04-07 DT Nro Project List2013
04-07 DT Nro Project List2013
04-07 DT Nro Project List2013
© 2013 The Cheesecake Factory Incorporated Confidential Information Do not duplicate or distribute outside of this company.
04-07 NRO DT Project List
Page 1 of 4
AFTM NRO Guide
Section 4: Captain Resources
1 FOH and 1 KIT “Project Clean” Daily AFTM Assign 2 DTs to be responsible for owning
These DTs will sanitation nightly prior to post shift. These
© 2013 The Cheesecake Factory Incorporated Confidential Information Do not duplicate or distribute outside of this company.
04-07 NRO DT Project List
Page 2 of 4
AFTM NRO Guide
Section 4: Captain Resources
Server Captain/CID Classroom Lunch Day 16 NRO workgroup AFTM and Workgroup Captains/CIDs to
Schedule agendas validate and then distributed to Kitchen
Ops
1 Server DT/1 Busser Dining Room Set up Day 15 Identify areas with post it notes by setup.
DT and labeling Use Blue tape for all pre-labeling.
© 2013 The Cheesecake Factory Incorporated Confidential Information Do not duplicate or distribute outside of this company.
04-07 NRO DT Project List
Page 3 of 4
AFTM NRO Guide
Section 4: Captain Resources
© 2013 The Cheesecake Factory Incorporated Confidential Information Do not duplicate or distribute outside of this company.
04-07 NRO DT Project List
Page 4 of 4