6 - Piling Works
6 - Piling Works
6 - Piling Works
6. Piling Works
HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation
Mechanical - Serious injury (5) Machine must operate by competent operator. Site Agent
Struck by moving part of -Damage to property / 2 4 8 - Workers stay away from moving machine. Site Engineer
machine utilities (6) To provide appropriate PPE.
Site Supervisor
2 Unload of machinery (5) Machine must operate by competent operator.
- Workers stay away from moving machine. SHO / SSS
Physical
-Serious injury 2 4 8 - Suitable track are provided and inspected by EO
Machine topple designated person.
(6) To provide appropriate PPE. Scaffolder
(5) Machine must operate by competent operator. Work Leader
Physical
Lifting/ hoisting of - Serious injury - Machine inspection before work commences. Machinery opr/
3 Load dislodge / Loss of load / 2 4 8
material -Damage to property - Toolbox talks for Workers before work commence.
Struck by load (6) To provide appropriate PPE. Driver
Physical Signalman
(5) Supervised by designated person.
-Serious injury 1 4 4
Load dislodge / Loss of load. (6) To provide appropriate PPE. Banksman
Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
-Minor injury (4) Spray water to pile to reduce the dust. Site Agent
Mineral dust 2 3 6
(lung-impaction) (6) To provide appropriate PPE. Site Engineer
Site Supervisor
-Minor injury SHO / SSS
(5) Work carry out by skill workers.
Noise exposure (long term can impair 2 3 6 (6) To provide appropriate PPE. EO
workers hearing)
Hack pile to expose Scaffolder
10
steel bar Physical (Ergonomic) (5) Manual handling should be carry out with correct Work Leader
-Negligible injury 2 3 6 method.
Improper method of handling (6) To provide appropriate PPE. Machinery opr/
Driver
Physical (4) Barricade/cordon the working area.
(5) Work to be carried out by skill workers. Signalman
Hit by falling object-material / -Serious injury / Fatality 2 5 10 - To inform supervisor/safety personnel
hand tool Banksman
(6) To provide appropriate PPE.
Rigger
Physical (4) Safety guide are in good condition. Welder
Vibration during hacking of -Minor injury 2 3 6 (5) Work carry out by skill workers. Workers
pile (6) To provide appropriate PPE.
Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)