Mark Ltd. (9356) : BK Bari, Taltoli, Mirzapur Bazar, Gazipur. (+24.125172N, 90.379235E) 29.06.2014
Mark Ltd. (9356) : BK Bari, Taltoli, Mirzapur Bazar, Gazipur. (+24.125172N, 90.379235E) 29.06.2014
Mark Ltd. (9356) : BK Bari, Taltoli, Mirzapur Bazar, Gazipur. (+24.125172N, 90.379235E) 29.06.2014
(9356)
BK Bari, Taltoli, Mirzapur Bazar, Gazipur.
(+24.125172N, 90.379235E)
29.06.2014
Identified Priority 1 Concerns
None
Identified Priority 2 Concerns
1. Poor documentation
2. Steelwork roof connections to brick walls of building number 03, 05, 06, 07 and 08 are
poorly designed.
1st Priority 2 Concern
• None
Overall Stability System
We require that these items
be investigated in a Detail
Engineering Assessment.
The factory engineer has to revise and produce drawing and documents
1 Priority 2 - Poor documentation to matched actual site conditions. Detailed structural documents are 6-weeks
required for proper investigation.
Priority 2 - Steelwork roof connections to brick walls of Carry out an Engineering Assessment to verify that the connections are
2 6-weeks
building number 03, 05, 06, 07 and 08 are poorly designed. properly design against wind loading.
Priority 2 - Loading plan for mezzanine of building number Carry out an Engineering Assessment to verify the maximum loading
4 6-weeks
4 (main building). on the mezzanine.
Priority 2 - Loading plan for mezzanine of building number Display maximum loading in storage area of the mezzanine (if
5 6-months
4 (main building). applicable).
7 Priority 3 - Overall stability system. Carry out highlight of Engineering Assessment recommendations. 6-months