Load Frequency Control Introduction
Load Frequency Control Introduction
Ain-Shams Univ.
Load Frequency Control
11/16/15
System Frequency
is the PowerSystem Health
Indicator
11/16/15
11/16/15
2003 Blackout
Power/Frequency
11/16/15
Impact of Under/Over
Frequency on Power System
Turbine (very tight
Components
1/2
over/under frequency
tolerance): vibrations arise in
turbine blades when the
generator is operating at off
nominal frequencies. Resonant
frequencies lie in the
neighborhood of the
fundamental base operating
speed of the turbine. Running
at these resonant freq. under
load for any extended period,
there is cumulative damage to
the
anFrequency
eventual
11/16/15blades and Load
Control
Impact of Under/Over
Frequency on Power System
Components
2/2
11/16/15
11/16/15
Power/ Frequency Vs
Time
11/16/15
11/16/15
10
Evaluation of System
Performance
11/16/15
11
11/16/15
12
Interconnected Control
Areas
(Power Pool)
Control Area
Net Interchange from area
11/16/15
13
Objectives of LFC
1. Maintain(Regulate) System
14
Levels of Generation
Control
Local Governor Control
Responds at generator level to correct frequency
deviation. Does not attempt to restore all the
way to nominal frequency 50/60 Hz
Automatic generation Control
Real-time control from Control centers controls
generation to restore frequency to 50/60 Hz and
interchanges to contracted amount
Economic dispatch
Reallocates generation to minimize cost
11/16/15
15
Generator Model
Generation (Mechanical Power) Load (Electrical
Power) Imbalance results in change in machine speed
(frequency).
Machine electro-mechanical dynamics are described by
the swing equation
For a single machine serving a load ( in per unit)
Pm-Pe = M d/dt
11/16/15
16
Pe
Pm
Pm- Pe = M d/dt
17
18
Generator
Model (3/3)
Pm- Pe = 2H d ( ) / dt
Apply Laplace transform:
19
Load Model
Generally, the P&Q absorbed by the load are functions of f&V.
Assume D as the load dependency on frequency, then
Pe = PL + D
Where PL is the incipient demand increase
D represents the response the additional load causes freq
to drop, all motors slow down=>load drops as D
D = 0 for resistive loads
D = -ve for static inductive loads
D = +ve for induction motors
The equivalent D of a system is often positive
11/16/15
20
11/16/15
21
System Behavior
(gen+load)
Lets say Pm=0
= P/s
(s) = - PL(s)/(Ms+D) = - P / s(MS+D)
tM/D
(t) = - (P/D)
(
1
e
)
P
e
Pm
11/16/15
22
MATLAB Model:
Inertia+Load
11/16/15
23
Governor Behavior
P
e
PL
Pm
Speed
Governor
Desired Generation
24
11/16/15
25
Droop
11/16/15
26
11/16/15
27
-0.02
With
Governor
-0.04
-0.06
-0.08
Without Governor
(Inertia + Load)
-0.1
-0.12
-0.14
11/16/15
t in sec
10
28
- (1/R)
Load
Change
= -0.2/20.8 = - 0.0096 pu
29
Behavior
Steady state response Role of
Pref
Pm = Pref (1/R)
At nominal frequency (=0) unit
would generate Pref0+ Pref
Pref
11/16/15
Pref
Pm
30
Multiple Areas
Pe1
Pm1
Ptie
jX
PLl
Area 1 or Gen 1 Tie Line
Pe2
PL2
Area 2 or Gen 2
Pm2
31
Pe1
Pe2
jX
P1l
Pm2
Area 1 or Gen 1 Tie Line Area 2 or Gen 2
A simple model for the line is just a series inductive reactance.
Let us also assume voltage magnitudes are ~nominal ( 1pu)
Pm1
Pl2
d 1 /dt =1
d 2 /dt = 2
32
Pe1
jX
P1l
Pm1
Area 1 or Gen 1
Pe2
Pm2
Pl2
Tie Line Area 2 or Gen 2
d 2 /dt = 2
33
Pe1
jX
P1l
Pm1
Area 1 or Gen 1
Pe2
Pl2
Tie Line
Pm2
Area 2 or Gen 2
d 2 /dt = 2
34
Pe1
jX
P1l
Pm1
Area 1 or Gen 1
Pe2
Pl2
Tie Line
Pm2
Area 2 or Gen 2
1(s) = 1(s)/s
11/16/15
2 (s) = 2(s)/s
35
Pe1
jX
P1l
Pm1
Area 1 or Gen 1
Pe2
Pl2
Pm2
Area 2 or Gen 2
Governor
Tie Line
Pm1(s) +
1(s)
Pl1(s) -
Pm2(s) +
1/(M1s+D1)
2(s)
Pl2(s) -
1(s)
Ptie(s)
1/(M2s+D2)
11/16/15
1/s
1/X
1/s
2(s)
Governor
Load Frequency Control
36
Multiple Generators
and
Areas
Ptie
Pe1
jX
P1l
Pm1
Area 1 or Gen 1
Qualitative Response
Pe2
Pl2
Tie Line
Pm2
Area 2 or Gen 2
37
11/16/15
38
Frequency Error
Interchange Error
ptie decreases from 1 to 2
11/16/15
39
11/16/15
40
Combined effects:
Inertia+ Governor + AGC
11/16/15
41
Multiple Generators
and
Areas
Ptie
Pe1
jX
P1l
Pm1
Area 1 or Gen 1
Pe2
Pl2
Tie Line
Pm2
Area 2 or Gen 2
- (1/R1) + Ptie
Load
Change
Load GenerationInterchange
Response Change from
Governor
- D2
- (1/R2) - Ptie
Pl2
11/16/15
D1
42
Multiple Generators
and
Areas
Ptie
Pe1
jX
P1l
Pm1
Area 1 or Gen 1
Pe2
Pl2
Tie Line
Pm2
Area 2 or Gen 2
43
Multiple Generators
and
Areas
Ptie
Pe1
jX
P1l
Pm1
Area 1 or Gen 1
Pe2
Pl2
Tie Line
Pm2
Area 2 or Gen 2
44
11/16/15
45
11/16/15
46
47
11/16/15
48