Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Astral CPVC - Manual.tecnic PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 40

ASTRAL FLOWGUARD

CPVC PIPES AND FITTINGS FOR


HOT & COLD
WATER DISTRIBUTION SYSTEMS

Corrosion For Hot & Cold


Resistant water

No electrical Easy cold


tools required welding process

Lower bacterial
growth Fire safety

PRODUCT CATALOGUE

Safe for IS 15778


drinking water Cost effective

CM/L-3673470
Only those products bearing
the NSF mark are certified
st to introduce

in india
ABOUT US
Astral Poly Technik Ltd is very proud to introduce Astral also produces FlowGuard pipes in iron pipe size
CHLORINATED POLY VINYL CHLORIDE [CPVC] for the first time into (IPS), available sizes are 65 mm (2½") to 100 mm (4") in SCH 40
this part of the globe, under license from Lubrizol, [formerly and 65mm (2½") to 300 mm (12") in SCH 80 which meets the
Noveon, USA] under brand name Astral FlowGuard CPVC. It is also requirements of ASTM F 441. The pressure ratings varies with
manufacturing Industrial Piping System under brand name Astral schedule pipe size and temperature.
Corzan CPVC. It has a techno commercial joint venture with
Astral is the only pipe manufacturing company in India
Specialty Process LLC, USA, the world leaders of manufacturing
having most prestigious quality certification from National
FlowGuard CPVC Pipes and Fittings in USA since last 32 Years.
Sanitation Foundations (NSF) and Bureau of Indian Standards(BIS).
Astral FlowGuard pipes and fittings, manufactured by Astral products are regularly tested at CIPET, CBRI - Roorkee and
Astral Poly Technik Ltd, are made from the specialty plastic, Shriram Institute and also received state approvals from BMC,
chemically known as Chlorinated Poly Vinyl Chloride [CPVC]. This CPWD, PWD, DGMAP etc. for domestic and public sanitation.
CPVC compound meets cell class 23447 B as defined by ASTM
D1784 and have a design stress of 2000 PSI and a maximum
service temperature upto 93°C. MARKETING NETWORK :
Pipes are produced in copper tube size (CTS) from 15 mm
Astral has marketing network of more than 300
(½") to 50 mm (2") with two different standard dimensional ratios
distributors and 9,500 dealers spread all over India with branch
- SDR-11 and SDR-13.5. The fittings are produced as per SDR 11.
offices at Mumbai, Delhi, Bengaluru, Chennai and Hyderabad
All Astral CPVC SDR 11 and SDR 13.5 pipes are made from
apart from that Astral has it's own warehouses at Bengaluru,
identical CPVC compound material having same physical
Coimbatore, Vijaywada, Goa and Delhi to deliver the material as
properties. The CPVC fittings are manufactured from compound
quick as possible.
material which meets all the requirement as per ASTM standard.
CPVC pipes of Copper Tube Size (CTS) dimensions can also be More than 150 techno marketing professionals and
applied to CPVC (IPS) dimensions by using IPS x CTS fittings. The administrative personals are on the board to coordinate with
CPVC pipes from 15 mm (½") to 50 mm (2") are also produced as architects, plumbing contractors and plumbers to utilize the best
per IS 15778 standard in both class that is Class 1 (SDR 11) and plumbing techniques and to get the best from the product.
Class 2 (SDR 13.5).
Apart from having the same physical properties, SDR 11
and SDR 13.5 which are having different wall thickness and FIELDS OF APPLICATIONS :
therefore, at any given temperature, they have different pressure Hot and Cold water applications in homes, apartments,
ratings. For e.g.
hotels, resorts, hospitals, high and low rise buildings, corporate
and commercial houses, academic institutes etc. for pure and
Pipe Temperature Pressure Rating hygienic water supply.
(°C) (PSI) (Kg/Cm2)
SDR 11 23 400 28.10
82 100 7.00
SDR 13.5 23 320 22.50
82 80 5.60

1
Factory - Santej, Ahmedabad
STANDARDS & SPECIFICATIONS
ASTM D1784 – Standard Specification for Rigid Poly MARKING AND UNIFORMITY :
(Vinyl Chloride) (PVC) Compounds and
Pipes and fittings made from CPVC compounds shall be
Chlorinated Poly (Vinyl Chloride)
clearly marked with the manufacturers trademark, material
(CPVC) Compounds.
designation, applicable ASTM standard.
ASTM D2846 – Specification for Chlorinated Poly
(Vinyl Chloride) (CPVC) Plastic Hot & SDR 11 Pipe : Tan coloured with red stripe
Cold water distribution systems. SDR 11 fittings : Tan Colour
ASTM F493 – Standard Specification for Solvent SDR 13.5 Pipe : Tan coloured with brown stripe
Cements for Chlorinated Poly (Vinyl SDR 11 fittings : Tan Colour
Chloride) (CPVC) Plastic Pipe &
SCH 40 Pipe : Tan coloure
Fittings.
ASTM F441 – Standard Specification for Chlorinated SCH 40 fittings : Tan Colour
Poly (Vinyl Chloride) (CPVC) Plastic SCH 80 Pipe : Tan colour
Pipe, SCH 40 & 80. SCH 80 fittings : Grey Colour
ASTM F438 – Socket-Type Chlorinated Polyvinyl
Chloride Plastic Pipe Fittings. SCH 40.
ASTM F439 – Socket-Type Chlorinated Polyvinyl ASTRAL FLOWGUARD CPVC LIMITED WARRANTY
Chloride Plastic Pipe Fittings. SCH 80.
Astral poly technik limited - Ahmedabad warrants to the
ASTM D2774 – U n d e r g r o u n d i n s t a l l a t i o n o f
original owner that the product will be free from manufacturing
Thermoplastic pipes.
defect and confirm to current applicable ASTM standards under
normal use. Buyer’s remedy for breach of this warranty is limited
NSF CERTIFIED : to replacement of or credit for the defective product. This
NSF International, a not-for-profit, non-governmental warranty excludes any expense for removal or reinstallation of any
organization, is the world leader in standards development, defective product and any offer incidental, consequential or
product certification, education, and risk management for public punitive damages
health and safety (www.nsf.org). For 65 years, NSF has been
committed to public health, safety and environmental protection.
The NSF Mark is recognized for its value in international trade and
is respected by regulatory agencies at the local, state, and
national levels. Astral is the first Indian company to obtain
certification from NSF for its CPVC products.

2
WHY PIPE AND FITTINGS ARE THE BEST CHOICE
FOR HOT AND COLD POTABLE WATER DISTRIBUTION ?
THE RAW MATERIAL
Astral FlowGuard CPVC
FlowGuard™ is a Hot and Cold Potable Water Distribution
piping system has winning edge over any
System made of chlorinated polyvinyl chloride (CPVC) for use in
other piping systems. Here are few
single and multi-family homes, apartments, high-rises,
parameters which make Astral FlowGuard
hotel/motels and commercial installations. FlowGuard™ CPVC
hot and cold water plumbing system stands
has been used for hot and cold water distribution in the United
as best in comparison to any other outdated
States since 1960. It has a history of superior performance and plumbing system…
competitive prices compared to metal and other alternative
piping systems. CPVC pipe and fittings are jointed by solvent
APPROVALS ACROSS THE WORLD
cementing which, through chemical bonding, essentially makes
the pipe and fitting become one continuous piece. Flowguard™
BY PROMINENT HEALTH
CPVC meets requirements of both ANSI/NSF standard 14-plastic AND
piping system components and related materials-and standard STANDARDS ASSOCIATIONS
61- Drinking Water System, components-health affects. Included
in these tests are strict standards and strict toxicological review • USA : NSF International

relating to chemical extraction products, taste and odour • Germany : Deutscher Verein des Gas-und Wasserfaches
produced in the water by the piping system. These tests ensure (DVGW)

that all Environmental Protection Agency (EPA) standards for • UK : Water Research Council (WRC)

safe drinking water are met by the CPVC piping system. • Canada : Canadian Standards Association (CSA)

• Holland : Keurings instituut voor Water leiding artikelen


(KIWA)

• France : Center Scientifique et technique du batiment


(CSTB)

• Turkey : Turkish Standard Institution (TSE)

3
Factory - Baddi, Himachal Pradesh

• NSF APPROVED SOLVENT CEMENT : All Weld-On Low VOC solvent cements provide
the following benefits :
All Weld-On solvent cements, primers
• High Quality Performance with excellent installation
and cleaners meet the requirements properties.

for Low VOC (volatile organic • User Friendly. Reduced fumes and odour for the comfort
and well being of pipe installers.
compound) emission limits • NSF, UPC and/or CSA Listed.*

established by the California South • Meet ASTM Standards for solvent cements used for plastic
pipe installation.*
Coast Air Quality Management
• Environmentally Responsible. LEED® Compliant (Leadership
District (SCAQMD), one of the USA's in Energy and Environmental Design).**
* Refer to individual solvent cement for specific ASTM
strictest air quality regulatory bodies. Standards, NSF, UPC and/or CSA Listings.
** LEED Green Building Rating System For New Construction &
Low VOC emissions contribute to Major Renovations Version 2.2 (Indoor Environmental Air
Quality: EQ Credit 4.1 Low-Emitting Materials - Adhesives &
cleaner air. Sealants)

Astral recommends NSF approved IPS weld on


solvent cement for reliable and leak proof
joints between CPVC pipes and fittings.

4
5
Test report from
Central Building Research Institute,
Roorkee

CBRI
5.0 Conclusions & Recommendations

— Based on generated data during experimental work, “Astral” brand CPVC


pipes and fittings have been found suitable for hot and cold water supply
in buildings.

— “Astral” brand CPVC pipes and fittings meet the requirements of ASTM D
2846 (properties of pipes and fittings) IS: 10500-91 (quality of water) and
IS: 10151-82 (overall migration of leachable additives).

— Works has been carried out on the samples supplied by the party and the
reported results are based on thees samples.

11/25

6
- Quality Assurance Laboratory
WHY ASTRAL CPVC ?
STATE OF ART MANUFACTURING CERTIFICATIONS
Astral is equipped with state of art manufacturing facilities at both • NSF and ISI Certifications : Astral the only
Ahmedabad and Himachal Pradesh plants. High speed and accurate pipe manufacturing company in India now having
extruders and injection molding machines including innovative most prestigious quality certifications from
manufacturing techniques being used to manufacture the ultra modern, National sanitation Foundation (NSF) and Bureau
errorless Astral FlowGuard pipes and fittings. of Indian Standards (BIS).

IS 15778
Astral now have
ISI mark for CPVC pipes
CM/L-3673470

NSF certification for


APPROVALS IN INDIA pw CPVC pipes and fittings.
® (check NSF website for
• Bureau of Indian Standards Approval - ISI marked listing of Astral's products)
Only those products bearing the

• NSF certificate for CPVC pipe & fittings (ASTRAL - The only pipe NSF Mark are certified

manufacturing company in India now having two most prestigious http://www.nsf.org/Certified/Plumbing/Listings.asp?Company=1S170&Standard=014


quality certifications from National Sanitation Foundation and
Bureau of Indian Standards.)
• State Approvals of CPVC System - BMC, CPWD, PWD, DGMAP etc.
• Tested in India regularly by CIPET, CBRI - Roorkee, Shriram Institute
Live Safer
• Apart from manufacturing and distributing world class FlowGuard
CPVC pipes and fittings, Astral takes care of its products by
constantly testing and checking CPVC pipes and fittings in their orld
class Quality Assurance Laboratory, where various tests are carried *NSF International is a non-profit non-
out at regular intervals to exceed the quality levels beyond the governmental organization that provides
industry standards. standards development, product certification,
auditing, education and risk management for
public health and safety.
Astral also takes care of its NSF is a World Health Organization
customers by training plumbers Collaborating Centre for Food and Water Safety
and plumbing contractors and Indoor Environment. Serving companies in
throughout the year by updating over 100 countries
them about modern plumbing
techniques and to do plumbing
work more effectively and
professionally.

7
BASIC PHYSICAL PROPERTIES
PROPERTY TEST CONDITION ENGLISH UNITS SI UNITS
GENERAL
• Specific Gravity ASTM D792 73°F / 23°C 1.55 g/cm3 1.55 g/cm3
• Specific Volume 73°F / 23°C 0.645 cm3 /g 0.645 cm3 /g
• Water Absorption ASTM D570 73°F / 23°C +0.03% +0.03%
212°F/100°C +0.55% +0.55%
• Rockwell Hardness ASTM D785 73°F / 23°C 119
• Cell class ASTM D1784 23447-B

MECHANICAL
• Izod Impact ASTM D256 73°F / 23°C 1.5 ft Ibs/in o.n 80 J/m o.n.
• Tensile Strength ASTM D638 73°F / 23°C 8000 psi 55 N/mm2
• Tensile Modulus ASTM D638 73°F / 23°C 360,000 psi 2500 N/mm2
• Flexural Strength ASTM D790 73°F / 23°C 15,100 psi 104 N/mm2
• Flexural Modulus ASTM D790 73°F / 23°C 415,000 psi 2860 N/mm2
• Compressive Strength ASTM D695 73°F / 23°C 10,100 psi 70 N/mm2
• Compressive Modulus ASTM D695 73°F / 23°C 196,000 psi 1350 N/mm2

THERMAL
• Coefficient of Thermal ASTM D696 3.4x10-5 in/in/°F 6.3x10-5 m/m/°K
Expansion
• Thermal Conductivity ASTM C177 0.95 BTU in/hr/ft2/°F 0.14 Wm/°K/m2
• Heat Distortion Temperature ASTM D638 217°F 103°C
• Heat Capacity DSC 73°F / 23°C 0.21 BTU/Ib°F 0.90 J/g°K
212°F / 100°C 0.26 BTU/Ib°F 1.10 J/g°K

FLAMMABILITY
• Flammability Rating UL 94 0.062 in/0.157 cm V-0, 5VB, 5VA
• Flame Spread ASTM E84 15
• Smoke Developed ASTM E84 70-125
• Limiting Oxygen Index ASTM D2863 60%

ELECTRICAL
• Dielectric Strength ASTM D147 1250 V/mil 492,000 V/cm
• Dielectric Constant ASTM D150 60 Hz, 30°F/-1°C 3.70 3.70
• Power Factor ASTM D150 1000 Hz 0.007% 0.007%
• Volume Resistivity ASTM D257 73°F/23°C 3.4x1015 ohm/cm 3.4x1015 ohm/cm

8
FEATURES & BENEFITS
Corrosion resistance
Astral CPVC Pipe gives excellent resistance even under
the harshest of water conditions so there are none of
the purity worries from corrosion of metal pipe or
soldered joints. Astral CPVC Pipe keeps pure water pure.

Lower bacterial growth


Bacteria build up with CPVC is far lower than
with alternative piping materials - Copper, Steel
and other thermoplastics.

No Scale, pit or leach formation


Even after years of use in the most aggressive conditions, Astral
CPVC pipe won’t corrode, standing up to low pH water, coastal
salt air exposures and corrosive soils. Astral CPVC Pipe stays as
solid and reliable as the day it was installed. It maintains full
water carrying Capacity because its scale resistance means no
build up to cause water pressure loss.

Unaffected by chlorine in the water


Some materials may be adversely affected by chlorine
contained in the water supply, which can cause
breakdown of the polymer chains and potential leaks.
In this respect, Astral CPVC pipe is unaffected by the
chlorine present in potable water supply.

Low thermal expansion


Astral CPVC pipe has a lower coefficient of thermal
expansion than alternative plastics, reducing the
amount that the pipe expands when hot water is
running, again reducing unsightly ‘looping’ of the pipe.

9
Thermal Conductivity
0.30

0.25

Number of Legionella bacteria 0.20


in the test water Coefficient of Thermal expansion

W/MK
200 2.00
0.15
175 1.75

150 0.10 1.50

125 1.25

(x10-4k-1)
0.05
cfu/ml

100 1.00
0.00
75 CPVC PVC PP PEX PB 0.75

50 0.50

25 0.25

0 0.00
CPVC* Stainless PEX* PB* PPR* CPVC PVC PP PEX PB
Steel

Easy Plumbing process


CPVC uses a simple, solvent cement jointing method. Tools
required are very simple and inexpensive (chamfering tool and
pipe cutter only) and avoid the need for an electrical source.
Superior insulation : Astral CPVC pipe is more energy efficient
than metal pipe. As an insulator it does not lose heat the way
metal pipe do. Heat loss and thermal expansion are reduced.

Hot water compatible


Astral CPVC pipe is compatible with both hot and
cold water. It withstand very high temperature
compared to any other thermoplastic plumbing
systems. Many solar and electric water heaters
have CPVC piping system for heat efficiency and
lower installation cost.

Tough, rigid material


Astral CPVC pipe has a much higher strength than other
thermoplastics used in plumbing. This means that CPVC needs less REHTO
EPIP CITSALP EPIP CVPC
hangers and supports and there is no unsightly looping of the pipe.
Astral CPVC pipe Has a higher pressure bearing capability. This
leads to the same flow rate with a smaller pipe size.

Fire safety
OTHER CPVC has a limiting Oxygen Index (LOI) of 60. Thus in
CPVC PIPE PLASTIC PIPE
air, Astral CPVC pipe does not support combustion.
No flaming drips, does not increase the fire load, low
flame spread, low smoke generation.

Approved world wide


CPVC plumbing system is approved for contact with potable Live Safer

water in wide range of countries including USA, UK, Canada,


NSF certification for
Germany, France, The Netherlands, Middle East among others. Astral now have
ISI mark for CPVC pipes
CPVC pipes and fittings.
(check NSF website for
listing of Astral's products)
Here in India, Astral CPVC plumbing system is approved by IS 15778
pw
BMC and CPWD for potable water supply.
Only those products bearing the
CM/L-3673470 NSF Mark are certified

10
CPVC PIPE & FITTINGS
FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
COPPER - TUBE SIZE AS PER ASTM D-2846

pw TRANSITION COUPLING
Size Size Quantity
(mm) (In.) PartNo. (Case)
20 x 20 ¾ IPS x ¾ CTS T 4342 10 / 100
TRANSITION BUSHING 25 x 25 1 IPS x 1 CTS M 4111 50 / ---
(IPS x CTS)

Size Size Quantity


(mm) (In.) PartNo. (Case)
15 x 15 ½ IPS x ½ CTS M 2902 1500
20 x 20 ¾ IPS x ¾ CTS M 2903 1000
25 x 25 1 IPS x 1 CTS M 2904 200 COUPLING
32 x 32 1¼ IPS x 1¼ CTS M 2905 150
40 x 40 1½ IPS x 1½ CTS M 2906 80 Size Size Quantity
50 x 50 2 IPS x 2 CTS M 2908 50 (mm) (In.) PartNo. (Case)
15 ½ M 4120 1200
20 ¾ M 4340 600
25 1 M 4100 600
32 1¼ M 4105 300
40 1½ M 4106 200
50 2 M 4200 50

REDUCER COUPLING
Size Size Quantity
(mm) (In.) PartNo. (Case)
20 x 15 ¾ x ½ M 4341 800
25 x 15 1 x ½ M 4420 500
25 x 20 1 x ¾ M 4134 400 REDUCER BUSHING
32 x 15 1¼ x ½* M 4520
32 x 20 1¼ x ¾* M 4530 Size Size Quantity
32 x 25 1¼ x 1 M 4540 200
(mm) (In.) PartNo. (Case)
40 x 15 1½ x ½* M 4620 20 x 15 ¾ x ½ M 2032 1000
40 x 20 1½ x ¾ M 4630 75 25 x 15 1 x ½ M 2102 600
40 x 25 1½ x 1 M 4640 75 25 x 20 1 x ¾ M 2103 600
40 x 32 1½ x 1¼ M 4650 50 32 x 15 1¼ x ½ M 2112 300
50 x 15 2 x ½ M 4820 40 32 x 20 1¼ x ¾ M 2113 300
32 x 25 1¼ x 1 M 2114 300
50 x 20 2 x ¾* M 4830
40 x 15 1½ x ½ M 2122 200
50 x 25 2 x 1 M 4840 30
40 x 20 1½ x ¾ M 2123 200
50 x 32 2 x 1¼ M 4850 30 40 x 25 1½ x 1 M 2124 200
50 x40 2 x 1½ M 4860 40 x 32 1½ x 1¼ M 2125 200
50 x 15 2 x ½ M 2202 100
50 x 20 2 x ¾ M 2203 150
50 x 25 2 x 1 M 2204 100
50 x 32 2 x 1¼ M 2205 100
50 x 40 2 x 1½ M 2206 100
Only Those products bearing the NSF Mark are certified.

11
* Reducer fittings are professionally assembled using Flowguard fittings and bushings. Quantity as per order.
NOTE : Fabricated reducer fittings are not eligible for return to the manufacturer.
CPVC PIPE & FITTINGS
FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
COPPER - TUBE SIZE AS PER ASTM D-2846

pw
TEE
Size Size Quantity
(mm) (In.) Part No. (Case)
15 ½ M 7120 600
20 ¾ M 7340 500
25 1 M 7100 300
32 1¼ M 7105 150
40 1½ M 7106 80 ELBOW 90°
50 2 M 7200 40
Size Size Quantity
(mm) (In.) PartNo. (Case)
15 ½ M 5120 N 1000
20 ¾ M 5340 N 800
25 1 M 5100 N 400
32 1¼ M 5105 N 200
40 1½ M 5106 N 120
50 2 M 5200 N 50
ELBOW 45°
Size Size Quantity
(mm) (In.) PartNo. (Case)
15 ½ M 5123 N 500
20 ¾ M 5343 N 200
25 1 M 5103 N 250
32 1¼ M 5153 N 60
40 1½ M 5163 N 40
50 2 M 5203 N 15

REDUCER TEE
Size Size Quantity
(mm) (In.) Part No. (Case)
15 x 15 x 20 ½x½x¾ * M 7223 As required
20 x 15 ¾x½ M 7341 300
20 x 15 x 20 ¾x½x¾ * M 7343 As required
20 x 15 x 15 ¾x½x½ * M 7342 As required
REDUCER ELBOW 90° 25 x 25 x 20 1x1x¾ M 7134 75
40 x 40 x 25 1½ x 1½ x 1 M 7161 30
Size Size Quantity 50 x 50 x 25 2x2x1 M 7201 15
(mm) (In.) Part No. (Case)
32 x 15 1¼ x ½ M 7552 100
20 x 15 ¾ x½ M 5341 N 500 32 x 20 1¼ x ¾ M 7553 100
25 x 15 1 x ½* M 5151 As required 32 x 25 1¼ x 1 M 7554 80
25 x 20 1 x ¾* M 5102 As required 50 x 15 2x½ M 7882 30
32 x 15 1¼ x ½ * M 5141 As required 25 x 15 1x½ M 7442 300
32 x 25 1¼ x 1 * M 5143 As required 40 x 15 1½ x ½ M 7159 70
50 x 25 2 x1 * M 5241 As required 40 x 20 1½ x ¾ M 7123 60
40 x 32 1½ x 1¼ M 7162 60
50 x 20 2x¾ M 7883 35
50 x 32 2 x 1¼ M 7885 30
50 x 40 2 x 1½ M 7886 25
Only those products bearing the NSF Mark are certified.

12
* Reducer fittings are professionally assembled using Flowguard fittings and bushings. Quantity as per order.
NOTE : Fabricated reducer fittings are not eligible for return to the manufacturer.
Application In Hospitals

CPVC PIPE & FITTINGS


FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
COPPER - TUBE SIZE AS PER ASTM D-2846
FEMALE ADAPTER
(CPVC Threads)
pw
MALE ADAPTER
(CPVC Threads)

Size Size Quantity


(mm) (In.) PartNo. (Case)
15 ½ M 6122 800
Size Size Quantity 20 ¾ M 6342 400
(mm) (In.) PartNo. (Case) 25 1 M 6101 200
15 ½ M 6120 600 32 1¼ M 6205 150
20 ¾ M 6340 600 40 1½ M 6206 100
25 1 M 6100 300 50 2 M 6201 50
32 1¼ M 6105 B 150
40 1½ M 6106 B 100
50 2 M 6200 B 50
20 x 15 ¾ Soc x ½ MIP M 6320 500

TANK ADAPTER
Size Size Quantity
CROSS (mm) (In.) PartNo. (Case)
Size Size Quantity 15 ½ M 9502 80
(mm) (In.) PartNo. (Case) 20 ¾ M 9503 60
25 1 M 9504 40
15 ½ M 8120 200
32 1¼ M 9505 30
20 ¾ M 8340 100
40 1½ M 9506 20
50 2 M 9508 15

UNION
Size Size Quantity
(mm) (In.) PartNo. (Case) CAP
15 ½ M 2502 200 Size Size Quantity
20 ¾ M 2503 150 (mm) (In.) PartNo. (Case)
25 1 M 2504 100 15 ½ M 3120 1000
32 1¼ M 2505 80 20 ¾ M 3340 500
40 1½ M 2506 50 25 1 M 3100 200
50 2 M 2508 30 32 1¼ M 3105 100
40 1½ M 3106 80
Only Those products bearing the NSF Mark are certified. 50 2 M 3200 40

13
FEMALE CPVC PIPE & FITTINGS
ADAPTER FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
(Brass Threads) COPPER - TUBE SIZE AS PER ASTM D-2846

Size Size Quantity


(mm) (In.) PartNo. (Case)
15 ½ M 6123 200
20 ¾ M 6343 150
25 1 M 6103 50 BRASS FPT TEE
32 1¼ M 6113 25
Size Size Quantity
40 1½ M 6153 25 (mm) (In.) PartNo. (Case)
50 2 M 6203 15
15 x 15 x 15 ½ x ½ x½ M 7722 200
20 x 20 x 15 ¾ x ¾ x½ M 7732 100
20 x 20 x 20 ¾ x ¾ x¾ M 7733 125
25 x 25 x 15 1 x 1 x½ M 7742 75
32 x 32 x 32 1¼ x 1¼ x 1¼ M 7755 30
32 x 32 x 15 1¼ x 1¼ x ½ M 7752 40

BRASS COUPLING
Size Size Quantity
(mm) (In.) PartNo. (Case)
20 x 15 ¾ X½ M 4732 200
25 x 15 1X½ M 4742 100

MALE ADAPTER
(Brass Threads)
Size Size Quantity
(mm) (In.) PartNo. (Case)
15 ½ M 6023 200
20 ¾ M 6033 100
25 1 M 6043 50
32 1¼ M 6053 25
BRASS FPT 90° ELBOW 40 1½ M 6063 25
Size Size Quantity 50 2 M 6083 15
(mm) (In.) PartNo. (Case) 20 x 15 ¾ Soc x ½ MIP M 6323 150
15 x 15 ½ x ½ M 5702 N 200
20 x 15 ¾ x ½ M 5730 N 150
20 x 20 ¾ x ¾ M 5703 N 100
25 x 15 1 x ½ M 5740 N 100
25 x 25 1 x 1 M 5704 N 50
32 x 32 1¼x 1¼ M 5705 N 30

14
Application In Corporates

CPVC PIPE & FITTINGS


FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
COPPER - TUBE SIZE AS PER ASTM D-2846

CONCEALED VALVE
(CHROME PLATED)
Size Size Quantity
(mm) (In.) PartNo. (Case)
15 ½ M 1822-005 01
20 ¾ M 1822-007 01

CONCEALED VALVE
(WHEEL TYPE)
Size Size Quantity
(mm) (In.) PartNo. (Case)
15 ½ M 1822-005W 01
20 ¾ M 1822-007W 01

STEP OVER BEND

Size Size Quantity


(mm) (In.) PartNo. (Case)
FABRICATED BAND 15 ½ F12 - SOB 150
Size Size Quantity 20 ¾ F34 - SOB 200
(mm) (In.) PartNo. (case) 25 1 F1 - SOB 150
20 ¾ M 5340 FB 130
25 1 M 5100 FB 75
32 1¼ M 5105 FB 45
40 1½ M 5106 FB 25
50 2 M 5340 FB 14

SSR ELBOW
BALL VALVES
(CTS Sockets)
Size Size Quantity
(mm) (In.) PartNo. (Case)
15 ½ M 1922 - 005 80
20 ¾ M 1922 - 007 120
25 1 M 1922 - 010 50 Size Size Quantity
32 1¼ M 1922 - 012 40 (mm) (In.) PartNo. (Case)
40 1½ M 1922 - 015 30 15 x 15 ½x½ M 5120 SR N 200
50 2 M 1922 - 020 15 20 x 15 ¾x½ M 5341 SR N 50

15
CPVC PIPE & FITTINGS
FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
SCH - 40 FITTINGS AS PER ASTM F- 438

TEE - Soc
Size Size Quantity
(mm) (In.) PartNo. (Case)
65 2½ M 401 - 025C 12
80 3 M 401 - 030C 08
100 4 M 401 - 040C 04

90°
ELBOW- Soc
Size Size Quantity
(mm) (In.) PartNo. (Case)
65 2½ M 406 - 025C 15
80 3 M 406 - 030C 10
100 4 M 406 - 040C 06
CAP - Soc
Size Size Quantity
(mm) (In.) PartNo. (Case)
65 2½ M 447 - 025C 10
80 3 M 447 - 030C 10
100 4 M 447 - 040C 10

REDUCER BUSHING
(Flush Style)

COUPLING - Soc
Size Size Quantity
(mm) (In.) PartNo. (Case)
Size Size Quantity 65 2½ M 429 - 025C 20
(mm) (In.) PartNo. (Case) 80 3 M 429 - 030C 15
65 x 32 2½ x 1¼ M 437 - 290C 25 100 4 M 429 - 040C 08
65 x 40 2½ x 1½ M 437 - 291C 25
65 x 50 2½ x2 M 437 - 292C 25
80 x 40 3 x 1½ M 437 - 337C 20
80 x 50 3 x2 M 437 - 338C 20
80 x 65 3 x 2½ M 437 - 339C 20
100 x 50 4 x2 M 437 - 420C 10
100 x 65 4 x 2½ M 437 - 421C 10
100 x 80 4 x3 M 437 - 422C 10

16
Application In Hotels

CPVC PIPE & FITTINGS


FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
SCH - 80 FITTINGS AS PER ASTM - 439

REDUCING TEE - Soc

TEE - Soc
Size Size Quantity
Size Size Quantity (mm) (In.) PartNo. (Case)
(mm) (In.) PartNo. (Case) 65 2½ M 801 - 025C 12
100 x 50 * 4x 2 801 - 420C As required 80 3 M 801 - 030C 07
100 x 80 * 4x 3 801 - 422C As required 100 4 M 801 - 040C 04
150 x 100 * 6x 4 801 - 532C As required 150 6 M 801 - 060C 02
200 8 M 801 - 080C 01
200 x 150 * 8x 6 801 - 585C As required
250 * 10 801 - 100C 01
250 x 200 *10 x 8 801 - 628C As required 300 * 12 801 - 120C 01
300 x 250 *12 x 10 801 - 670C As required

MALE ADAPTER
Soc x MBSP REDUCER
BUSHING
(Flush Style)
Size Size Quantity
Size Size Quantity (mm) (In.) PartNo. (Case)
(mm) (In.) PartNo. (Case) 100 x 50 4 x 2 M 837 - 420C 20
65 2½ M 836 - 025C 30 65 x 50 2½ x 2 M 837 - 292C 50
80 3 M 836 - 030C 20 80 x 50 3 x 2 M 837 - 338C 35
100 4 M 836 - 040C 15 100 x 80 4 x 3 M 837 - 422C 20
150 x 100 6 x 4 M 837 - 532C 06
200 x 150 8 x 6 M 837 - 585C 03
250 x 200 * 10 x 8 837 - 628C 01
300 x 250 * 12 x 10 837 - 670C 01
100 x 65 4 x 2½ M 837 - 421C 10
UNION 80 x 65 3 x 2½ M 837 - 339C 35
Soc With EPDM
O-Ring Seal

FEMALE ADAPTER
Size Size Quantity
Soc x FBSP
(mm) (In.) PartNo. (Case)
65 *2½ 897 - 025C 05
80 *3 897 - 030C 05
100 *4 897 - 040C 05
150 *6 897 - 060C 03 Size Size Quantity
(mm) (In.) PartNo. (Case)
65 2½ M 835 - 025C 30
80 3 M 835 - 030C 20
100 4 M 835 - 040C 15

17
*Trading Item
CPVC PIPE & FITTINGS
FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
SCH - 80 FITTINGS AS PER ASTM F-439

CAP
Soc
Size Size Quantity
(mm) (In.) PartNo. (Case)
65 * 2½ 847 - 025C 10
80 * 3 847 - 030C 10
100 * 4 847 - 040C 06
150 * 6 847 - 060C 03
200 * 8 847 - 080C 01 COUPLING - Soc
250 *10 847 - 100CF 01
300 *12 847 - 120CF 01
Size Size Quantity
(mm) (In.) PartNo. (Case)
65 2½ M 829 - 025C 20
80 3 M 829 - 030C 15
100 4 M 829 - 040C 12
150 6 M 829 - 060C 02
200 8 M 829 - 080C 01
250 * 10 829 - 100C 01
300 * 12 829 - 120C 01

REDUCER COUPLING - Soc


Size Size Quantity
(mm) (In.) PartNo. (Case)
80 x 50 3 x 2 M 829 - 338 C 25
100 x 50 * 4 x 2 829 - 420 C As required
100 x 80 4 x 3 M 829 - 422 C 15
150 x 100 * 6 x 4 829 - 532C As required
200 x 150 * 8 x 6 829 - 585C As required
250 x 200 *10 x 8 829 - 628CF As required 90° ELBOW
300 x 250 *12 x 10 829 - 670CF As required
62 x 50 2½ x 2 M 849 - 292 C 40 Soc
80 x 65 3 x 2½ M 829 - 339 C 25 Size Size Quantity
100 x 65 4 x 2½ 829 - 421 As required (mm) (In.) PartNo. (Case)
65 2½ M 806 - 025C 15
80 3 M 806 - 030C 10
100 4 M 806 - 040C 05
150 6 M 806 - 060C 02
200 8 M 806 - 080C 01
250 * 10 806 - 100C 01
300 * 12 806 - 120C 01

45° ELBOW
Soc
Size Size Quantity
(mm) (In.) PartNo. (Case)
65 * 2½ 817 - 025C 05
80 * 3 817 - 030C 05
100 4 M 817 - 040C 05
150 * 6 817 - 060C 02
200 * 8 817 - 080C 01
250 *10 817 - 100C 01
300 *12 817 - 120C 01

18
*Trading Item
Application In Residential Projects

CPVC PIPE & FITTINGS


FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
SCH - 80 FITTINGS AS PER ASTM F-439

VANSTONE FLANGE Spig


BLIND FLANGE Size Size Quantity
(mm) (In.) PartNo. (Case)
65 * 2½ 856 - 025C 05
Size Size Quantity 80 3 M 856 - 030C 10
(mm) (In.) PartNo. (Case) 100 4 M 856 - 040C 06
65 * 2½ 853 - 025C 05 150 * 6 856 - 060C 03
200 * 8 856 - 080C 01
80 3 M 853 - 030C 20
250 * 10 856 - 100C 01
100 4 M 853 - 040C 12
300 * 12 856 - 120C 01
150 * 6 853 - 060C 03
200 * 8 853 - 080C 01
250 *10 853 - 100C 01
300 *12 853 - 120C 01

FLANGE Soc
Size Size Quantity
(mm) (In.) PartNo. (Case)
65 * 2½ 851- 025C 05
FLANGE HUB Spig 80 3 M 851 - 030C 15
100 4 M 851 - 040C 12
Size Size Quantity 150 * 6 851 - 060C 03
(mm) (In.) PartNo. (Case) 200 * 8 851 - 080C 01
80 3 M 856 - 030-2C 05 250 *10 851 - 100C 01
100 4 M 856 - 040-2C 05 300 *12 851 - 120C 01

VANSTONE
FLANGE - Soc
Size Size Quantity FLANGE HUB Soc
(mm) (In.) PartNo. (Case)
65 2½ M 854 - 025 C 15 Size Size Quantity
80 3 M 854 - 030 C 12 (mm) (In.) PartNo. (Case)
100 4 M 854 - 040 C 08 65 2½ M 854 - 025 - 2C As Required
150 6 M 854 - 060 C 03 80 3 M 854 - 030 - 2C As Required
200 8 M 854 - 080 C 01 100 4 M 854 - 040 - 2C As Required
250 *10 854 - 100C As required 150 6 M 854 - 060 - 2C As Required
300 *12 854 - 120C As required 200 8 M 854 - 080 - 2C As Required

19
*Trading Item
CPVC PIPE & FITTINGS
FOR HOT & COLD WATER DISTRIBUTION SYSTEMS
COPPER - TUBE SIZE
Class 1 - PIPE SDR-11
®
pw

IS 15778

CM/L-3673470

Class 2 - PIPE SDR -13.5

IS 15778

CM/L-3673470

IPS - IRON PIPE SIZE AS PER ASTM F-441

PIPE SCHEDULE 40

PIPE SCHEDULE 80

Only Those products bearing the NSF Mark are certified.

20
Application In Educational Institutes

CPVC PIPE & FITTINGS


FOR HOT & COLD WATER DISTRIBUTION SYSTEMS

FLOWGUARD 1-STEP ADHESIVE SOLUTION


(YELLOW)
Reduced VOC Emissions, NSF Listed ASTM F-493
N.B. For sizes 15 mm (½") to 50 mm (2")

Size PartNo. Quantity


(case)
50 ml MTINS - 50 48
118 ml MTINS - 118 24
237 ml MTINS - 237 24
473 ml MTINS - 473 12
946 ml MTINS - 946 12

CPVC 724
N.B. For sizes 65 mm (2½") and above

Size PartNo. Quantity


(case)
473 ml IPS - 473 12
946 ml IPS - 946 12

PRIMER P70
N.B. Must use primer for 65 mm (2½") & above

Size PartNo. Quantity


(case)
118 ML EZ - 223 24
237 ML EZ - 222 24
473 ML EZ - 221 12
946 ML EZ - 220 12

21
CPVC PIPE & FITTINGS
FOR HOT & COLD WATER DISTRIBUTION SYSTEMS

PLASTIC STRAP
Size Size Part No. Quantity
(mm) (In.) (case) METAL STRAP
15 ½ M 9120 2500 Size Size Part No. Quantity
20 ¾ M 9340 2000 (mm) (In.) (case)
25 1 M 9100 1200
32 1¼ M 9105 600 15 ½ 9120 M 100
40 1½ M 9106 500 20 ¾ 9340 M 100
50 2 M 9200 300 25 1 9100 M 100
32 1¼ 9105 M 50
40 1½ 9106 M 50
50 2 9200 M 50

END PLUG
Size Size Part No. Quantity
(mm) (In.) (case)
15 ½ M PLUG -12 I 300

ELBOW HOLDER METAL STRAP (N)


Size Size Part No. Quantity Size Size Part No. Quantity
(mm) (In.) (case) (mm) (In.) (case)
15 x 15 ½x½ MH - 12I 200 15 ½ 9120 MN 100
20 x 15 ¾x½ MH - 12-34 N 200 20 ¾ 9340 MN 100
25 1 9100 MN 100
32 1¼ 9105 MN 50
40 1½ 9106 MN 50
50 2 9200 MN 50

PUNCHARE KIT TEE HOLDER


Size(mm) Size Quantity Size Size Part No. Quantity
(case) (In.) PartNo. (mm) (In.) (case)
15 ½ F12-PPK As required 20 x 15 ¾x½ M-T-H -34-12N 200
20 ¾ F34-PPK As required

22
TECHNICAL DETAILS

Outside Diameters and Wall Thicknesses For CPVC 4120, SDR 11 Plastic Pipe As Per ASTM D-2846
Nominal Size Outside Diameter, in. (mm) Wall Thickness, in. (mm) Pressure Rating.PSI (Kg/Cm2)
(in.) (mm) Average Tolerance Minimum Tolerance 73.4°F (23°C) 180°F (82°C)
½* (15) 0.625 (15.9) ± 0.003 (0.08) 0.068 (1.73) + 0.020 (0.51) 400 (28.1) 100 (7.0)
¾ (20) 0.875 (22.2) ± 0.003 (0.08) 0.080 (2.03) + 0.020 (0.51) 400 (28.1) 100 (7.0)
1 (25) 1.125 (28.6) ± 0.003 (0.08) 0.102 (2.59) + 0.020 (0.51) 400 (28.1) 100 (7.0)
1¼ (32) 1.375 (34.9) ± 0.003 (0.08) 0.125 (3.18) + 0.020 (0.51) 400 (28.1) 100 (7.0)
1½ (40) 1.625 (41.3) ± 0.004 (0.10) 0.148 (3.76) + 0.020 (0.51) 400 (28.1) 100 (7.0)
2 (50) 2.125 (54.0) ± 0.004 (0.10) 0.193 (4.90) + 0.023 (0.58) 400 (28.1) 100 (7.0)
* For ½" wall thickness minimum is not a function of SDR.

Outside Diameters and Wall Thicknesses For CPVC 4120, SDR 13.5 Plastic Pipe
Nominal Size Outside Diameter, in.(mm) Wall Thickness, in. (mm) Pressure Rating.PSI (Kg/Cm2)
(in.) (mm) Average Tolerance Minimum Tolerance 73.4°F (23°C) 180°F (82°C)
½* (15) 0.625 (15.9) ± 0.003 (0.08) 0.055 (1.40) + 0.020 (0.51) 320 (22.5) 80 (5.6)
¾ (20) 0.875 (22.2) ± 0.003 (0.08) 0.065 (1.65) + 0.020 (0.51) 320 (22.5) 80 (5.6)
1 (25) 1.125 (28.6) ± 0.003 (0.08) 0.083 (2.12) + 0.020 (0.51) 320 (22.5) 80 (5.6)
1¼ (32) 1.375 (34.9) ± 0.003 (0.08) 0.102 (2.59) + 0.020 (0.51) 320 (22.5) 80 (5.6)
1½ (40) 1.625 (41.3) ± 0.004 (0.10) 0.120 (3.06) + 0.020 (0.51) 320 (22.5) 80 (5.6)
2 (50) 2.125 (54.0) ± 0.004 (0.10) 0.157 (4.00) + 0.023 (0.58) 320 (22.5) 80 (5.6)
* For ½" wall thickness minimum is not a function of SDR.

Outside Diameters, Wall Thickness & Pressure Rating For CPVC 4120,
Schedule 40 Piping System As per ASTM F 441
Pipe - Pr. R. Fitting - Pr. R.
Nominal Size Outside Diameter, in. (mm) I.D. Wall Thickness, in. (mm) PSI (Kg/Cm2) PSI (Kg/Cm2)
(in.) (mm) Average Tolerance Average Minimum Tolerance 73.4°F (23°C) 73.4°F (23°C)
2½ (65) 2.875 (73.0) ± 0.007 (0.18) 2.444 (62.07) 0.203 (5.16) + 0.024 (0.61) 300 (21.10) 180 (12.65)
3 (80) 3.500 (88.9) ± 0.008 (0.20) 3.041 (77.26) 0.216 (5.49) + 0.026 (0.66) 280 (18.28) 156 (10.96)
4 (100) 4.500 (114.3) ± 0.009 (0.23) 3.998 (101.55) 0.237 (6.02) + 0.028 (0.71) 220 (15.47) 132 (09.28)
Pr. R. = Pressure Rating

Outside Diameters, Wall Thickness & Pressure Rating For CPVC 4120,
Schedul 80 Piping System As per ASTM F 441
Nominal Size Outside Diameter, in. (mm) I.D. Wall Thickness, in. (mm) Pipe-Pr. R. Fitting-Pr. R.
PSI (Kg/Cm2) PSI (Kg/Cm2)
(in.) (mm) Average Tolerance Average Minimum Tolerance 73.4°F (23°C) 73.4°F (23°C)
2½ (65) 2.875 (73.0) ± 0.007 (0.18) 2.288 (58.14) 0.276 (7.01) + 0.033 (0.84) 420 (29.53) 252 (17.71)
3 (80) 3.500 (88.9) ± 0.008 (0.20) 2.864 (72.75) 0.300 (7.62) + 0.036 (0.91) 370 (26.01) 222 (15.60)
4 (100) 4.500 (114.3) ± 0.009 (0.23) 3.778 (95.97) 0.337 (8.56) + 0.040 (1.02) 320 (22.50) 192 (13.49)
6 (150) 6.625 (168.3) ±0.011 (0.28) 5.710 (145.04) 0.432 (10.97) + 0.052 (1.32) 280 (19.69) 168 (11.81)
8 (200) 8.625 (219.1) ±0.015 (0.38) 7.565 (192.15) 0.500 (12.70) + 0.060 (1.52) 250 (17.57) 150 (10.54)
10 (250) 10.750 (273.1) ±0.015 (0.38) 9.493 (241.12) 0.593 (15.06) + 0.071 (1.80) 230 (16.17) 138 (09.70)
12 (300) 12.750 (323.90) ±0.015 (0.38) 11.294 (286.87) 0.687 (17.45) + 0.082 (2.08) 230 (16.17) 138 (09.70)
Pr. R. = Pressure Rating

Temperature Derating Factors


Working Temperature (°F) 73-80 90 100 120 140 160 180 200
Working Temperature (°C) 23-25 32 38 49 60 71 82 93
Pipe Derating Factor 1.00 0.91 0.82 0.65 0.50 0.40 0.25 0.20
Valve Derating Factor 1.00 0.95 0.90 0.80 0.70 0.61 0.53 0.45

N.B. : For obtaining working pressure in system, multiply the maximum pressure with derating factor at the working temperature of system.
* Valves, Unions & Speciality Products have different elevates temperature rating than pipe.

23
0
J
45
J

Tapered Socket Dimensions For CPVC 4120, SDR 11, Plastic Pipe Fittings AS PER ASTM D2846
Nominal Socket Entrance Socket Bottom Socket Inside Wall Thickness in. (mm)
Size Diameter in.(mm) Diameter in.(mm) Length Diameter Socket Socket
in (mm) Enterance Bottom
(in.) (mm) "A" Average "A" Tolerance "B" Average "B" Tolerance "C" min. "D" min "EA" min. "EB" min. "F"
½ (15) 0.633 (16.08) ± 0.003 (0.08) 0.619 (15.72) ± 0.003 (0.08) 0.500 (12.70) 0.489 (12.42) 0.068 (1.73) 0.102 (2.59) 0.128 (3.25)
¾ (20) 0.884 (22.45) ± 0.003 (0.08) 0.870 (22.10) ± 0.003 (0.08) 0.700 (17.78) 0.715 (18.16) 0.080 (2.03) 0.102 (2.59) 0.128 (3.25)
1 (25) 1.135 (28.83) ± 0.003 (0.08) 1.121 (28.47) ± 0.003 (0.08) 0.900 (22.86) 0.921 (23.39) 0.102 (2.59) 0.102 (2.59) 0.128 (3.25)
1¼ (32) 1.386 (35.20) ± 0.003 (0.08) 1.372 (34.85) ± 0.003 (0.08) 1.100 (27.94) 1.125 (28.58) 0.125 (3.18) 0.125 (3.18) 0.156 (3.96)
1½ (40) 1.640 (41.66) ± 0.004 (0.10) 1.622 (41.20) ± 0.004 (0.10) 1.300 (33.02) 1.329 (33.76) 0.148 (3.76) 0.148 (3.76) 0.185 (4.70)
2 (50) 2.141 (54.38) ± 0.004 (0.10) 2.123 (53.92) ± 0.004 (0.10) 1.700 (43.18) 1.739 (44.17) 0.193 (4.90) 0.193 (4.90) 0.241 (6.12)

J
450
G J
G
N

G G
AMERICAN NATIONAL STANDARD TAPER PIPE
THREADS (NPT) ANSI STANDARD B1.20.1 Minimum Dimensions from Center to End of Socket (Laying Length)
for CPVC 4120, SDR 11 Plastic Tubing Fittings* per ASTM D 2846
ASTM STANDARD F 1498
Nominal (G) Min. (J) Min. (N) Min.
Effective Size
Nominal Size Thread Pitch of
Threads Length Thread ½ 0.382 0.183 0.102
(mm) (in.) Per in. L P ¾ 0.507 0.235 0.102
15 ½ 14 0.5337 0.07143 1 0.633 0.287 0.102
20 ¾ 14 0.5457 0.07143 1¼ 0.758 0.339 0.102
1½ 0.884 0.391 0.102
25 1 11½ 0.6828 0.08696 2 1.134 0.495 0.102
32 1¼ 11½ 0.7068 0.08696
40 1½ 11½ 0.7235 0.08696
50 2 11½ 0.7565 0.08696
65 2½ 8 1.1375 0.12500
80 3 8 1.2000 0.12500 NPT BSPT
100 4 8 1.3000 0.12500

BSP ISO 7/1 PARALLEL THREADS BASIC SOCKET DIMENSIONS


Effective SCHEDULE 40 CPVC FITTINGS AS PER ASTM F 438
Nominal Size Thread Pitch of SCHEDULE 80 CPVC FITTINGS AS PER ASTM F 439
Threads Length Thread Nominal Size Diameter (in.) Socket Length
(mm) (in.) Per in. L P Socket Socket Minimum C (in.)
15 ½ 14 13.152 1.8143 (mm) (in.) Entrance Bottom
A B Tolerance SCH 40 SCH 80
20 ¾ 14 14.514 1.8143
25 1 11 16.714 2.3091 65 2½ 2.889 2.868 ±0.007 1.750 1.750
32 1¼ 11 19.050 2.3091 80 3 3.516 3.492 ±0.008 1.875 1.875
40 1½ 11 19.050 2.3091 100 4 4.518 4.491 ±0.009 2.000 2.250
50 2 11 23.378 2.3091 150 6 6.647 6.614 ±0.011 3.000 3.000
65 2½ 11 26.698 2.3091 200 8 8.655 8.610 ±0.015 4.000 4.000
80 3 11 29.873 2.3091 250 10 10.780 10.735 ±0.015 5.000 5.000
100 4 11 35.791 2.3091 300 12 12.780 12.735 ±0.015 6.000 6.000

24
FLUID HANDLING CHARACTERISTIC
OF ASTRAL FLOWGUARD PIPE 900 450 Standard Standard
Linear Fluid Flow Velocity Nominal Standard Standard TEE TEE
The linear velocity of a flowing fluid in a pipe is calculated from : Size(mm) Elbow Elbow Run Flow Branch Flow
½ 1.55 0.83 1.04 3.11
0.4085g ¾ 2.06 1.10 1.37 4.12
V =
d2 1 2.62 1.40 1.75 5.25
1¼ 3.45 1.84 2.30 6.90
Where V = Linear fluid flow velocity in feet per second 1½ 4.03 2.15 2.68 8.05
g = Flow rate in gallons per minute 2 5.17 2.76 3.45 10.30
d = Inside diameter of pipe in inches 2½ 6.10 3.30 4.10 12.20
3 7.60 4.10 5.10 15.20
The values in the following tables are based on this formula. 4 10.00 5.30 6.70 20.00
These values are accurate for all fluids. 6 15.10 8.00 10.10 30.20
8 19.90 10.60 13.20 39.70
Linear fluids flows velocity in a system should generally be 10 24.90 13.30 16.60 49.90
12 29.70 15.90 19.80 59.40
limited to 5 ft/s, particularly for pipe size 6” and grater. Following
this guideline will minimize risk of hydraulic shock damage due to
water hammer surge pressures. Water Hammer Surge Pressure
Whenever the flow rate of fluid in a pipe is change, there is a surge in
Friction Loss in Pipes pressure known as water hammer, The longer the line and the faster
A great advantage that Flowguard Pipe enjoys over its metallic the fluid is moving, the greater the hydraulic shock will be. Water
competitors is a smooth inner surface which is resistant to scaling hammer may be caused by opening or closing a valve, starting or
and fouling. This means that friction pressure losses in the fluid flow
are minimized from the beginning and do not significantly increase stopping a pump, or the movement of entrapped air through the
as the system ages, as can be the case with metal pipes subject to pipe. The maximum water hammer surge pressure may be
scaling. calculated from :
p∆V P 1 + d
½

The Hazen-Willims formula is the generally accepted method


Pwh =
gc [
gc K bE ]
of calculating friction head losses in piping systems. The values in where Pwh = Maximum surge pressure, psi
the following fluid tables are based on this formula and a surface p = Fluid density
roughness constants for other piping materials are given beside : ∆V = Change in fluid velocity
gc = Gravitational constant
1.852 K = Bulk modulus of elasticity of fluid
f =0.2083 X ( )
100
C
g1.852
d4.8655
b = Pipe wall thickness
E = Pipe material bulk modulus of elasticity
d = Pipe inside diameter
where f = Friction head in feet of water per 100 feet of pipe The value in the following tables are based on this formula at
d = Inside diameter of pipe in inches 730F and the assumption that water flowing at a given rate of gallons
g = Flow rate in gallons per minute per minute is suddenly completely stopped. At 180°F, the surge
c = pipe surface roughness constant pressure is approximately 15% less. The value for fluids other then
water may be by multiplying by the square root of the fluid’s
Constant (C) Type of Pipe specific gravity.
150 - CPVC pipe, new-40 years old
130-140 - steel / cast iron pipe, new THE WATER HAMMER SURGE PRESSURE PLUS THE SYSTEM
125 - steel pipe, old OPERATING PRESSURE SHOULD NOT EXCEED 1.5 TIMES THE
120 - cast iron, 4 - 12 years old galvanized steel RECOMMENDED WORKING SEPARATE RATING OF THE SYSTEM.
- cast iron, 13 - 20 years old
In order to minimize hydraulic shock due to water hammer,
60 - 80 - cast iron, worn / pitted
linear fluid flow velocity should generally be limited to 5ft/s,
particularly for pipe size of 6” or longer. Velocity at system start-up
should be limited to 1 ft/s during filling until it is certain that all air
Friction Loss in Fittings has been brought up to operating conditions. Air should not be
Friction losses through fittings are calculated from the equivalent allowed to draw in air.
length of straigth pipe which would produce the same friction loss in Where necessary, extra protective equipment may be used to
the fluid. The equivalent lengths of pipe for common fittings are prevent water hammer damage, shock absorbers, surge arrestors
given here.
and vacuum air relief valves.

25
Friction Loss and Flow velocity for SDR 11 CTC CPVC Thermoplastic Pipe
(Friction head and Friction Loss are per 100 feet of pipe)
NOTICE : Flow velocity should not exceed 5 feet per second. Velocities in excess of 5 feet per second may result in system failure and property damage.

PSI
PSI
PSI
PSI
PSI
PSI

Velocity
Velocity
Velocity
Velocity
Velocity
Velocity

Per 100 Ft.


Head Loss
Per 100 Ft.
Per 100 Ft.
Head Loss
Per 100 Ft.
Per 100 Ft.
Head Loss
Per 100 Ft.
Per 100 Ft.
Head Loss
Per 100 Ft.
Per 100 Ft.
Head Loss
Per 100 Ft.
Per 100 Ft.
Head Loss
Per 100 Ft.

Feet of Water
Feet of Water
Feet of Water
Feet of Water
Feet of Water
Feet of Water

Pressure Loss
Pressure Loss
Pressure Loss
Pressure Loss
Pressure Loss
Pressure Loss

Feet Per Second


Feet Per Second
Feet Per Second
Feet Per Second
Feet Per Second
Feet Per Second

Gallons Per Minut


1 3 1 1
/2 in. /4 in. 1 in. 1 /4 in. 1 /2 in. 2 in.

1 1.71 3.19 1.38 0.80 0.50 0.22 0.48 0.15 0.06


2 3.42 11.53 5.00 1.60 1.82 0.79 0.96 0.53 0.23
3 5.16 24.43 10.59 2.40 3.85 1.67 1.44 1.12 0.49
4 6.83 41.62 18.04 3.20 6.55 2.84 1.93 1.91 0.83
5 8.54 62.91 27.27 4.00 9.91 4.29 2.41 2.89 1.25 1.61 1.09 0.47 1.16 0.49 0.21 0.68 0.13 0.06
6 10.25 88.18 38.23 4.79 13.89 6.02 2.89 4.05 1.76
7 11.96 117.32 50.86 5.59 18.47 8.01 3.37 5.39 2.34
8 13.67 150.23 65.13 6.39 23.66 10.26 3.85 6.90 2.99
9 15.38 186.85 81.00 7.19 29.42 12.76 4.33 8.59 3.72
10 17.08 227.11 98.45 7.99 35.76 15.50 4.82 10.43 4.52 3.23 3.94 1.71 2.31 1.75 0.76 1.35 0.49 0.21
15 11.99 75.78 32.85 7.22 22.11 9.58 4.84 8.35 3.62 3.47 3.71 1.61 2.03 1.03 0.45
20 15.98 129.11 55.97 9.63 37.67 16.33 6.46 14.23 6.17 4.63 6.33 2.74 2.70 1.76 0.76
25 12.04 56.94 24.69 8.07 21.51 9.33 5.78 9.56 4.15 3.38 2.66 1.15
30 14.45 79.82 34.60 9.68 30.15 13.07 6.94 13.40 5.81 4.05 3.73 1.62
35 16.86 106.19 46.03 11.30 40.11 17.39 8.09 17.83 7.73 4.73 4.96 2.15
40 12.91 51.37 22.27 9.25 22.83 9.90 5.40 6.35 2.75
45 14.52 63.89 27.70 10.41 28.40 12.31 6.08 7.89 3.42
50 16.14 77.66 33.66 11.56 34.52 14.96 6.75 9.60 4.16
55 17.75 92.65 40.16 12.72 41.18 17.85 7.43 11.45 4.96
60 13.88 48.38 20.97 8.10 13.45 5.83
70 16.19 64.37 27.90 9.46 17.89 7.76
80 10.61 22.91 9.93
90 12.16 28.50 12.35
100 13.51 34.64 15.02
125 16.89 52.37 22.70

26
27
Carrying Capacity and Friction Loss for Schedule 40 Thermoplastic Pipe
(Independent variables : Gallons per minute and nominal pipe size O.D.
Dependent variables : Velocity, Friction head and pressure drop per 100 feet of pipe, interior smooth.)

2.5"

3"

4"

CAUTION : Flow velocity should not exceed 5 feed per second. • CPVC pipe can not be used for compressed air service.
Carrying Capacity and Friction Loss for Schedule 80 Thermoplastic Pipe
(Independent variables : Gallons per minute and nominal pipe size O.D.
Dependent variables : Velocity, Friction head and pressure drop per 100 feet of pipe, interior smooth.)

2 1/2 in.

3 in.

4 in.

6 in.

8 in.

10 in.

12 in.

28
CAUTION : Flow velocity should not exceed 5 feed per second. • CPVC pipe can not be used for compressed air service.
Fixed
Point

op
Lo

Guide-
hanger

THERMAL EXPANSION AND CONTRACTION


Like all piping material, Flowguard CPVC expand when However, a long straight run may require an offset or
heated and contract when cooled. CPVC piping (regardless of pipe loop. Only one expansion loop, properly sized is required in any
diameter) will expand about 1 inch per 50 feet of length when single straight run, regardless of its total length. If more
subjected to a 50° F temperature increase, therefore, allowances convenient, two or more smaller expansion loops, properly sized,
must be made for this resulting movement. However, laboratory can be utilized in a single run of pipe to accommodate the
testing and installation experience have demonstrated that the thermal movement. Be sure to hang pipe with smooth straps that
practical issues are much smaller than the coefficient of thermal will not restrict movement. For convenience, loop (or offset)
expansion would suggest. The stresses developed in CPVC pipe length have been calculated for different pipe sizes and different
are generally much smaller than those developed in metal pipe run length with a temperature increase (DT) of about 80°F. The
for equal temperature changes because of the difference in results, shown in Tables A and B, are presented simply as a handy
elastic modulus. Required loops are smaller than those guide for quick and easy determinations of acceptable loop length
recommended by the Copper Development Association for for the approximate conditions. Loop length for other
copper systems. temperatures and run length can be calculated utilizing the
following equations :
Expansion is mainly a concern in hot water lines, Generally,
thermal expansion can be accommodated with changes in
direction.

Expansion Loop Formula

3 ED (∆ L )
L=
2S
Where:
L = Loop Length (in.)
E = Modululs of elasticity at maximum temperature (psi)
S = Working stress at maximum temperature (psi)
D = Outside diameter of pipe (in.)
∆L = Change in length due to change in temperature (in.)

Thermal Expansion Formula


∆L = Lp C ∆T
Where:
∆L = Change in length due to change temperature (in.)
Lp = Length of pipe (in.)
C = Coefficient of thermal expansion (in. / in. /°F)
= 3.4 x 10-5in. / in. /°F for CPVC
∆T = Change in temperature (°F)

29
LOOP OFFSET Modulus of Elasticity and Working Stress
for CPVC
X = 2L/5 4 Temperature Modulus,E(psi) Stress, S(psi)
Y = L/5 °F (°C)
73 (27) 423,000 2000
2 =X
5 90 (32) 403,000 1800
110 (43) 371,000 1500
2 120 (49) 355,000 1300
140 (60) 323,000 1000
160 (71) 291,000 750
6' 6' 180 (82) 269,000 500
MIN Y= MIN
5

4
TABLE A
Flowguard CPVC pipe CTS PIPES (ASTM D 2846)
Change of Direction Calculated Loop (Offset) Length with
∆ T of approx. 80°F in inches
Long Run of Pipe
Nominal Length of Run in feet
Pipe size
mm in. 40 60 80 100
15 ½ 22 27 31 34
= Hanger or Guide 20 ¾ 26 32 36 41
25 1 29 36 41 46
= Restraint
32 1¼ 32 40 46 51
40 1½ 35 43 50 56
50 2 40 49 57 64
Do not butt-up against fixed structure (joist, stud or wall)

CPVC pipeline
for Hot Water

3rd Floor
TABLE B
Flowguard CPVC IPS PIPES (ASTM F 441)
5
2

MIN
6'

Calculated Loop (Offset) Length with


∆ T of approx. 80°F in inches
Loop

2nd Floor
5
MIN

Fixed
6'

Point

1st Floor
Guide/
hanger

Ground
Floor

30
HORIZONTAL & VERTICAL SUPPORTS
SPACING
Horizontal & Vertical runs of Astral FlowGuard Pipe Nominal Pipe 21°C 49°C 71°C 82°C
should be supported by pipe clamps or by hangers Size (70°F) (120°F) (160°F) (180°F)
located on the horizontal connection close to the Riser,
mm in. Ft. (cm) Ft. (cm) Ft. (cm) Ft. (cm)
Hangers should not have rough or sharp edges, which 15 ½ 5.5 (167.70) 4.5 (137.16) 3.0 (91.44) 2.5 (76.20)
come in contact with the pipe. 20 ¾ 5.5 (167.70) 5.0 (152.40) 3.0 (91.44) 2.5 (76.20)
25 1 6.0 (182.88) 5.5 (167.70) 3.5 (106.68) 3.5 (91.44)
32 1¼ 6.5 (198.12) 6.0 (182.88) 3.5 (106.68) 3.5 (106.68)
40 1½ 7.0 (213.36) 6.0 (182.88) 3.5 (106.68) 3.5 (106.68)
50 2 7.0 (213.36) 6.5 (198.12) 4.0 (121.92) 3.5 (106.68)
65 2½ 8.0 (244.00) 7.5 (228.60) 4.5 (137.16) 4.0 (121.92)
Band Hanger Anchor Strap 75 3 8.0 (244.00) 7.5 (228.60) 4.5 (137.16) 4.0 (121.92)
100 4 9.0 (274.32) 8.5 (259.08) 5.0 (152.40) 4.5 (137.16)
150 6 10.0 (304.80) 9.0 (274.32) 5.5 (167.07) 5.0 (152.40)
200 8 11.0 (335.28) 10.0 (304.80) 6.0 (182.88) 5.5 (167.07)
250 10 11.5 (350.52) 10.5 (320.04) 6.5 (198.12) 6.0 (182.88)
300 12 12.5 (381.00) 11.0 (335.28) 7.5 (228.60) 6.5 (198.12)
Pipe Clamp U-Bolt

TRANSITION FITTINGS & JOINTS


Special transition fittings or joints are used whenever The standard practice is to thread a male thread adapter
CPVC piping is connected to a metal valve, fittings, or other into the female threaded part, such as a valve of stop, and then
appurtenance such as a filter, or to parts made of another plastic. solvent cement to the CPVC pipe. However, when using the male
These special transition fittings can have many forms. One thread adapter, there are two limitations that the installer must
common form is the true union with a metal end and a CPVC end consider when deciding where and how to use it. First, the male
held together with a plastic or metal gland nut and having an thread adapter may develop a drip leak if the joint is subjected to
elastomeric seal between them. Other forms are the flanged too broad temperature range. And second, some thread sealants
joint, the grooved joint, insert molded metal in CPVC fittings, intended to minimize leak problems may chemically attack the
patented push-on type fittings and finally the CPVC female CPVC and cause stress cracking of the adapter (see Thread
threaded adapter with an elastomeric seal at the bottom of the Sealants section). The preferred method of transitioning between
thread. The later fittings are designed so that they have no thread metal and CPVC plumbing component is to use an insert molded
interference and rely entirely on the elastomeric seal for water metal-in-CPVC fitting or true union with a metal and a CPVC end.
tightness. They require only minimal torque to attain an adequate A typical Hot and Cold Water Distribution system
seal. operating at 60-700C requires support for horizontal lines every
Standard compression fittings which utilize brass of plastic 90cm for diameters of 32mm and below, and every 120cm on
ferrules can be used to assemble CPVC. However, Teflon® tape larger size. However, the following spacings are based on
should be applied over the brass ferrule to compensate for the conservative engineering assumptions and can be used at water
dissimilar thermal expansion rates of the brass and CPVC that temperatures indicated.
could possibly otherwise result in a leak. Care should be taken not Vertical CPVC piping should be supported at each floor
to over-torque the compression connection. and should have a mid-story guide, unless thermal expansion
Metal fittings with CPVC socket inserts are also available. design call for other provisions.
The tubing is cemented directly into the socket in the same way Piping should not be anchored tightly by the supports, but
as an all-CPVC fittings. secured in a manner to allow for a degree of movement caused
by thermal expansion. Hangers of strapping with rough edges
should not be used.

Ball valve
Plastic O.H.T.

Tank connector
Tap

Female Male Transition


Transition Nipple Nipple or M.T.A.
or F.T.A. Elbow Female Threaded

31
UNDERGROUND INSTALLATION
CPVC pipes and fittings can be installed underground. Since
these piping systems are flexible systems, proper attention should
be given to burial conditions. The stiffness of the piping system is
affected by sidewall support, soil compaction, and the condition
of the trench. Trench bottoms should be smooth and regular in
either undisturbed soil or a layer of compacted backfill. Pipe must
lie evenly on this surface throughout the entire length of its barrel.
Excavation, bedding and backfill should be in accordance with the
provision of the local Plumbing Code having jurisdiction.

TRENCHING
The following trenching and burial procedures should be used to
protect the piping system.
1. The trench should be excavated to ensure the sides will be
stable under all working conditions.
2. The trench should be wide enough to provide adequate room
for the following :
A. Joining the pipe in the trench.
B. Snaking the pipe from side or side to compensate for
expansion and contraction.
C. Filling and compacting the side fills. The space between
the pipe and trench wall must be wider than the
compaction equipment used in the compaction of the
back fill. Minimum width shall not be less than the
greater of either the pipe outside diameter plus
16.inches or the pipe outside diameter times 1.25 plus 12
inches. Trench width may be different if approved by the
design engineer.
3. The trench bottom should be smooth, free of rocks and
debris, continuous, and provide uniform support. If ledge
BEDDING AND BACKFILLING
rock, hardpan or large boulders are encountered, the trench 1. Even though sub-soil conditions vary widely from place to
bottom should be padded with bedding of compacted place, the pipe backfill should be stable and provide
granular material to a thickness of at least 4 inches. protection for the pipe.
Foundation bedding should be installed as required by the 2. The pipe should be surrounded with a granular material which
engineer. is easily worked around the sides of the pipe Backfilling should
4. Trench depth is determined by the pipe’s service be performed in layer of 6 inch with each layer being
requirements. Plastic pipe should always be installed at least sufficiently compacted to 85% to 95% compaction.
below the frost level. The minimum cover for lines subject to 3. A mechanical tamper is recommended for compacting sand
heavy overhead traffic is 24 inches. and gravel backfill which contain a significant proportion of
5. A smooth trench bottom is necessary to support the pipe fine grained material, such as silt and clay. If a tamper is not
over its entire length on firm stable material. Blocking should available, compacting should be done by hand.
not be used to change pipe grade or to intermittently support 4. The trench should be completely filled. The backfill should be
pipe over low sections in the trench. placed and spread in fairly uniform layers to prevent any
unfilled spaces or voids.

32
REQUIRMENT OF THARMALLY HANDLING :
INSULATING CPVC PIPE The pipe should be handled with reasonable care. Because
CPVC has much lower thermal conductivity then metals used thermoplastic pipe is much lighter in weight than metal pipe,
in piping systems (0.14W / mk for CPVC verus > 400 W / mk for there is sometimes a tendency to throw it around. This should be
copper). avoided.
For this reason in most cases it is not necessary to thermally
insulate CPVC piping. However the equation below can be used to The pipe should never be dragged or pushed from a truck
calculat the approximate heat loss from CPVC pipes 1 meter bed. Pallets for pipe should be removed with a fork lift. Loose pipe
length of pipe. can be rolled down timbers as long as the pieces do not fall on
each other or on any hard or uneven surface. In all cases, severe
Q= λ
e
II.
[
di + do
2 ] . ∆Τ contact with any sharp objects (rocks, angle irons, forks on
forklifts, etc.) should be avoided.

Where Q = Heat loss per meter of pipe, W/m


STORING :
λ = Thermal conductivity. [W/mk] for CPVC,
λ = 0.14 w/mk If possible, pipe should be stored inside. When this is not
e = Thickness of pipe, mm .068 possible, the pipe should be stored on level ground which is dry
II = 3, 1416 and free from sharp objects. If different schedules of pipes are
di = Inside diameter, mm stacked together, the pipes with the thickest walls should be at the
∆Τ = Temperature differential between inner and outer bottom.
surface of pipe.
This can be approximated to : T water. The pipes should be protected from the sun and be in an
T ambient (K) area with proper ventilation. This will lessen the effects of
ultraviolet rays and help prevent heat built-up.

Example : If the pipes are stored in racks, it should be continuously


What is the heat loss/meter from a 20mm outside diameter CPVC supported along its length. If this is not possible, the spacing of
pipe. wall thickness 2,3mm, with water flowing inside at 800C and the supports should not exceed three feet (3’).
an ambient air temperature of 250C?
When storage temperatures are below 0°C (32°F), extra
care should be taken when handling the pipe. This will help
Q = 0.14 .
2.3
3,1416 [ 2
]
20 + 15.4
. (80-25)
prevent any problems which could be caused by the slightly lower
impact strength of PVC pipes at temperature below freezing.

= 186 W/m

Equation (1) can be simplified for standard pipe dimensions to :

Q =K ∆Τ

Where K is a conductivity of CPVC and the pipe geometry in the


previus example. do = 20mm, and e = 2.3mm

K = 0.14 .
2.3
3,1416 [ ]
20 + 15.4 . = 3.38 (W/mks)
2

33
JOINING ASTRAL In order to make a proper and neat joint,
measure the pipe length accurately and

CPVC PIPES & FITTINGS make a small mark. Ensure that the pipe
and fittings are size compatible. You can
easily cut with a wheel type plastic pipe
cutter or hacksaw blade. Cutting tubing as
squarely as possible provides optimal Burrs and filings can prevent proper
Solvent cement set and cure times are a bonding area within a joint. contact between tube and fitting during
function of pipe size, temperature and assembly and should be removed from the

1
relative humidity. Curing time is shorter CUTTING outside and inside of the pipe. Debarking
for drier environments, smaller sizes and tool, pocket knife or file are suitable for
higher temperatures. It requires 10 to 20
minutes for perfect joint. this. A slight bevel on the end of the
tubing will ease entry of the tubing into
SET AND CURE

6
the fitting socket.

2 DEBURRING /
BEVELING

3
FITTING

ASSEMBLY
5 PREPARATION
Using a clean, dry rag, wipe dirt and
moisture from the fitting sockets and tubing
end. The tubing should make contact with
Immediately insert the tubing into the the socket wall 1/3 to 2/3 of the way into
fitting socket, rotate the tube ¼ to ½ turn the fitting socket.
while inserting. This motion ensures and
even distribution of cement within the
joint. Properly align the fittings. Hold the
assembly for approximately 10 seconds,
allowing the joint to set-up.
4 SOLVENT CEMENT
APPLICATION
use only CPVC cement or an all - purpose
cement conforming to ASTM F 493 or joint
failure may result. When making a joint,
apply a heavy, even coat of cement to the
pipe end. Use the same applicator without
additional cement to apply a thin coat
inside the fitting socket. Too much cement
can cause clogged water ways.

Note : For sizes above 65 mm (2½") use IPS 70 primer before applying solvent cement. The purpose of a primer is to penetrate and soften the surfaces
so they can stick together. The proper use of a primer ensures that the surfaces are prepared for fusion in a wide variety of weather conditions.

34
HOW TO USE SOLVENT CEMENT, PRIMER & CLEANER
JOINT CURING : BEFORE BEGINNING :
Recommended initial set times. 1. Verify the cement is the same as the pipes and fittings being
Temperature Pipe Size Pipe Size Pipe Size Pipe Size used.
Range 1 1/4” 1 1/2” to 3” 4”to 8” 10” to 12”
1/2” to 2. Check the temperature where the cementing will take place.
15 mm 40 mm 100 mm 250 mm • Cement take longer time to set up in cold weather. Be
to to to to sure to allow extra time for curing. Do not try to speed
32 mm 80 mm 200 mm 300 mm up the cure by artificial means this could cause porosity
15.5OC - 37.7OC 15 min 30 min 1 hrs. 2 hrs. and blisters in the cement film.
4.4OC - 15.5OC 1 hrs. 2 hrs. 4 hrs. 8 hrs. • Solvents evaporate faster in warm weather. Work quickly
to avoid the cement setting up before the joint is
Recommended initial cure times. assembled. Keep the cement as cool as possible. Try to
stay out of direct sunlight.3. Keep the lid on cements,
Temperature Pipe Size Pipe Size Pipe Size Pipe Size cleaner, and primers when not is use Evaporation of the
Range 1/2” to1 1/4” 1 1/2” to 3” 4”to 8” 10” to 12” solvent will effect the cement.4. Stir or shake cement
15 mm 40 mm 100 mm 250 mm before using.
to to to to 5. Use 20 mm (¾") dauber on small diameter pipes,40 mm
32 mm 80 mm 200 mm 300 mm (1½") dauber up through 80 mm (3") pipe, and a natural
15.5OC - 37.7OC 6 hrs. 12 hrs. 24 hrs. 48 hrs. bristle brush, swab, or roller ½ the pipe diameter on pipes 4"
4.4OC - 15.5OC 12 hrs. 24 hrs. 48 hrs. 96 hrs. and up.
6. Do not mix cleaner or primer with cement.
7. Do not use thickened or lumpy cement. It should be like the
CHOOSING CEMENTS & PRIMERS : consistency of syrup or honey.
Solvent cements for Flowguard CPVC systems must conform 8. Do not handle joints immediately after assembly.
to the requirements of ASTM F-493 or equivalent and should 9. Do not allow daubers to dry out.
carry this identification on the can label. A primer or cleaner 10. Maximum temperature allowable for CPVC pipe is 180°F.
must be used on CPVC Primers for PVC pipe are acceptable for 11. All coloured cements, primers, and cleaners will have a
CPVC. The National Sanitation Foundation mark (NSF) or other permanent stain. There is no known cleaning agent.
potable water approval should also be located on the container.
12. Use according to the step outline in ASTM D-2846, joining of
Certain code bodies require orange CPVC solvent cement pipe and fittings.
and purple primer to facilitate identification by plumbing
inspectors. However, unpigmented (clear) CPVC solvent cement
and primer are available and accepted by various jurisdictions. If
you decide to use clear products, we strongly recommend
contracting the local plumbing inspector prior to beginning a job
to determine if these clear cements and primers are acceptable.

CPVC CEMENT’S SHELF LIFE :


CPVC solvent cement are formulated to have a Shelf life of
two years. Cans are usually marked with manufacturing dates.
Good CPVC cement should have the consistency of syrup or
honey with no undissolved materials. Ages cement will often
change colour or begin to thicken and become gelatinous or jelly-
like. When this occurs, the cement must be thrown away.

SOLVENT CEMENT FREEZING :


Use the same precautions to protect CPVC solvent cement
from freezing as you would with PVC cement. Once cement gels,
it can not be recovered and should be discarded.

35
Number of joints Dia of Pipe Appx. Nos
(mm) (In.) of joints*
IMPORTANT NOTES
per liter of 15 ½ 1200
cement by pipe size 20 ¾ 750 WATER HEATER CONNECTIONS
25 1 500
32 1¼ 450
40 1½ 325
50 2 225
65 2½ 50
75 3 40
100 4 30
150 6 10
200 8 5
250 10 2-4
300 12 1-2

*Approximate numbers of joints which can be made per ltr. of solvent cement L K
* For primer, number of joints are approximate double than solvent cement
Some plumbing codes contain detailed requirements for
connections to gas or electric storage type water heaters.
Determine whether your code has such requirements and satisfy

SAFE HANDLING OF SOLVENT CEMENT them. If no detailed requirements exist, use the following
information. On electric water heaters CPVC can be piped directly
When using solvent cements, primers and cleaners
to the heater with special metal- to- CPVC transition fittings
there are some basic safety measures.
(photo L). On gas water heaters there should be at least 6 inches
All users should keep in mind. of clearance between the exhaust flue and any CPVC piping (photo
• Avoid prolonged breathing of solvent vapors. When pipe and K). Twelve inch long metal nipples or appliance connector should
fittings are being joined in enclosed areas, the use of
ventilating devices are advised be connected directly to the heater so that the CPVC tubing
• Keep cements, primers and cleaners away from all sources of cannot be damaged by the build-up of excessive radiant heat from
ignition, heat, sparks and open flame. the flue. An approved temperature/pressure (T/P) relief valve
• Keep containers of cements, primers and cleaners tightly should be installed so that the probe or sensing element is in the
closed except when the product is being used.
water at the top of the heater. CPVC is approved by all the model
• Dispose of all rags used with solvents in a proper outdoor
waste receptacle. codes for use as relief valve drain line piping. Use a metal-to-
• Avoid eye and skin contact. In case of eye contact, flush with CPVC transition fitting to connect to the relief valve and continue
plenty of water for 15 minutes and call a physician. the pipe full size to the outlet. For horizontal runs, slope the pipe
towards the outlet and support it at three-feet centers or closer.
The pipe must discharge to the atmosphere at an approved
THREAD SEALANTS location.
Threaded CPVC fittings with tapered pipe threads (e.g. male Do not use CPVC pipe and fittings with commercial-type,
thread adapters) must be used with a suitable thread sealant to non-storage water heaters.
insure leak-proof joints. Over the years, PTFE (Teflon® or
equivalent) tape has been the preferred thread sealant, it is still
the most widely accepted and approved sealant. Some paste
sealant can affect CPVC fittings; therefore only sealants
recommended for use with CPVC by the thread sealant
manufacturer should be used.

36
GENERAL GUIDELINE FOR ALL INSTALLATIONS
DO's
1. Install product according to ASTRAL's Installation instructions 12. When connecting to a gas water heater, CPVC tubing should
and manual and follow recommended safe work practices. not be locat ed within 50cm of the flue. For water heaters
2. Keep Pipe and Fittings in original packaging until needed and lacking reliable temperature control, this distance may be
store pipes in covered areas. increased up to 1m. A metal nipple or flexible appliance
3. Use tools designed for use with plastic pipe and fittings. connector should be utilized. This measure eliminates the
4. Cut-off minimum 25 mm beyond the edge of the crack in potential for damage to plastic piping that might result from
case any crack is discovered on the pipe. excessive radiant heat from the flue. 13. Use of a brass/CPVC
4A. Pipe may be cut quickly and efficiently by several methods. transition adapter when connecting CPVC to a water heater
Wheel-type plastic tubing cutters are preferred. Ratchet type will help facilitate water heater replacement in the future.
cutters or fine tooth saws are another option. However, 14. Pressure test CPVC systems in accordance with local code
when using the ratchet cutter, be certain to score the requirements.
exterior wall by rotating the cutter blade in a circular motion
around the pipe. Do this before applying significant
downward pressure to finalise the cut. This step leads to a
square cut. In addition, make sure ratchet cutter blades are
sharp. Cutting tubing as squarely as possible provides
optimal bonding area within a joint.
4B. Burrs and filings can prevent proper contact between the
tube and fittings during assembly, and should be removed
from the outside and inside of the tube. A chamfering tool is
preferred, but a pocket knife or file is also suitable for this
purpose.
4C. Use CPVC Cement only. Use only CPVC Cement or an all
purpose cement conforming to ASTM F-493 or joint failure
may result.
5. Always conduct hydraulic pressure testing after installation to
detect any leaks and faults. Wait for appropriate cure time
before pressure testing. Fill lines slowly and bleed air from
the system prior to pressure testing. DON'T's
6. Rotate the pipe 90° to 180° to spread the CPVC Solvent
Cement evenly in the joint while pushing the Pipe into 1. Do not use Metal Hooks or Nails to support / hold or put
pressure on the pipes. Do not use straps & hangers with
Fitting. rough or sharp edges. Do not tighten the straps over the
7. Use Teflon tapes with threaded fittings. pipes.
8. Ensure that there are no sharp edges in contact with the pipe 2. Never expose the pipe to Open Flame while trying to bend it.
while embedding the pipes on the walls or in the floors. 3. Do not drop pipes on edges from heights. Do not drop heavy
8A. When making a transition connection to metal threads, use a objects on pipes or walk on pipes.
special transition fitting or CPVC male threaded adapter 4. Do not dilute Solvent Cement with Thinners /MTO or any
whenever possible. Do not over-torque plastic threaded other liquid etc.
connections. Head tight plus one-half turn should be 5. Do not use air or gases for pressure testings.
adequate. 6. Do not use any other petroleum or solvent- based sealant,
adhesive, lubricant or fire stop material on CPVC pipes and
9. Provide Vertical & Horizontal Supports as recommended fittings.
using the Plastic Straps only. 7. Do not use CPVC Pipes & Fittings for pneumatic applications.
10. Apply a water- based paint only on exposed pipes & fittings.
11. Visually inspect all joints for proper cementing at the end of
shift or day. A Visual inspection of the complete system is
also recommended during pressure testing.

37
NOTES

38
OTHER PIPING SYSTEMS

• CPVC PIPING SYSTEM FOR INDUSTRIES • CPVC PIPING SYSTEM FOR FIRE SPRINKLERS • ULTRADRAIN CONVENTIONAL SYSTEM
• ASTM uPVC PIPING SYSTEM • DRAINAGE SYSTEMS • LIGHT WEIGHT FOAMCORE uPVC PIPES
• LEAD FREE & HEAVY METAL FREE COLUMN PIPES FOR SUBMERSIBLE PUMPS • MULTI-LAYER COMPOSITE PIPE
• LEAK PROOF uPVC DRAIN WASTE & VENT SYSTEM • uPVC PIPES FOR DRAINAGE & SEWERAGE APPLICATIONS
• THE LEADING SOUNDPROOF SOIL & WASTE SYSTEM • BATHROOM WITHOUT COMPROMISE

Authorised Distributor :
Spectrum : 09824097300

ASTRAL POLY TECHNIK LIMITED


Registered & Corporate Office : 207/1, Astral House, B/h. Rajpath Club, Off. S.G. Highway,
Ahmedabad-380 059, India. Phone : 91-79-6621 2000, Fax : 91-79-6621 2121,
E-mail : info@astralcpvc.com Website : www.astralcpvc.com
Mumbai : New Delhi : Bengaluru : Hyderabad : Chennai :
Unit No.138, Udyog Bhavan, 414, Ansal Chamber - II, No. 102, 1st floor, Plot No. 67, 1st Floor, Flat No. AK6, 2nd Floor,
Sonawala Road, Goregaon (E), 6, Bikaji Cama Place, Bull Temple Road, Paigah Colony, “Natraj Palace”,
Mumbai-400063. New Delhi - 110 066. Next To Ram Krishna Ashram, B/h. Anand Theatre, S.P. Road, No. 54 (22), Saravanan Street,
Phone : 022 - 2686 2227 Phone : 011 - 2616 9461 Bengaluru - 560019. Secunderabad-500 003. T. Nagar, Chennai-600 017.
Telefax : 022 - 2686 2397 Telefax : 011 - 2616 8156 Telefax : 080-26617236 Telefax : 040 - 2790 0023 Phone : 044 - 4350 6384
E-mail : mumbai@astralcpvc.com E-mail : delhi@astralcpvc.com E-mail : bgloffice@astralcpvc.com E-mail : hyderabad@astralcpvc.com E-mail : chennai@astralcpvc.com
All information contained in this manual is given in good faith and believed to be accurate and reliable. But because of many factors which are outside our knowledge
and control and affect use of product, no warranty is given or is to be implied with respect to such information, nor we offer any warranty of immunity against patent
infringement. No responsibility can be accepted for any error, omissions or incorrect assumptions. Any specification can change without prior notice.

You might also like