2 - Concrete Mixer
2 - Concrete Mixer
2 - Concrete Mixer
2. Concrete Mixer
HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation
Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
Project Manager
--Heat stress (4) Good / open ventilation at working area.
- To provide shelter/ rest area & drinking facilities Site Manager
Hot weather (low productivity) 2 3 6 (5) Take a 2-3 minutes rest after every 2 ( two ) hours.
- Skin burn Site Agent
(6) To provide appropriate PPE.
Site Engineer
Site Supervisor
SHO / SSS
Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)