Construction and Rehabilitation of Multi-Purpose Building / Structure (Covered Court) Brgy. Sambat, Balayan, Batangas
Construction and Rehabilitation of Multi-Purpose Building / Structure (Covered Court) Brgy. Sambat, Balayan, Batangas
Construction and Rehabilitation of Multi-Purpose Building / Structure (Covered Court) Brgy. Sambat, Balayan, Batangas
DESIGNED BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:
BENCIO A AGUZAR
HERMINIO C. SIMBOL RODRIGO M. SUMANGA FLORENCIA G. CORDOVA JULIANA D. VERGARA
ENGINEER III / CHIEF, MAINTENANCE SECTION
ARCHITECT ENGINEER CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER Officer - in - Charge
A PERSPECTIVE
NTS
A-1
N
A T AGA
SAMBAT
AL
ELEM.
(COVERED COURT) BRGY.
C
D
SCHOOL SCHOOL
SAMBAT, BALAYAN, BATANGAS
TO
A
RO
N
AYA
BAL
TO
GO
BA
N
LI
BA
OAD
A NR
LAY
/ BA
-
IB AGO
BAL
AN Y
ALA
TUY
BUIL
DIN
G
TO
B
/ G 6.04
GAN TIN
AT A EXIS 2
CA L
TO ROAD
N
LIA 1
1
TO B
13.79 A LAYA
N TOW
34.00 N PRO
PER AD
- 88
4m
2 )
- 17
2
9m
)
RO
9-B
(A
9-A
(A
TY
CI
228 228
L OT LOT 3
4.00
S
26.00
A
4
URT
NG
CO
V E RED
E CO
POS
TA
PRO 12.79
PALICO - BALAYAN - BA
TO BATANGAS CITY
4
5
26.00 2
5.00
4.34
0.60
1.00 16.70M 1.00
8.00 M.
1.47
6.00
LINE OF ROOF EAVES ABOVE 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
1.00
3.36
0.30
FINISH FLOOR LEVEL
5.85
2.00
6.00
EXISTING BUILDING
F 2 - 6mm x 63mm x 63mm
3.00
29.85 M.
2.75
ANGLE BARS COLUMN
6.00
E A V E S
.86 .30
FINISH FLOOR LEVEL
R O O F
O F
L I N E
6.00
COLOR ROOF
2.00
EXISTING POWER
2.00
2.64
2.40
6.00
6.00
1.00 1.00 1.00
4.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3.36
0.85 1.00 1.00 1.00
2 - 6mm x 63mm x 63mm
3.00
2.75
ANGLE BARS COLUMN
1.00
.86 .30
LINE OF ROOF EAVES ABOVE UP FINISH FLOOR LEVEL
4.00
VERIFY
A NATURAL GRADE LINE
F L O O R P L A N
A-2 SCALE 1:50 M. C LEFT SIDE ELEVATION
SCALE 1:100 M.
A-2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION AND FLOOR PLAN HERMINIO C. SIMBOL
REGION IV-A
REHABILITATION OF MULTI-PURPOSE FRONT ELEVATION ARCHITECT II
BATANGAS I DISTRICT ENGINEERING OFFICE
BUILDING / STRUCTURE REAR ELEVATION CHECKED BY: A-2
OFFICE OF THE DISTRICT ENGINEER
(COVERED COURT) RIGHT SIDE ELEVATION FLORENCIA G. CORDOVA BENCIO A. AGUZAR JULIANA D. VERGARA
BATANGAS CITY
LEFT SIDE ELEVATION RODRIGO M. SUMANGA 2 6
BRGY. SAMBAT, BALAYAN, BATANGAS CHIEF, PLANNING & DESIGN SECTION ENGINEER III / CHIEF, MAINTENANCE SECTION Officer - in - Charge
DRAWN BY: J.I.M. DIO ENGINEER II OIC - ASSISTANT DISTRICT ENGINEER
SUMMARY OF QUANTITIES
1.20
2.00 SPL-5 Electrical Room(Power House) sq.m. 4.00
3.00
2.10
.40 2.00 SPL-6 Fiberglass Board w/ Flexible Ring set 2.00
SPL-7 Mobilization/Demobilization mo. 3.00
STP-1
.90
C1/F1 SPL-8 Main Scoreboard set 1.00
.50
.90
.90
SPL-9 Project Billboard pcs. 2.00
SPL-10 Construction Safety & Health Program L.S. ALL
C1/F1
F D W
2.00
2.00
3.00
1 1
2.70
2.30
2.30
.50
1 (SET) 1 (SET)
C1/F1
.15
.15
STP-1
A FRONT ELEVATION B RIGHT SIDE ELEVATION C SCHEDULE OF DOOR & WINDOW D FOUNDATION PLAN
A-2 SCALE 1:50 M. P-1 SCALE 1:50 M.
A-2 SCALE 1:50 M. A-2 SCALE 1:50 M.
.20
2" X 12"
0.127 FASCIA BOARD
.30
HORIZONTAL BARS @ 3RD LAYER
ON FILL ON FILL
.90
BARS @ .60M.O.C
.80
BOTH WAYS
.40
FFL
RB
5" thk. CHB
.40
FIREWALL
2.70
.20
.20
2.30
5" thk. CHB ON FILL ON FILL
RB
FIREWALL
.20
.80
RB
.40
G SECTION PLAN
E ROOF FRAMING PLAN F WALL FOOTING PLAN A-2 SCALE 1:50 M.
.80
.15
.15 L BOTH WAYS
.20
.20
RB RB
.80
@.15M.O.C
2.00
.60
.92 .92 .92 .92 .92 .92 .46
1.00
3.85
DS T-1 0.84 0.84 0.84 2 - 50mm X 50mm X 5mm
DS SEE DETAIL C ANGULAR BARS
SEE DETAIL F S-1 (WEB MEMBERS)
8.00 M.
S-1
7 EQUAL PARTS@
2" x 6" x 15mm C - PURLINS
.86M = 6.00M
SPACED @ 1.00 M.
1.20
5.85
E S I D E S T R U T D E T A I L
3.00
2.75
S-1 SCALE 1:20 M.
TURN BUCKLE
0.30
DS T-1
DS
1.00
B SCHEMATIC TRUSS DIAGRAM
G.A. 26 PRE-PAINTED GUTTER S-1 SCALE 1:100 M.
6.00
.30
1
4" THK. x 5" WIDE
STEEL PLATE
DS T-1 2" x 2" 3 16" FULLY WELDEL
DS ANGLE CLEATS
G.A 26 PRE-PAINTED LONG 2 - 6mm x 63mm x 63mm
SPAN G.I ROOF SHEETS ANGLE BARS COLUMN
1.00
29.85
6.00
DS T-1
.30
DS
F S E C T I O N D E T A I L E D
S-1 SCALE 1:20 M.
.30
.30
6.00
.30
W/ NUT & WASHERS
.30 .30
.86
DS RB
EXISTING DS
RB
3
8''
THK. X 4'' WIDE STEEL PLATE
RB
CENTER JOINT SUPPORT (FULLY WELDED)
C S E C T I O N D E T A I L E D
SCALE 1:20 M. G S E C T I O N D E T A I L E D
S-1
DS T-1 S-1 SCALE 1:20 M.
DS
1.00
18.85
ANGULAR BARS
(WEB MEMBERS)
S-1 SCALE 1:50 M.
.82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82
D C E N T E R S T R U T D E T A I L
S-1 SCALE 1:50 M.
SIZE OF THE WIRE FOR POWER AND LIGHTING CIRCUIT HOME RUN SHALL BE
6.00
SERVICE ENTRANCE
SINGLE PHASE 2 WIRE
6.00
WEATHER-PROOF,
SW FLUSHED MOUNTED
SWITCH
6.00
UNDERGROUND OR UNDER
FLOOR CONDUIT
CONCEALED OR EMBEDDED
CONDUIT RUN
1.00
TO STREET
DRAINAGE
CB
CB
5.85
CB
CB
6.00
CB
29.85 M.
6.00
CB
CB
C ISOMETRIC VIEW
6.00
CB
EXISTING DS - DOWNSPOUT RUN ALL HORIZONTAL PIPING IN PERFECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO
POWER
HOUSE SD - STORM DRAINAGE PERCENT (2%)
2. CHANGE IN DIRECTION
WYES, LONG SWEEP QUARTER BEND, SIXTH - EIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF
6.00
FLOW IS FROM HORIZONTAL TO VERTICAL A SINGLE 81 BEND COMBINATION MAYBE USED ON VERTICAL
STACK AND SHORT QUARTER BENDS MAYBE USED ON WASTE LINE, TEE AND CROSSES MAYBE USED
IN BENT PIPES.
0.60
0.10 .40 0.10 3. PROHIBITED FITTINGS
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE
0.10
DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES OF SADDLE HUB AND BEND PROHIBITED.
0.10
CB
CB
VAR.
4. PIPE CLEAN - OUTS
0.40
0.60
UP CLEAN - OUTS ARE REQUIRED UNDER FOLLOWING CONDITIONS:
a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWO AND ONE HALF (22 21)
0.10
b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE
0.10
CONNECTION.
PLAN SECTION c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES
d) AT THE END OF ANY HORIZONTAL PIPE LINES.
8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPERVISION OF A LICENSED MASTER PLUMBING AND
LICENSED PLUMBING CONTRACTOR.