z = R + j X = Z /Δθ , the power produced is
called Apparent Power or Complex Power), S or PS with unit Volt-Amp (VA)
S = V *I
S = V *I
S = P + jQ S = P – jQ
L
θ positive, inductive load
θ negative, capacitive load
S = VI (VA)
P = VI cos θ = I R = VR /R (W)
= S cos θ (W)
Q = VI sin θ = I X = Vx /X (VAR) = S
sin θ
S = √(P + Q ) = V I
Power Triangle
Note that Reactive power only becomes important when an "electrical load" or a home
appliance contains coils or capacitors. If the electrical load behaves purely as a resistor, (such
as a heater or incandescent bulb for example,) then the device consumes "real power" only.
Reactive power and "power factor" can be ignored,
• Reactive power is simply this: when a coil or capacitor is connected to an AC power supply,
the coil or capacitor stores electrical energy during one-fourth of an AC cycle. But then
during the next quarter-cycle, the coil or capacitor dumps all the stored energy back into the
distant AC power supply. Ideal coils and capacitors consume no electrical energy, yet they
create a significant electric current. This is very different from a resistor which genuinely
consumes electrical energy, and where the electrical energy flows continuously in one
direction; moving from source to load.
POWER FACTOR
S (Z)
Q (X)
P (R)
C jX
V
S QC
Q
θ
θJ QJ
Find the complex power for the circuit. Correct the circuit power factor to p.f. = 1 using
parallel reactance.
shunt capacitors are used for lagging power factor circuits whereas shunt reactors are
used for leading power factors that are created by lightly loaded cables. In both the cases
the effect is to supply the required amount of reactive power to maintain the voltage.
Capacitors are connected either directly to the bus bar or to
the tertiary winding of the main transformer and are distributed along the line to
minimise the losses and the voltage drops. Now when the voltage drops, the vars
produced by shunt capacitor or reactor falls, so when required most, the effectiveness of
these capacitors or the reactors also falls. On the other hand, on light loads when the
voltage is high, the capacitor output is large and the voltage tends to rise to excessive
level, so some of the capacitors or reactors are to be switched out by over voltage relays.
For fast control of voltages in power systems, switched capacitors in parallel with
semiconductor controlled reactors
are generally used to provide var compensation.
Series capacitors:
Here the capacitors are connected in series with the line. The main aim is to reduce the
inductive reactance between supply point and the load. The major disadvantage of the
method is, whenever a short circuit current flows through the capacitor, protective
devices like spark gaps and non linear resistors are to be incorporated. Phasor diagram
for a line with series capacitor is shown in the
figure (b).
A great advantage of the method is the flexible operation for all load conditions.
• Being a rotating machine, its stored energy is useful for riding through transient
disturbances, including voltage drops.
Dept. of EEE, SJBIT Page 56
Power System Operation and Control (PSOC) 10EE82
K = Xc/X
L be the degree of compensation.
X = (XL – Xc) = XL(1 – K) is the equivalent reactance of the compensated line.
Let the SSR occur at a frequency fr. Then f2= (1/ 2_L ) * (1/ 2_C)
(OR) (fr/ fn)2= Xc/XL=Kor fr= fn*sqrt(K)
Thus SSR occurs at a frequency fr which is the product of normal frequency and the
root of the degree of compensation K. The condition of SSR can occur during the
faults on the power system, during switching operations and changing system
configurations. Solution to SSR problems
1. Use of filters: For eliminating/damping the harmonics. The various filters include:
static blocking filters, bypass damping filters, dynamic filters.
2. Bypassing the series capacitor bank under resonance condition
There are several power system disturbances which contribute to the voltage collapse.
i. increase in inductive loading
ii. Reactive power limits attained by reactive power compensators and generators.
iii. On Load Tap Changing operation
iv. Load recovery dynamics.
v. Generator outage
vi. Line tripping.
most of these factors have significant effects on reactive power production,
transmission and consumption. Switching of shunt capacitors, blocking of OLTC
operation, generation rescheduling, bus voltage control, strategic load shedding and
allowing temporary reactive power over loading of generators may be used as some of
the effective countermeasures against voltage collapse.
Voltage Stability
The voltage stability may be defined as the ability of a power system to maintain
steady acceptable voltage at all busses in the system at normal operating conditions
and after being subjected to disturbances/ perturbations. OR
Voltage stability is the ability of a system to maintain voltage so that when load
admittance is increased, load power will increase, and so that both power and voltage
are controllable. Power system is “Voltage Stable “if voltages at respective busses
after a disturbance are close to the voltages at normal operating conditions. So voltage
instability is that appears when the attempt of load dynamics to restore power
consumption is just beyond the capability of the combined transmission and generator
system. Though voltage instability may be a local problem, its consequences may have
a widespread effect. Voltage collapse is the catastrophic result of a sequence of events
leading to a sudden low-voltage profile in a major part of the system, i.e. in a
significant part of the system. Voltage Stability can also be called Load Stability. A
Power system lacks the capability to transfer an infinite amount of electrical power to
the loads. The main factor causing voltage instability is the inability of the power
system to meet the demands for reactive power in the heavily stressed system keeping
desired voltages. Other factors contributing to voltage instability are the generator
reactive power limits. Transfer of reactive power is difficult due to extremely high
reactive power losses, which is why the reactive power required
for voltage control is generated and consumed at the control area. A classification of
power system stability is shown in the table below. The driving forces for instability
are named generator– driven and load-driven. It is to be noted that these terms do
not exclude the effect of other components to the mechanism. The time scale is
divided into short and long-term time scale.
Now let us analyse voltage stability using Q-V curves. Consider a simple system as
shown below and its P-V curves.
Fig: Normalised P-V curves for fixed (infinite) source Now map the normalised P-V
curves onto V-Q curves. for constant value of P, note the values of Q and V and then re
plot to get Q-V curves as shown below. from P-V curves it is observed that the critical
voltage is very high for high loadings. V is above 1.0p.u for P = 1.0p.u The right side
represents normal conditions where applying a capacitor bank raises voltage.
Fig : Q – V Curves
Figure shows the Q-V diagram of a bus in a particular power system at four different
loads: P1, P2, P3, P4 . the Q axis shows the amount of additional reactive power that
must be injected into the bus to operate at a given voltage. The operating point is the
intersection of the power curve with the voltage axis, where no reactive power is
required to be injected or absorbed. If the slope of the curve at the intersection point is
positive, the system is stable, because any additional reactive power will raise the
voltage and vice-versa. Hence for P 1 load, there is a reserve of reactive power that
can be used to maintain stability even if the load increases. For load P 2 the system is
marginally stable. For higher load P3 and P4 the system is not stable (Since a certain
amount of reactive power must be injected into the bus to cause an intersection with
the voltage axis.) Thus the measure of Q reserve gives an indication of the margin
between stability and instability. The slope of the Q-V curve represents the stiffness
of the test bus. when nearby generators reach their Var limits, the slope of the Q-V
curve becomes less steep and the bottom of the curve is approached. V-Q curves are
presently the workhorse method of voltage stability analysis at many utilities. Since
the method artificially stresses a single bus, conclusions should be confirmed by more
realistic methods.
PART - B
UNIT -5
OPTIMAL SYSTEM OPERATION AND UNIT COMMITMENT: Introduction ,
Optimal operation of generators on a bus bar, Statement of the Unit Commitment
problem, need and importance of unit commitment, Constraint in Unit Commitment,
Unit Commitment solution methods-Priority lists method, Forward Dynamic
Programming method( excluding problem), Spinning reserve. 6 Hours
INTRODUCTION
Electric Power Systems (EPS): Economic Aspects:
In EPS, the first step is to properly assess the load requirement of a given area where
electrical power is to be supplied. This power is to be supplied using the available units
such as thermal, hydroelectric, nuclear, etc. Many factors are required to be considered
while choosing a type of generation such as: kind of fuel available, fuel cost, availability
of suitable sites for major station, nature of load to be supplied, etc.
Variable load: The load is not constant due to the varying demands at the different times
of the day. The EPS is expected to supply reliable and quality power. It should ensure the
continuity of power supply at all times.
{Qn.: write a note on the choice of the number and size of the generating units at a
power station from economic operation point of view}
Single unit Vs. multiple units: the use of a single unit to supply the complete load demand
is not practical since, it would not be a reliable one. Alternately, a large number of
smaller units can be used to fit the load curve as closely as possible. Again, with a large
number of units, the operation and maintenance costs will increase. Further, the capital
cost of large number of units of smaller size is more as compared to a small number of
units of larger size. Thus, there has to be compromise in the selection of size and number
of generating units within a power plant or a station.
Electric energy is generated at large power stations that are far away from the load
centers. Large and long transmission lines (grid lines) wheel the generated power to the
substations at load centers. Many electrical equipment are used for proper transmission
and distribution of the generated power. The grid lines are such that:
Each grid operates independently, although power can be exchanged between various
grids.
Optimum economic efficiency is achieved when all the generators which are running in
parallel are loaded in such a way that the fuel cost of their power generation is the
minimum. The units then share the load to minimize the overall cost of generation. This
economical approach of catering to the load requirement is called as ‘economic
dispatch’. The main factor in economic operation of power systems is the cost of
generating the real power. In any EPS, the cost has two components as under:
• The Fixed Costs: Capital investment, interest charged on the money borrowed, tax
paid, labour, salary, etc. which are independent of the load variations.
• The Variable Costs: which are dependant on the load on the generating units, the
losses, daily load requirements, purchase or sale of power, etc.
Further, the factors affecting the operating cost of the generating units are: generator
efficiency, transmission losses, fuel cost, etc. Of these, the fuel cost is the most important
factor.
Since a given power system is a mix of various types of generating units, such as hydel,
thermal, nuclear, hydro-thermal, wind, etc., each type of unit contributes its share for the
total operating cost. Since fuel cost is a predominating factor in thermal (coal fired)
plants, economic load dispatch (ELD) is considered usually for a given set of thermal
plants in the foregoing discussion.
There are two problem areas of operation strategy to obtain the economic operation of
power systems. They are: problem of economic scheduling and the problem of optimal
Dept. of EEE, SJBIT Page 66
Power System Operation and Control (PSOC) 10EE82
power flow.
* The problem of economic scheduling: This is again divided into two categories:
• The unit commitment problem (UCP): Here, the objective is to determine the
various generators to be in operation among the available ones in the system,
satisfying the constraints, so that the total operating cost is the minimum. This
problem is solved for specified time duration, usually a day in advance, based on
the forecasted load for that time duration.
• The economic load dispatch (ELD): Here, the objective is to determine the
generation (MW power output) of each presently operating (committed or put on)
units to meet the specified load demand (including the losses), such hat the total
fuel cost s minimized.
* The problem of optimal power flow: Here, it deals with delivering the real power to the
load points with minimum loss. For this, the power flow in each line is to be optimized
to minimize the system losses.
{Qn.: compare ELD and UCP and hence bring out their importance and objectives.}
PERFORMANCE CURVES:
The Performance Curves useful for economic load dispatch studies include many
different types of input-output curves as under:
2. Heat Rate Curve: A plot of heat rate in Btu/kWH, as a function of the MW output
of the unit. Thus, it is the slope of the I-O curve at any point. The reciprocal of
heat rate is termed as the ‘Fuel Efficiency’.
Dept. of EEE, SJBIT Page 67
Power System Operation and Control (PSOC) 10EE82
3. Incremental Fuel Rate Curve: A plot of incremental fuel rate (IFC) in Btu/kWH as
a function of the MW output of the unit, where,
IFC= input/ output = Incremental change in fuel
input/ Incremental change in power output (1)
4. Incremental Fuel Cost Curve: A plot of incremental fuel cost (IFC) in
Rs./kWH as a function of the MW output of the unit, where,
IFC in Rs./kWH = (Incremental fuel rate
in Btu/kWH) (Fuel cost in Rs./Btu) (2)
The IFC is a measure of how costlier it will be to produce an increment of power output
by that unit.
Generally, the quadratic curve is used widely to represent the cost curve, with the IC
curve given by the linear curve as above.
Various constraints are imposed on the problem of economic operation of power systems
as listed below:
1. Primary constraints (equality constraints):
The above constraints arise due to the need for the system to balance the generation and
load demand of the system.
These arise due to physical and operational limitations of the units and
components.
Pimin ≤ Pi ≤ Pimax
Qimin ≤ Qi ≤ Qimax
i = 1,2,….n, the number of generating units in the system. (7)
These are used to account for the errors in load prediction, any
sudden or fast
change in load demand, inadvertent loss of scheduled generation, etc. Here, the
total generation available at any time should be in excess of the total anticipated
load demand and any system loss by an amount not less than a specified
minimum spare
capacity, PSP (called the Spinning Reserve) given by:
PlG (Generation) ≥ Σ Pl (Losses) + PSP + PDj (Load) (8)
4. Thermal Constraints:
Bus voltage and Bus angle Constraints are needed to maintain a flat
bus voltage
where, n is the number of nodes and m is the number of nodes neighboring each
node with interconnecting branches.
6. Other Constraints:
where Ti is the percentage tap setting of the tap changing transformer used.
where PSi is the phase shift obtained from the phase shifting transformer used.
SPINNING RESERVE
Spinning reserve (SR) is the term used to describe the total amount of generation
available from all the synchronized (spinning) units of the system minus the
present load plus the losses being supplied. i.e.,
The SR must be made available in the system so that the loss of one or more
units does not cause a large drop in system frequency. SR must be allocated to
different units based on typical Council rules. One such rule is as follows:
Reserves must be spread around the system to avoid the problem of ‘bottling of
reserves’ and to allow for the various parts of the system to run as ‘islands’,
whenever they become electrically disconnected.
{Qn.: Derive the EIC criterion for economic operation of power systems with
transmission losses neglected, MW limits considered/ not considered}
The solution to economic load dispatch problem is obtained as per the equal
incremental cost criterion (EIC), which states that:
‘All the units must operate at the same incremental fuel cost for economic
operation’
This EIC criterion can be derived as per LaGrangian multiplier method for
different cases as under.
Consider a system with N generating units supplying a load PD MW. Let the unit
Dept. of EEE, SJBIT Page 72
Power System Operation and Control (PSOC) 10EE82
MW limits and the transmission losses are negligible. Suppose the fuel cost of
unit ‘i’ is given by:
Ci(Pi) = ai+ biPi+ ciPi2 Rs./Hr. so that
ICi = d(Ci)/dPi = bi+ 2ciPi Rs./MWHr. (14)
Hence, the total cost, CT = Σ Ci(Pi) i= 1,2,… N
The ELD problem can thus be stated mathematically as follows:
where, CT is the total fuel cost of the system in Rs./Hr., PD is the total demand in
MW and Pi is the MW power output of unit i. The above optimization problem
can be solved by LaGranje’s method as follows.
Further, since the cost of a given unit depends only on its own power output, we
have,
∂CT/∂Pi = ∂Ci/∂Pi = dCi/dPi i= 1,2,… N (18)
Thus,
dCi/dPi – λ = 0 i = 1,2,… N or
‘For the optimum generation (power output) of the generating units, all
the units must operate at equal incremental cost (EIC)’
Consider a system with N generating units supplying a load PD MW. Let the unit
MW limits be considerable and the transmission losses be negligible. Suppose
the fuel cost
of unit ‘i’ is given by:
Ci(Pi) = ai+ biPi+ ciPi2 Rs./Hr. so that the total cost,
CT = Σ Ci(Pi) i= 1,2,… N
where, CT is the total fuel cost of the system in Rs./Hr., PD is the total demand in
MW, Pi is the MW power output of unit i, Pimin is the minimum MW power
output and Pimax is the maximum power output by the unit i.
The necessary conditions for the solution of the above optimization problem can
be obtained as follows:
λi = dCi/dPi
= λi = λ Rs./MWHr. for Pimin ≤ Pi ≤ Pimax
dCi/dPi ≤ λi λ Rs./MWHr. for Pi = Pimax
= dCi/dPi ≥ λ Rs./MWHr. for Pi = Pimin (22)
From the above equations, if the outputs of the unit, according to optimality
rule, is:
* Less than its minimum value, then it is set to Pimin, the corresponding IC will
be greater than the system λ,
* More than its maximum value, then it is set to Pimax, the corresponding IC
will be less than the system λ,
* With in its maximum and minimum values, then the corresponding IC will
be equal to the system λ.
1. First, find the power output according to the optimality rule (EIC
Criterion)
2. If the power output of any unit is less than its minimum value, then set
the value to be equal to its Pimin,
3. Similarly, if the power output of any unit is more than its maximum
value, then set the value to be equal to its Pimax,
4. Adjust the demand for the remaining units after accounting for the
settings made for the above units (those units which have violated the
limits)
5. Finally, apply the EIC criterion, for the remaining units. Here, the
system lambda is determined by only those units whose power output
values are with in the specified MW limits.
{Qn.: Derive the EIC criterion for economic operation of power systems with
transmission losses considered. Use penalty factor method}
Consider a system with N generating units supplying a load PD MW. Let the
transmission losses be considerable. Suppose the fuel cost of unit ‘i’ is given
by:
Ci(Pi) = ai+ biPi+ ciPi2 Rs./Hr. so that the total cost,
CT = Σ Ci(Pi) i= 1,2,… N
Let PL be the total transmission losses in the system. The ELD problem can
now be stated mathematically as follows:
where, CT is the total fuel cost of the system in Rs./Hr., PD is the total demand
in MW, Pi is the MW power output of unit i, PL is the transmission losses in
the system. This above optimization problem can be solved by LaGranje’s
method as follows.
Thus,
dCi/dPi – λ (1- dPL/dPi) = 0 i = 1,2,… N or
‘For the optimum generation (power output) of the generating units, when the
transmission losses are considered, all the units must operate such that the
product of the incremental fuel cost and their penalty factor must be the same
for all units’
Where, Nk1 and Nk2 (assumed to be real values) are the current distribution
factors of units 1 and 2 respectively.
It is assumed that the currents Ik1 and IL as well as Ik2 and IL have the same phase
angle or they have a zero phase shift. Thus, they can be added as real numbers as
under.
Where σ1 and σ2 are the phase angles of currents. Consider now, the magnitude
of current Ik, in branch k, given by
Thus,
₃Ik₃2 = Nk1₃I1₃2 + Nk2₃I2₃2 + 2 Nk1Nk2₃I1₃₃I2₃ cos(σ1-σ2) (29)
However, we have,
P1 = √3V1I1cosθ1; P2 = √3V2I2cosθ2; PL = Σ3₃Ik₃2Rk (30)
where, P1 and P2 are the MW power output values by the units 1 and 2
respectively, V1 and V2 are the respective line voltages and θ1, θ2 are the
respective power factor angles and PL is the transmission loss in the system.
From equations (29) and (30),
PL = ΣNk12RkP12/(V12cos2θ1) + ΣNk22RkP22/(V22cos2θ2) +
2 ΣNk1Nk2RkP1P2 cos(σ1-σ2)/ (V1V2cosθ1cosθ2)
= B11P12 + B22P22 + 2 B12P1P2 (31)
Where, the B coefficients are called as the loss coefficients. Thus, in general, for
a system of n units we have,
PL = Σ Σ PiBijPj Where,
i j
Bij = Σ {cos(σi-σj)/ (ViVjcosθicosθj) NkiNkjRk (32)
Note:
1. The B coefficients are represented in units of reciprocal MW, (MW-1)
2. For a three unit system , equation (32) takes the form:
PL = B11P12 + B22P22 + B33P32 + 2 B12P1P2+2 B13P1P3+ 2 B23P2P3
= PTBP (33)
Where, P = [P1 P2 P3], the vector of unit power output values and
B = [B11 B12 B13; B21 B22 B23; B31 B32
B33]
the loss coefficient matrix for the 3 unit system.
Consider, PL = Σ Σ PjBjkPk
j k
= Σ Σ PjBjkPk + Σ PjBjiPi
j k≠i j
= Σ Σ PjBjkPk + Σ PjBjiPi + BiiPi 2
j k≠i j≠i
=Σ Σ PjBjkPk + Σ PiBikPk + Σ PjBjiPi + BiiPi2
j≠i k≠i k≠i j≠i
(34)
Thus,
ITLi = dPL/dPi = 0+ Σ BikPk + Σ PjBji + 2 BiiPi
k≠i j≠i
= 2 Σ PkBik
k (35)
The calorific value of coal at plant#1 and plant#2 are respectively equal to 4000
kCals/kg. and 5000 kCals/kg. The corresponding cost of coal is Rs.55/- and
Rs.65/-per Ton. Find the following: (i)Incremental Fuel Rate in kCals/MWHr
(ii)Incremental Fuel Cost in Rs./MWHr and (iii)Incremental Production Cost in
Rs./MWHr if the cost of other items can be taken as 10% of the incremental fuel
cost/plant.
Solution:
(i)Incremental Fuel Rate in kCals/MWHr
Example-2:
The incremental costs of a two unit system are given by: IC1 = (0.008 PG1 + 8.0);
IC2 = (0.0096 PG2 + 6.4) Find the incremental cost and the distribution of loads
between the two units for optimal operation for a total load of 1000 MW. What
is this value if the same total load is equally shared among the two units?
Solution:
For the total load values of PT = 1000 MW, if the load is shared equally among
the two units then:
PG1 = 500 MW; PG2 = 500 MW with
λ1 = 12 Rs./MWHr and λ2 = 11.2 Rs./MWHr. (unequal lambda values)
Now, for optimal operation, we have as per EIC principle, the IC’s to be equal.
i.e., IC1=IC2; PT = P1+P2 = 1000
are the equations to be solved for the output power values. Thus,
IC1 =0.008 PG1 + 8.0= IC2 = 0.0096 PG2 + 6.4
= 0.0096 (1000 - PG1) + 6.4
Solution:
Consider the incremental cost curves given by: ICi= dCi/dPi = (2ciPi+bi)
Rs./MWHr IC1=dC1/dP1 = (0.20P1+40) Rs./MWHr
For the total load values of PT = 400 MW, for optimal operation, as per EIC
principle, the IC’s are equal. i.e., IC1=IC2=IC3; and PT = P1+P2+P3 = 400 MW.
Also, the system lambda is given by:
Using this value of common system lambda, the MW output values of all the 3
units are obtained from their IC curves as:
P1= 118.9 MW, P2= 135.12 MW and P3=91.90 MW.
(All the MW output values are found to be within their capacity limits specified)
Thus, with λsystem = λ1 = λ2 = λ3 =63.78 Rs./MWHr, the total load is optimally
shared between the three units and the operating cost would be at its minimum.
Example-4:
The incremental costs of a two unit system are given
by: IC1 =0.008 PG1 + 8.0 ; IC2 =0.0096 PG2 + 6.4
Find the incremental cost and the distribution of loads between the two units for
optimal operation for a total load of 900 MW. Also determine the annual saving
in cost in optimal operation as compared to equal sharing of the same total load.
Solution:
For a total load of PT = 900 MW, if the load is shared equally among the two
units then: PG1 = PG2 = 450 MW.
Now, for optimal operation, we have as per EIC principle, the IC’s to be equal.
i.e., IC1=IC2; PT = P1+P2 = 900 are the equations to be solved for the output
power values.
Thus, IC1 =0.008 PG1 + 8.0 = IC2 = 0.0096 (900 - PG1) + 6.4
Solving, we get,
PG1 = 400 MW; PG2 = 500 MW. (λ= 11.2 Rs./MWHr.)
The increase in cost of operation by Unit 1 if it supplies 450 MW (equal
sharing) instead of 400 MW (optimal sharing) is given by:
C1= ∫ IC1 dPG1 = ∫ (0.008PG1+8) dPG1 = |(0.004PG12+8PG1)|400450 = Rs.570/hr.
Similarly, the decrease in cost of operation by Unit 2 if it supplies 450
MW (equal sharing) instead of 500 MW (optimal sharing) is given by:
Rs. 570 – 548 = Rs. 22/- per hour or it is equivalent to an annual saving in cost
of (assuming continuous operation): Rs.(22)(24)(365) = Rs. 1,92, 720/- PA.
Example-5:
The fuel costs of a two generator system are given by:
C1 =α1 + β1P1+ γ1P12; C2 =α2 + β2P2+ γ2P22
Where, β1=40, β2=30, γ1=0.1, γ2=0.125, and α1,α2 are constants. How will
the load of 150 MW be shared optimally between the two units? Also determine
the saving in cost in Rs./Hr. in optimal operation as compared to equal sharing of
the same total load.
Solution:
Consider the incremental cost curves given by:
IC1=dC1/dP1 = β1 + γ1P1 = 40+0.2P1
Rs./MWHr IC2=dC2/dP2 = β2+ γ2P2 =
30+0.25P2 Rs./MWHr
For a total load of PT = 150 MW, if the load is shared equally among the two
units then: PG1 = PG2 = 75 MW.
Now, for optimal operation, we have as per EIC principle, the IC’s to be equal.
i.e., IC1=IC2; PT = P1+P2 = 150 are the equations to be solved for the output
power values.
Example-6:
The fuel cost function in Rs./Hr. for three thermal plants is given by the
following
(with P’s in MW):
F1 = 350 + 7.20 P1 + 0.0040 P1 2
F2 = 500 + 7.30 P2 + 0.0025 P2 2
F3 = 600 + 6.74 P3 + 0.0030 P3 2
Find the optimal schedule for a total load of 450 MW. Also compute the costs of
operation for this schedule. Compare the same when the three generators share
the same total load equally among them.
Solution:
Consider the IC curves in Rs./MWHr for the 3 units as under:
For optimal operation, we have as per EIC, the common lambda of the
system given
Using this value of common system lambda, the MW output values of all the 3
units are obtained from their IC curves as:
P1= 100 MW, P2= 140 MW and P3=210 MW.
The operating costs for this schedule are found by using the cost
curves as: FT(Optimal operation) = F1+F2+F3 = 1110+1571+2147.7
= 4828 Rs./Hr.
Similarly, the operating costs for the equal sharing of total load are also found by
using the cost curves as: (with P1= P2= P3=150 MW.
Example-7:
Given that IC1=(40+0.2P1) ; IC2 =(30+0.25P2) Calculate and tabulate the load
shared by each unit for optimal operation if the total load varies from 50 to
250MW, in steps of 50MW, given that max.MW is 125 and min. MW is 20 for
both the units.
Solution:
Stage 1: Consider the IC’s at Pmin:
IC1|P1=P1min = 20MW = 40+0.2(20) = 44 Rs./MWHr
IC2|P2=P2min = 20MW = 30+0.25(20) = 35 Rs./MWHr
Thus, IC2 < IC1; i.e., the EIC holds good only from the stage where, the system
lambda is equal to 44 Rs./MWHr. Now find P2 corresponding to this Lambda:
λ
Sl. syste
No. PT P1 P2 Remarks
m
20 44 Unit 2 only shares
1. 50 30
(fixed) (fixed) the additional load
Example-8:
For the total load values of PT = 100, 150 and 200 MW, the equations to be
solved for the output power values are: IC1=IC2; PT = P1+P2 and λsystem is
calculated using any one of the IC equations. The values so obtained for the said
range of load values are tabulated as under.
Calculate and tabulate the load shared by each unit for optimal sharing of the
total load in the range 50-250 MW in steps of 100 MW. Also find system in each
case.
Solution:
Thus, IC2 < IC1; i.e., the EIC holds good only from the stage where, the system
lambda is equal to 32.16 Rs./MWHr. Now find P2 corresponding to this Lambda:
P2|λ2=32.16 = 100.8 MW so that then PTotal = 112.8 MW
Thus, until PT=112.8 MW, EIC will not be feasible, Unit 1 will work at its
Dept. of EEE, SJBIT Page 91
Power System Operation and Control (PSOC) 10EE82
minimum load, 12 MW and the additional load is shared by unit 2 alone till
λ=32.16 Rs./MWHr.
Stage 2: Consider the IC’s at Pmax: since the Unit 2 is expected to reach its max.
limit earlier, find:
IC2|P2=P2max = 125MW = 37 Rs./MWHr
P1|λ1=37 = 38.88 MW so that then
PTotal = 163.88 MW
Thus, after PT= 163.88 MW, EIC ceases to hold good; Unit 2 will work at its
maximum load sharing of 125 MW only and all the additional load variations are
shared by unit 1 alone untill P1 also reaches 125 MW.
Stage 3: In summary, EIC holds good only for PT and λsystem values which satisfy
the limits: 112.8 ≤ PT ≤ 163.88 MW and 32.16 ≤ λsystem ≤ 37 Rs./MWHr
For the total load value of PT = 150 MW, where the EIC holds good, the
equations to be solved for the output power values are: IC1=IC2; PT = P1+P2 and
λsystem is calculated using any one of the IC equations. The values so obtained for
the said range of load values are tabulated as under.
λ
Sl. No. PT P1 P2 system Remarks
12 32.16 Unit 2 only shares
1. 50 38
(fixed) (fixed) the additional load
Unit 1 and Unit 2 share
2. 112.8 12 100.8 32.16
the total load as per
EIC
Criterion. The system
3. 150 31.58 118.42 35.67
works with a common
4. 163.88 38.88 125 37 system lambda
125 37 Unit 1 only shares
5. 250 125
(fixed) (fixed) the additional load
Example-9:
A system is fed by two steam plants with IC functions as under:
The maximum and minimum loads on the units are 100 MW and 10 MW
respectively. Determine the minimum cost of generation for supplying a load as
follows based on the EIC criterion:
Load 12 Midnight 6 am 12 noon 2-6 6-9 9pm –
12
Duration – 6 am – 12 noon -2 pm pm pm Midnight
Load in
60 100 80 120 175 50
MW
Solution:
However all the required loads to be supplied are above this total load of
48.4 MW!
Again, it is observed that all the required loads to be supplied are below this total
load of 196 MW!
In summary, EIC holds good for all the load values specified. Now for the total
load value of PT = P1+P2, where EIC is shown to holds good, the equations to be
solved for the output power values are: IC1=IC2; PT = P1+P2 and λsystem is
calculated using any one of the IC equations. The values so obtained for the said
range of load values are tabulated as under.
Example-10:
Assume that the fuel input in Btu/Hr. for unit 1 and unit 2 of a plant are
given by:
F1 = {P1+ 0. 024P12+80}106; F2={6P2+ 0.04P22 +120)106
The maximum and minimum loads on the units are 100 MW and 10 MW
respectively. Determine the minimum cost of generation for supplying a load as
follows with the fuel cost at Rs.2 per MBtu.
Solution:
Thus, IC2 >IC1; i.e., the EIC holds good only from the stage where, the system
Solution:
Consider the IC curves in Rs./MWHr for the 3 units as under:
IC1=dH1/dP1 = (1.1) (7.2+0.000284P1) Rs./MWHr
IC2=dH2/dP2 = (1.0) (7.85 + 0.00388P2) Rs./MWHr and
IC3=dH3/dP3 = (1.0) (7.97 + 0.00964P3) Rs./MWHr
For optimal operation, we have as per EIC, the common lambda of the
system given
by:
λ = {PD+Σ(bi/2ci)}/ {Σ(1/2ci)} i= 1,2,3
Substituting the values, we get after
simplification, λ = 9.148 Rs./MWHr.
Using this value of common system lambda, the MW output values of all the 3
units are obtained from their IC curves as:
P1= 393.2 MW, P2= 334.6 MW and P3=122.2 MW.
(All the MW output values are within their capacity limits specified)
Example-12:
Three plants of total capacity 500 MW are scheduled for operation to supply a
total load of 310 MW. Find the optimal load schedule if the IC curves and
limitations are:
Solution:
For optimal operation, we have as per EIC, the λsystem given by:
λsystem = 42 Rs./MWHr.
Using this value of λsystem, the MW output values of all the 3 units are obtained
from their IC curves as:
Thus, P2<P2min (of 20 MW) and P1,P3 are within the limits.
In such cases, for optimal operation, we set P2=P2min = 20
And hence the total load to be shared only between the unit 1 and unit
3 is: 310-10=290 MW;
Solution:
For optimal operation, we have as per EIC, the common lambda of the system
given by:
Using this value of common system lambda, the MW output values of all the 3
units are obtained from their IC curves as:
P1= 704.6 MW, P2= 111.8 MW and P3= 32.6 MW.
Thus, P1>P1max (of 600 MW) ; P3<P3min (of 50
MW) and P2 is within the limits.
Thus between units 2 and 3, the optimal operation may be feasible since IC3<IC2.
For this, we solve the equations:
Example-14:
If the total load at a certain hour of the day is 400 MW for a 3 unit system, obtain
the optimum generation schedule, if the IC curves of the three units are as under
(with IC’s in Rs./MWHr. and PG’s in MW):
Solution:
Thus,
In EPS, the first step is to properly assess the load requirement of a given area
where electrical power is to be supplied. This power is to be supplied using the
available units such as thermal, hydroelectric, nuclear, etc. Many factors are
required to be considered while choosing a type of generation such as: kind of
fuel available, fuel cost, availability of suitable sites for major station, nature of
load to be supplied, etc.
Variable load: The load is not constant due to the varying demands at the
different times of the day. The EPS is expected to supply reliable and quality
power. It should ensure the continuity of power supply at all times. {Qn.: write a
note on the choice of the number and size of the generating units at a power
station from economic operation point of view}
Single unit Vs. multiple units: the use of a single unit to supply the complete load
demand is not practical since, it would not be a reliable one. Alternately, a large
number of smaller units can be used to fit the load curve as closely as possible.
Again, with a large number of units, the operation and maintenance costs will
increase. Further, the capital cost of large number of units of smaller size is more
as compared to a small number of units of larger size. Thus, there has to be
compromise in the selection of size and number of generating units within a
power plant or a station.
Electric energy is generated at large power stations that are far away from the
load centers. Large and long transmission lines (grid lines) wheel the generated
power to the substations at load centers. Many electrical equipment are used for
proper transmission and distribution of the generated power. The grid lines are
such that:
• GRID: The transmission system of a given area.2
• Regional GRID: Different grids are interconnected through transmission lines.
• National GRID: Interconnection of several regional grids through tie lines.
Each grid operates independently, although power can be exchanged between
various
grids.
(coal fired) plants, economic load dispatch (ELD) is considered usually for a
given set of thermal plants in the foregoing discussion.
* The problem of economic scheduling: This is again divided into two categories:
• The unit commitment problem (UCP): Here, the objective is to determine the
various generators to be in operation among the available ones in the system,
satisfying the constraints, so that the total operating cost is the minimum. This
problem is solved for specified time duration, usually a day in advance, based on
the forecasted load for that time duration.
• The economic load dispatch (ELD): Here, the objective is to determine the
generation (MW power output) of each presently operating (committed or put
on) units to meet the specified load demand (including the losses), such hat the
total fuel cost s minimized
* The problem of optimal power flow: Here, it deals with delivering the real
power
to the load points with minimum loss. For this, the power flow in each line is to
be optimized to minimize the system losses.
{Qn.: compare ELD and UCP and hence bring out their importance and
objectives.}
PERFORMANCE CURVES:
The Performance Curves useful for economic load dispatch studies include many
different types of input-output curves as under:
The above constraints arise due to the need for the system to balance the
generation
and load demand of the system.
SPINNING RESERVE
Spinning reserve (SR) is the term used to describe the total amount of generation
available from all the synchronized (spinning) units of the system minus the
present load plus the losses being supplied. i.e.,
Sp.Res., PSP = {Total generation, PlG}-{ PDj(load)+ Pl (losses)}
The SR must be made available in the system so that the loss of one or more
units does not cause a large drop in system frequency. SR must be allocated to
different units based on typical Council rules. One such rule is as follows:
‘SR must be capable of making up for the loss of the most heavily loaded unit in
the system’ Reserves must be spread around the system to avoid the problem of
‘bottling of reserves’ and to allow for the various parts of the system to run as
‘islands’, whenever they become electrically disconnected.
where, CT is the total fuel cost of the system in Rs./Hr., PD is the total demand
in MW
and Pi is the MW power output of unit i. The above optimization problem can be
solved by LaGranje’s method as follows.
The LaGranje function L is given by:
Where, Nk1 and Nk2 (assumed to be real values) are the current distribution
factors
of units 1 and 2 respectively.
It is assumed that the currents Ik1 and IL as well as Ik2 and IL have the same
phase angle
or they have a zero phase shift. Thus, they can be added as real numbers as
under.
Let I1 = I1Ð1 = I1cos 1+ jI1sin1
I2 = I2Ð2 = I2cos 2+ jI2sin 2
Where 1 and 2 are the phase angles of currents.
where,
p1 and p2 are the mw power output values by the units 1 and 2 respectively,
v1 and v2 are the respective line voltages and 1, 2 are the respective power
factor angles and PL is the transmission loss in the system. after simplification,
an expression for the transmission loss as a function of plant generation can be
obtained as:
PL = SNk1 2RkP1 2/(V1 2cos2q1) + SNk2 2RkP2 2/(V2 2cos2q2) + 2
SNk1Nk2RkP1P2 cos(_1-_2)/ (V1V2cosq1cosq2)
= B11P1 2 + B22P2 2 + 2 B12P1P2
Where, the B coefficients are called as the loss coefficients. Thus, in general, for
a system of n units we have,
PL = S S PiBijPj
Where,
Bij = S {cos(δi-δj)/ (ViVjcosqicosqj) NkiNkjRk (32)
Note:
1. The B coefficients are represented in units of reciprocal MW, (MW-1)
2. For a three unit system , equation (32) takes the form:
PL = B11P12 + B22P2 2 + B33P32 + 2 B12P1P2+2 B13P1P3+ 2 B23P2P3=
PTBP
Where, P = [P1 P2 P3], the vector of unit power output values and
B = [B11 B12 B13; B21 B22 B23; B31 B32 B33]
the loss coefficient matrix for the 3 unit system.
3. The B coefficient matrix is a square, symmetric matrix of order n, n being the
number of generating units present in the system.
4. The following are the assumptions made during the above analysis:
The costs of two units at the busses connected through a transmission line are
(with P1 and P2 in MW): IC1=15+0.125 P1; IC2=20+0.05 P2
If 125 MW is transmitted from unit-1 to the load at bus-2, at which the unit-2 is
present, a line loss of 15.625 MW is incurred. Find the required generation for
each of the units and the power received by the load when the system lambda is
Rs.24.0 per MWHr. Use Penalty Factor method.
Solution:
With unit-2 not contributing to the line loss, it is due to the unit-1 alone, and
hence,
dPL/dP2 = ITL2 =0; where, PL=B11P12; i.e., B11= PL/ P12 = 15.625/1252 = 10-3 MW-1
Thus, PL=10-3P12 so that dPL/dP1= ITL1 = 2(10-3)P1 MW
Hence we have,
= 15+0.125 P1 = λ (1-ITL1) = 24 {1 - 2(10-3)P1
IC1 } and
= 20+0.05 P2 = λ (1-ITL2) = λ =
IC2 24
Solving, we get, P1=52 MW and P2= 80 MW.
Total loss = Total Generation – Total Load = (P1+P2) – PLoad
= (52+80) - 15.625 = 116.4 MW.
Example-3:
In a power system, the ICs of the two units are (with P1 and P2 in MW):
IC1=0.01 P1+20 ; IC2=0.015 P2 +22.5 Rs./ MWHr.
Dept. of EEE, SJBIT Page 108
Power System Operation and Control (PSOC) 10EE82
The system is running under optimal scheduling with P1=P2=100 MW. If the
incremental transmission loss of unit 2 is 0.2, find the penalty factors and the
incremental transmission loss of unit 1.
Solution:
For optimal power dispatch, we have, PnAλA = PnBλB = λSystem
i.e., (0.01 P1+20) Pn1 = (0.015 P2 +22.5) Pn2 where,
Pn2 = {1 – ITL2}-1 = {1 – 0.2}-1 = 1.25 so that,
[0.01 (100) +20] Pn1 = [0.015 (100) +22.5] 1.25
Solving, we
get, Pn1 = 1.4286 and
Since, Pn1 = {1 – ITL1}-1 we get, ITL1 = 0.3.
Example-4:
A hydro plant and a steel plant are to supply a common load of 90 MW for a
week (168 Hrs.). the unit characteristics are as under:
Hydro Plant: C1=300+15PH acre feet/ Hr. 0≤PH≤100 MW
125≥PS≥50
2
Steam Plant: HS=53.25+11.27PS+0.0213PS MW
If the Hydro plant is limited to 10000 MWH of energy usage, find the sharing of
load during the period as a means of economic operation schedule.
Solution:
Since load=90 MW, total energy=90(168) = 15128 MWH
Energy to be supplied by steam plant, ES=15128 – 10000 = 5128
MWH. Now, the steam plant has the max. efficiency when
(HS=a+bPS+cPS2); Power, P= √√a/c = √{53.25/0.0213} = 50 MW.
Example-5:
Solution:
PL = PTBP
= B11P12 + B22P2 2
+ B33P32 + 2 B12P1P2+2 B13P1P3+ 2 B23P2P3
= 0.308 pu = 30.8 MW
ITLi = 2 Σ PkBik
i.e., ITL1 = 2[P1B11 + P2B12 + P3B13] = 0.004 pu = 0.4
MW i.e., ITL2 = 2[P1B21 + P3B22 + P3B23] = 0.06 pu = 6
MW i.e., ITL3 = 2[P1B31 + P2B32 + P3B33] = 0.082 pu =
Dept. of EEE, SJBIT Page 110
Power System Operation and Control (PSOC) 10EE82
8.2 MW.
Example-6:
Two units are at two busses connected through a transmission line. If 100 MW is
transmitted from plant 1 at bus-1 to the load at bus-2, a line loss of 10 MW is
incurred. The IC curves of the units are, IC1=0.02P1+16; IC2=0.04P2 +20
Rs./MWHr. If λsystem = 26 Rs./MWHr., the no-load fuel costs are Rs.250/- and
Rs.350/- per hour for unit-1 and unit-2 respectively, determine the following:
(xvii) The values of P1, P2 and the received load for optimal operation?
(xviii) The optimum values of P1, P2 for the above received load, if the system
losses are accounted for but not coordinated.
(xix) Total fuel costs in Rs./Hr. for both the parts above.
Solution:
Consider: IL = Ia + Ib; IL1 = Ia = 1- j0.15 and IL2 = Ib = 0.5 – j0.1
IL1/IL= 0.6649 IL2/IL= 1 - 0.6649 = 0.3351
The current distribution factors are as follows:
Na1 = Na2 = 0.6649 Nc1 = - 0.3351
Nb1 = Nb2 = 0.3351 Nc2 = 0.6649
V1=1.0 00; V2 = 1 + Ic Zc = 1.0176 2.760
I
G
θθ2= 2.76+12.09 =
Thus, σ1= -7.12 ; σ2= -12.09 ; θθ1= -7.12
0 0 0
and 14.85 0
B11=ΣΣNk12Rk/(V12cos2θθ1)={1/(V12cos2θ1)}{Na12Ra+Nb12Rb+Nc12Rc}=
0.01462 pu B22 = ΣΣNk22Rk/(V22cos2θθ2) =
2
{1/(V2 cos 2
θ2)}{Na2 Ra+Nb22Rb+Nc22Rc}=
2
0.2175 pu and B12 = ΣΣNk1Nk2Rk
cos(σ1-σ2)/ (V1V2cosθθ1cosθθ2)
= {1/(V1V2cosθ1cosθ2)}{Na1Na2Ra+Nb1Nb2Rb+Nc1Nc2Rc}= 0.0079 pu
Example-8:
Figure below shows a system with plant-1 and plant-2 connected to bus-1 and
bus-2 respectively. There are two loads and 3 branches. The bus-1 is the
reference bus with 1.0 00 pu voltage. Base MVA is 100. Calculate the loss
formula coefficients in pu and in MW-1 units, if the branch currents and branch
impedance values are as under:
Ia = 2.0 – j 0.50 pu Za = 0.06 + j 0.24 pu
Ib= 1.6 – j 0.40 pu Zb = 0.03 + j 0.12 pu
Ic = 1.8 – j 0.45 pu Zc = 0.03 + j 0.12 pu
Solution:
Consider: Ic/(Ib+Ic) = 0.5294
Ib/(Ib+Ic) = (1-0.5294) = 0.4706
The current distribution factors are as follows:
Na1 = -0.5294; Nb1 = Nb2 = 0.4706
Na2 = 0.4706; Nc1 = Nc2 = 0.5294
V1=1.0 00; V2 = 1 + Ia Za = 1.319 200
I1 = Ib – Ia = -0.4+j0.1 = I1 1660 ; I2 = Ia + Ic = I2 -140
Thus, σ1= 1660; σ2= -140; θθ1= 1660 and θθ2= 20+14 = 340
So that the PF values are: cosθθ1 = 0.97 and cosθθ2= 0.829
Now, the loss coefficients are given by the expression:
Bij = ΣΣ {cos(σi-σj)/ (ViVjcosθθicosθθj) NkiNkjRk
So that
B11 = ΣΣNk12Rk/(V12cos2θθ1) = 0.0338 pu = 0.3387(10-3) MW-1
B22 = ΣΣNk22Rk/(V22cos2θθ2) = 0.0237 pu = 0.237(10-3) MW-1 and
B12 = ΣΣNk1Nk2Rk cos(σ1-σ2)/(V1V2cosθθ1cosθθ2)=9.6073(10-5) pu
=0.9607(10)MW-1
Example-9:
The following table gives the unit charges of a 3 unit system. Initially the unit 2
is ON for 4 hours. Min. up time is 3 hours for all the units. The priority schedule
is 2-1-3. Find the unit commitment schedule.
Unit Max. Incr. Cost No load Start up Load
# MW Rs./MW cost Rs./Hr. cost Rs. pattern
Hrs. MW
1 200 75 100 100
1-2 200
2 200 75 100 100 3-4 500
5-6 200
3 100 100 100 200
7-8 200
Solution:
Based on the priority schedule we have the UC combination and the load
supplied worked out as per the table below:
Unit combination A: 010 B: 110 C: 111
for one hour (due to min. up time of 3 hours for unit-1 and unit-3) and with only
the unit-2 ON at full load for the next one hour. (Now,the unit-2 does not have
any start up cost component). Thus,
Operating cost is = {75(200) + no load cost of unit 1 + no load cost of unit 3} +
75(200) = 15000 + 100+ 100 + 15000 = Rs. 30200.00
Stage d:
7-8 for 2 hours: 200 MW
It is combination-a again with unit 2 only ON. Thus
Operating cost is = 75(200)2 = 30000 = Rs. 30000.00 (there is no start up cost
now)
Thus, the total operating cost
= Rs. 30100.00 + Rs. 80300.00 + Rs. 30200.00 + Rs. 30000.00
= Rs. 1,70,600/-
Example-10:
The unit charges of a 3 unit system are as under. Initially the unit 1 is ON for 4
hours. Min. up time is 2 hours for all the units. The priority schedule is 1-2-3.
Find the unit commitment schedule.
Unit Max. Incr. Cost No load Start up Load
# MW Rs./MW cost Rs./Hr. cost Rs. pattern
Hrs. MW
1 200 900 200 400
1-2 200
Solution:
Based on the priority schedule we have the UC combination and the load
supplied worked out as per the table below:
Unit combination A: 100 B: 110 C: 111
UNIT -6
POWER SYSTEM SECURITY: Introduction, factors affecting power system security,
Security analysis, Contingency Selection, Techniques for contingency evaluation-D.C. load
flow and fast decoupled load flow.
6 Hours
Introduction
The Power System needs to be operationally secure, i.e. with minimal probability of blackout
and equipment damage. An important component of power system security is the system’s
ability to withstand the effects of contingencies. A contingency is basically an outage of a
generator, transformer and or line, and its effects are monitored with specified security limits.
The power system operation is said to be normal when the
power flows and the bus voltages are within acceptable limits despite changes in load or
available generation. From this perspective, security is the probability of a power system’s
operating point remaining in a viable state of operation. System security can be broken down
into TWO major functions that are carried out in an operations control centre:
(i) Security assessment and (ii) security control.
The former gives the security level of the system operating state. The latter determines the
appropriate security constrained scheduling required to optimally attaining the target security
level. Before going into the static security level of a power system, let us analyze the different
operating states of a power system. The states of power system are classified into FIVE states:
Normal
Alert
Emergency
Extreme Emergency and
Restorative.
Fig below depicts these states and the ways in which transition can occur from one state to
another.
The operation of a power system is usually in a normal state. Voltages and the frequency of the
system are within the normal range and no equipment is overloaded in this state. The system
can also maintain stability during disturbances considered in the power system planning. The
security of the power system is described by Thermal, voltage and stability limits. The system
can also withstand any single contingency without violating any of the limits. The system
transits into the emergency state if a disturbance occurs when the system is in the alert state.
Many system variables are out of normal range or equipment loading exceeds short-term
ratings in this state. The system is still complete. Emergency control actions, more powerful
than the control actions related to alert state, can restore the system to alert state. The
emergency control actions include fault clearing,
excitation control, fast valving, generation tripping, generation run back-up, HVDC
modulation, load curtailment, blocking of on-load tap changer of distribution system
transformers and rescheduling of line flows at critical lines. The extreme emergency state is a
result of the occurrence of an extreme disturbance or action of incorrect of ineffective
emergency control actions. The power system is in a state where cascading outages and
shutdown of a major part of power system might happen. The system is in unstable state.
The control actions needed in this state must be really powerful. Usually load shedding of the
most unimportant loads and separation of the system into small independent parts are
required.
– Illustrative Example
– Procedure
– Methods of of Security Analysis
For Example:
– Maintaining Adequate Spinning Reserve ensures that when a generator fails, the remaining
units can take up the deficit load without too much of a drop in frequency
– Taking care of Transmission Line Flows When generation is dispatched ensures that, when a
Line is taken out, the remaining lines do not get overloaded
• Power System Problems due to events such as Transmission Line and Generator Outages etc,
can cause serious damage within very short duration
• Contingency Analysis Programs
– Model the events before they occur
– Combined with standard analysis procedures such as Power Flow etc to study the system
– Generate Operator Alarms
• Other Features
– Fast Solution Methods
– Automatic Contingency Selection
– Automatic Initialization of Contingency Power Flows using Actual System Data and State
Estimation Procedures
State when contingency occurs at the base operating condition- with corrections
• A Security Analysis procedure run at an Energy Control Centre must be very fast
• Three Techniques commonly used
– Study the Power System with Approximate but fast Algorithms (DC Power Flow Methods,
Linear Sensitivity factors)
– Select only important cases for detailed analysis (Contingency Selection)
– Use Multiple Processors or Vector Processors: running cases in parallel (Still in research
stage)
UNIT 7
SYSTEM MONITORING AND CONTROL: Introduction , Energy management system, the
basis of power system state estimation(PSSE), mathematical description of PSSE process,
minimization technique for PSSE, Least Square estimation, Error and detection in PSSE,
System security and emergency control. 6 Hours
Power system state estimation (PSSE) has been traditionally performed at regional control
centers with limited interaction. However, due to the deregulation of energy markets, large
amounts of power are transferred over high-rate, long-distance lines spanning several control
areas [11]. These so-called tie lines, originally constructed for emergency situations, are now
fully operational and must be accurately monitored. Since
any control area can be strongly affected by events and decisions elsewhere, independent
system operators (ISOs) can no longer operate in a truly independent fashion. The ongoing
penetration of renewable sources further intensifies inter-area power transfers, while their
intermittent nature necessitates more frequent state acquisition. At the same time, the advances
in metering infrastructure are unprecedented: phasor measurement units (PMUs) provide
finely-sampled voltage and current phasors, synchronized across the grid; smart meters reach
the distribution level; and networked processors arebeing installed throughout the grid. The
abundance and diversity of measurements offer advanced monitoring capabilities, but
processing them constitutes a major challenge, which is exacerbated in the presence of
malicious data attacks and bad data. There are two key issues in modernizing the power grid
monitoring infrastructure: Firstly, PSSE should be performed at the interconnection level. Yet
an interconnection may include thousands of buses, while 2-3 measurements per state are
typically needed. Requiring also real-time processing along with resilience to corrupted data
render centralized state estimation computationally formidable. Further, a centralized approach
is vulnerable and is not flexible when it comes to policy and privacy issues. Secondly,
decentralizing information processing for the power grid can be performed at several
hierarchies. PMU measurements can be processed by phasor data concentrators (PDCs) [26];
conventional supervisory control and data acquisition (SCADA) measurements together with
PDC fused data can be aggregated by the ISO; and finally, estimates from ISOs can be merged
at the interconnection level. These considerations corroborate that distributed PSSE and bad
data analysis are essential for realizing the smart grid vision.
Existing distributed methods for PSSE and bad data analysis are reviewed in Section II. The
PSSE problem, its unique requirements and challenges are highlighted in Section III. In
Section IV, a new distributed PSSE methodology is developed. Based on the alternating
direction method of multipliers a systematic cooperation between local control centers is
enabled with unique features: it facilitates several practical PSSE formulations; it lowers the
overhead for inter-area information exchanges; its convergence is guaranteed regardless of
local observability or parameter tuning; and the resultant algorithm can be executed by solvers
already in use at local control centers. Building on this framework, a robust decentralized
estimator is derived in Section V. Different from the conventional two-step bad data analysis,
the novel approach implements Huber’s M-estimator in a decentralized manner, while PSSE is
accomplished jointly with bad data removal. Leveraging sparsity of the introduced bad data
vectors, the new algorithm augments standard PSSE solvers by a few iterations. The novel
robust decentralized algorithms are numerically evaluated in Section VI, and the paper is
wrapped up in Section VII. Regarding notation, lower- (upper-) case boldface letters denote
column vectors (matrices), and calligraphic letters stand for sets.
State estimation
The tool used for power system monitoring and which is central for all subsequent grid
analysis is the state estimator. The objective of state estimation is to estimate the voltage
phasor at each bus of the monitored electrical grid so that it is as consistent as possible with the
measurements made on the grid. An important aspect of the problem is the redundancy,
meaning that there are more measured variables than state variables to estimate. The network
equations are given in 1 and give the relations between the measurement vector z and the state
vector x
z = h(x) + e; (1)
where e is the measurement noise vector [2, 5]. Because of the redundancy, there are more
measurements than state variables to estimate so the system is over determined.
This is why a statistical method must be used to get an estimation of the state variables. The
Weighted Least Squares (WLS) method is used for power system state estimation. The
method ensures that the performance index or sum of squared residuals J is minimized. J(x) =
(z � h(x))T R�1 (z h(x)); (2)
where R is the covariance matrix which gives the variance of each measurement. The
algorithm used to solve this equation depends on the type of measurement. Minimization of J
gives the equation below:
l(x) =@J(x)@x
= HT (x)R1 (z h(x)) = 0; (3)
where H = @h(x) @x is the Jacobian matrix of h with respect to the state variables. Resolution
of equation 3 depends on the linearity of h(x), which depends on the measurements used.
The measurement residual r can be computed as
r = z h(bx); (4)
where bx is the estimated state vector, and thus represents the difference between the actual
measurement and the estimated measurement. The measurement residual r can also be
expressed as r = S e; (5)
where S is the residual sensitivity matrix and represents the sensitivity of the measurement
residuals to the measurement errors and e is the measurement noise vector. The sensitivity
matrix S can be calculated as S = I K; (6)
where I is the identity matrix. The residual sensitivity matrix S has certain properties S is not
symmetric unless the variances associated with all measurement types are equal. _ S:S = S_
S:R:ST = S:R
Using equation (5), the covariance of the measurement errors called the residual covariance
matrix can be determined = SR: (7)
Measurements provided by the SCADA system are the voltage, active or reactive line power
and active or reactive injected power, while PMUs will provide voltage phasors at the bus and
current phasors owing in the transmission line. The h(x) functions between power
measurements and state variables are non-linear so the relations must be linearized during the
resolution process and converge to the solution after some iterations. In the case of phasor
measurements, all h(x) functions are linear, so the computation time needed by the state
estimator is shorter when only phasor measurements are used. It can be shown that when the
input of a state estimator includes measure- ments to which a normalized noise has been added
then indices J and Jt can be evaluated statistically [5]
E(J) = m n; (8)
E(Jt) = n (9)
where m is the number of measurements available, n is the number of state variables to
estimate, J and Jt are the performance indices. The sum of the squared residuals is shown to
have distribution. This can be deduced from the property of a sum of squared random
variables, which have a normal distribution. The redundancy is particularly important for bad
data detection and elimination.
UNIT-8
POWER SYSTEM RELIABILITY: Introduction, Modes of failures of a system, Generating
system and its performance, derivation of reliability index, reliability measure for N-unit
system, cumulative probability outages-Recursive Relation, Loss of load probability,
Frequency and duration of a state. 8 Hours
Reliability Indices
This analysis relies on two general classes of information to estimate the reliability:
component reliability parameters and system structure. Using system structure and component
performance data, we can evaluate the reliability of specific load points or the whole
distribution system. The structure information is achieved by the circuit traces presented
previously.
In the following paragraphs the performance data is discussed. Predictive reliability techniques
suffer from data collection difficulties. Simplifying assumptions (default values) are required
for practical analysis of distribution systems.
In the reliability analysis program, failure rates and repair times from field data are preferred.
When this data is not available, default values are fetched from a table in the relational
database which has generic average failure rates and repair times for each type of device.
Probability of failure
Chance that a component will fail
Probabilistic value with no unit
May be difficult to interpret
Frequency of failure (failure rate)
In terms of number of failure within specified time
Easier to predict from history
Express in per hour, per day, per year
Reliability is a measure of the ability of the power system to deliver electricity to all
points of utilization within accepted standards and in the amount desired, for the period
of time intended, under the operating conditions intended.
RELIABILITY
: :
<: :>
Adequacy SECURITY
Adequacy : relates to the existence of sufficient facilities within the system to satisfy the
consumer load demand at all times; taking into account scheduled/ unscheduled outages
• assessed using the power flow (AC/DC) solutions.
Security : ability of the electric systems to respond to sudden disturbances arising within that
system, such as electric short circuits
• assessed using dynamic calculation.
Probabilistic indexes
• Reflect uncertainties in the system
• Loss of load probability (LOLP)
• Probability that generation will not meet demand in a year
• Loss of load frequency (LOLF)
• How often does the system fail in a year
• Expected energy not supplied (EENS)
Deterministic criteria
N-m contingency analysis System with ‘N’ components should be able to serve peak load
when loss ‘m’ components Sometimes called security analysis
Probabilistic criteria
Loss of load expectation, for example, 1 day in 10 years