KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

F/TQM/04
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV. 03
Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 10. Scaffolding (False works)
Klang, Selangor. Date: Date:

10. Scaffolding (False works) - Erecting


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

(4) Place a warning signs.


Site preparation –
1 Scaffold topple. Fatality / Serious injury 1 5 5 (5) Safe and adequate access.
Ground condition (5) Check ground condition.
(4) Place a warning signs. Project Manager
Vehicle overturn. Minor injury 1 3 3 (4) Safe position of machinery. Site Manager
(5) Safe and adequate access.
2 Transporting Site Agent
(4) Place a warning signs. Site Engineer
Damage of load. Dangerous occurrence 1 3 3 (4) Safe position of machinery.
(5) Safe and adequate access. Site Supervisor
SHO / SSS
(4) Place a warning signs.
Physical (ergonomic) improper EO
Negligible injury 1 3 3 (5) Safe position of machinery.
method of handling activity. Scaffolder
(5) Safe and adequate access.
3 Lifting
Work Leader
(4) Place a warning signs.
Damage of load. Dangerous occurrence 1 3 3 (5) Safe position of machinery. Machinery opr/
(5) Safe and adequate access. Driver
(4) Place a warning sign. Signalman
(4) Edge protection (guardrails).
Scaffold topple. Fatality / Serious injury 1 5 5 Banksman
(5) Safe and adequate access.
(5) Check ground condition. Rigger

4 Erecting of scaffold (4) Place a warning sign. Welder


Physical worker slip and fall
Fatality / Serious injury 1 5 5 (5) Safe and adequate access. Workers
from height.
(6) Wear proper PPE (body harness)
(4) Place a warning signs.
Falling object. Serious injury 1 4 4
(5) Safe and adequate access.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Scaffolding (False works) - Dismantling


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

(4) Place a warning sign.


Falling object. Serious injury 1 4 4 (5) Safe and adequate access. Project Manager
(6) Wear proper PPE
Site Manager
(4) Place a warning sign. Site Agent
(4) Edge protection (guardrails).
5 Dismantling work Scaffold collapse. Serious injury 1 4 4
(5) Safe and adequate access. Site Engineer
(5) Inform others of the work. Site Supervisor

(4) Place a warning sign. SHO / SSS


Physical worker slip and fall Fatality / Serious
1 5 5 (5) Safe and adequate access. EO
from height. injury (6) Wear proper PPE (body harness) Scaffolder
Work Leader
(4) Place a warning sign.
6 Stacking Falling object. Serious injury 1 4 4 (5) Safe and adequate access. Machinery opr/
(6) Wear proper PPE Driver
Signalman
(5) Briefing By SHO on safety awareness. Banksman
Hit by moving object. Serious injury 1 4 4
Additional control shall be made if necessary.
Rigger
7 Lifting work Welder
Physical (ergonomic) (4) Place a warning signs.
Workers
improper method of Negligible injury 1 3 3 (5) Safe position of machinery.
handling activity. (5) Safe and adequate access.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)