One Room BOQ

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 159

01-01-a Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st: 50 meter

01-01-b Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd 50 meter
01-01-c Carriage of 100 cft / 5 tonne of all materials by truck or other means : 3rd to 5th 50 meter
01-01-d Carriage of 100 cft / 5 tonne of all materials by truck or other means : 250 to 1000 meter
01-01-e Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st kilometer
01-01-f Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd -5th kilometer
01-01-g Carriage of 100 cft / 5 tonne of all materials by truck or other means : 6th to 10th kilometer
01-01-h Carriage of 100 cft / 5 tonne of all materials by truck or other means : 11th & subsequent ilometer
01-02-a Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st 50 meter
01-02-b Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd 50 meter
01-02-c Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 3rd to 5th 50 meter
01-02-d Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 250 - 1000 meter
01-02-e Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st kilometer
01-02-f Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd - 5th kilometer
01-02-g Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 6th - 10th kilometer
01-02-h Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 11th & subsequent kilometer
01-03-a Carriage of cement(bag), bitumen/lubricants (drum) by truck or other means : 1st 50 meter
01-03-b Carriage of cement (bag) bitumen/lubricant (drum) by truck or other means : 2nd 50 meter
01-03-c Carriage of cement (bag), bitumen/lubricant (drum) by truck or other means : 3rd to 5th 50 meter
01-03-d Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 250 to 1000 meter
01-03-e Carriage of cement(bags), bitumen/lubricant (drum) by truck or other means : 1st kilometer
01-03-f Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 2nd - 5th kilometer
01-03-g Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 6th - 10th kilometer
01-03-h Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 11th & subsequent km
01-04-a Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 1st 50 meter
01-04-b Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd 50 meter
01-04-c Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 3rd to 5th kilometer
01-04-d Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 250 to 1000 meter
01-04-e Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 1st kilometer
01-04-f Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd - 5th kilometer
01-04-g Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 6th - 10th kilometer
01-04-h Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 11th & subsequent kilometer
01-05-a Carriage of small consignments upto 250kg 1st 50 meter
01-05-b Carriage of small consigmnments upto 250 kg 2nd 50 meter
01-05-c Carriage of small consignments upto 250 kg 3rd to 5th 50 meters
01-05-d Carriage of small consignments upto 250 kg 250 - 1000 meter
01-05-e Carriage of small consignments upto 250 kg 1st kilometer
01-05-f Carriage of small consignments upto 250 kg 2nd to 5th kilometer
01-05-g Carriage of small consignments upto 250 kg 6th to 10th kilometer
01-05-h Carriage of small consignments upto 250 kg 11th & subsequent kilometer
01-06-a Carriage of consignments (odd job) Coolie load
01-06-b Carriage of consignments (odd job) Donkey load
01-06-c Carriage of consignments (odd job) Cart Load
01-06-d Carriage of consignments (odd job) Camel load
01-07-a Hire Charges of Truck
01-07-b Hire charges of Tractor with trolley
01-07-c Hire charges of Tractor without trolley
01-08-a Hand shunting loaded railway wagons Upto 500 meter
01-08-b Hand shunting loaded railway wagons Upto 1 kilometer
01-08-c Hand shunting loaded railway wagons Upto 2 kilometer
01-08-d Hand shunting loaded railway wagons 3rd & subsequent kilometer
01-09-a Hand shunting empty railway wagons Upto 500 meter
01-09-b Hand shunting empty railway wagons Upto 1 kilometer
01-09-c Hand shunting empty railway wagons Upto 2 kilometer
01-09-d Hand shunting empty railway wagons 3rd & subsequent kilometer
02-01 Load into or unload from railway wagons within 50m shingle, sand, ballast, tiles, etc, laid & stacked
02-02-a Load into or unload from railway wagons within 50m laid & stacked : Bricks 10" size
02-02-b Load into or unload from railway wagons within 50m laid & stacked : Bricks 9" or smaller size
02-03 Load into or unload from railway wagons, cement in bags and stacking within 50m.
02-04 Load into or unload from railway wagons, empty cement bags and stacking
02-05 Load into or unload from railway wagons and stacking white lime in bags
02-06 Load into or unload from railway wagons structural steel, RS joists, rails, rail fastenings etc
02-07 Load into or unload from 45 gallon drums full, into or from railway wagons,lead upto 50m
02-08 Loading or unloading packages of all sorts upto 50 kg.
02-09-a Load or unload sleepers other than wooden, incl stacking, lead upto 50 m : Broad gauge
02-09-b Load or unload sleepers other than wooden, including stacking, lead upto 50 m : Metre gauge &
02-10 Load or unload timber logs or shuttering into or from railway wagons, including stacking within 50m
02-11 Loading or unloading bhoosa in railway wagons lead upto 50 m.
02-12 Load or unload timber scrap or wooden plugs into or from railway wagons & stacking within 50m
02-13 Load or unload pitching stone/spawl from railway wagons of any guage including clearing 1.5m away
02-14 Loading or unloading building stone including clearing away 1.5m from rails
02-15-a Unloading oil,bitumen or tar etc : Crude Oil (to be pumped from tank wagon into tank)
02-15-b Unloading oil,bitumen or tar etc Crude oil (drained by gravity)
02-15-c Unloading oil,bitumen or tar etc Crude oil materials from railway wagons
02-15-d Unloading oil, bitumen or tar etc : Fuel Oil from tank into empty drums including stacking within 50 m
02-15-e Unloading oil,bitumen or tar etc Petrol (2 gallon tin)
02-15-f Unloading oil, bitumen or tar etc Kerosine oil (4 gallon tin)
02-15-g Unloading oil,bitumen or tar etc Tar & Bitumen in drums with carriage upto 1 km
02-16-a Removing and stacking within 50m. lead Stone, spawl, brick bats, shingle, sand, lime etc
02-16-b Removing and stacking within 50m. lead Bricks
02-16-c Removing and stacking within 50m. lead Broad gauge wooden sleepers
02-16-d Removing and stacking within 50m. lead Metre gauge or narrow guage wooden sleepers
02-16-e Removing and stacking within 50m. lead Rails, girders, pipes, cement etc.
02-16-f Removing and stacking within 50m. lead Bridge and crossing timbers, etc.
02-17 Load into wagons girders, rails, MS bars, pipes etc. including 50m lead & stacking inside wagons
02-18 Unload from wagons girders, rails, MS bars, girder etc. including 50m lead but excluding stacking
02-19 Load into wagons wooden baord guage sleepers including 50m lead & stacking
02-20 Unload wooden broad gauge sleepers from wagons including 50m lead and stacking
02-21 Loading metre gauge or narrow guage wooden sleepers including 50m lead & stack inside wagons
02-22 Unloading metre gauge or narrow guage wooden sleepers including 50m lead but excluding stacking
02-23 Loading bridge and crossing timber including 50m lead & stacking
02-24 Unloading bridge and crossing timbers including 50m lead but excluding stacking
02-25 Load or unload bitumen, asphalt, tar in drums, into or from railway wagons, lead upto 50m
03-01-a Earth excavation undressed upto single throw of kassi phaorah or shovel etc : in ashes, sand, soft soil or silt clearance
03-01-b Earth excavation undressed upto single throw of kassi phaorah or shove etc : in ordinary soil,
03-02 Earth excavation in ashes, sand & soft soil or silt clearance, undressed lead upto 25m.
03-03-a Bed clearance and dressing slopes of drains including removing of weeds and roots etc. Excavated material undressed within 25m
03-03-b Bed clearance and dressing slopes of drains including removing of weeds and roots etc. Excavated material dressed within 25m lead
03-04-a Borrowpit excavation undressed lead upto 50m in Ordinary soil
03-04-b Borrowpit excavation undressed lead upto 50m in Hard soil
03-04-c Borrowpit excavation undressed lead upto 50m in shingle/gravel formation
03-05-a Embankment formation in ordinary soil & compaction by mechanical means at optimum moistures content to 95% to 100% max. modifie
03-05-b Embankment formation in ordinary soil & compaction by mechanical means at optimum moistures content to 90% max. modified AASHTO
03-05-c Embankment formation in ordinary soil & compaction by mechanical means at optimum moistures content to 85% max. modified AASHTO
03-06-a Earth fill in lawns including dressing & compaction with earth available from cutting/excavation
03-06-b Earth fill in lawns including dressing & compaction with suitable earth borrowed.
03-07-a Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Ordinary Soil
03-07-b Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Hard Soil
03-07-c Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Very hard Soil
03-07-d Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Gravel & shingle
03-08-a Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in Ordinary Soil
03-08-b Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in Hard Soil
03-08-c Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in Very Hard Soil
03-08-d Earth excavation in open cut 1.5m - 3m depth for drains etc & disposal : in Gravel & shingle
03-09-a Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m lead : Dry
03-09-b Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m lead : Wet
03-09-c Excavation in shingle or gravel formation & rock not req. blast, undressed, 50m lead : in Flowing Water
03-10-a Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Ordinary Soil
03-10-b Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Hard Soil
03-10-c Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Very Hard Soil
03-10-d Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Shingle/Gravel
03-11-a Rock Excavation, dressing & disposal up to 50m Soft Rock, slate, shale, schist or lateriate
03-11-b Rock Excavation, dressing & disposal up to 50m Medium hard rock, requiring occasional blasting
03-12-a Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade I
03-12-b Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade II
03-12-c Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade III
03-12-d Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade IV
03-12-e Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade V
03-12-f Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade VI
03-13-a Excavation in hard rock requiring blasting but blasting prohibited, dispose & dress within 25 m : Grade I
03-13-b Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m : Grade II
03-13-c Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m: Grade III
03-13-d Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m: Grade IV
03-13-e Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m: Grade V
03-13-f Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m: Grade VI
03-14-a Rehandling of earthwork Lead upto a single throw of kassi, shovel, phaorah
03-14-b Rehandling of earthwork upto a lead of 25 m.
03-15 Rehandling of gravel work or excavated rock, lead upto 25m.
03-16-a Filling, watering and ramming earth under floor with surplus earth from foundation, etc
03-16-b Filling, watering and ramming earth under floor with earth excavated from outside lead upto 50m
03-17-a Extra for every 25 m extra lead or part thereof for earthwork soft, ordinary, hard & very hard.
03-17-b Extra for every 25 m extra lead or part thereof for gravel, shingle or rock.
03-18-a Transportation of earth all types beyond 250 m and upto 500 m.
03-18-b Transportation of earth all types for every 100m extra lead beyond 500m upto 1.5 km.
03-18-c Transportation of earth all types for every 500m extra lead beyond 1.5 km. upto 8 km.
03-18-d Transportation of earth all types for every 1 km extra lead or part thereof beyond 8 km.
03-19-a Dressing & levelling earth to designed sections Ashes, sand, silt or soft soil upto cut or fill 6 inches
03-19-b Dressing & levelling earth to designed sections Ordinary or hard soil upto cut or fill 6 inches
03-19-c Dressing & levelling earth to designed section Gravel work or soft rock not requiring blasting upto cut or fill 6 inches
03-20 Dowel dressing
03-21 Dressing slopes of banks or ground surface
03-22 Dressing of earthwork (done by machinery or otherwise & left undressed) to designed section
03-23-a Excavation in foundation of building, bridges etc complete : in sand, ashes or loose soil
03-23-b Excavation in foundation of building, bridges etc complete : in ordinary soil
03-23-c Excavation in foundation of building, bridges etc complete : in hard soil or soft murum
03-23-d Excavation in foundation of building, bridges etc complete : in shingle/gravel
03-24 Cutting hard rock such as granite, ballast, hard lime etc with chisels/hammers for small foundation
03-25 Extra for excavaton requiring shoring
03-26-a Mixing & moistening of earthwork to OMC in layers for compaction etc complete.
03-26-b-01 Compaction by rolling with animal driven roller or hand rammed : Soft or sandy soil
03-26-b-02 Compaction by rolling with animal driven roller or hand rammed : Ordinary soil
03-26-b-03 Compaction by rolling with animal driven roller or hand rammed : Hard soil
03-26-b-04 Compaction by rolling with animal driven roller or hand rammed : Admixture of shingle
03-26-c Ramming earthwork (all types of soil)
03-26-d Ramming earthwork behind retaining wall
03-27-a Compaction of earth with power road roller 95% to 100% max. mod. AASHTO dry density.
03-27-b Compaction of earth with power road roller 90% max. mod. AASHTO dry density
03-27-c Compaction of earth with power road roller 85% max. mod. AASHTO dry density
03-28 Extra for wet earthwork
03-29 Extra for slush or daldal including dewatering
03-30 Extra for puddling.
03-31 Earthwork on small rain water drains, along canal banks, roads, drains, etc complete
03-32 Filling and Compacting Soil, Earth and Boulders behind retaining walls.
03-33 Dag belling 75 mm deep.
03-34 Turfing slopes of banks or lawns with grass sods including ploughing, laying, setting & watering.
03-35-a Berm cutting : Lead upto single throw of phaorah or shovel, without dressing.
03-35-b Berm cutting : Upto 25 m lead (including dressing).
03-36-a Berm trimming both sides of channels Upto 1 m depth
03-36-b Berm trimming both sides of channels Over 1m to 1.5m depth
03-36-c Berm trimming both sides of channels Over 1.5m to 2.5m depth
03-37-a Ploughing and levelling borrow pits Upto 1m depth
03-37-b Ploughing and levelling borrow pits Exceeding 1m depth
03-38-a-01 Making boundary or service roads complete in unploughed land : From 3 m to 6 m wide
03-38-a-02 Making boundary or service roads complete in unploughed land : Over 6 m to 12 m wide
03-38-b-01 Making boundary or service roads complete in ploughed land : From 3 m to 6m wide
03-38-b-02 Making boundary or service roads complete in ploughed land : Over 6 m to 12 m wide
03-39-a Earthwork by boats, Digging and loading into boats, upto 25m lead
03-39-b Earthwork by boats, including hire of boats Carriage by boats upto 250m.
03-39-c Earthwork by boats, including hiring of boats Extra for every additional 50m beyond 250m
03-39-d Earthwork by boats, Unloading earth from boats
03-40 Unloading earth from BG trucks and clearing 1.5m from rail
03-41 Earthwork by tramway, digging and loading in trucks, upto 25m lead
03-42 Unloading earth from BG trucks and spreading upto 5m from rail
03-43 Supplying clean and screened river or pit sand within 150m including removal of loose earth or overburden.
03-44-a Excavation in open cut for sewers & manhole except shingle, gravel & rock : Upto 2m.
03-44-b Excavation in open cut for sewers & manholes except shingle, gravel & rock : 2m to 5m
03-44-c Excavation in open cut for sewers & manholes except shingle, gravel & rock : Below 5m depth
03-45-a Trench Excavation in open cutting below water level for sewers & manholes : Upto 1 .25m depth
03-45-b Trench Excavation in open cutting below water level for sewers & manholes : 1 .25m to 2.5m depth
03-45-c Trench Excavation in open cutting below water level for sewers & manholes : Exceeding 2.5m depth
03-46 Excavation of trench in all kinds of soils except cutting in rock for pilelines upto 1.5m depth
03-48-a Uprooting stump and removing within 50 m upto 2 m girth
03-48-b Uprooting stump and removing within 50 m above 2 m girth
03-48-c Uprooting stump and removing within 50 m upto 2 m girth including sand filling and trinches
03-48-d Uprooting stump and removing within 50 m above 2 m girth including sand filling and trinches
03-49-a Jungle clearance and removing within 50m Light Jungle
03-49-b Jungle clearance and removing within 50m Thick Jungle
03-50 Uprooting sarkanda growth & disposal within 50m
03-51 Ploughing 3 times
03-52 Levelling, dressing and making lawns
03-53 Turfing of lawn with Dacca Grass
03-54 Clearance of shingle, gravel including sand, soft soil and silt deposits in channel bed upto 25m
03-55-a Clearance of choked up syphon including dewatering Upto 1.25m dia
03-55-b Clearance of choked up syphon including dewatering Exceeding 1 .25m dia
03-56 Clearing & Grubbing
03-57-a Removal of Tree : Girth 150mm - 300mm including removal of stump & backfilling with sand
03-57-b Removal of Tree : Girth 300mm - 600mm including removal of stump & backfilling with sand
03-57-c Removal of Tree : Girth over 600mm including removal of stump & backfilling with sand
03-58 Compaction of Natural Ground
03-59-a Roadway Excavation in Surplus / Unsuitable Common Material
03-59-c Roadway Excavation in Surplus / Unsuitable Rock (Medium) Material requiring blasting
03-60-a Structural Excavation in Common Material
03-60-b Structural Excavation in Rock Material requiring blasting
03-60-c Structural backfill using Common Material available at site.
03-60-d Structural Backfill using Granular Material brought from outside
03-61-a Formation of Embankment from Roadway Excavation in Common Material including compaction by power roller.
03-61-b Formation of Embankment from Roadway Excavation in Rock Material requiring blasting and compaction of embankment by power roller
03-61-c Formation of Embankment from Borrow Excavation in Common Material including compaction by power roller.
03-61-d Formation of Embankment from Roadway Excavation in granular Material including compaction by power roller.
03-62-a Subgrade Preparation in Earth Cut
03-62-b Subgrade Preparation in Rock Cut
03-62-c Subgrade Preparation on Existing Road
03-63-a Earthwork by mechanical means in drains and irrigation channels in DRY soil dressed to designed section, grades profile/with excavated m
03-63-b Earthwork by mechanical means in drains and irrigation channels in DRY & WET soil dressed to designed section, grades profile/with exca
03-63-c Earthwork by mechanical means in drains and irrigation channels in WET & SLUSH soil dressed to designed section, grades profile/with e
03-63-d Earthwork by mechanical means in drains and irrigation channels in SLUSH soil dressed to designed section, grades profile/with excavate
03-63-e Earthwork by mechanical means in drains and irrigation channels in DRY & WET to that of SLUSH (1:2) soil dressed to designed section,
03-63-f Earthwork by mechanical means in drains and irrigation channels in BORROW AREA soil dressed to designed section, grades profile/with
03-63-g Earthwork by mechanical means in drains and irrigation channels in UNDER WATER soil dressed to designed section, grades profile/with
03-64 Provide, place and compact impervious clay core in dam embakement of specified grading, permiability i/c leveling dressing and haua
03-65 Provide , Place & compact shoulder material (sandy / silty gravel) in Dam Embankment, of specified grading, leveling / dressing i/c ha
03-66 Provide , Place & compact Fine Filter in chimney drain vertical / horizantol on downstream of clay core
03-67 Provide , Place & compact Coarse Filter (well graded gravel) in chimney drain vertical / horizantol on downstream of fine filter i/c
leveling, moistening etc
03-68 Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System upto a minimum depth of 35 ft
in common soil including removing of excavated material bymachinery in 1 KM radius
03-68-a Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System upto a minimum depth of 35 ft
in shingle gravel including removing of excavated material by machinery in 1 KM radius
03-68-b Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System upto design depth in Soft
Rock/Shale requiring 20% blasting i/c removing of material from outside of the structure area.
03-68-c Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System upto design depth in Medium
Hard Rock requiring 50% blasting i/c removing of material from outside of the structure area.
03-68-d Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System upto design depth in Hard
Rock requiring 75% blasting i/c removing of material from outside of the structure area.
04-01 Dismantling dry stone masonry
04-02 Dismantling stone masonry in mud mortar
04-03 Dismantling stone masonry in lime or cement mortar
04-04-a Dismantling dry stone or spawl pitching
04-04-b Dismantling stone or spawl pitching (mud grouted)
04-05 Dismantling stone or spawl pitching and apron in silted condition
04-06 Dismantling stone pitching, cement or lime grouted
04-07-a Dismantling stone in Wooden crates
04-07-b Dismantling stone in Wire crates
04-08 Dismantling stone ware drain including base concrete
04-09 Dismantling mud/pise walling
04-10 Dismantling sun dried brick masonry
04-11 Dismantling dry brick masonry
04-12 Dismantling brick work in mud mortar
04-13 Dismantling brick work in lime or cement mortar
04-14 Dismantling cement block masonry
04-15 Dismantling Dhajji walling
04-16 Dismantling mud concrete
04-17 Dismantling lime concrete
04-18 Dismantling lime or cement concrete, under water
04-19-a Dismantling : Plain Cement Concrete 1:4:8
04-19-b Dismantling : Plain Cement Concrete 1:3:6
04-19-c Dismantling : Plain Cement Concrete 1:2:4
04-19-d Dismantling : Cement Concrete with brick aggregate
04-19-e Dismantling : DPC of cement concrete 1.5" thick and clearing the site
04-20 Dismantling RCC, separating reinforcement, cleaning & straightening the same
04-21 Dismantling sirki sarkanda or thached roofing supported on battens or ballies
04-22-a Dismantling 1st class tile roofing
04-22-b Dismantling 2nd class tile roofing
04-23 Dismantling from any height, asbestos sheets & ridge coping
04-24 Dismantling roof of wooden planks & battens from any height
04-25 Dismantling wooden ceiling above 20' height in difficult position including lifting along live wire
04-26 Dismantling jack arch roofing, including removing joists
04-27 Dismantling RB roof complete with mud and mud plaster including reinforcement complete
04-28-a Stripping and stacking: Slate or tiles from the truss roofing
04-28-b Stripping and stacking: GI sheet roofing
04-29 Extra for dismantling CI sheet roof above 20 ft. in dificult position including lifting along live wire
04-30 Dismantling slates or tiles including battens, purlins and planking
04-31 Dismantling brick or flagged flooring without concrete foundation
04-32 Dismantling plank or wooden block flooring etc
04-33-a Disjointing RCC pipes inside trench & removing pipes & stacking outside : 6" to 12" diameter
04-33-b Disjointing RCC pipes inside trench & removing pipes & stacking outside : 13" to 24" diameter
04-33-c Disjointing RCC pipes inside trench & removing pipes & stacking outside : 25" to 36" diameter
04-33-d Disjointing RCC pipes inside trench & removing pipes & stacking outside : Over 36" diameter
04-34 Removing door with chowkat
04-35 Removing windows and sky lights with chowkat
04-36 Removing ventilators and wooden sunshades
04-37-a Dismantling: Woden beams up to 12' in length
04-37-b Dismantling: Wooden beams from 12.1' to 23' length
04-37-c Dismantling: Wooden partiton Jaffry Work etc
04-37-d Dismantling: Wooden trusses
04-37-e Dismantling: Wooden palisade fencing
04-38 Dismantling iron work of trusses, sheds, water tanks, etc excluding cutting of rivets
04-39 Dismantling rolled steel beams or iron rails etc.
04-40 Dismantling iron latrine
04-41 Dismantling tees, bends or sluice valves upto 12" i/d
04-42-a Dismantling water column : BG
04-42-b Dismantling water column : MG or NG
04-43 Dismantling all type of wire fencing, including rolling wire into bundles and collecting material
04-44 Dismantling wire netting of tennis courts and frame work
04-45 Dismantling cloth ceiling and supporting timber
04-46 Dismantling and removing road metalling
04-47 Dismantling & removing road pavement etc including screening & stacking of by-products upto 50m.
04-48-a Removing from walls: Mud plaster
04-48-b Removing from walls: Cement or lime plaster
04-49-a Scraping : White wash or colour wash
04-49-b Scraping : Ordinary distemper, oil bound distemper or paint off wall
04-50 Dismantling glazed or accoustics tiles etc
04-51 Scraping boulders.
04-52 Cleaning mortar of old stones to be used in masonry
04-53 Dismantling light, fan and call bell point including casing, capping/strip open type complete
04-54 Dismantling plug point & making good damaged surface (building portion)
04-55-a Dismantle GI/MS conduit/GI flexible/PVC pipes or conduit wiring of all sizes : On surface
04-55-b Dismantle GI/MS conduit/GI flexible/PVC pipes or conduit wiring of all sizes : Recessed in wall
05-01 Lime Sand Mortar 1 : 2 (one Lime: 2 Sand)
05-02 Lime Sand Mortar 1 : 3 (one Lime: 3 Sand)
05-03 Lime Surkhi Mortar 1 : 1-1/2 (one Lime: 1-1/2 Surkhi)
05-04 Lime Surkhi Mortar 1 : 2 (one Lime: 2 Surkhi)
05-05 Lime Surkhi Mortar 1 : 3 (one Lime: 3 Surkhi)
05-06 Lime Sand And Surkhi Mortar 1 : 1 : 1 (one Lime: 1 Sand And : 1 Surkhi)
05-07 Lime Sand And Surkhi Mortar 1 : 2 : 1 (one Lime: 2 Sand And : 1 Surkhi)
05-08 Lime, Cement And Sand Mortar 1 : 1 : 3 (one Lime: One Cement And : 3 Sand)
05-09 Lime, Cement And Sand Mortar 1 : 1 : 4 (one Lime: One Cement And : 4 Sand)
05-10 Lime, Cement And Sand Mortar 1 : 1 : 5 (one Lime: One Cement And : 5 Sand)
05-11 Lime, Cement And Sand Mortar 1 : 1 : 6 (one Lime: One Cement And : 6 Sand)
05-12 Lime, Cement And Sand Mortar 1 : 1 : 7 (one Lime: One Cement And : 7sand)
05-13 Lime, Cement And Sand Mortar 1 : 1 : 8 (one Lime: One Cement And : 8 Sand)
05-14 Lime, Cement And Sand Mortar 1 : 1 : 9 (one Lime: One Cement And : 9 Sand)
05-15 Lime, Cement And Sand Mortar 1 : 1 : 10 (one Lime: One Cement And : 10 Sand)
05-16 Cement, Lime And and Mortar 1 : 2 : 6 (one Cement: 2 Lime And : 6 Sand)
05-17 Cement, Lime And Sand Mortar 1 : 2 : 9 (one Cement: 2 Lime And : 9 Sand)
05-18 Cement Sand Mortar 1 : 1 (one Cement: One Sand)
05-19 Cement Sand Mortar 1 : 1-1/2 (one Cement: 1-1/2 Sand)
05-20 Cement Sand Mortar 1 : 2 (one Cement: 2 Sand)
05-21 Cement Sand Mortar 1 : 2-1/2 (one Cement: 2-1/2 Sand)
05-22 Cement Sand Mortar 1 : 3 (one Cement: 3 Sand)
05-23 Cement Sand Mortar 1 : 4 (one Cement: 4 Sand)
05-24 Cement Sand Mortar 1 : 5 (one Cement: 5 Sand)
05-25 Cement Sand Mortar 1 : 6 (one Cement: 6 Sand)
05-26 Cement Sand Mortar 1 : 7 (one Cement: 7 Sand)
05-27 Cement Sand Mortar 1 : 8 (one Cement: 8 Sand)
05-28 Clay Mortar.
05-29 Clay Mortar Mixed With Chipped Bhoosa Or Straw.
05-30 Clay Mortar Mixed With Cow-dung 1 : 1 (1 Clay: 1 Cow Dung).
05-31 White Cement And Sand Mortar1 : 3 (1 White Cement 3 Sand)
05-32 Coloured Cement Mortar Made By Mixing White Cement And Pigment Of Approved Shade (1 White Cement Mixed With Pigment Of App
05-33 White Cement And Sand Mortar1 : 2 (1 White Cement 2 Sand)
05-34 Coloured Cement Mortar Made By Mixing Grey Cement And Pigment Of Approved Shade (1 Grey Cement Mixed With Pigment Of Appro
06-01 Mud concrete in foundation using brick ballast or stone ballast 1.5" gauge to 2" guage
06-02 Dry rammed shingle brick ballast or stone ballast 1.5" to 2" guage
06-03-a Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:3:6)
06-03-b Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:4:8)
06-03-c Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:5:10)
06-03-d Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:6:12)
06-03-e Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:6:18)
06-03-f Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:7:20)
06-04-a Extra on Item 3 above, for sedimentation tank or filter beds in PHE works (in bed)
06-04-b Extra on Item 3 above, for sedimentation tank or filter beds in PHE works (On slope)
06-05-a Plain Cement Conrete including placing, compacting, finishing & curing (Ratio 1:1:2)
06-05-b Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:1.5:1.5)
06-05-c Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:1.5:3)
06-05-d Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:3)
06-05-e Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:3)
06-05-f Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:4)
06-05-g Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:6)
06-05-h Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:6)
06-05-i Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:4:8)
06-06-a-01 RCC in roof slab, beam, column & other structural members, insitu or precast. Type A (1:1:2).
06-06-a-02 RCC in roof slab, beam, column & other structural members, insitu or precast. Type B (1:1.5:3)
06-06-a-03 RCC in roof slab, beam, column & other structural members, insitu or precast. Type C (1:2:4)
06-06-b-01 RCC in raft foundation slab, base slab of column & ret. wall etc, not including in 06-06. Type A (1:1:2)
06-06-b-02 RCC in raft foundation slab, base slab of column & ret. wall etc, not including in 06-06 Type B (1:1.5:3)
06-06-b-03 RCC in raft foundation slab, base slab of column & ret. wall etc, not including in 06-06. Type C(1 :2:4)
06-06-c-01 RCC including Precast/Prestressed in slab, beam, column, lintel, girder, etc. Type A (1:1:2)
06-06-c-02 RCC including Precast/Prestressed in slab, beam. column, lintels, girder, etc. Type B (1:1.5:3)
06-06-c-03 RCC including Precast/Prestressed slab, column, beam, lintel, girder etc. Type C (1:2:4).
06-06-d-01
Reinforced cement concrete work as in dams, spillways, weirs, barrages, cross drainage works and other hydrolic structures using
crushed stone aggregate(screening & washing) and coarse sand i/c costof all labour and material and all kinds of form works, oulds,
shuttering lifting/pumping, curing, rendering and finishing the xposed surface, cast in situ/precast excluding the cost of steel
reinforcement and labour for bending binding also excludig cost of additives which have to be paid separately. Type A (1:1:2)
06-06-d-02
Reinforced cement concrete work as in dams, spillways,weirs, barrages, cross drainage works and other hydrolic tructures using
crushed stone aggregate(screening & washing) and coarse sand i/c costof all labour and material and all kinds of form works, moulds,
shuttering lifting/pumping, curing, rendering and finishing the exposed surface, cast in situ/precast excluding the cost of steel
reinforcement and labour for bending binding also excludig cost of additives which have to be paid separately. Type B (1:1.5:3)
06-06-d-03
Reinforced cement concrete work as in dams, spillways, weirs, barrages, cross drainage works and other hydrolic structures using
crushed stone aggregate(screening & washing) and coarse sand i/c costof all labour and material and all kinds of form works, oulds,
shuttering lifting/pumping, curing, rendering and finishing the xposed surface, cast in situ/precast excluding the cost of steel
reinforcement and labour for bending binding also excludig cost of additives which have to be paid separately. Type C (1:2:4)
06-06-e Add extra labour for RCC in 2nd & subsequent storeys
06-07-a Supply & fabricate M.S. reinforcement for cement concrete (Plain bars)
06-07-b Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)
06-07-c Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 40)
06-08 Supplying & fixing high tensile steel wire in prestressing cables in precast girders.
06-09 Precast cement concrete solid or face blocks 1:2:4, including cost of templates.
06-10 Precast cem. concrete hollow blocks 1:2:4, including cost of templates & constructing wall thereof
06-11 Provide & fix ornamental cement jali 1:2:4 2" thick without steel.
06-12-a Extra labour for laying concrete (plain or reinforced) From 20' upto 40' height
06-12-b Extra labour for laying concrete (plain or reinforced) For every extra10' height
06-13 Extra labour for work of weirs, rails or bridges, syphons & concreting in superstructure
06-14 RCC spout, 2.5'x6"x5", including fixing in position
06-15 Making holes upto 3" dia, 18" depth in cement concrete or stone masonry walls and repairing
06-16 Extra labour for skipping concrete in wells
06-17-a Nicking cement concrete surface.
06-17-b Nicking lime concrete surface.
06-18-a Prepare, water and ramming surface for laying concrete (for Headworks only) Horizontal floor
06-18-b Prepare, water and ramming surface for laying concrete (for Headworks only) Glacis and crest
06-18-c Prepare, water and ramming surface for laying concrete (for Headworks only) inverted filters
06-19 Providing and fixing 6" wide GI sheet 18 SWG. stopper to expansion joint.
06-20 Fill expansion joints with bitumen, sand & saw dust in Ratio 1:2:2
06-21-a Filling expansion joints with bitumen
06-21-b Laying Asphaltic Mixture in Expansion Joints
06-22-a-01 Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 1 coat bitumen (1.5" thick)
06-22-a-02 Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 1 coat bitumen (2" thick)
Damp proof course of cem. conc. 1:2:4 (2" thick)
06-22-a-03 Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 1 coat bitumen (3" thick)
06-22-b-01 Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 2 coats bitumen (1.5" thick)
06-22-b-02 Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 2 coats bitumen (2" thick)
06-22-b-03 Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 2 coats bitumen (3" thick)
06-23-a-01 Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:4 (0.5" thick)
06-23-a-02 Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:4 (0.75" thick)
06-23-a-03 Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:3 (0.5" thick)
06-23-a-04 Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:3 (0.75" thick)
06-23-a-05 Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:2 (0.5" thick)
06-23-a-06 Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:2 (0.75" thick)
06-23-b-01 Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:4 (0.5" thick)
06-23-b-02 Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:4 (0.75" thick)
06-23-b-03 Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:3 (0.5" thick)
06-23-b-04 Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:3 (0.75" thick)
06-23-b-05 Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:2 (0.5" thick)
06-23-b-06 Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:2 (0.75" thick)
06-24-a-01 V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:4 (0.5" thick)
06-24-a-02 V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:4 (0.75" thick)
06-24-a-03 V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:3 (0.5" thick)
06-24-a-04 V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:3 (0.75" thick)
06-24-a-05 V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:2 (0.5" thick)
06-24-a-06 V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:2 (0.75" thick)
06-24-b-01 V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:4 (0.5" thick)
06-24-b-02 V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:4 (0.75" thick)
06-24-b-03 V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:3 (0.5" thick)
06-24-b-04 V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:3 (0.75" thick)
06-24-b-05 V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:2 (0.5" thick)
06-24-b-06 V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:2 (0.75" thick)
06-25 Grouting concrete between the grooves of gates including shuttering
06-26 Chisel dressing concrete surface on sides of grooves
06-27 Laying and ramming dry ballast or kankar
06-28 Hoisting & placing in position RCC shelves
06-29-a Breaking brick ballast, screening & stacking 2" ring
06-29-b Breaking brick ballast, screening & stacking 1.5" ring
06-29-c Breaking brick ballast, screening & stacking 1" ring
06-29-d Breaking brick ballast, screening & stacking. Jhama ballast 3/4" ring
06-30 Supply & fix broken glasses on court yard walls, including 1:3:6 cement concrete coping
06-31 Crushing stone ballast by machine
06-32-a Breaking stone ballast screened & stacked 2" ring
06-32-b Breaking stone ballast screened & stacked 1.5" ring
06-32-c Breaking stone ballast screened & stacked 1" ring
06-32-d Breaking stone ballast screened & stacked 0.5" ring
06-32-e Breaking stone ballast screened & stacked 1/8" to 1/4" ring
06-33 Screening and stacking stone ballast, shingle or bajri etc
06-34 Washing ballast, bajri or shingle
06-35 Erecting and carting sun shades of precast RCC (upto 5"x 2.5")
06-36-a PCC 1:3:6 in mass concrete less formwork using 50% boulders
06-36-b PCC 1:3:6 in mass concrete less formwork using 40% boulders
06-36-c PCC 1:3:6 in mass concrete less formwork using 30% boulders
06-37-a PCC 1:4:8 in mass concrete less formwork using 50% boulders
06-37-b PCC 1:4:8 in mass concrete less formwork using 40% boulders
06-37-c PCC 1:4:8 in mass concrete less formwork using 30% boulders
06-38-a Errecting & removing formwork to concrete in any shape / position (Horizontal)
06-38-b Errecting & removing formwork to concrete in any shape / position (Vertical)
06-39-a Errection and removal of steel Form work for RCC or Plain Concrete horizontal
06-39-b Errection and removal of steel Form work for RCC or Plain Concrete vertical
06-40-a Class A1 concrete in reinforcement/non reinforcement concrete structure with minimum cylinder compressive strength 3000 psi on 28 day
06-40-b Class A2 cement concrete for concrete place under water with minimum cylinder compressive strength 3500 psi on 28 days with consist
06-40-c Class A3 cement concrete for concrete in pile with minimum cylinder compressive strenght 4000 psi on 28 days other than concrete in w
06-40-d Class B concrete for concrete in pile specified works only with minimum cylinder compressive strenght 2418 psi on 28 days and consist
06-40-e Class C concrete for concrete for cribbing or otherwise specified in special provision with minimum cylinder compressive strength 300
06-40-f Class D1 concrete for concrete in pre-stressed & post tensioned with minimum cylinder compressive strength 4978.12 psi on 28 days a
06-40-g Class D2 concrete for concrete in pre-stressed & post tensioned with minimum cylinder compressive strength 6045 psi on 28 days and
06-40-h Class D3 concrete for concrete in pre-stressed & post tensioned with minimum cylinder compressive strength 7112 psi on 28 days and
06-40-i Class Y concrete for concrete use as filler in steel grid, Bridge floor, in then reinforced section etc with minimum cylinder compressiv
06-40-j Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
07-01-a Pacca brickwork in mud mortar in buildings in foundation and plinth
07-01-b Pacca brickwork in mud mortar in buildings in ground floor
07-02-a Add extra labour on Item 07-01 for brickwork in First floor
07-02-b Add extra labour on Item 07-01 for brickwork in Second floor
07-02-c Add extra labour on Item 07-01 for brickwork in Third floor
07-02-d Add extra labour on Item 07-01 for brickwork in Fourth & subsequent floors.
07-03-a Pacca brick work in mud mortar other than building Upto 20 ft. height
07-03-b Pacca brick work in mud mortar other than building Extra labour for each 5 ft. addl. height or part
07-04-a-01 Pacca brick work in foundation and plinth in Cement, sand mortar 1:2
07-04-a-02 Pacca brick work in foundation and plinth in Cement, sand mortar 1:3
07-04-a-03 Pacca brick work in foundation and plinth in Cement, sand mortar 1:4
07-04-a-04 Pacca brick work in foundation and plinth in Cement, sand mortar 1:5
07-04-a-05 Pacca brick work in foundation and plinth in Cement, sand mortar 1:6
07-04-a-06 Pacca brick work in foundation and plinth in Cement, sand mortar 1:7
07-04-a-07 Pacca brick work in foundation and plinth in Cement, sand mortar 1:8
07-04-b-01 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:6
07-04-b-02 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:7
07-04-b-03 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:8
07-04-b-04 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:9
07-04-b-05 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:10
07-04-c Pacca brick work in foundation and plinth in Lime, sand mortar 1:2
07-04-c-01 Pacca brick work in foundation and plinth in lime, sand, surkhi 1:1:1
07-04-c-02 Pacca brick work in foundation and plinth in lime, coarse cinder.
07-04-c-03 Pacca brick work in foundation and plinth in lime, surkhi mortar 2:3
07-04-c-04 Pacca brick work in foundation and plinth in lime, surkhi mortar 1:2
07-04-c-05 Pacca brick work in foundation and plinth in lime, surkhi mortar 1:3
07-05-a-01 Pacca brick work in ground floor Cement, sand mortar 1:2
07-05-a-02 Pacca brick work in ground floor Cement, sand mortar 1:3
07-05-a-03 Pacca brick work in ground floor Cement, sand mortar 1:4
07-05-a-04 Pacca brick work in ground floor Cement, sand mortar 1:5
07-05-a-05 Pacca brick work in ground floor Cement, sand mortar 1:6
07-05-a-06 Pacca brick work in ground floor Cement, sand mortar 1:7
07-05-a-07 Pacca brick work in ground floor Cement, sand mortar 1:8
07-05-b-01 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:6
07-05-b-02 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:7
07-05-b-03 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:8
07-05-b-04 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:9
07-05-b-05 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:10
07-05-c Pacca brick work in ground floor Lime, sand mortar 1:2
07-05-c-01 Pacca brick work in foundation and plinth in lime, sand, surkhi 1:1:1.
07-05-c-02 Pacca brick work in Ground floor lime, coarse cinder.
07-05-c-03 Pacca brick work in Ground floor lime, surkhi mortar 2:3
07-05-c-04 Pacca brick work in Ground floor lime, surkhi mortar 1:2
07-05-c-05 Pacca brick work in Ground floor lime, surkhi mortar 1:3
07-06-a Add extra labour on item No.07-05 for brick work in First floor
07-06-b Add extra labour on item No.07-05 for brick work in in Second floor
07-06-c Add extra labour on item No.07-05 for brick work in Third floor
07-06-d Add extra labour on item No.07-05 for brick work in in Fourth & subsequent floors.
07-07-a-01 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:2
07-07-a-02 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:3
07-07-a-03 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:4
07-07-a-04 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:5
07-07-a-05 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:6
07-07-a-06 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:7
07-07-a-07 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:8
07-07-b-01 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:6
07-07-b-02 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:7
07-07-b-03 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:8
07-07-b-04 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:9
07-07-b-05 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:10
07-07-c Pacca brick work other than building upto 10 ft. height : Lime, sand mortar 1:2
07-07-c-01 Pacca brick work in other than building upto 10 ft height in lime, sand, surkhi 1:1:1
07-07-c-02 Pacca brick work in other than building upto 10 ft height in lime, coarse cinder 1:1
07-07-c-03 Pacca brick work in other than building upto 10 ft height in lime, surkhi mortar 2:3
07-07-c-04 Pacca brick work in other than building upto 10 ft height in lime, surkhi mortar 1:2
07-07-c-05 Pacca brick work in other than building upto 10 ft height in lime, surkhi mortar 1:3
07-08 Add extra labour on item No. 07-07 for every 10 ft. additional height, or part thereof
07-09 Extra labour for arch work in brick masonry, including labour for centring and decentring
07-10 Extra for pacca brick work in steining of wells or any other circular masonry.
07-11 Extra labour for profile & flared walls
07-12-a Extra labour for pacca brick work in pier/abutment From 10 ft.to 20 ft. height.
07-12-b Extra labour for pacca brick work in pier/abutment Exceeding 20 ft height.
07-13 Extra for face work (half brick thick) using special bricks instead of first class bricks.
07-14 Reinforced brick work in lintel of openings, laid in 1:3 cement mortar complete
07-15-a Extra for dressing or chamfering bricks for Special architectural bricks
07-15-b Extra for dressing or chamfering bricks for all other purposes.
07-16-a Perf. pacca brick wall 1/2 brick thick in ground floor : Mud mortar
07-16-b-01 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:2
07-16-b-02 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:3
07-16-b-03 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:4
07-16-b-04 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:5
07-16-b-05 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:6
07-16-b-06 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:7
07-16-b-07 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:8
07-16-c-01 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:6
07-16-c-02 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:7
07-16-c-03 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:8
07-16-c-04 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:9
07-16-c-05 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:10
07-16-d Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, sand mortar 1:2
07-17-a Add extra labour on item No. 07-16 for pacca brick work in First floor
07-17-b Add extra labour on item No. 07-16 for pacca brick work in Second floor
07-17-c Add extra labour on item No. 07-16 for pacca brick work in Third floor
07-17-d Add extra labour on item No. 07-16 for pacca brick work in Fourth & subsequent floors.
07-18-a Perf. pacca brick wall 1 brick thick in ground floor : Mud mortar
07-18-b-01 Perf. pacca brick wall 1 brick thick in ground floor :Cement, sand mortar 1:2
07-18-b-02 Perf. pacca brick wall 1 brick thick in ground floor :Cement, sand mortar 1:3
07-18-b-03 Perf. pacca brick wall 1 brick thick in ground floor :Cement, sand mortar 1:4
07-18-b-04 Perf. pacca brick wall 1 brick thick in ground floor :Cement, sand mortar 1:5
07-18-b-05 Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:6
07-18-b-06 Perf. pacca brick wall 1 brick thick in ground floor :Cement, sand mortar 1:7
07-18-b-07 Perf. pacca brick wall 1 brick thick in ground floor :Cement, sand mortar 1:8
07-18-c-01 Perf. pacca brick wall 1 brick thick in ground floor : Lime,cement, sand mortar 1:1:6
07-18-c-02 Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:7
07-18-c-03 Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:8
07-18-c-04 Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:9
07-18-c-05 Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:10
07-18-d Perf. pacca brick wall 1 brick thick in ground floor : Lime, sand mortar 1:2
07-19-a Add extra labour on item No. 07-18 for perf. pacca brick work in First floor
07-19-b Add extra labour on item No. 07-18 for perf. pacca brick work in Second floor
07-19-c Add extra labour on item No. 07-18 for perf. pacca brick work in Third floor
07-19-d Add extra labour on item No. 07-18 for perf. pacca brck work in Fourth & subsequent floors
07-20-a Fire brick masonry in fire-clay mortar Upto 20 ft. height including all charges
07-20-b Fire brick masonry in fire-clay mortar. Extra for every 5 ft. additional height, or part thereof
07-21-a 1st class brick wall laid in 1:3 c/s mortar reinfd 4.5" thick wall with hoop iron bonding 6" apart
07-21-b 1st class brick wall laid in 1:3 c/s mortar reinfd 4.5" thick wall with hoop iron bonding 12" apart
07-21-c 1st class brick wall laid in 1:3 c/s mortar reinfd 3" thick wall with hoop iron bonding 6" apart
07-21-d 1st class brick wall laid in 1:3 c/s mortar reinfd 3" thick wall with hoop iron banding 12" apart
07-22 Ghilafi work (1.5 brick thick wall)
07-23 Dry brick pitching
07-24 Sun dried bricks in mud mortar
07-25 Pise wall (mud walling)
07-26-a Eave brick moulded in 1:3 c/s mortar 3" thick drip course cornice
07-26-b Eave brick moulded in 1:3 c/s mortar 4.5" thick drip course cornice
07-26-c Eave brick moulded in 1:3 c/s mortar 4.5" thick eave brick with back brick
07-27-a Laying dressed or moulded brick cornices in c/s mortar,plaster or paint (1 brick)
07-27-b Laying dressed or moulded brick cornices c/s mortar, plaster or paint (2 brick)
07-27-c Laying dressed or moulded brick cornices c/s mortar, plaster or paint (3 brick)
07-27-d Laying dressed or moulded brick cornices c/s mortar, plaster or paint (4 brick)
07-28 Cleaning bricks dismantled from kacha pacca masonry
07-29 Scraping bricks dismantled from pacca masonry
07-30 Supplying and filling sand under floor or plugging in wells
07-31 Provide & lay 2" thick & 15" projected tile band, laid in 1:2 c/s mortar
07-32-a First class brick tiles clad by laying tiles in stretcher course, in cement sand mortar 1:3
07-32-b First class brick tiles clad by laying tiles in stretcher course, in cement sand mortar 1:4
07-33 Chamfering sides of head regulators and masonry walls to increase width
07-34 Replacing kallar eaten bricks
07-35 Repairing corners of bridges & other hydraulic masonry works
07-36 Extra labour for drains of bath rooms etc
07-37 Maroo corners
07-38-a Masonry with Facing/Machine/Special Bricks in cement sand mortar 1:2 upto 10 ft. height
07-38-b Masonry using Facing/Machine/Special bricks in cement sand mortar 1:3 upto 10 ft. height
07-38-c Masonry using Facing/Machine/Special bricks in cement sand mortar 1:4 upto 10 ft. height
07-39 Add extra labour on Item 07-38 for every 10 ft additional height or part thereof
07-40 Masonry with Machine/Special Bricks in 1:3 c/s mortar in circular core wall of Overhead Reservoir
07-41-a Hollow Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5"
07-41-b Hollow Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5"
07-41-c Hollow Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5"
07-41-d Hollow Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5"
07-41-e Hollow Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5"
07-41-f Hollow Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5
07-41-g Hollow Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5"
07-42-a Hollow Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5
07-42-b Hollow Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5"
07-42-c Hollow Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5"
07-42-d Hollow Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5"
07-42-e Hollow Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5"
07-42-f Hollow Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5"
07-42-g Hollow Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5"
07-43-a Hollow Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25
07-43-b Hollow Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.2
07-43-c Hollow Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25
07-43-d Hollow Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25
07-43-e Hollow Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25
07-43-f Hollow Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25
07-43-g Hollow Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25
07-44-a Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with streng
07-44-b Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with streng
07-44-c Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with streng
07-44-d Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with streng
07-44-e Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with streng
07-44-f Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with streng
07-44-g Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with streng
07-45-a Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with streng
07-45-b Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with streng
07-45-c Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with streng
07-45-d Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with streng
07-45-e Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with streng
07-45-f Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with streng
07-45-g Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with streng
07-46-a Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with streng
07-46-b Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with streng
07-46-c Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with streng
07-46-d Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with streng
07-46-e Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with streng
07-46-f Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with streng
07-46-g Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with streng
08-01-a Random rubble masonry in foundn. & plinth Dry masonry.
08-01-b Random rubble masonry in foundn. & plinth in mud mortar
08-01-c-01 Random rubble masonry (Un coursed) in foundn. & plinth in lime, sand mortar 1:2
08-01-c-02 Random rubble masonry (Un coursed) in foundn. & plinth in lime, sand mortar, Surkhi Ratio 1:1:1
08-01-c-03 Random rubble masonry (Un coursed) in foundn. & plinth in lime, Surkhi Ratio 1:2
08-01-d-01 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:3
08-01-d-02 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:4
08-01-d-03 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:6
08-01-d-04 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:8
08-02-a Coursed rubble masonry in foundn. & plinth dry masonry.
08-02-b Coursed rubble masonry in foundn. & plinth in mud mortar
08-02-c-01 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in lime, sand mortar 1:2
08-02-c-02 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in lime, sand mortar, Surkhi Ratio 1:1:1
08-02-c-03 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in lime, Surkhi Ratio 1:2
08-02-d-01 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand mortar : Ratio 1:3
08-02-d-02 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand mortar : Ratio 1:4
08-02-d-03 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand mortar : Ratio 1:6
08-02-d-04 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand mortar : Ratio 1:8
08-03-a Random rubble masonry in ground floor Dry masonry.
08-03-b Random rubble masonry in ground floor in mud mortar
08-03-c-01 Random rubble masonry in ground floor in lime, sand mortar 1:2
08-03-c-02 Random rubble masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1
08-03-c-03 Random rubble masonry in ground floor in lime, Surkhi Ratio 1:2
08-03-d-01 Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:3
08-03-d-02 Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:4
08-03-d-03 Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:6
08-03-d-04 Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:8
08-04-a Coursed rubble masonry in ground floor Dry masonry.
08-04-b Coursed rubble masonry in ground floor in mud mortar
08-04-c-01 Coursed rubble masonry in ground floor in lime, sand mortar 1:2
08-04-c-02 Coursed rubble masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1
08-04-c-03 Coursed rubble masonry in ground floor in lime, Surkhi Ratio 1:2
08-04-d-01 Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:3
08-04-d-02 Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:4
08-04-d-03 Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:6
08-04-d-04 Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:8
08-05-a-01 Ashlar block masonry in ground floor in lime, sand mortar 1:2
08-05-a-02 Ashlar block masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1
08-05-a-03 Ashlar block masonry in ground floor in lime, Surkhi Ratio 1:2
08-05-b-01 Ashlar block masonry in ground floor in cement,sand mortar : Ratio 1:3
08-05-b-02 Ashlar block masonry in ground floor in cement,sand mortar : Ratio 1:4
08-05-b-03 Ashlar block masonry in ground floor in cement,sand mortar : Ratio 1:6
08-06-a-01 Ashlar fine masonry in ground floor in lime, sand mortar 1:2
08-06-a-02 Ashlar fine masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1
08-06-a-03 Ashlar fine masonry in ground floor in lime, Surkhi Ratio 1:2
08-06-b-01 Ashlar fine masonry in ground floor in cement,sand mortar : Ratio 1:3
08-06-b-02 Ashlar fine masonry in ground floor in cement,sand mortar : Ratio 1:4
08-06-b-03 Ashlar fine masonry in ground floor in cement,sand mortar : Ratio 1:6
08-07-a Extra labour on items 08-03-a-01 to 08-06-b-03 for work in First floor
08-07-b Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Second floor
08-07-c Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Third floor
08-07-d Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Fourth & subsequent floors
08-08 Extra labour on items 08-03-a-01 to 08-06-b-03 for every 5' additional height, other than building
08-09 Extra labour for arch work in stone masonry including centring & decentring etc.
08-10-a Extra labour for coping & caps etc
08-10-b Extra labour for cornice & string course
08-11-a Dressing stones : Hammer dressed
08-11-b Dressing stones : Rough tooled dressed
08-11-c Dressing stones : Chisel dressed
08-11-d Dressing stones : Fine dressed
08-12 Dhajji walling 5"x5" thick deodar framing with stone laid in 1:6 c/s mortar & 1:4 c/s plaster
08-13 Provide & fix stone blocks from 2 cft. to 6 cft. each, including lift upto 20 ft.
08-14 Providing and fixing stone blocks, under 2 cft. each, including lift upto 20 ft.
08-15 Provide & lay stone/boulder dry hand packed as filling behind retaining walls or in pitching
09-01 First class tile roofing including earth, mud plaster, gobri leeping, cement plaster etc complete.
09-02 Second class tile roofing consisting of 4" earth and 1" mud plaster with gobri leeping etc.
Second class tile roofing consisting of 4" earth and 1" mud plaster with gobri leeping etc.
09-03 Covering mud roof with coal tar and fine sand.
09-04-a Filling spaces in between wooden battens over beams, filled with deodar wood pieces
09-04-b Filling spaces in between RCC battens, filled with PCC block 1:3:6
09-04-c Filling spaces in between spacers filled with bricks
09-05 Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1" mud plaster on top of RCC roof slab.
Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1" mud plaster on top of RCC roof slab.
09-06-a Jack arch roof 4.5" thick laid in 1:5 c/s mortar a) cement concrete in haunches 1:6:12
09-06-b Jack arch roof 4.5" thick laid in 1:5 c/s mortar b) cement concrete in haunches 1:3:6
09-07-a Jack arch roofing 4.5"thick laid in 1:5 c/s mortar complete Cement concrete in haunches 1:6:12.
09-07-b Jack arch roofing 4.5"thick laid in 1:5 cement mortar,
09-08 including complete. Cement concrete in haunches 1:3:6 Extra for vaulted jack arch roofing
09-09 Jack arch roofing of shingle & cement concrete 1:3:6, 4.5"
09-10-a at crown & 1/2" cem. plaster complete Earth filling over roof including watering, ramming etc 3" thick earth filling and 1" mud plaster
09-10-b Earth filling over roof including watering, ramming etc 4"
09-11 thick earth filling and 1" mud plaster 1/8" thick gobri leeping on roofs or floors
09-12 2 coats of bitumen laid hot using 34 lbs. for %sft over roof
09-13-a & blinded with sand at 1 cft per % sft Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 20 BWG
09-13-b Supply & fix corrugated GI sheet with GI bolts, nuts,
09-13-c limpet etc. complete : 22 BWG Supply & fix corrugated GI sheet with GI bolts, nuts,
09-14 limpet etc. complete : 24 BWG Khassi parnalas in c/s mortar 1:2, 12" outside width
09-15 finished smooth with a floating coat Khuras on roof 2'x2'x6"
09-16 Bottom khuras of brick masonry in c/s mortar 1:6,4'x2'x4.5" over 3" cem. concrete 1:4:8
09-17-a Plain GI sheets 22 SWG rain water down pipe a) 4" diameter down pipe
09-17-b Plain GI sheets 22 SWG rain water down pipe b) 5" diameter down pipe
09-18 Plain galvanized iron sheet flashing, 22 guage
09-19-a Cast iron rain water down pipe fixed in position excluding heads & shoes : 4" dia
09-19-b Cast iron rain water down pipe fixed in position excluding heads & shoes : 3" dia
09-20 Heads for cast iron rain water down pipe fixed in place including cost of clamp holdfast and painting
09-21 Shoes, bends or offsets for cast iron ran water down pipe, including fixing & painting
09-22 Plain GI sheet spouts fixed in position, including paint
09-23 Laying 1/2" thick deodar ceiling complete, including sawing, planing & fixing
09-24-a Flat sheet roof with GI plain sheets, including batten rolls, screws, clips etc : 22 BWG
09-24-b Flat sheet roof with GI plain sheets, including batten rolls, screws, clips etc : 24 BWG
09-25 Asbestos cement corrugated sheet roofing including overlaps, GI hooks, bolts, nuts etc
09-26 Extra labour for erection of GI sheets, flat sheet or asbestos sheet roofing above 20' height
09-27 Fixing asbestos cement sheet ridges and valleys 1/4" thick
09-28-a Plain GI sheet ridging including fixture complete 6" lap & 18" overall of 22 gauge GI sheet ridging
09-28-b Plain GI sheet ridging including fixture complete 9" lap & 24" overall, of 24 gauge GI sheet ridging
09-28-c Plain GI sheet ridging including fixture complete 12" lap & 30 overall, of 22 gauge GI sheet ridging
09-29 Plain 22 gauge GI sheet gutter semi circular 8" diameter
09-30 Fixing water spouse or parnala.
09-31 Making masonry ventilators in c/s mortar 1:4
09-32 Making drip course 2"x1/2" under RCC slab edges in outer opening, in c/s mortar 1:2
09-33 Supply and laying of twin GI sheet 20 SWG painted with bitumen & polythene fim complete
09-34-a Provide & lay roof insulation complete with Thermopore sheet 1/2" thick
09-34-b Provide & lay roof insulation complete with Thermopore sheet 3/4" thick
09-34-c Provide & lay roof insulation complete with Thermopore sheet 1" thick
09-35 Providing and fixing AC rain water down pipe 4" dia, with shoe, tee, bend & clamp etc
09-36-a Making jharries in existing brick masonry For slabs upto 6" thick
09-36-b Making jharries in existing brick masonry For slabs exceeding 6" to 12" thick
09-37-a Making recess in existing brick masonry a) upto 1.0' height of girder or beam
09-37-b Making recess in existing brick masonry b) for every 6" additional height or part thereof
09-38 Hoisting RS Beams & wooden beams and placing in position
09-39 Hoisting and placing in position sahl ballies, over roof
09-40-a Hoist precast RCC/pre-stressed conc. battens a) From 5' to 6' long
09-40-b Hoist precast RCC/pre-stressed conc. battens b) Over 6' to 7' long
09-40-c Hoist precast RCC/pre-stressed conc. battens c) Over 7' to 8' long
09-40-d Hoist precast RCC/pre-stressed conc. battens d) Over 8' to 9' long
09-40-e Hoist precast RCC/pre-stressed conc. battens e) Exceeding 9' length
09-41-a Hoisting and placing in position RCC troughs Upto 10' in length
09-41-b Hoisting and placing in position RCC troughs Upto 11' in length
09-41-c Hoisting and placing in position RCC troughs Upto 12' in length
09-41-d Hoisting and placing in position RCC troughs Upto 13' in length
09-41-e Hoisting and placing in position RCC troughs Upto 14' in length
09-41-f Hoisting and placing in position RCC troughs Upto 15' in length
09-41-g Hoisting and placing in position RCC troughs Upto 16' in length
09-41-h Hoisting and placing in position RCC troughs Upto 17' in length
09-41-i Hoisting and placing in position RCC troughs Upto 18' in length
09-41-j Hoisting and placing in position RCC troughs Upto 19' in length
09-41-k Hoisting and placing in position RCC troughs Upto 20' in length
09-42-a Hoist & place in position RCC inverted battens Upto 10' span
09-42-b Hoist & place in position RCC inverted battens Upto 12' span
09-42-c Hoist & place in position RCC inverted battens Upto 13' span
09-42-d Hoist & place in position RCC inverted battens Upto 14' span
09-42-e Hoist & place in position RCC inverted battens Upto 15' span
09-42-f Hoist & place in position RCC inverted battens Upto 16' span
09-42-g Hoist & place in position RCC inverted battens Upto 18' span
09-42-h Hoist & place in position RCC inverted battens Upto 20' span
09-43 RCC spout including fixing in position, with top and bottom khuras
09-44 P/F Burnt Brick Tile Roofing over Tee Iron and Steel Girder, in 1:6 c/s mortar (12' max span)
09-45 Providing and Laying Prestressed Roof of Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh, polythene, mud, tar
10-01 Laying murum flooring complete as per specs
10-02 Earth flooring 6" thick consolidated layer of moistened earth, including ramming
10-03-a Provide, lay, water & ram clean coarse sand under floor / brick paving, complete
10-03-b Provide, lay, water & ram brick ballast 1.5" to 2" guage mixed with 25% sand for floor foundations
10-04 Mud floor of 6" thick consolidated layer of moist earth & finished off with 1" mud plaster
10-05 Dry brick paving laid flat,sand grouted, including prep. Of bed, by 1/2" thick mud plaster
10-06 Dry brick on edge paving, sand grouted, including prep. Of bed, by 1/2" thick mud plaster
10-07 Grouting 4.5" dry brick work with cement sand mortar 1:5
10-08 Flat brick flooring laid in 1:6 c/s mortar over a bed of 3/4" thick cement mortar 1:6
10-09 Brick on edge flooring, laid in 1:6 c/s mortar, over a bed of 3/4" thick cement mortar 1:6
10-10 Brick tiles (12"x6"x2") laid in 1:6 c/s mortar, over a bed of 3/4" thick c/s mortar 1:6
10-11 Brick tiles (9"x4.5"x1.5") laid flat in 1:3 c/s mortar over a bed of 3/4" thick cement mortar 1:6
10-12 Cement tiles (8"x8"x3/4") laid flat in 1:2 c/s mortar, over 3/4" thick bed of c/s mortar 1:2
10-13-a Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of c/s mortar 1:2 : 12" x 12" x 1"
10-13-b Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of c/s mortar 1:2 : 9" x 9" x 3/4"
10-13-c Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of c/s mortar 1:2 : 6" x 6" x 3/4"
10-14 Coloured cement tile (8"x8"x3/4") of dark shade laid flat in 1:2 c/s mortar over 3/4" mortar bed
10-15-a Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 1" thick.
10-15-b Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 1.5" thick
10-15-c Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 1.5" thick
10-15-d Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 1.75" thick
10-15-e Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 2" thick
10-15-f Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 2.25" thick
10-15-g Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 2.5" thick
10-15-h Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 2.75" thick
10-15-i Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 3" thick
10-16-a Provide & laying conglomerate floor (two coat work) with top layer of 1/2" thick wearing surface of one part of cement 2 parts of stone chi
10-16-b Provide & laying conglomerate floor (two coat work) with top layer of 1/2" thick wearing surface of one part of cement 2 parts of stone chi
10-16-c Provide & laying conglomerate floor (two coat work) with top layer of 1/2" thick wearing surface of one part of cement 2 parts of stone chi
10-17 Add extra in cement concrete floor topping if finished with pigment and polishing
10-18 Extra labour for each storey above ground for mosaic, conglomerate, tiles, stone & wood floor.
10-19-a Flag stone flooring in lime mortar 1:2, over 3/4" bedding : 2" thick
10-19-b Flag stone flooring in lime mortar 1:2, over 3/4" bedding : 3" thick
10-20-a Asphalt floor, including base preparation, remelting, setting out & finish : 1" thick topping
10-20-b Asphalt floor, including base preparation, remelting, setting out & finish : 1/2" thick topping
10-20-c Asphalt floor, including base preparation, remelting, setting out & finish : 1/4" thick topping
10-21-a 1.375" thick mosaic flooring, including rubbing and polishing complete : Using grey cement
10-21-b 1.375" thick mosaic flooring, including rubbing and polishing complete : Using white cement
10-22-a 1.5" thick mosaic flooring, including rubbing & polishing complete : Using grey cement
10-22-b 1.5" thick mosaic flooring, including rubbing & polishing complete : Using white cement
10-23 Laying floor of mosaic marble chips tiles of approved shade including finishing complete
10-24 Lay floor of white glazed tile 1/4" thick in white cement 1:2 over 3/4" thick cement mortar 1:2
10-25 Lay floor of approved coloured glazed tiles 1/4" thick laid in white cement & pigment complete
10-26-a Provide & lay marble fine dressed stone flooring on surface in white cement complete: 3/4" thick (Badel, Silky black, Sunny white, Sunny
10-26-b Provide & lay marble fine dressed stone flooring on surface in white cement complete: 1" thick (Badel, Silky black, Sunny white, Sunny G
10-26-c Provide & lay marble fine dressed stone flooring on surface in white cement complete: 1/2" thick (Badel, Silky black, Sunny white, Sunny
10-26-d Providing and Laying marble fine dressed stone 4-5 feet and 12" wide 1" thick for stairs steps.
10-26-e Providing and Laying marble fine dressed stone 7x1.5 feet and 1" thick for stairs steps.
10-26-f Providing and fixing glazed tile colour printed border 2" wide.
10-26-g Providing and fixing glazed tile colour printed border 3" wide
10-26-h Providing and fixing glazed tile colour printed border 4" wide
10-27 Rubbing and polishing old grit/mosaic floor, including repairing voids, uneven surface, complete.
10-28 Rubbing & polishing grit floor, including repairing voids,uneen surface, complete.
10-29 Cleaning and washing mosaic or marble floor with caustic soda mixture
10-30 Shisham wood boarding or strip flooring 3/4" thick including 2 coats of bitumen laid hot complete
10-31 Deodar wood boarding or strip flooring 3/4" thick
including 2 coats of bitumen laid hot complete
10-32 Teak wood boarding or strip flooring 1/2" thick including 2 coats of bitumen laid hot complete
10-33 Shisham wood block flooring 1" thick out to required size, fixed on a layer of bitumen base
10-34 Teak wood block 1" thick cut to required size, fixed on a layer of asphalt bitumen laid on base
10-35-a Laying wooden paving of hard wood on edge in coal tar & asphalt : Shisham wood
10-35-b Laying wooden paving of hard wood on edge in coal tar & asphalt : Kikar wood
10-36-a Tile skirting laid in 1:2 c/s mortar over 3/4" thick cement mortar 1:2 complete : Cement tiles
10-36-b Tile skirting laid in 1:2 c/s mortar over 3/4" thick cement mortar 1:2 complete : Mosaic tiles
10-37-a Provide grey cement skirting 3/8" thick complete 1:2 cement, sand mortar
10-37-b Provide grey cement skirting 3/8" thick complete 1:3 cement, sand mortar
10-37-c Provide grey cement skirting 3/8" thick complete Extra if skirting or dado is finished with pigment
10-38-a Glazed tile 1/4" thick dado jointed in white cement complete : White Plain tiles
10-38-b Glazed tile 1/4" thick dado jointed in white cement complete : Coloured Plain tiles
10-38-c Glazed tile 1/4" thick dado jointed in white cement complete : Printed tiles
10-39 Glazed tile dado 1/4" thick in pigment over 1:2 c/s mortar 3/4" thick including finishing complete
10-40-a-01 Mosaic dado or skirting complete as per specs Using grey cement : 3/8" thick
10-40-a-02 Mosaic dado or skirting complete as per specs Using grey cement : 1/2" thick
10-40-b-01 Mosaic dado or skirting complete as per specs Using white cement : 3/8" thick including grinding and polishing
10-40-b-02 Mosaic dado or skirting complete as per specs Using white cement : 1/2" thick including grinding and polishing
10-41-a Provide & lay marble fine dressed and polished stone dado or skirting in white cement complete : 3/8" thick (Badel, Silky black, Sunny w
10-41-b Provide & lay marble fine dressed and polished stone dado or skirting in white cement complete : 1/2" thick (Badel, Silky black, Sunny w
10-42 Rubber flooring, consisting of 12"x12"x1/8" rubber tiles laid on firm foundation.
10-43-a Provide & fix glass strip 1.5" wide for dividing the floors into panels : 5mm thick
10-43-b Provide & fix glass strip 1.5" wide for dividing the floors into panels : 3mm thick
10-43-c Providing and Fixing marble strip 1.5 inch wide 3/8 inch thick for dividing the floor into panels
10-43-d Providing and Fixing marble strip 2" wide and 3/8" thick for dividing the floor into panels
10-44 P/F Vinyl Tiles or Vinyl Sheet flooring over firm foundation
10-45 P/F Precast Concrete 7000 psi TUFF Tiles over bed of 2" thick sand & 4" thick brick ballast comp
10-46-a P/F Ceramic Floor Tiles (Emco, National or eq) Size : 12" x 12"
10-46-b P/F Ceramic Floor Tiles (Emco, National or eq) Size 20" x 20"
10-47 Burnt brick (1st class) pavement on edge grouted with sand including preparation of bed
10-48-a Porceline tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement mortar 1:2 (Local Master Tiles)
10-48-b Porceline tile floor 1/4" thick laid cement 1:2 over 3/4" thick cement mortar 1:2 (Imported Tiles)
10-48-c Granitto tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement mortar 1:2 (Imported Tiles UAE) 24"x24"
10-48-d Granitto tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement mortar 1:2 (Imported Tiles UAE) 16"x16"
10-49-a Providing and Laying marble fine dressed stone flooring on surface in white cement complete using indian green marble 12"x12"x3/4" thi
10-49-b Providing and Laying marble fine dressed stone flooring on surface in white cement complete using Trevera marble 12"x12"x3/4" thick
10-49-c Providing and Laying marble fine dressed stone flooring on surface in white cement complete using Botocina marble 12"x12"x3/4" thick
10-49-d Providing and Laying marble fine dressed stone flooring on surface in white cement complete using Veroona/Lasbela marble 12"x12"x3/4"
10-50 Chemical polishing of marble floor/Dado
10-51 Replaced coloured glass panes of sizes upto 4 mm thickness with iron, nails and putty including removing broken ones if required in all fl
11-01-a Mud plaster on walls (excluding gobri leeping) upto 20' height : 1/2" thick
11-01-b Mud plaster on walls (excluding gobri leeping) upto 20' height : 1" thick
11-02-a Mud plaster on floor / roof (excluding gobri leeping) upto 20' height : 1/2" thick.
11-02-b Mud plaster on floor / roof (excluding gobri leeping) upto 20' height : 1" thick
11-03-a Cement lime plaster 1:7:12 (c/l/s) upto 20' height 1/4" thick
11-03-b Cement lime plaster 1:7:12 (c/l/s) upto 20' height 1/2" thick
11-04-a Cement Neru plaster 1:2 (c/s) upto 20' height 1/4" thick
11-04-b Cement Neru plaster 1:2 (c/s) upto 20' height 1/2" thick
11-05 2" stucco cement plaster 1:2:4 (c/s/shingle) upto 20' height
11-06-a Provide/lay machine sprayed plaster 1/2" thick using cement & zero guage chips : Ratio 1:1
11-06-b Provide/lay machine sprayed plaster 1/2" thick using cement & zero guage chips : Ratio 1:1.5
11-06-c Provide/lay machine sprayed plaster 1/2" thick using cement & zero guage chips : Ratio 1:2
11-07-a Cement plaster 1:2, upto 20' height 3/8" thick
11-07-b Cement plaster 1:2, upto 20' height 1/2" thick
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick
11-08-a Cement plaster 1:3 upto 20' height 3/8" thick
11-08-b Cement plaster 1:3 upto 20' height 1/2" thick
11-08-c Cement plaster 1:3 upto 20' height 3/4" thick
11-09-a Cement plaster 1:4 upto 20' height 3/8" thick
11-09-b Cement plaster 1:4 upto 20' height 1/2" thick
11-09-c Cement plaster 1:4 upto 20' height 3/4" thick
11-10-a Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:2)
11-10-b Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:3)
11-10-c Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:4)
11-11-a Cement plaster 1:5, upto 20' height 3/8" thick
11-11-b Cement plaster 1:5, upto 20' height 1/2" thick
11-11-c Cement Plaster 1:5, upto 20' height 3/4" thick
11-12-a Cement plaster 1:6, upto 20' height 3/8" thick
11-12-b Cement plaster 1:6, upto 20' height 1/2" thick
11-12-c Cement plaster 1:6, upto 20' height 3/4" thick
11-13 Applying floating coat of cement 1/32" thick
11-14 Lime pointing flush upto 20' height, including racking joints in lime sand mortar 1:2
11-16-a Cement pointing flush, upto 20' height Ratio 1:2
11-16-b Cement pointing flush, upto 20' height Ratio 1:3
11-17-a Cement pointing 1:2 flush, on floor
11-18-a Cement pointing struck joints, on walls, upto 20' height : Ratio 1:2
11-18-b Cement pointing struck joints, on walls, upto 20' height : Ratio 1:3
11-19-a Pointing flush on stone work, upto 20' height in lime sand mortar 1:2 (lime, sand)
11-19-c-01 Pointing flush on stone work, upto 20' height On stone work raised : in lime sand mortar 1:2
11-19-c-02 Pointing flush on stone work, upto 20' height On stone work raised : in c/s mortar 1:3
11-20 Racking and washing joints of stone masonry (old work)
11-22 Priming coat of chalk under distemper
11-23-a-01 Distempering New surface : one coat
11-23-a-02 Distempering New surface : Two coats
11-23-a-03 Distempering New surface : Three coats
11-23-b-01 Distempering Old surface : One coat
11-23-b-02 Distempering Old surface : Two coats
11-24-a-01 Colour washing: New surface : One coat
11-24-a-02 Colour washing: New surface : Two coats
11-24-b-01 Colour washing: Old surface : One coat
11-24-b-02 Colour washing: Old surface : Two coats
11-25-a-01 White washing: New surface : One coat
11-25-a-02 White washing: New surface : Two coats
11-25-a-03 White washing: New surface : Three coats
11-25-b-01 White washing: Old surface : One coat
11-25-b-02 White washing: Old surface : Two coats
11-26-a Gobri leeping: On walls
11-26-b Gobri leeping: Over roofs
11-27 Striking joints of burnt brick in lime or cement mortar
11-28 Extra for lime, mud or cement plaster & pointing from 20' & above for each additional 10' height
11-29 Caulking joints of sleeper wall, with sand and coaltar
11-30 Caulking joints of sleepers, with mud and chopped straw
11-31 Extra cost of labour & material for red oxide pigment in cement pointing to match bricks
11-32-a Provide grooved c/s plaster 1:3 over existing plastered & roughened surface 3/8" thick
11-32-b Provide grooved c/s plaster 1:3 over existing plastered & roughened surface 1/2" thick
11-32-c Providing ornamental plaster 3/4" thick with (1:3) cement sand mortar on walls, columns chajja and slabs finished smooth including all ch
11-32-d Providing ornamental moulding of approved design in column with base/top and nosing and shade of lintle or pediments in cement mortar(1 :
11-33 Provide & fit expanded metal edge bead for corners, with nails on both sides of edges
11-34-a Petty repairs to Fire Place
11-34-b Petty repairs to Verandah
11-34-c Petty repairs to Room upto 100 sft area
11-34-d Petty repairs to Room exceeding 100 sft area
11-35 Extra labour for white washing, priming etc. from 20' height & above for every extra 10' height.
11-36 Providing and fixing of clad stones over 1/2" c/s mortar 1:1 incl curing etc.
11-37 Supply & apply acrylic wall coating 10 to 12mm thick of approved quality over plastered surface.
11-38 P/F Ceramic Exterior Finish Tiles over 1/2" cement sand mortar 1:1 including curing complete.
11-39-a Providing and fixing Chakwal tiles red colour in 1:3 cement mortar complete.
11-39-b Providing and fixing Chakwal tiles white colour in 1:3 cement mortar complete.
12-01-a Plain wood work sawn, wrought, planed & fixed in position, including nails & screws : Deodar wood
12-01-b Plain wood work sawn, wrought, planed & fixed in position, including nails & screws : Shisham wood
12-02-a Plain woodwork for regulation karries or needles etc. complete as per specs : Deodar wood
12-02-b Plain woodwork for regulation karries or needles etc. complete as per specs : Shisham wood
12-03-a 1st class teak wood wrought joinery in doors & windows, panelled or glazed complete : 2" thick
12-03-b 1st class teak wood wrought joinery in doors & windows, panelled or glazed complete : 1.75" thick
12-03-c 1st class teak wood wrought joinery in doors & windows, panelled or glazed complete : 1.5" thick
12-04-a-01 1st class teak wood wrought joinery Teak wood frame 1.75" thick w/o spring/hinge.
12-04-a-02 1st class teak wood wrought joinery Teak wood frame 1.75" thick w/o spring/hinge
12-04-b-01 1st Class Teak Wood Wrought Joinery : Teak Wood framing 1.5" thick w/ wire guaze w/o springs
12-04-b-02 1st Class Teak Wood wrought joinery : Teak Wood framing 1.5" thick w/ wire guaze w/ springs
12-04-c 1st class teak wood wrought joinery GI wire guaze 22 SWG, fixed to chowkat
12-04-d 1st class teak wood wrought joinery GI wire guaze 22 SWG, fixed on teak wood frame
12-05 Provide & fix exp. metal 1/2"-3/4" mesh, 16 guage fixed to chowkat, with 1" teak wood cover strips
12-06 Provide & fix expanded metal 1/2" to 3/4", 16 guage fixed to chowkat with 1" cover moulding
12-07-a First class deodar wood wrought joinery in doors and windows etc. complete : 2" thick
12-07-b First class deodar wood wrought joinery in doors and windows etc. complete : 1-3/4" thick
12-07-c First class deodar wood wrought joinery in doors and windows etc. complete : 1.5" thick
12-08-a Deodar wood framed, braced & battened doors & windows : 2.25" thick, 1.25" battens & 1" planks
12-08-b Deodar wood framed, braced & battened doors & windows : 1.75" thick, 1" battens & 3/4" planks
12-09 1" thick battened doors & windows fitted in position, complete with iron fittings
12-10 Deodar wood battened ledged & braced doors & windows 2.25" thick complete
12-11-a Deodar wood doors framed with braces & 22 SWG GI sheet facing on one side complete
12-11-b Deodar wood doors framed with braces & 22 SWG GI sheet facing on both sides complete
12-12-a Partal wood doors framed with braces & 22 SWG GI sheet facing on one side complete
12-12-b Partal wood doors framed with braces & 22 SWG GI sheet facing on both sides complete
12-13-a-01 First class deodar wood wrought joinery work Deodar wood frame 1-3/4" thick w/o springs
12-13-a-02 First class deodar wood wrought joinery work Deodar wood frame 13/4" thick with springs
12-13-b-01 First class deodar wood wrought joinery work Deodar wood frame 1.5" thick w/o springs
12-13-b-02 First class deodar wood wrought joinery work Deodar wood frame 1" thick with springs
12-13-c First class deodar wood wrought joinery work GI wire guaze fixed to chowkat with 3/4" strip
12-13-d First class deodar wood wrought joinery work GI wire guaze fixed to chowkat with 1/2" strip
12-14 Making and fixing trellis doors & windows of deodar wood complete.
12-15-a Provide & fix MS chowkat of doors, windows etc MS angle iron 1.5"x1.5"x1/4" welded with MS flat
12-15-b Provide & fix MS chowkat of doors, windows etc MS tee iron 1.5"x 1.5"x 1/4" welded with MS flat
12-16 Extra for providing & fixing iron double spring hinges with brass fittings including finger plate etc
12-17-a P/F brass spring hinges to wire gauzed door.
12-17-b P/F hydraulic Door Closer (Best Quality)
12-18-a-01 Providing and fixing sliding bolt to doors Iron sliding bolts : 10" long
12-18-a-02 Providing and fixing sliding bolt to doors Iron sliding bolts : 12" long
12-18-b-01 Providing and fixing sliding bolt to doors CP sliding bolts : 10" long
12-18-b-02 Providing and fixing sliding bolt to doors CP sliding bolts : 12" long
12-18-c-01 Providing and fixing sliding bolt to doors Brass sliding bolts : 10" long
12-18-c-02 Providing and fixing sliding bolt to doors Brass sliding bolts : 12" long
12-19-a Extra for brass fittings to doors & windows Deodar panelled, panelled+glazed or fully glazed
12-19-b Extra for brass fittings to doors & windows Deodar wood wire guazed shutters
12-20-a-01 Extra for providing/fixing approved quality Rim locks : Imported
12-20-a-02 Extra for providing/fixing approved quality Rim locks : Local
12-20-b-01 Extra for providing/fixing approved quality Rim locks : Imported
12-20-b-02 Extra for providing/fixing approved quality Rim locks : Local
12-21-a Provide & fix exp. metal 1/2"-3/4"mesh 16 gauge Fixed to chowkat with 1" deodar wood strip etc
12-21-b Provide & fix exp. metal 1/2"-3/4"mesh 16 gauge Fixed with 1" cover mould & screws including frame
12-22-a Provide & fix deodar wood almirah 9"-12" depth including boxing with back, shelves, shutters etc
12-22-b Provide & fix deodar wood almirah 9"-12" depth With shelves, shutters etc w/o boxing & back
12-23-a Provide & fix wooden box type wardrobe 22" deep Partal wood boxing & deodar wood shelves etc
12-23-b Provide & fix wooden box type wardrobe 22" deep Deodar wood boxing & deodar shelves etc
12-24-a Provide & fix chowkat for doors, windows & CS windows, including holdfast etc : Teak wood
12-24-b Provide & fix chowkat for doors, windows & CS windows, including holdfast etc : Shisham wood
12-24-c Provide & fix chowkat for doors, windows & CS windows, including holdfast etc : Deodar wood
12-25-a Make & fix deodar planking in eave boards etc planed on both sides complete : 1" thick
12-25-b Make & fix deodar planking in eave boards etc planed on both sides complete : 3/4" thick
12-25-c Make & fix deodar planking in eave boards etc planed on both sides complete : 1/2" thick
12-26-a Make & fix deodar wood shelves, incl brackets 1" thick
12-26-b Make & fix deodar wood shelves, incl brackets 1.5" thick
12-26-c Make & fix deodar wood shelves, incl brackets 2" thick
12-27-a Make & fix cleats for doors & windows including hinges and screws.
12-27-b Make & fix cleats with brass hooks for roof ventilators
12-27-c Make & fix Door stops of 1.5" dia rubber block
12-27-d Make & fix GI hook with clamps for doors
12-28-a Teak wood railing of any shape & design including bends, corners, polishing etc complete
12-28-b Shisham wood railing of any shape & design including bends, corners, polishing etc complete
12-29 Deodar wood dado or picture rail 3"x1.5" as per approved design, including moulding etc. complete
12-30-a Sawing wood by hand : Soft wood (deodar, kail or chir)
12-30-b Sawing wood by hand : Hard wood (shisham, kikar, teak or sahl)
12-31-a Sawing wood by machine : Soft Wood
12-31-b Sawing wood by machine : Hard Wood
12-32 Making and fixing sun-shade of deodar wood including fixing brackets
12-33 Making and fixing 1" thick kail or chir wooden notice board with frame
12-34 Making deodar punkha pole 10'x6"x6"
12-35 Dismantling and refixing eave boards
12-36 Wooden stair-cases complete 2'-3' wide frame 1.5" thick planks of deodar wood including hand rails
12-37-a-01 Providing and fixing partition including framework : Sheet on one side of frame : Hard board
12-37-a-02 Providing and fixing partition including framework : Sheet on one side of frame : Ply wood 1/4" thick
12-37-a-03 Providing and fixing partition including framework : Sheet on one side of frame : Masonite
12-37-b-01 Providing and fixing partition including framework : Sheets on both sides of frame : Hard board
12-37-b-02 Providing and fixing partition including framework : Sheets on both sides of frame : Ply wood 1/4"
12-37-b-03 Providing and fixing partition including framework : Sheets on both sides of frame : Masonite
12-38-a Providing and fixing ceiling, including frame work : Hard board
12-38-b Providing and fixing ceiling, including frame work : Chip Board
12-38-c Providing and fixing ceiling, including frame work : Ply wood 1/4" thick
12-38-d Providing and fixing ceiling, including frame work : Masonite
12-39-a-01 Provide & fix, thermorpore false ceiling complete Deodar wood frame panelling : 3/4" thick
12-39-a-02 Provide & fix, thermorpore false ceiling complete Deodar wood frame panelling : 1" thick
12-39-b-01 Provide & fix, thermorpore false ceiling complete Partal wood frame panelling : 3/4" thick
12-39-b-02 Provide & fix, thermorpore false ceiling complete Partal wood frame panelling : 1" thick
12-40 Supply and Fixing accoustic miller fibre tile ceiling fixed with aluminium tee hung by GI wire fixed in roof
12-41-a Fixing Door including chowkats
12-41-b Fixing Windows including chowkats
12-42-a Glazing with panes (16-18 oz) including cost of putty
12-42-b Glazing with panes (16-18 oz) using deodar wooden fillets & putty
12-42-c Glazing with panes (24-26 oz) using putty & deodar wooden fillets
12-43-a Cutting to required size & fixing glass panes with putty.
12-43-b Cutting to required size & fixing glass panes Using deodar wood fillets & putty
12-44-a Glazing with plate glass 6 mm thick including cost of deodar wood fillet & putty : Upto 0.75 m2
12-44-b Glazing with plate glass 6 mm thick including cost of deodar wood fillet & putty : 0.75m2 to 2.25 m2
12-45-a 1.5" thick deodar doors & windows, chowkat of MS angle iron 1.5"x1.5"x1/4" welded with MS flat
12-45-b 1.5" thick deodar doors & windows, chowkat of MS tee iron 1.5"x 1.5"x 1/4" welded with MS flat
12-46-a 1.5" thick hollow flush door/window, chowkat of MS angle iron 1.5"x1.5"x1/4" welded with MS flat
12-46-b 1.5" thick hollow flush door/window, chowkat of MS tee iron 1.5"x 1.5"x 1/4" welded with MS flat
12-47 Panelled door of MS sheet with forged door leaves of MS sheet 22 SWG etc complete
12-48 24 SWG aluminium kick plate 4" high, on bottom rail of flush doors of commercial ply
12-49 Curtain railing to doors & windows comprising TOSO-elite Japanese railing or equiv. including paint
12-50 MS flat 1/2"x1/8" grill in windows of approved design including painting 3 coats, complete
12-51 Provide & fix GI wire gauze 22 SWG, 12x12 mesh per sq. in, fixed to steel window complete
12-52-a Hollow flush door 1.5"-2" thick including iron mongery excluding chowkat & lock : Teak veneered
12-52-b Hollow flush door 1.5"-2" thick including iron mongery excluding chowkat & lock : Shisham veneered
12-52-c Hollow flush door 1.5"-2" thick including iron mongery excluding chowkat & lock : Deodar veneered
12-52-d Hollow flush door 1.5"-2" thick including iron mongery excluding chowkat & lock : Commercial eneered
12-53-a-01 Supply and Fixing aluminium door/window, Economy model Sliding window
12-53-a-02 Supply and Fixing aluminium door/window, Economy model Hinges window
12-53-a-03 Supply and Fixing aluminium door/window, Economy model Fixed louver in door frame
12-53-a-04 Supply and Fixing aluminium door/window, Economy model Fixed louver in 2" frame
12-53-b-01 Supply and Fixing aluminium door/window, Deluxe 3" sect. Sliding window
12-53-b-02 Supply and Fixing aluminium door/window, Deluxe 3" sect. Hinges window
12-53-b-03 Supply and Fixing aluminium door/window, Deluxe 3" sect. Fixed glazing
12-53-b-04 Supply and Fixing aluminium door/window, Deluxe 3" sect. Fixed arch
12-53-b-05 Supply and Fixing aluminium door/window, Deluxe 3" sect. Fixed louvers
12-53-b-06 Supply and Fixing aluminium door/window, Deluxe 3" sect. Sliding door
12-53-b-07 Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door single action (short handle)
12-53-b-08 Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door single action (long handle)
12-53-b-09 Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door double action (short handle)
12-53-b-10 Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door double action (short handle)
12-53-c-01 Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Sliding window
12-53-c-02 Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Hinges window
12-53-c-03 Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Fixed glazing
12-53-c-04 Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Fixed arch
12-53-c-05 Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Sliding door
12-53-c-06 Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Swing door single action (short handle)
12-53-c-07 Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Swing door single action (long handle)
12-53-d-01 Supply and Fixing aluminium door/window, Premium 4" sect. Sliding window
12-53-d-02 Supply and Fixing aluminium door/window, Premium 4" sect. Hinges window
12-53-d-03 Supply and Fixing aluminium door/window, Premium 4" sect. Fixed glazing
12-53-d-04 Supply and Fixing aluminium door/window, Premium 4" sect. Fixed arch
12-53-d-05 Supply and Fixing aluminium door/window, Premium 4" sect. Sliding door
12-53-d-06 Supply and Fixing aluminium door/window, Premium 4" sect. Swing door single action (short handle)
12-53-d-07 Supply and Fixing aluminium door/window, Premium 4" sect. Swing door single action (long handle)
12-53-d-08 Supply and Fixing aluminium door/window, Premium 4" sect. Swing door double action (short handle)
12-53-d-09 Supply and Fixing aluminium door/window, Premium 4" sect. Swing door double action (long handle)
12-53-e-01 Supply and Fixing aluminium door/window. Other items : Fly screen shutter for Deluxe model
12-53-e-02 Supply and Fixing aluminium door/window. Other items : Fly screen shutter for Premium model
12-53-e-03 Supply and Fixing aluminium door/window. Other items : Fly screen shutter with separate outer frame
12-54-a-01 Supply and Fixing aluminium bronze/black. Economy model Sliding window
12-54-a-02 Supply and Fixing aluminium bronze/black. Economy model Hinges window
12-54-a-03 Supply and Fixing aluminium bronze/black. Economy model Fixed louver in door frame
12-54-a-04 Supply and Fixing aluminium bronze/black. Economy model Fixed louver in 2" frame
12-54-b-01 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Sliding window
12-54-b-02 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Hinges window
12-54-b-03 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Fixed glazing
12-54-b-04 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Fixed arch
12-54-b-05 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Fixed louvers
12-54-b-06 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Sliding door
12-54-b-07 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing door single action (short handle)
12-54-b-08 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing door single action (long handle)
12-54-b-09 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing door double action (short handle)
12-54-b-10 Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing door double action (long handle)
12-54-c-01 Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Sliding window
12-54-c-02 Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Hinges window
12-54-c-03 Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Fixed glazing
12-54-c-04 Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Fixed arch
12-54-c-05 Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Sliding door
12-54-c-06 Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Swing door single action (short handle)
12-54-c-07 Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Swing door single action (long handle)
12-54-d-01 Supply and Fixing aluminium bronze/black. Premium 4" sect. Sliding window
12-54-d-02 Supply and Fixing aluminium bronze/black. Premium 4" sect. Hinges window
12-54-d-03 Supply and Fixing aluminium bronze/black. Premium 4" sect. Fixed glazing
12-54-d-04 Supply and Fixing aluminium bronze/black. Premium 4" sect. Fixed arch
12-54-d-05 Supply and Fixing aluminium bronze/black. Premium 4" sect. Sliding door
12-54-d-06 Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing door single action (short handle)
12-54-d-07 Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing door single action (long handle)
12-54-d-08 Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing door double action (short handle)
12-54-d-09 Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing door double action (long handle)
12-54-e-01 Supply and Fixing aluminium bronze/black. Other items : Fly screen shutter for Deluxe model
12-54-e-02 Supply and Fixing aluminium bronze/black. Other items : Fly screen shutter for Premium model
12-54-e-03 Supply and Fixing aluminium bronze/black. Other items : Fly screen shutter with separate outer frame
12-55-a Wall Panelling over 0.5" thick chipboard & wood frame (2"x0.75") 2'x2' grid : Sheesham Ply
12-55-b Wall Panelling over 0.5" thick chipboard & wood frame (2"x0.75") 2'x2'grid : Lamination Sheet
12-55-c Wall Panelling over 0.5" thick chipboard & wood frame (2"x0.75") 2'x2' grid : Commercial Ply
12-56-a Supply and Fixing MS Sheet 16 guage(10x20 feet) box type chowkats including fixing in position with all charges for Hold fast, Hinges an
12-56-b Wood plastic composite door patio door leap delux (laker coated)
12-56-c Wood plastic composite door patio door leap premium grade ( UV coated )
12-56-d Wood plastic composite door patio door with frame and beading deluxe grade (laker coated)
12-56-e Wood plastic composite patio door with frame and beading premium grade(UV coated)
12-57-a Wood plastic composite door bukhara flush door steppe type
12-57-b Wood plastic composite door rock type single side door
12-57-c Wood plastic composite door rock type double side door
12-58 Wood plastic composite door image type single side with frame and beading
12-59 Wood plastic composite door carving type single side with frame and beading
12-60-a Composite windows deluxe grade (laker coated)
12-60-b Composite windows premium grade (UV coated)
12-61-a Wood Plastic Fly Screen Delux Grade
12-61-b Wood Plastic Screen Premium Grade
12-61-c Wood Plastic Screen Door Frame Only
12-61-d Wood Plastic Screen Beading Smaller
12-61-e Wood Plastic Screen Beading larger
12-62-a Kitchen Floor Cabinet as per MES Design/Specification..
12-62-b Kitchen Wall Cabinet as per MES Design/Specification.
12-62-c Providing and Fixing Sink Cabinet as per MES Design/Specification.
12-63 Supply and fixing UPVC Flush doors with 60mm wide frame 2-2.5mm wall thickness inclusive of all accessories and galvanized iron suppor
12-64 Supply and fixing UPVC Fancy doors with 60mm wide frame 2-2.5mm wall thickness inclusive of all accessories and galvanized iron suppo
12-65 Supply and fixing UPVC Fancy doors with 60mm wide frame 2-2.5mm wall thickness inclusive of all accessories and galvanized iron supp
12-66 Supply and fixing UPVC Partially glazed doors with 60mm wide frame 2-2.5mm wall thickness inclusive of all accessories and galvanized i
12-67 Supply and fixing UPVC Full glazed doors with 60mm wide frame 2-2.5mm wall thickness inclusive of all accessories and galvanized iron
12-68 Supply and fixing UPVC full glazed sliding windows with 80mm wide frame 2-2.2mm wall thicknesses inclusive of all accessories and galvan
12-69 Supply and fixing UPVC full glazed sliding windows with 80mm wide frame 2-2.2mm wall thicknesses inclusive of all accessories and galvan
12-70 Supply and fixing UPVC full glazed openable windows with 60mm wide frame 2-2.2mm wall thicknesses inclusive of all accessories and gal
12-71 Supply and fixing UPVC full glazed Fixed windows with 80mm wide frame 2-2.2mm wall thicknesses inclusive of all accessories and galvan
12-72 Supply and fixing UPVC full glazed sliding windows with 80mm wide frame 2-2.2mm wall thicknesses inclusive of all accessories and galva
12-73 Supply and fixing UPVC full glazed sliding windows with 80mm wide frame 2-2.2mm wall thicknesses inclusive of all accessories and galva
12-74 Supply and fixing UPVC full glazed openable windows with 60mm wide frame 2-2.2mm wall thicknesses inclusive of all accessories and g
12-75 Supply and fixing UPVC full glazed fixed windows with 80mm wide frame 2-2.2mm wall thicknesses inclusive of all accessories and galva
12-76 Supply and fixing UPVC full glazed fixed lowvers windows with 80mm wide frame 2-2.2mm wall thicknesses inclusive of all accessories an
13-01 Cleaning painted woodwork with oil & water
13-02 Oiling woodwork with boiled linseed oil
13-03 Brushing & scraping blisters of old paints from woodwork
13-04 Scraping, brushing and removing old paint, from metal surface
13-05-a-01 Painting old corrugated surfaces, pent roofing etc. with oil paint : First coat
13-05-a-02 Painting old corrugated surfaces, pent roofing etc. with oil paint : Each subsequent coat
13-05-b-01 Painting old surfaces : Sashes, fanlights, doors or windows : First coat
13-05-b-02 Painting old surfaces : Sashes, fanlights, doors or windows : Each subsequent coat
13-05-c-01 Painting old surfaces : Doors / windows any type First coat
13-05-c-02 Painting old surfaces : Doors / windows any type Each subsequent coat
13-05-d-01 Painting old surfaces : Guard bars, gratings, railing & similar open work : First coat
13-05-d-02 Painting old surfaces : Guard bars, gratings, railing & similar work : Each subsequent coat
13-05-e-01 Painting old surfaces : Fillets, framing, skirting pipes, etc. less than 6" girth : First coat
13-05-e-02 Painting old surfaces : Fillets, framing, skirting pipes, etc. less than 6" girth : Each subseq. coat
13-05-f-01 Painting old surfaces : Small detached articles Not exceeding 1 sft : First coat
13-05-f-02 Painting old surfaces : Small detached articles Not exceeding 1 sft : Each subsequent coat
13-05-g-01 Painting old surfaces : Small detached articles 1sft-3sft area : First coat
13-05-g-02 Painting old surfaces : Small detached articles 1sft-3sft area : Each subsequent coat
13-06-a-01 Prepare & Paint new corrugated surface, pent roofing etc : Priming coat
13-06-a-02 Prepare & Paint new corrugated surface, pent roofing etc : Each subsequent coat of paint
13-06-b-01 Prepare & Paint new surface, sashes, doors & windows etc : Priming coat
13-06-b-02 Prepare & Paint new surface, sashes, doors & windows etc : Each subsequent coat of paint
13-06-c-01 Prepare & Paint new surface, doors & windows Priming coat.
13-06-c-02 Prepare & Paint new surface, doors & windows Each subsequent coat of paint
13-06-d-01 Prepare & Paint new surfaces of guard bars, railing & similar open work : Priming coat
13-06-d-02 Prepare & Paint new surfaces of guard bars, railing & similar work : Each subsequent coat
13-06-e-01 Prepare & Paint new surface of fillets, framing, skirtings etc : Priming coat
13-06-e-02 Prepare & Paint new surface of fillets, framing, skirtings etc : Each subsequent coat of paint
13-06-f-01 Prepare & Paint new surface of small detached articles upto 1 sft : Priming coat
13-06-f-02 Prepare & Paint new surface of small detached articles upto 1 sft : Each subsequent coat
13-06-g-01 Prepare & paint surf. of small detached articles 1sft - 3sft area : Priming coat
13-06-g-02 Prepare & paint surf. of small detached articles 1sft - 3sft area : Subsequent coat of paint
13-06-h Extra for knotting & stopping to prime coat on new surface of wood
13-06-i Providing and applying 3 coats of approved type of Plastic emulsion paint to Plastic surface as per manufucture specification.
13-07-a Khanki mixture, applied hot to barrage gates First coat
13-07-b Khanki mixture, applied hot to barrage gates Second coat
13-08-a French polishing complete: On new work
13-08-b French polishing complete: On old work
13-09-a Varnishing wood work, including cleaning & preparing surface : First coat.
13-09-b Varnishing wood work, including cleaning & preparing surface : Second coat
13-09-c Varnishing wood work, including cleaning & preparing surface : Third coat.
13-10-a Bitumen coating to plastered / cement concrete surface : 20 Ibs. per 100 sft.
13-10-b Bitumen coating to plastered / cement concrete surface : 14 Ibs. per 100 sft.
13-10-c Bitumen coating to plastered / cement concrete surface : 10 Ibs. per 100 sft.
13-11 Writing letters or figures
13-12-a Coaltar paint applied hot: First coat
13-12-b Coaltar paint applied hot: Second coat
13-13-a Solignum paint applied hot: First coat
13-13-b Solignum paint applied hot: Second coat
13-14-a Creosote paint applied hot: First coat
13-14-b Creosote paint applied hot: Second coat
13-15 Burning off or rubbing down with pumice stone, old paint from wood work
13-16 Removing with caustic soda,old paint from wood work
13-17 Painting distance marks with white ground and black letterin on both faces
13-18 Painting two feet wide gauges, reading to 1/10th of a foot.
13-19 Painting sounding rods and other guages, reading to 1/10th of a foot
13-20 Painting levelling staves
13-21-a Painting & lettering (2 coats) on both sides with syn. enamel paint : Mile/km posts
13-21-b Painting & lettering (2 coats) on both sides with syn. enamel paint : Furlong or 1/10 km posts
13-21-c Painting & lettering (2 coats) on both sides with syn. enamel paint : Sign posts
13-22 Removing paint or varnish from wall
13-23-a Scraing of Khanki paint from barrage gates
13-23-b Scraping of Aluminium paint from barrage headworks
13-24 Painting letters with shade
13-25 Scraping rust from old rails or girders
13-26 Chiselling old paint from brick work
13-27 Cleaning glasses with chalk and spirit etc
13-28 Cleaning and oiling rafter or rolled steel beams
13-29 Cleaning and painting punkha poles, including fixing hooks
13-30-a Preparing surface and painting with emulsion paint : First coat
13-30-b Preparing surface and painting with emulsion paint : 2nd & each subsequent coat.
13-31 Pavement Marking using Reflective Chlorinated Rubber Paint with Glass Beads as per specification
13-33 Repainting of ceiling fan (all sizes & types) incl painting of blades, canopy etc with syn. enamel
13-34 Repainting of iron poles with cross arms, with bitumen or other approved paint
13-35-a Repainting of pipes and specials of GI, MS or PVC conduit etc : Upto 1.5" i/d
13-35-b Repainting of pipes and specials of GI, MS or PVC conduit etc : From 1.5" to 2" i/d
13-35-c Repainting of pipes and specials of GI, MS or PVC conduit etc : From 2" to 4" i/d
13-36 Repainting main switches & branch distribution boards of all sizes & types with approved paint
13-37 Extra labour for painting, varnishing etc from 20' height & above, for every additional 10'.
13-38-a Preparing surface & painting with snowcem / weathershield paint : First coat
13-38-b Preparing surface & painting with snowcem / weathershield paint : 2nd & subsequent coats
14-01-a Providing and Fixing glazed earthen ware WC European type excluding cost of seat & cover : White
14-01-b Providing and Fixing glazed earthen ware WC European type excluding cost of seat & cover : Coloured
14-02-a Providing and Fixing double seat & cover only : Bakelite
14-02-b Providing and Fixing double seat & cover only : Plastic
14-03-a Providing and Fixing glazed earthen ware WC squatting type with built-in foot rests : White
14-03-b Providing and Fixing glazed earthen ware WC squatting type with built-in foot rests : Coloured
14-04 Providing and Fixing white glazed earthernware WC squatting type with separate foot rests
14-05-a-01 Providing and Fixing glazed earthen ware WHB complete Size 22"x16" : White with pedestal
14-05-a-02 Providing and Fixing glazed earthen ware WHB complete Size 22"x16" : Coloured with pedestal
14-05-a-03 Providing and Fixing glazed earthen ware WHB complete Size 22"x16" : White without pedestal
14-05-a-04 Providing and Fixing glazed earthen ware WHB complete Size 22"x16' : Coloured without pedestal
14-05-b-01 Providing and Fixing glazed earthen ware WHB complete Size 25"x18" : White with pedestal
14-05-b-02 Providing and Fixing glazed earthen ware WHB complete Size 25"x18" : Coloured with pedestal
14-05-b-03 Providing and Fixing glazed earthen ware WHB complete Size 25"x18" : White without pedestal
14-05-b-04 Providing and Fixing glazed earthen ware WHB complete Size 25"x18" : Coloured without pedestal
14-06-a Providing and Fixing stainless steel sink with drain board size 48"x24", including set of brackets, waste pipe etc
14-06-b Providing and fixing stainless steel sink with drain board size 18"x36" including set of brackets, waste pipe etc
14-06-c Providing and fixing stainless steel sink with drain board size 18"x48" including set of brackets, waste pipe etc
14-06-d Providing and fixing stainless steel sink with drain board size 20"x60" including set of brackets, waste pipe etc
14-06-e Providing and fixing stainless steel sink with drain board size 20"x72" including set of brackets, waste pipe etc
14-07 Providing and Fixing terrazzo concrete sink 25"x18", with drain board of mosaic, including set of brackets etc
14-08-a Providing and Fixing glazed earthen ware sink including set of brackets, waste pipe etc : 25"x18"
14-08-b Providing and Fixing glazed earthen ware sink including set of brackets, waste pipe etc : 25"x18"
14-09 Providing and Fixing white glazed earthernware flat back urinal
14-10-a Providing and Fixing glazed earthen ware low down flushing cistern 3 gallons capacity : White
14-10-b Providing and Fixing glazed earthen ware low down flushing cistern 3 gallons capacity : Coloured
14-11 Providing and Fixing white enamelled CI low down flushing cistern (3 gallons capacity) including CP water connection
14-12-a Providing and Fixing cast iron high level flushing cistern, including high level flushing cistern including CP : 3 gallons
14-12-b Providing and Fixing cast iron high level flushing cistern, including high level flushing cistern including CP : 1 gallon
14-13 Providing and Fixing CP soap dish.
14-14-a Providing and Fixing glazed earthen ware soap dish White
14-14-b Providing and Fixing glazed earthen ware soap dish Coloured
14-15 Providing and Fixing CP toilet paper holder
14-16-a Providing and Fixing CP towel rail : 24" long, 3/4" dia
14-16-b Providing and Fixing CP towel rail : 20" long, 1/2" dia
14-17 Providing and Fixing best quality 5mm mirror 22"x16" size
14-18-a Providing and Fixing best quality 5mm glass shelf 24"x5" With chromium plated brackets & railing
14-18-b Providing and Fixing best quality 5mm glass shelf 24"x5" Glass shelf only, w/o chromium plated bracke
14-19-a Providing and Fixing glazed earthen ware shelf 24"x5" with CP brackets & railing of : 24" length, 3/4" dia
14-19-b Providing and Fixing glazed earthen ware shelf 24"x5" with CP brackets & railing of : 20" length, 1/2" dia
14-20-a Providing and Fixing Plastic soap dish.
14-20-b Providing and Fixing Plastic toilet paper holder.
14-20-c Providing and Fixing Plastic towel rail.
14-20-d Providing and Fixing Plastic shelf 24"x5" with
14-21-a Providing and Fixing CP pillar-cock, heavy type : 3/4"
14-21-b Providing and Fixing CP pillar-cock, heavy type : 1/2"
14-22-a Providing and Fixing CP stop-cock, heavy type : 3/4"
14-22-b Providing and Fixing CP stop-cock, heavy type : 1/2"
14-23 Providing and Fixing underground stop-cock 1/2" with CP cover
14-24-a Providing and Fixing CP bib-cock, heavy type : 3/4"
14-24-b Providing and Fixing CP bib-cock, heavy type : 1/2"
14-25 Providing and Fixing 1/2" CP tee stop cock
14-26-a Providing and Fixing CP shower rose : 1/2"x4"
14-26-b Providing and Fixing CP shower rose : 3/4"x6"
14-27 Providing and Fixing CP mixing valve for WHB, sink or shower
14-28-a Providing and Fixing gun metal peet / gate valve (screwed) 1¬" dia
14-28-b Providing and Fixing gun metal peet / gate valve (screwed) 1«" dia
14-28-c Providing and Fixing gun metal peet / gate valve (screwed) 2" dia
14-28-d Providing and Fixing gun metal peet / gate valve (screwed) 2«" dia
14-28-e Providing and Fixing gun metal peet / gate valve (screwed) 3" dia
14-29-a Providing and Fixing CP or brass oxidized swan-neck cock 1/2" dia : Single way
14-29-b Providing and Fixing CP or brass oxidized swan-neck cock 1/2" dia : Double way
14-29-c Providing and Fixing CP or brass oxidized swan-neck cock 1/2" dia : Three way
14-30-a Providing and Fixing brass union 1/2" dia
14-30-b Providing and Fixing brass union 3/4" dia
14-31-a Providing and Fixing CI floor trap including CI grating & concrete chamber all round : 4"x2"
14-31-b Providing and Fixing CI floor trap including CI grating & concrete chamber all round : 4"x3"
14-32-a Providing and Fixing 'P' trap including GI grating & PCC chamber 4" of cast iron
14-32-b Providing and Fixing 'P' trap including GI grating & PCC chamber 4" glazed
14-33 Providing and Fixing 4" gully trap with PCC, including masonry chamber 1'x1' and PVC grating 6"x6"
14-34-a-01 Providing and fitting CI soil pipe with : Lead & yarn caulked joint : 4" dia.
14-34-a-02 Providing and fitting CI soil pipe with : Lead & yarn caulked joint : 2" dia.
14-34-b-01 Providing and fitting CI soil pipe with : Cement caulked joint : 4" dia
14-34-b-02 Providing and fitting CI soil pipe with : Cement caulked joint : 2" dia
14-35-a Providing and Fixing AC soil pipe with cement caulked joint including all specials : 1¬" i/d
14-35-b Providing and Fixing AC soil pipe with cement caulked joint including all specials : 3¬" i/d
14-35-c Providing and Fixing AC soil pipe with cement caulked joint including all specials : 4" i/d
14-35-d Providing and Fixing AC soil pipe with cement caulked joint including all specials : 6" i/d
14-36-a Providing and Fixing CI specials, such as tees, bends etc,Lead caulked joint.
14-36-b Providing and Fixing CI specials, such as tees, bends etc Cement caulked joint
14-37-a Supply and Fixing CI manhole cover with frame etc complete 12" dia.
14-37-b Supply and Fixing CI manhole cover with frame etc complete 18" dia
14-37-c Supply and Fixing CI manhole cover with frame etc complete 24" dia
14-37-d Providing & Fixing Steel manhole cover with frame 18"x18" full heavy duty
14-38 Providing and Fixing RCC pipe 4" dia, including laying & jointing in trenches
14-39-a Providing and Fixing brass stop/bib cock : 1/2" dia
14-39-b Providing and Fixing brass stop/bib cock : 3/4" dia
14-40 Hoisting & Placing in position precast RC latrine seat
14-41-a Providing and Fixing CP waste coupling : 1.25"
14-41-b Providing and Fixing CP waste coupling : 1.5"
14-42-a Providing and Fixing rubber plug with chain : 1.25"
14-42-b Providing and Fixing rubber plug with chain : 1.5"
14-43-a Providing and Fixing waste pipe of PVC : 1.25"
14-43-b Providing and Fixing waste pipe of PVC : 1.5"
14-44-a Providing and Fixing flushing bend of PVC : 1.25"
14-44-b Providing and Fixing flushing bend of PVC : 1.5"
14-45-a Providing and Fixing CP bottle trough with waste pipe : 1.25" i/d.
14-45-b Providing and Fixing CP bottle trough with waste pipe : 1.5" i/d.
14-46-a Providing and Fixing angle iron brackets for : WHB and cistern.
14-46-b Providing and Fixing angle iron brackets for : Sink
14-47-a Providing and Fixing 1/2" dia connection including check nuts etc Plastic rubber connection
14-47-b Providing and Fixing 1/2" dia connection including check nuts etc Copper connection
14-47-c Providing and Fixing 1/2" dia connection including check nuts etc CP connection
14-48-a Providing and Fixing brass ball float valve 1/2" dia
14-48-b Providing and Fixing brass ball float valve 3/4" dia
14-48-c Providing and Fixing brass ball float valve 1" dia
14-48-d Providing and Fixing brass ball float valve 1.25" dia
14-48-e Providing and Fixing brass ball float valve 1.5" dia
14-48-f Providing and Fixing brass ball float valve 2" dia
14-49-a Providing and Fixing 4" dia MS high pressure seamwelded pipe & specials complete : 2" dia
14-49-b Providing and Fixing 4" dia MS high pressure seamwelded pipe & specials complete : 1" dia
14-50-a Providing and Fixing Audco type valve : 4" dia
14-50-b Providing and Fixing Audco type valve : 2" dia
14-50-c Providing and Fixing Audco type valve : 1" dia
14-51-a Providing and Fixing pressure regulator : No. 103
14-51-b Providing and Fixing pressure regulator : No. 043
14-51-c Providing and Fixing pressure regulator : People type
14-52-a Providing and Fixing high pressure flange type valve : 4" dia
14-52-b Providing and Fixing high pressure flange type valve : 2" dia
14-52-c Providing and Fixing high pressure flange type valve : 1"dia
14-53 Providing and Fixing nipple or bush 1/4" to 3/8" i/d
14-54-a Providing and Fixing eclipse cock : 1" dia
14-54-b Providing and Fixing eclipse cock : 3/4" dia
14-55-a Providing and Fixing GI pipe(light) & including specials complete 2" dia
14-55-b Providing and Fixing GI pipe(light) & including specials complete 1.5" dia
14-55-c Providing and Fixing GI pipe(light) & including specials complete 1.25" dia
14-55-d Providing and Fixing GI pipe(light) & including specials complete 1" dia
14-55-e Providing and Fixing GI pipe(light) & including specials complete 3/4" dia
14-55-f Providing and Fixing GI pipe(light) & including specials complete 1/2" dia
14-56-a Providing and Fixing oxidized gas cock : 1" dia.
14-56-b Providing and Fixing oxidized gas cock : 3/4" dia.
14-56-c Providing and Fixing oxidized gas cock : 1/2" dia.
14-57-a Providing and Fixing brass gas cock : 1/2" dia
14-57-b Providing and Fixing brass gas cock : 3/4" dia
14-58-a Providing and Fixing 1/4" CP or oxidized gas cock Single way
14-58-b Providing and Fixing 1/4" CP or oxidized gas cock Two way
14-58-c Providing and Fixing 1/4" CP or oxidized gas cock Three way
14-59-a Providing and Fixing approved best quality light burners Single
14-59-b Providing and Fixing approved best quality light burners Double
14-60-a Providing and Fixing approved best quality gas room heaters Single pannel
14-60-b Providing and Fixing approved best quality gas room heaters Double pannel.
14-61-a Providing and Fixing approved best quality cooking range with 2 burners & oven
14-61-b Providing and Fixing approved best quality cooking range with 2 burners, oven & rostary
14-61-c Providing and Fixing approved best quality cooking range with 3 burners, oven & hot case
14-61-d Providing and Fixing approved best quality cooking range with 3 burners, oven, hot case & roastary
14-61-e Providing and Fixing approved best quality cooking range with 5 burners, oven, hot case & roastary
14-62-a Providing and Fixing approved best quality gas water heaters 20 gallons capacity
14-62-b Providing and Fixing approved best quality gas water heaters 30 gallons capacity
14-62-c Providing and Fixing approved best quality gas water heaters 50 gallons capacity
14-63-a Providing and Fixing gas cross burners : 6" Size
14-63-b Providing and Fixing gas cross burners : 9" Size
14-63-c Providing and Fixing gas cross burners : 12" Size
14-64-a Providing and Fixing gas nozzle star burner with injector 12" nozzle
14-64-b Providing and Fixing gas nozzle star burner with injector 18" nozzle
14-64-c Providing and Fixing gas nozzle star burner with injector 24" nozzle
14-64-d Providing and Fixing gas nozzle star burner with injector 32" nozzle
14-65 Providing and Fixing flue pipe for gas room heater any type/make
14-66 Providing and Fixing gas twin burners with stand complete Imperial make
14-67 Providing and Fixing angle iron frame wall type brackets for gas room heater
14-68-a Providing and Fixing gas tandoor complete : 24" nozzle
14-68-b Providing and Fixing gas tandoor complete : 32" nozzle
14-68-c Providing and Fixing gas tandoor complete : 48" nozzle
14-69-a-01 P/F Fibre Glass Water Tank (Shalimar/Spectrum) 300 gallons
14-69-a-02 P/F Fibre Glass Water Tank (Sepctrum/Shalimar) 400 gallons
14-69-b-01 P/F Polyethylene Water Tank (Super Tuff) 200 gallons (Horizontal)
14-69-b-02 Supplying and Fixing Polyethylene Water Tank (Super Tuff) 400 gallons (Vertical)
14-69-b-03 P/F Polyethylene Water Tank (Super Tuff) 500 gallons (Vertical)
14-69-b-04 P/F Polyethylene Water Tank (Super Tuff) 1000 gallons (Vertical)
14-69-b-05 P/F Polyethylene Water Tank (Super Tuff) 1500 gallons (Vertical)
14-70-a Providing and Fixing of pipe type B nikasi system including testing in all respect 110 mm (using dadex, or eq)
14-70-b Providing and Fixing of pipe type B nikasi system including testing in all respect 75 mm (using dadex, or eq)
14-71-a Providing and Fixing of poly dex high pressure PPR(green including testing ect complete 25 mm (including all special ect)
14-71-b Providing and Fixing of poly dex high pressure PPR(green including testing ect complete 20 mm (including all special ect)
14-72-a Providing of plumbing tape insulation on G.I pipe complete 1/2" dia
14-72-b Providing of plumbing tape insulation on G.I pipe complete 3/4" dia
14-72-c Providing of plumbing tape insulation on G.I pipe complete 1" dia
14-72-d Providing of plumbing tape insulation on G.I pipe complete 1.5" dia
14-72-e Providing of plumbing tape insulation on G.I pipe complete 2" dia
14-72-f Providing of plumbing tape insulation on G.I pipe complete 2.5" dia
14-73-a Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping
14-73-b Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping
14-73-c Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping
14-73-d Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping
14-73-e Providing of thermal insulation of high density (64kg/m3)fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping c
14-73-f Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping
14-73-g Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping
14-74-a Providing and Fixing Gas water Geyser "Singer" 30 gallons SG 35 DLX with imported (American) Thermostat
14-74-b Providing and Fixing Gas water Geyser "Singer" 35 gallons SG 35 DLX with imported (American) Thermostat
14-75-a Providing & Fixing "Singer" Cooking Range Model 307 (3Burners Black), Bigger size
14-75-b Providing & Fixing "Singer" Cooking Range Model 308 (3 Burners Black), Smaller size
14-76 Providing & Fixing "Singer" Cooking Range Model 310 (3 Burners White)
14-77 Providing & Fixing "Singer" Cooking Range Model 312 (5 Burners), (Automatic)
14-78 Supply and Fixing low level plastic flushing cistern.
14-79-a Supply and fixing of 0.5 HP Monoblock water pump 1 .25"x1" single phase upto 72 ft head (Deen Pump Type SE) i/c all accessories.
14-79-b Supply and fixing of 1.0 HP Monoblock water pump 1 .25"x1" single phase upto 90 ft head (Deen Pump Type SE) i/c all accessories.
14-79-c Supply and fixing of 1.0 HP Monoblock water pump 1 .25"x1" single phase upto 88 ft head (Deen Pump Type DE-S2) i/c all accessories.
14-79-d Supply and fixing of 1.5 HP Monoblock water pump 1.25"x1" single phase upto 130 ft head (Deen Pump Type DE-S2) i/c all accessories.
14-80-a Supply and fixing of 2.0 HP Monoblock water pump 1.5"x1.25" 3 stage model DE-S3 (DEENS' PUMPS) single phase for 150 ft head with
14-80-b Supply and fixing of 2.0 HP Monoblock water pump 1.5"x1.5" 4 stage model DE-S4 (DEENS' PUMPS) single phase for 190 ft head with al
14-80-c Supply and fixing of 2.0 HP Monoblock water pump 2"x2" size 1 stage SE model (DEENS' PUMPS) single phase for 65 ft head with all acc
14-81-a Supply and fixing of 3.0 HP Monoblock water pump 1.5"x1.5" size 5 stage DE-S5 model (DEENS' PUMPS) single phase for 220 ft head wi
14-81-b Supply and fixing of 3.0 HP Monoblock water pump 1.5"x1.25" size 6 stage DE-S6 model (DEENS' PUMPS) single phase for 260 ft head
14-81-c Supply and fixing of 4.0 HP Monoblock water pump 1.5"x1.25" size 7 stage DN-S7 model (DEENS' PUMPS) single phase for 300 ft head
14-81-d Supply and fixing of 3.0 HP Monoblock water pump 2.5"x2" size 2 stage DE-S2 model (DEENS' PUMPS) single phase for 100 ft head wit
14-81-e Supply and fixing of 4.0 HP Monoblock water pump 1.5"x2" size 3 stage DN-S3 model (DEENS' PUMPS) single phase for 130 ft head wit
14-81-f Supply and fixing of 4.0 HP Monoblock water pump 1.5"x2" size 4 stage DN-S4 model (DEENS' PUMPS) single phase for 160 ft head wit
14-81-g Supply and fixing of 3.0 HP Monoblock water pump 3"x3" size 1 stage P.P model (DEENS' PUMPS) single phase for 60 ft head with all a
14-81-h Supply and fixing of 4.0 HP Monoblock water pump 3"x2.5" size 1stage P.P model (DEENS' PUMPS) single phase for 60 ft head with all
14-82-a Supply and fixing of 1.0 HP Deep well water pump 1"x1" size 1stage Jet S-1 model (DEENS' PUMPS) single phase for 60 ft suction and up
14-82-b Supply and fixing of 2.0 HP Deep well water pump 1"x1" size 2 stage Jet S-2 model (DEENS' PUMPS) single phase for 80 ft suction and u
14-82-c Supply and fixing of 3.0 HP Deep well water pump 1"x1" size 3 stage Jet S-3 model (DEENS' PUMPS) single phase for 120 ft suction and
14-82-d Supply and fixing of 4.0 HP Deep well water pump 1"x1" size 4 stage Jet S-4 model (DEENS' PUMPS) single phase for 160 ft suction and
14-83 Providing & Fixing Solar Geysers 35 gallons capacity (aproduct of Enercon, National Energy Conservation Centre Islamabad)
15-01-a-01 Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 1/2" i/d
15-01-a-02 Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 3/4" i/d
15-01-a-03 Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 1" i/d
15-01-a-04 Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 1.25" i/d
15-01-a-05 Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 1.5" i/d
15-01-a-06 Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 2" i/d
15-01-b-01 Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 1/2" i/d
15-01-b-02 Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 3/4" i/d
15-01-b-03 Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 1" i/d
15-01-b-04 Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 1.25" i/d
15-01-b-05 Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 1.5" i/d
15-01-b-06 Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 2" i/d
15-02-a-01 Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 1/2" i/d
15-02-a-02 Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 3/4" i/d
15-02-a-03 Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 1" i/d
15-02-a-04 Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 1.25" i/d
15-02-a-05 Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 1.5" i/d
15-02-a-06 Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 2" i/d
15-02-a-07 Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 3" i/d
15-02-a-08 Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 4" i/d
15-02-b-01 Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 1/2" i/d
15-02-b-02 Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 3/4" i/d
15-02-b-03 Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 1" i/d
15-02-b-04 Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 1.25" i/d
15-02-b-05 Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 1.5" i/d
15-02-b-06 Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 2" i/d
15-02-b-07 Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 3" i/d
15-02-b-08 Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 4" i/d
15-03-a Supply and Erection GI flexible pipe for wiring purpose complete 1/2" i/d
15-03-b Supply and Erection GI flexible pipe for wiring purpose complete 3/4" i/d
15-03-c Supply and Erection GI flexible pipe for wiring purpose complete 1" i/d
15-03-d Supply and Erection GI flexible pipe for wiring purpose complete 1.25" i/d
15-03-e Supply and Erection GI flexible pipe for wiring purpose complete 1.5" i/d
15-03-f Supply and Erection GI flexible pipe for wiring purpose complete 2" i/d
15-03-g Supply and Erection GI flexible pipe for wiring purpose complete 3" i/d
15-04-a Supply and Erection Sahl wood strip batten for wiring complete 1/2" i/d
15-04-b Supply and Erection Sahl wood strip batten for wiring complete 3/4" i/d
15-04-c Supply and Erection Sahl wood strip batten for wiring complete 1" i/d
15-05-a Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 3/0.029"
15-05-b Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 3/0.036"
15-05-c Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.029"
15-05-d Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.036"
15-05-e Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.044"
15-05-f Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.064"
15-05-g Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 19/0.064"
15-06-a Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 3/0.029"
15-06-b Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 3/0.036"
15-06-c Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 7/0.029"
15-06-d Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 7/0.036"
15-06-e Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 7/0.044"
15-06-f Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 7/0.064"
15-07-a Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1 100V cable : 7/0.064"
15-07-b Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1 100V cable : 19/0.052"
15-07-c Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1 100V cable : 19/0.064"
15-07-d Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1 100V cable : 19/0.083"
15-07-e Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1 100V cable : 37/0.072"
15-07-f Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1 100V cable : 37/0.083"
15-07-g Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1 100V cable : 37/0.103"
15-08-a Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 3/0.029"
15-08-b Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 3/0.036"
15-08-c Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 7/0.029"
15-08-d Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 7/0.036"
15-08-e Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 7/0.044"
15-08-f Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 7/0.064"
15-09-a Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 4"x4"
15-09-b Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 7"x4"
15-09-c Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 9"x4"
15-09-d Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 8"x10"
15-09-e Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 10"x12"
15-09-f Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 12"x14"
15-10-a Supply and Erection Sahl wood board, 1.75" deep : 3" dia
15-10-b Supply and Erection Sahl wood board, 1.75" deep : 4"x4"
15-10-c Supply and Erection Sahl wood board, 1.75" deep : 7"x4"
15-10-d Supply and Erection Sahl wood board, 1.75" deep : 8"x10"
15-10-e Supply and Erection Sahl wood board, 1.75" deep : 10"x12"
15-10-f Supply and Erection Sahl wood board, 1.75" deep : 12"x14"
15-11-a-01 Supply and Erection of iron/aluminium clad, 500V main switch Double pole : 15/20 Amp.
15-11-a-02 Supply and Erection of iron/aluminium clad, 500V main switch Double pole : 30/35 Amp
15-11-a-03 Supply and Erection iron/aluminium clad 500 volts main switch Double Pole : 60/65 Amp
15-11-a-04 Supply and Erection iron/aluminium clad 500 volts main switch Double Pole : 100 Amp
15-11-b-01 Supply and Erection of iron/aluminium clad, 500V main switch Triple pole with neutral link : 15/20 Amp.
15-11-b-02 Supply and Erection of iron/aluminium clad, 500V main switch Triple pole with neutral link : 30/35 Amp.
15-11-b-03 Supply and Erection of iron/aluminium clad, 500V main switch Triple pole with neutral link : 60/65 Amp.
15-11-b-04 Supply and Erection of iron/aluminium clad, 500V main switch Triple pole with neutral link : 100 Amp.
15-12-a Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 60 Amp.
15-12-b Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 100 Amp.
15-12-c Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 200 Amp.
15-12-d Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 300 Amp.
15-12-e Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 500 Amp.
15-13 Supply and Erection plain pendent lamp holder, complete with bakelite lamp holder & flexible twin wire of 2m.
15-14 Supply and Erection 9" long swan neck plain brass/steel/brass oxidised bracket lamp holder, complete
15-15 Supply and Erection wall/pole type bracket with double cover water tight reflector, flexible wire & brass holder
15-16 Supply and Erection call bell 220/250V, fixed on Sahl wood board 7"x4"
15-17 Supply and Erection bell push or bed switch, with 5m. Twin flexible wire 23/0.0076"
15-18-a Supply and Erection switches 10/15 Amp : Open type
15-18-b Supply and Erection switches 10/15 Amp : Recessed type
15-19-a Supply and Erection 3 pin 10/15 Amp. wall socket : Open type
15-19-b Supply and Erection 3 pin 10/15 Amp. wall socket : Recessed
15-20-a Supply and Erection 3 pin switch & plug combined recessed type : 5 Amp
15-20-b Supply and Erection 3 pin switch & plug combined recessed type : 10/15 Amp
15-21 Supply and Erection 3 pin 10/15 Amp. wall socket with shoe open type
15-22-a Supply and Erection button holder/angle holder Bakelite large size
15-22-b Supply and Erection button holder/angle holder Brass
15-23-a Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron board : 10/15 Amp.
15-23-b Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron board : 30 Amp.
15-23-c Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron board : 60 Amp.
15-23-d Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron baord : 100 Amp.
15-23-e Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron board : 200 Amp.
15-24-a Supply and Erection tube light, including rod, choke etc complete Double rod (80 watts) with 2 chokes & 2 starters
15-24-b Supply and Erection tube light, including rod, choke etc complete Single rod (40 watts) with 1 choke & 1 starter
15-24-c Supply and Erection tube light, including rod, choke etc complete Round tube (10 watt) 1 choke +1 starter w/o cover
15-25 Supply and Erection girder clamp hook, 5/8" dia.for hanging ceiling fans
15-26-a Supply and Erection circuit breaker (imported) on sahl wood board complete : 2/5/15 Amp.
15-26-b Supply and Erection circuit breaker (imported) on sahl wood board complete : 20/25/3 0 Amp.
15-27 Supply and Erection stay for house service pipe, erected with straining screws and 7/14 SWG stay wire
15-28 Supply and Erection of house service pipe Henley or pole, type 2" dia. erected to install insulated wire etc
15-29 Supply and Erection shackle/pin insulator, medium size
15-30 Supply and Erection bare copper conductor wire, No. 2 to 16 SWG, including binding wire No. 16 SWG
15-31 Supply and Erection GI wire of sizes, including binding wire No. 16 SWG for support of rubber wire, pole to pole
15-32-a Wiring overhead line in 2 single core, PVC insulated cable with GI wire #8 SWG : 3/0.029"
15-32-b Wiring overhead line in 2 single core, PVC insulated cable with GI wire #8 SWG : 7/0.029"
15-32-c Wiring overhead line in 2 single core, PVC insulated cable with GI wire #8 SWG : 7/0.036"
15-32-d Wiring overhead line in 2 single core, PVC insulated cable with GI wire #8 SWG : 7/0.044"
15-33 Supply and Erection street light pole bracket 1.25" GI pipe 2m. long, complete with 2 pole clamps
15-34 Supply and Fixing dust & weather proof street light fitting with reflector, 400W mercury vapour lamp etc comp.
15-35-a Supply and Erection pole mounted street light complete for fitting 125/250 W mercury lamp : GEC make
15-35-b Supply and Erection pole mounted street light complete for fitting 125/250 W mercury lamp : Philips make
15-36-a Supply and Fixing 125 W mercury vapour lamp with choke
15-36-b Supply and Fixing 250 W mercury vapour lamp with choke
15-36-c Supply and Fixing 400 W mercury vapour lamp with choke
15-37 Supply and Fixing mercury sodium lamp 360 Sunlux 400 W complete with choke
15-38 Supply and Fixing mercury blended lamp 160 W
15-39 Supply and Erection MS angle lattice structure pole 36' long 14"sq at base & 8"sq. at top for elec. Distribution.
15-40-a-01 Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4" dia, 5' of 3" dia, Single arm of 5' of 1.5" dia
15-40-a-02 Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4" dia, 5' of 3" dia, Double arm of 5' of 1.5" dia
15-40-b-01 Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3" dia, 5' of 2" dia, Single arm of 5' of 1.5" dia
15-40-b-02 Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3" dia, 5' of 2" dia, Double arm of 5' of 1.5" dia
15-40-b-03 Providing street light poles of 40 ft height without arms including fixing complete.
15-41 Earthing of iron clad/aluminium switches etc with GI wire #8 SWG in GI pipe 0.5" dia.
15-42 Supply and Erection 2'x2'x1/8" copper plate including rivetting to copper tape & placing in mixture of salt etc
15-43-a Supply and Erection copper tape, including copper stapple & copper nails etc : Size 1.5"x1/8"
15-43-b Supply and Erection copper tape, including copper stapple & copper nails etc : Size 2"x1/8"
15-44 Supply and Erection 1" dia & 1m long lightening conductor copper rod with 5 spikes ball & base etc.
15-45 Wiring of light/fan/call-bell point in 3/0.029 PVC insulated & sheathed cable on sahl wood strip
15-46 Wiring of 2/3-pin 5-Amp plug point in 3/0.029 PVC insulated & sheathed cable on sahl wood
15-47-a Wiring of main & sub-main in 2 single core PVC insulated & sheathed cable : 3/0.029
15-47-b Wiring of main & sub-main in 2 single core PVC insulated & sheathed cable : 7/0.029
15-47-c Wiring of main & sub-main in 2 single core PVC insulated & sheathed cable : 7/0.044
15-47-d Wiring of main & sub-main in 2 single core PVC insulated & sheathed cable : 7/0.064
15-48-a Wiring of sub main/earthing in 1 single core PVC insulated & sheathed cable : 3/0.029
15-48-b Wiring of sub main/earthing in 1 single core PVC insulated & sheathed cable : 7/0.029
15-48-c Wiring of sub main/earthing in 1 single core PVC insulated & sheathed cable : 7/0.044
15-48-d Wiring of sub main/earthing in 1 single core PVC insulated & sheathed cable : 7/0.064
15-49 Wiring of light point in 3/0.029 PVC insulated sheathed cable on sahl wood strip batten
15-50 Wiring of light/fan/call-bell point in 3/0.029 PVC insulated bare cable in PVC pipe recessed
15-51 Wiring of 2/3-pin 5-Amp. plug point in 3/0.029 PVC insulated bare cable in PVC pipe recessed
15-52 Wiring of light point in 3/0.029 PVC insulated bare cable in PVC pipe recessed in wall comp.
15-53 Special earthing of iron/metal clad switches etc with copper wire No. 8 SWG in GI pipe 1/2" dia
15-54 Supply and Erection enclosed switch of bakelite DP (China) 15/30 Amp. fixed on wooden board complete
15-55-a Supply and erection of fancy wall type bracket with brass holder & fancy shade : Single
15-55-b Supply and erection of fancy wall type bracket with brass holder & fancy shade : Double
15-56-a Supply and Erection white round globe with holder, gallery & 100 Watt bulb complete : 6" dia.
15-56-b Supply and Erection white round globe with holder, gallery & 100 Watt bulb complete : 8" dia.
15-56-c Supply and Erection white round globe with holder, gallery & 100 Watt bulb complete : 10" dia.
15-57-a Supply and Erection white flat globe with holder, gallery & 100 W bulb complete : 8" dia
15-57-b Supply and Erection white flat globe with holder, gallery & 100 W bulb complete : 10" dia
15-57-c Supply and Erection white flat globe with holder, gallery & 100 W bulb complete : 12" dia
15-58 Supply and Erection white round globe 6" dia with angle type bakelite gallery, holder & 60-W bulb complete
15-59 Supply and Erection 1' long strip light fitting comp. with cover of opalescent perspex in plain finish 10-Watt
15-60 Supply and Erection double fluorescent tube light fitting 2 No. 4' long, 40-W with 2 chokes & starters complete
15-61-a Supply and Erection fluorescent tube light fitting including 4' rod, choke, starter, flexible wire etc : Single
15-61-b Supply and Erection fluorescent tube light fitting including 4' rod, choke, starter, flexible wire etc : Double
15-62 Supply and Erection porch-light fitting round/square type with gallery, holder & 40 W bulb
15-63-a Supply and Erection gate-light fitting complete with holder & 160-Watt mercury blended lamp: Small
15-63-b Supply and Erection gate-light fitting complete with holder & 160-Watt mercury blended lamp: Medium
15-63-c Supply and Erection gate-light fitting complete with holder & 160-Watt mercury blended lamp: Large
15-64-a Supply and Erection garden-light fitting with holder and 160 W mercury blended lamp & choke : 1 8" dia.
15-64-b Supply and Erection garden-light fitting with holder and 160 W mercury blended lamp & choke : 19" dia
15-64-c Supply and Erection garden-light fitting with holder and 160 W mercury blended lamp & choke : 22" dia
15-65-a Supply and Erection garden-light fitting with porcelain holder 125 W mercury vapour lamp & choke : 18" dia.
15-65-b Supply and Erection garden-light fitting with porcelain holder 125 W mercury vapour lamp & choke : 19" dia
15-65-c Supply and Erection garden-light fitting with porcelain holder 125 W mercury vapour lamp & choke : 22" dia
15-66-a Supply and Erection flood-light fitting with holder, complete 14" dia with 500-W lamp
15-66-b Supply and Erection flood-light fitting with holder, complete 19«" dia with 1000-W lamp
15-67 Making hole in wall with necessary masonry work for exhaust fan any size complete
15-68-a Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 36" sweep.
15-68-b Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 48" sweep
15-68-c Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 56" sweep
15-69-a Supply and Erection best quality exhaust fan complete with shutter & regulator : 12"sweep
15-69-b Supply and Erection best quality exhaust fan complete with shutter & regulator : 16"sweep
15-69-c Supply and Erection best quality exhaust fan complete with shutter & regulator : 18"sweep
15-70-a Supply and Erection transpower auto circuit breaker 3-phase, 400V fungus moisture proofing : 30 Amp.
15-70-b Supply and Erection transpower auto circuit breaker 3-phase, 400V fungus moisture proofing : 60 Amp.
15-70-c Supply and Erection transpower auto circuit breaker 3-phase, 400V fungus moisture proofing : 100 Amp.
15-71-a Supply and Erection single phase imported auto circuit breaker 6 Amp.
15-71-b Supply and Erection single phase imported auto circuit breaker 15 Amp.
15-71-c Supply and Erection single phase imported auto circuit breaker 20 Amp.
15-71-d Supply and Erection single phase imported auto circuit breaker 30 Amp.
15-72-a Supply and Erection of bus bars for 500 volts 3 phase AC S/W 4 copper bars 40 Amp with bar size 1 1/2" X 1/8"
15-72-b Supply and Erection of bus bars 500 volts 3 phase AC supply with 4 copper bars - 100 Amp with bar size1 1 1/2" X 1/8"
15-72-c Supply and Erection of bus bars 500 volts 3 phase AC supply with 4 copper bars - 200 Amp with bar size 2"X 1/8"
15-72-d Supply and Erection of bus bars 500 volts 3 phase AC supply with 4 copper bars - 300 Amp with bar zise 2" X 3/16"
15-72-e Supply and Erection of bus bars 500 volts 3 phase AC supply with 4 copper bars - 500 Amp with zise 2" X 1/4"
15-73-a Supply and Erection of bracket of channel 3" X 1 1/2" X 1/4" section 2' long for 2 lines
15-73-b Supply and Erection of bracket of MS channel 3" X 1 1/2" X 1/4" Section:- 4' long for 4 lines
15-74 Supply and Erection of anchor rod honley type for poles i/e clamps & 7/13 SWG stay wire straning screws PCC 1:3:6.
15-75-a Supply and Erection cubical type factory fabricated floor/wall mounting steel main board comp. : On surface
15-75-b Supply and Erection cubical type factory fabricated floor/wall mounting steel main board comp. : Recessed
15-76-a Flouresent tube lights fitting 2.5x2.5 feet square type suitable for fixing in recess or direct on complete with 4 Nos 2 ft 20 watts tubes, cho
15-76-b Supply and Fixing of fluoresent tube fitting rectanglular box types housing made of 22 SWG stave enamelled steel sheet having spring lo
15-77-a Supply and Fixing electric AC exhuast/fresh air circulation(double way) 220/230 single phase plastic frame body and blade complete 8"x8
15-77-b Supply and Fixing electric AC exhuast/fresh air circulation(double way) 220/230 single phase plastic frame body and blade complete 10"
15-77-c Supply and fixing electric AC exhaust/fresh air circulation(Double way) 220/23 0 single phase plastic frame body and blade complete 12
15-78 Supply and Fixing bracket fan pak made complete
15-79-a Supply and Fixing PVC conduit for surface wiring (dura duct) 1/2" including all charges for nail screws etc
15-79-b PVC conduit for surface wiring (dura duct) 1" including all charges for nail screws etc complete
15-79-c PVC conduit for surface wiring (dura duct) 1.5" including all charges for nail screws etc complete
15-79-d PVC conduit for surface wiring (dura duct) 2" including all charges for nail screws etc complete
15-80 Supply and Fixing dimmer switch complete
15-81 Supply and Fixing 20 Amp power plug
15-82 Supply and Fixing Asia porcelin power plug 30 Amp
15-83 Supply and fixing light plug 10 Amp
15-84 Supply and fitting of capacitor 2.2 uf for ceiling fans
15-85 Supply and fitting of ball bearing of size 6201, 6202 or 6203 for ceiling fans
15-86 Supply and erection of cut out, bakelite open type
15-87 Supply and erection of cut out bakelite Recessed type cut out
15-88 Supply and erection of kit kat 500 volts 15/20 Amp
15-89 Supply and erection of kit kat 500 volts 30/35 Amp
15-90 Supply and erection of kit kat 500 volts 60/65 Amp
15-91 Supply and erection of kit kat 500 volts 100 Amp
15-92 Supply and erection of kit kat 500 volts 200 Amp
15-93 Supply and erection of kit kat 500 volts 300 Amp
15-94 Supply and erection of kit kat 500 volts 400 Amp
15-95-a Providing & Fixing Honda Generator EP 2500ex, 2.2 KVA Petrol driven.
15-95-b Providing & Fixing Honda Generator EP 2500ex, 2.2 KVA Petrol-cum-Gas driven
15-95-c Providing & Fixing Honda Generator EP 2800ex, 3.1 KVA Petrol-cum-Gas driven.
15-95-d Providing & Fixing Honda Generator EP 2800ex, 3.1 KVA Petrol driven.
16-01 Providing and Laying sub-base course of brick on edge 4.5" thick including compaction to required camber & grade
16-02 Providing and Laying sub-base course of brick aggregate,including compaction to required camber, grade & density.
16-03-a Granular Sub Base Course using Pit Run Gravel
16-03-b Granular Sub Base Using Crushed Stone Aggregate
16-04-a Aggregate Base Course
16-04-b Water Bound Macadam Base Course
16-05 Providing and Laying road edging of 3" wide & 9" deep brick on end, complete
16-06 Bitumenous Prime Coat
16-07 Bitumenous Tack Coat
16-08-a Single bitumenous Surface Treatment
16-08-b Double bitumenous Surface Treatment
16-08-c Triple bitumenous Surface Treatment
16-09-a Resurfacing of road complete with per 100sft : 22 Ibs. bitumen, 2.5"cft bajri/crush aggregate
16-09-b Resurfacing of road complete with per 100sft : 20 Ibs. bitumen, 2"cft bajri/crush aggregate
16-10 Scarifying/Dismantling old road surface, including removal of debris within one chain (NHA specified)
16-11-a Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 1" Thick, without prime coat or tack coat
16-11-b Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 1.5" Thick
16-11-c Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 2" Thick
16-12-a Asphaltic Base Course (Asphalt Batch Plant Hot Mixed)
16-12-b Asphaltic Wearing Course (Asphalt Batch Plant Hot Mixed)
16-12-c Carriage of asphalt concrete from asphalt batch plant to the site of work by dump trucks.
16-13 Providing RCC railing on bridges (3 feet high)
16-14 Providing and fixing GI pipe railing (3 feet high)
16-15-a P&E at site : RCC km stone
16-15-b P&E at site : RCC 1/10th km stone.
16-15-c P&E at site : RCC boundry pillar.
16-16-a Road signs (not exceeding 1 m2) without reflection sheet & lettering : Supply and Fixing at site with PCC 1:3:6 upto max 3' depth.
16-16-b Road signs (not exceeding 1 m2) without reflection sheet & lettering : Supply to the C&W store/site of work
16-17-a Road sign (any size) double pedestal 4"x2"x0.25" 11' long without reflection sheet & lettering: Supply and Fixing at site with PCC 1:3:6 m
16-17-b Road sign (any size) double pedestal 4"x2"x0.25" 11' long without reflection sheet & lettering: Supply to the C&W store/site of work
16-18-a Supply and Fixing reflective sheet on MS/aluminium road signs etc including lettering : Diamond grade.
16-18-b Supply and Fixing reflective sheet on MS/aluminium road signs etc including lettering : High intensity grade
16-18-c Supply and Fixing reflective sheet on MS/aluminium road signs etc including lettering : Engineering grade
16-19-a-01 Supply and Fixing aluminium alloy road studs as per specs Large, strip 146x30mm, 171 beads: Uni-direction
16-19-a-02 Supply and Fixing aluminium alloy road studs as per specs Large, strip 146x30mm, 171 beads: Bi-direction
16-19-b-01 Supply and Fixing aluminium alloy road studs as per specs Medium, strip 1 14x1 8mm, 74 beads: Uni-direction
16-19-b-02 Supply and Fixing aluminium alloy road studs as per specs Medium, strip 1 14x1 8mm, 74 beads: Bi-direction
16-19-c-01 Supply and Fixing aluminium alloy road studs as per specs Small, strip 75x14mm, 43 beads: Uni-directional
16-19-c-02 Supply and Fixing aluminium alloy road studs as per specs Small, strip 75x14mm, 43 beads: Bi-directional
16-19-c-03 Supply & Fixing Cat Eye single as specified
16-20 Providing and Fixing gantry of structural steel sections as per design / drawings including foundation complete.
16-21 Providing and Laying dry brick pavement/soling in streets etc including prep, water, compaction & sand cushion.
16-22 Supply & spreading 1"-1.5" guage shingle on road surface including compaction.
16-23-a Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 460mm
16-23-b Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 610mm
16-23-c Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia:760mm
16-23-d Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 910mm
16-23-e Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1070mm
16-23-f Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia:1220mm
16-23-g Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1520mm
16-24 Granular Material in Bed to RCC Pipe Culvert
16-25-a Confirmatory Boring including SPT's, samples, lab test bore-hole logs & Report : Alluvial Soils.
16-25-b Confirmatory Boring including SPT's, samples, lab test,bore-hole logs, report : in Gravelly Soil.
16-26-a Pile Load Testing : Max Load up to 240 tonne
16-26-b Pile Load Testing : Max Load 240 - 300 tonne
16-26-c Pile Load Testing : Max Load 300 - 360 tonne
16-26-d Pile Load Testing : Max Load 360 - 600 tonne
16-27-a Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia up to 760mm
16-27-b Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 760 - 1220 mm.
16-27-c Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 1220 - 2000 mm
16-28-a Boring for Cast-in-place RCC Piles in Gravelly Soils : Dia up to 660mm
16-28-b Boring for Cast-in-place RCC Piles in Gravelly Soils : Dia 660 - 910 mm
16-29 Supply fabricate & install welded MS lining in piles of thickness as per specs/drwg
16-30-a Supply and Fixing Neoprene Bearing Pad as per specs & design
16-30-b Supply and Fixing Steel Bearing Pads as per specs & design
16-34 Supply and Fixing spirally wound sheath of 50mm dia. For pre-stressing of cables in precast conc. girders
16-35 Supply and Fixing stressing anchorages for high tensile steel wire cables in precast girders
16-36 Launching girders in place, including lifting & handli any number of time including temporary works comp
16-37 Stressing Cable of High Tensile Steel Wire Strands
16-38 Inject Cement Grout in Sheath Pipe after stressing
16-39 Cut off projecting wire ends of cables & make good anchorage recess with 1:2:4 cem. conc.
16-40 Supply and place in position MS expansion joint assemblies as specified & as per drawing
16-41 Supply and place in position galvanised steel 3" dia drain scuppers in deck slab as per specs/drwg
16-42 Providing and Fixing rain water outlet of AC pipe
16-43 Supply and Fixing polystrene fill in expansion joints & under diaphragms at transoms.
16-44 Providing and Laying expansion joint of neoprene strip 4"x1/4" and plastic bitumen
16-46 Repair to cracks to reinforced or plain cement concrete work by grouting with cement gun in (1:2) cement sand mortar including cutting t
16-47 Dismantling bitumen carpet of any description from existing roads surface including its removal and disposal within 3 chains lead as desi
16-48 Removing the existing worn out bitumanious surface having pot holes and ruts in patches of regular shape brushing and re-carpeting wit
16-49 Providing and Laying 1" thick(consolidated) asphalt macadam with liquid asphalt (cut backs) of any approved grade with premixed sand se
16-50 Removing the existing worn out bitumanious surface pot holes and ruts in patches of regular shape brushing and re-carpeting with 2" th
16-51 Providing and Laying 2" thick (consolidated) asphalt macadam with liquid asphalt(cut backs) of approved grade with precoated bajri seal
16-52 within one chain.
16-53 Providing and Laying 3" thick (consolidated) asphalt macadam with liquid asphalt(cut backs) of approved grade with precoated bajri seal
16-54 Surface dressing with bituman 80/100 or any other approved grade on a primary coat of liquid asphalt (cut backs) of any approved grade pr
16-55 Providing and Laying PVC pipe (b) 8" dia in foot path of bridge for utilities.
16-56 Providing and filling sand behind abutment of bridges, culverts.
16-57 Formation of shoulder with permeable material less than 7 % from 200 seive and P.I less than 4 as specified by NHA
16-58-a Cold Milling of asphalt concrete 0-70 mm
16-58-b Cold Milling of asphalt concrete 0-50 mm
16-58-c Cold Milling of asphalt concrete 0-30 mm
16-59 Seal Coat / Pad Coat
16-60 Providing and Laying Asphalt concrete in pot holes/ deep patching upto 30 cm including ramming completel
16-61 Grooving in existing BT road of size 4x4 cm @ 2 meter c/c.
16-62 Leveling dressing and compaction with power roller of existing base coarse layer after asphalt scarification.
16-63-a Providing and fixing kerb stone (12"x18"x6") in cement sand mortar 1:3 in center media or round about as specified.
16-63-b Providing and fixing kerb stone (12"x14"x6") in cement sand mortar 1:3 in center media or round about as specified.
16-63-c Providing and fixing kerb stone (12"x12"x6") in cement sand mortar 1:3 in center media or round about as specified.
16-64 Bailing out water by Mechanical mean.
16-65-a Pavement marking in reflective thermoplast paint with glass beads for line 15 cm width.
16-65-b Pavement marking in reflective thermoplast paint with glass beads for line 20 cm width.
16-66-a Pavement marking in non-reflective thermoplast paint for line 15 cm width.
16-66-b Pavement marking in non-reflective thermoplast paint for line 20 cm width.
16-67-a Pavement marking in reflective chlorinated rubber paint with glass beads for line 15 cm width.
16-67-b Pavement marking in reflective chlorinated rubber paint with glass beads for line 20 cm width.
16-68-a Pavement marking in reflective chlorinated rubber paint for line 15 cm width.
16-68-b Pavement marking in reflective chlorinated rubber paint for line 20 cm width.
16-69 Providing & laying stone soling in water logged area including granular filling & compaction complete.
16-70 Tucking and chipping of road surface before hot surface dressing over existing road.
16-71 Leveling course on existing surface of road.
16-72-a Jack Anchorage For 20 to 24 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete).
16-72-b Jack Anchorage For 16 to 19 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete).
16-72-c Jack Anchorage For 10 to 12 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete).
16-72-d Jack Anchorage For 13 to 15 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete)
16-72-e Jack Anchorage For 8 to 9 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete)
16-72-f Jack Anchorage For 5 to 7 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete)
16-72-g Jack Anchorage For upto 4 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete)
16-73-a Un-galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable
16-73-b Un-galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable
16-73-c Un-galvanized Sheath for 13 to 15 Wires 0.5" Strand Cable
16-73-d Un-galvanized Sheath for 10 to 12 Wires 0.5" Strand Cable
16-73-e Un-galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable
16-73-f Un-galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable
16-73-g Un-galvanized Sheath for upto 4 Wires 0.5" Strand Cable
16-73-h Stressing and Grouting for Cables upto 24/0.5" (Single End Stressing).
16-73-i Stressing and Grouting for Cables ranging from 13/0.5" to 24/.05" (Single End Stressing).
16-73-j Stressing and Grouting for Cable below 13/0.5" (Single End Stressing).
16-74-a Supply of High Tensile Pre-stressed concrete steel wire strand Grade 270K 0.5" dia. Packed in standard reeless/weldless coils of two
16-74-b Supply of P.C Steel wire Dia 7 mm and 8 mm. Packed in reeless coils of 600 kgs to 800kgs properly binded.
16-74-c Supply of P.C Steel wire Dia 4 mm and 5 mm. Packed in reeless coils of 600 kgs to 800kgs properly binded.
16-75-a Galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable
16-75-b Galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable
16-75-c Galvanized Sheath for 13 to 15 Wires 0.5" Strand Cable
16-75-d Galvanized Sheath for 10 to 12 Wires 0.5" Strand Cable
16-75-e Galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable
16-75-f Galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable
16-75-g Galvanized Sheath for upto 4 Wires 0.5" Strand Cable
16-76-a Precast Reinfored Concrete Kerb New Jersy Barrier for Median (Double Face)
16-76-b Precast Reinforced Concrete Kerb New Jersy Barrier for Bridge (Single Face)
16-77 Repair to pot holes including cleaning, brushing, removal of loose material and filling of the same with clean stone of size 0.75" to 1
16-78-a Metal Guard Rail as per NHA (604a)
16-78-b Metal Guard Rail End Pieces as per NHA (604b)
16-78-c Steel Post of Metal Guard Rail as per NHA (604d)
17-01-a Formation, dressing and preparing sub-grade in bed
17-01-b Formation, dressing and preparing sub-grade On slope
17-02 Stabilized layer of cement, sand mortar 1:30 2" thick on slope
17-03-a 1/2" thick plaster of cement, sand motar 1:10 in bed
17-03-b 1/2" thick plaster of cement, sand motar 1:10 On slope
17-04-a 1«" thick plaster of cement, sand mortar 1:6 in bed
17-04-b 1«" thick plaster of cement, sand mortar 1:6 On slope
17-05-a 3/8" thick plaster of cement, sand mortar 1:3 in bed
17-05-b 3/8" thick plaster of cement, sand mortar 1:3 On slope
17-06-a Lining with Brick tiles 12"x6"x2", in c/s mortar 1:6 over a layer of 1/8" thick c/s mortar 1:6 (in bed)
17-06-b Lining with Brick tiles 12"x6"x2", in c/s mortar 1:6 over a layer of 1/8" thick c/s mortar 1:6 (On slope)
17-07-a Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer of 1/8" thick c/s mortar 1:3 (in bed)
17-07-b Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer of 1/8" thick c/s mortar 1:3 (On slope)
17-08-a Lining with bricks 9"x4.5"x3" (First Class) in c/s mort. 1:6 ove a layer of 1/8" thick c/s mortar 1:6 (in bed)
17-08-b Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:6 over a layer of 1/8" thick c/s mortar 1:6 (On slope)
17-09-a Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over a layer of 1/8" thick c/s mortar 1:3 (in bed)
17-09-b Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over a layer of 1/8" thick c/s mortar 1:3 (On slope)
17-10-a-01 4" thick PCC lining, using washed screened & graded stone aggregate : in bed : Ratio 1:2:4
17-10-a-02 4" thick PCC lining, using washed screened & graded stone aggregate : in bed : Ratio 1:3:6
17-10-a-03 4" thick PCC lining, using washed screened & graded stone aggregate : in bed : Ratio 1:4:8
17-10-b-01 4" thick PCC lining, using washed screened & graded stone aggregate : On slope : Ratio 1:2:4
17-10-b-02 4" thick PCC lining, using washed screened & graded stone aggregate : On slope : Ratio 1:3:6
17-10-b-03 4" thick PCC lining, using washed screened & graded stone aggregate : On slope : Ratio 1:4:8
17-11-a Providing and Laying PCC SEGMENTS in PRECAST Lining (PARABOLA TYPE) TYPE A
17-11-b PROVIDinG AND LAYin PCC SEGMENTS in PRECAST Lining (PARABOLA TYPE) TYPE B
17-11-c Providing and Laying PCC segments in Precast lining (Parabola type) Type C
17-11-d Providing and Laying PCC segments in Precast lining (Parabola type) Type D
17-11-e Providing and Laying PCC segments in Precast lining (Parabola type) Type SPL D
17-11-f Providing and Laying PCC segments in Precast lining (Parabola type) Type e
18-01 Cutting Ransome & Larson piles.
18-02 Cutting universal piles
18-03-a Driving steel piles to depth of: Upto 15'
18-03-b Driving steel piles to depth of: More than 15' to 25'
18-03-c Driving steel piles to depth of: More than 25' to 30'
18-04 Dolleying piles upto 5'
18-05 Drilling holes in piles by hand
18-06 Raising and lowering machine
18-07-a Turning Machine : 90
18-07-b Turning Machine : 135
18-07-c Turning Machine : 180
18-08 Travelling machine (light)
18-09 Loading and unloading piles
18-10 Carriage of piling machine under different conditions
18-11 Erecting piling machines
18-12 Dismantling piling machine
19-01 Cutting pilchi, frash or sarkanda including carriage within 1.5km.
19-02 Weaving matresses
19-03-a Supply & fill used synthetic fibre/plastic bags 1 .25cft capacity with sand or earth, sewing & stacking : in dry
19-03-b Supply & fill used synthetic fibre/plastic bags 1.25cft capacity with sand or earth, sewing & stacking : Under water.
19-03-c Supply & fill used cotton bags 1.25 cft capacity with sand or earth, sewing & stacking : in dry
19-03-d Supply & fill used cotton bags 1.25 cft capacity with sand or earth, sewing & stacking : Under Water
19-04-a Supply & fill new synthetic fibre/plastic bags 4-5cft capacity with sand or earth,sewing, stacking : in dry
19-04-b Supply & fill new synthetic fibre/plastic bags 4-5cft capacity with sand or earth,sewing, stacking : Under water
19-04-c Supply & fill used cotton bags 4-5 cft capacity with sand or earth, sewing & stacking : in dry
19-04-d Supply & fill used cotton bags 4-5 cft capacity with sand or earth, sewing & stacking : Under Water
19-05-a Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with sand / earth : 1st 50 m
19-05-b Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with sand / earth : 2nd & 3rd 50 m
19-05-c Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with sand / earth : 4th and subsequent 50 m
19-06-a Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled with sand/earth : 1st 50 m
19-06-b Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled with sand/earth : 2nd & 3rd 50 m
19-06-c Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled with sand/earth : 4th & subsequent 50 m
19-07-a Rolling matresses to river edge & floating, after unrolling with area : Upto 200 m2
19-07-b Rolling matresses to river edge & floating, after unrolling with area : Over 200 to 250 m2
19-07-c Rolling matresses to river edge & floating, after unrolling with area : Over 250 m2
19-08 Sewing empty cement bags in sheets
19-09 Making compact round pilchi, frash or sarkanda round bundles of specified size for the work.
19-10 Launching the bundles mentioned in Item 19-09 above & placing in position
19-11-a Supply within 150m (500 feet) : Boulders 9" and above
19-11-b Supply within 150m (500 feet) : Over size shingle 3" to 9"
19-11-c Supply within 150m (500 feet): Mixed graded shingle
19-12 Supplying munj or patha trungers (6" mesh to hold 3 cft) stones/boulders
19-13-a-01 Provide & weave GI wire netting for wire crates 6"x9" mesh : 15 SWG wire
19-13-a-02 Provide & weave GI wire netting for wire crates 6"x9" mesh : 10 SWG wire
19-13-a-03 Provide & weave GI wire netting for wire crates 6"x9" mesh : 8 SWG wire
19-13-b-01 Provide & weave GI wire netting for wire crates 6"x6" mesh : 15 SWG wire
19-13-b-02 Provide & weave GI wire netting for wire crates 6"x6" mesh : 10 SWG wire
19-13-b-03 Provide & weave GI wire netting for wire crates 6"x6" mesh : 8 SWG wire
19-13-c-01 Provide & weave GI wire netting for wire crates 4"x6" mesh : 15 SWG wire
19-13-c-02 Provide & weave GI wire netting for wire crates 4"x6" mesh : 10 SWG wire
19-13-c-03 Provide & weave GI wire netting for wire crates 4"x6" mesh : 8 SWG wire
19-14 Providing and Laying shingle on top of bund, including handling of materials within 100 m.
19-15-a Supply & dump at site, without boat, including handling within 100m : Stone or boulder
19-15-a-01 Supply & dump at site, without boat, including handling within 100m : boulders
19-15-b Supply & dump at site, without boat, including handling within 100m : Shingle or spawls
19-15-c Supply & dump at site, without boat, including handling within 100m : Brick bats
19-16-a Supplying and dumping by boat, including loading within 1 00m lead : Stone or boulder
19-16-b Supplying and dumping by boat, including loading within 100m lead : Shingle or spawls
19-16-c Supplying and dumping by boat, including loading within 100m lead : Brick bats
19-17-a Provide & fill brick bats in crates, excluding cost of crates : without hand packing.
19-17-b Provide & fill brick bats in crates, excluding cost of crates : with hand packing.
19-18-a Supply & fill bricks in wire crates including sewing crates, excl cost of crates : Stone or boulder
19-18-b Supply & fill bricks in wire crates including sewing crates, excl cost of crates : Shingle or spawls
19-19 Extra for anchoring boat for dumping by boats or tipping crates
19-20 Extra for tipping crates (in addition to achoring boats)
19-21 Pilchi revetment, including carriage upto 1.5 km
19-22 Surface protection with pilchi matresses including carriage upto 1.5 km.
19-23 Pilchi, sarkanda or frash pitching on slopes, incl supply within 1.5 km, pegging & tying with wire
19-24-a P&E groynes, vertical wooden stakes 7"-12" dia Upto 1.5 m high, single row of stakes at 0.3m
19-24-b P&E groynes, vertical wooden stakes 7"-12" dia Upto 3 m high, double row of stakes at 0.6m
19-25 Providing and Laying stone pithcing/filling, dry hand packed in pitching & aprons
19-26 Supplying stone and stone filling in GI wire crate and its sewing, excluding cost of crates
19-27 Providing and Laying stone pitching with hammer dressed stones on surface, laid in courses
19-28-a Providing and Laying stone pitching for top layer only : On slope
19-28-b Providing and Laying stone pitching for top layer only : On level
19-29-a Providing and Laying stone or spawl filling : On slope
19-29-b Providing and Laying stone or spawl filling : On level
19-30-a Providing and Laying grouted stone pitching, in 1:8 c/s mortar Top layer on slope
19-30-b Providing and Laying grouted stone pitching, in 1:8 c/s mortar Top layer on level
19-30-c Providing and Laying grouted stone pitching, in 1:8 c/s mortar Stone pitching/filling on slope or on level
19-31-a Grouting stone pitching or apron etc, in : Cement, sand mortar 1:3
19-31-b Grouting stone pitching or apron etc, in : Cement, sand mortar 1:8
19-32 Sand grouting in stone apron, with high pressure hose
19-33 Grouting stone filling or pitching with bajri
19-34 Remove stone & repitching hand packed, on slopes or level, making good damaged portion
19-35 Collect & stack boulders from nullah beds or loose shale etc within 100m lead
19-36 Levelling and dressing stone filling under blocks and grouting with shingle
19-37 Grouting jharies between blocks with bajri
19-38-a Breaking stone into spawls and stacking
19-38-b Stone pitching with hammer dressed stone on surface laid in courses including carriage of material with in 91.50 (300 feet) meters.
19-38-c Stone pitching hand packed with surface levelled off to the correct section with hammer dressed stone and voids filled in 1:8 cement mort
19-38-d Removing stone and repitching, hand packed on slopes after making good damage slope.
19-38-e Collecting and stacking boulders from nullah beds or loose shale from any other site, within 91.50 (300 feet) meter lead
19-38-f-01 Stone pitching for top layer only on slop
19-38-f-02 Stone pitching for top layer only on Bed
19-38-g-01 Laying stone or spawl filling. a)on level
19-38-g-02 Laying stone or spawl filling. a)on slop
19-39-a Fix floating spurs, with material from canal plantation within 1 km : Upto 2' FS depth
19-39-b Fix floating spurs, with material from canal plantation within 1 km : Over 2' to 3' FS depth
19-39-c Fix floating spurs, with material from canal plantation within 1 km : Over 3' to 4' FS depth
19-39-d Fix floating spurs, with material from canal plantation within 1 km : Exceeding 4' depth
19-40-a-01 Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Unsharpened within 1km
19-40-a-02 Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Sharpening one end
19-40-a-03 Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Driving 1' below ground
19-40-a-04 Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Tying with munj, patha ban
19-40-a-05 Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Wattle+intertwine brushwood
19-40-b-01 Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Unsharpened within 1km
19-40-b-02 Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Sharpening one end
19-40-b-03 Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Driving 1.25' below ground
19-40-b-04 Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Tying with munj, patha ban
19-40-b-05 Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Wattle+intertwine brushwood
19-40-c-01 Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Unsharpened within 1km
19-40-c-02 Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Sharpening one end
19-40-c-03 Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Driving 1.5' below ground
19-40-c-04 Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Tying with munj, patha ban
19-40-c-05 Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Wattle+intertwine brushwood
19-40-d-01 Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Unsharpened within 1km
19-40-d-02 Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Sharpening one end
19-40-d-03 Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Driving 1.75' below ground
19-40-d-04 Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Tying with munj, patha ban
19-40-d-05 Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Wattle+intertwine brushwood
19-40-e-01 Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Unsharpened within 1km
19-40-e-02 Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Sharpening one end
19-40-e-03 Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Driving 2' below ground
19-40-e-04 Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Tying with munj, patha ban
19-40-e-05 Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Wattle+intertwine brushwood
19-41-a-01 Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Supply bamboo
19-41-a-02 Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Sharpen one end
19-41-a-03 Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Driving bamboo 2.5'
19-41-a-04 Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Tying bamboo with wire
19-41-a-05 Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Wattle & intertwine.
19-41-b-01 Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Supply bamboo
19-41-b-02 Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Sharpen one end
19-41-b-03 Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Driving bamboo 2.75'
19-41-b-04 Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Tying bamboo with wire
19-41-b-05 Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Wattle & intertwine
19-41-c-01 Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Supply bamboo
19-41-c-02 Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Sharpen one end
19-41-c-03 Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Driving bamboo 3.5'
19-41-c-04 Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Tying bamboo with wire
19-41-c-05 Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Wattle & intertwine
19-41-d-01 Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Supply bamboo
19-41-d-02 Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Sharpen one end
19-41-d-03 Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Driving bamboo 4'
19-41-d-04 Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Tying bamboo with wire
19-41-d-05 Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Wattle & intertwine.
19-41-e-01 Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Supply bamboo
19-41-e-02 Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Sharpen one end
19-41-e-03 Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Driving bamboo 4'
19-41-e-04 Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Tying bamboo with wire
19-41-e-05 Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Wattle & intertwine
19-42 Cut & supply brushwood from canal plantation or from any other source, within 1.5 km.
19-43 Filling brush wood only, thoroughly packed
19-44 Covering road 10' to 12' wide, with 3" sarkanda or jungle, upto 50m lead
19-45 Gachi pitching 1' thick
19-46 Gachi pitching done with silt clearance and berm dressing
19-47 Filter granular backfill behind retaining wall (stone/boulder filling upto one meter to prevent choking of weep holes).
20-01-a Earthwork for Outlets : Exc/Refill/Ram/Puddle Upto 50 cusecs channel discharge.
20-01-b Earthwork for outlets : Exc/Refill/Ram/Puddle 51-100 cusecs channel discharge
20-01-c Earthwork for outlets : Exc/Refill/Ram/Puddle 101-200 cusecs channel discharge
20-01-d Earthwork for outlets : Exc/Refill/Ram/Puddle 201-350 cusecs channel discharge
20-01-e Earthwork for Outlets : Ex/Refill/Ram/Puddle Over 350 cusecs channel discharge
20-02-a Dismantling outlets: Old types such as KGO's orfices, etc
20-02-b Dismantling outlets: APM or OF, 'H' upto 2.0 ft.
20-02-c Dismantling outlets: APM or OF, 'H' from 2.1-3.0ft
20-02-d Dismantling outlets: APM or OF, 'H' above 3.0 ft
20-02-e Dismantling outlets: Tail cluster bifurcation
20-02-f Dismantling outlets: Tail cluster trifurcation
20-02-g Dismantling outlets: Tail cluster quardification
20-03 Making temporary APM brick block & fixing at site
20-04 Dismantling walls, taking out temporary APM brick block, fixing iron block & rebuilding walls
20-05 Dismantling walls & fitting iron block of OF outlet
20-06-a Constructing, watching & removing bund for outlet built in running water : Upto 3' depth
20-06-b Constructing, watching & removing bund for outlet built in running water : Over 3' depth
20-07 Adjusting "B" of tail cluster by dismantling and rebuilding throat walls
20-08 Adjusting "Y" of an APM outlet, including dismantling and rebuilding
20-09-a Extra labour in fixing APM and OF outlet blocks Depth exceeding 5.0'
20-09-b Extra labour in fixing APM and OF outlet blocks Depth more than 4.0' to 5.0'
20-09-c Extra labour in fixing APM and OF outlet blocks Depth more than 3.0' to 4.0'
20-09-d Extra labour in fixing APM and OF outlet blocks Depth more than 2.0' to 3.0'
20-09-e Extra labour in fixing APM and OF outlet blocks Depth upto 2.0'
20-10 Repairing damaged reducing collar of hume pipe outlets
20-11 Laying iron pipes for outlets.
20-12 Water allowance for constructing outlets or culverts, when canal water not flowing.
20-13 Hoisting and placing RC slab or stone in position on outlets or WC culverts
20-14-a Fixing pipe outlet, including backfilling of earth & puddling : Portion under bank
20-14-b Fixing pipe outlet, including backfilling of earth & puddling : Portion under road, beyond bank
20-15-a Removing pipe outlet,refilling earth & puddling Portion under bank
20-15-b Removing pipe outlet,refilling earth & puddling Portion under road, beyond
20-16-a Changing pipe outlets by removing one pipe & replacing : Portion under bank
20-16-b Changing pipe outlets by removing one pipe & replacing : Portion under road, beyond
21-01-a-01 Excavate well in dry & dispose of soil within 50m in ordinary soil or sand : Upto 1.5 m depth
21-01-a-02 Excavate well in dry & dispose of soil within 50m in ordinary soil or sand : 1.5 to 3 m depth
21-01-a-03 Excavate well in dry & dispose of soil within 50m in ordinary soil or sand : 3 to 4.5 m depth
21-01-a-04 Excavate well in dry & dispose of soil within 50m in ordinary soil or sand : 4.5 to 6 m depth
21-01-b-01 Excavate well in dry & dispose of soil within 50m in hard soil : Upto 1.5 m depth
21-01-b-02 Excavate well in dry & dispose of soil within 50m in hard soil : Above 1.5 to 3 m depth
21-01-b-03 Excavate well in dry & dispose of soil within 50m in hard soil : Above 3 to 4.5 m depth
21-01-b-04 Excavate well in dry & dispose of soil within 50m in hard soil : Above 4.5 to 6 m depth
21-01-c-01 Excavate well in dry & dispose of soil within 50m in hard strata like shingle : Upto 1.5 m depth
21-01-c-02 Excavate well in dry & dispose of soil within 50m in hard strata like shingle :1.5 to 3 m depth
21-01-c-03 Excavate well in dry & dispose of soil within 50m in hard strata like shingle : 3 to 4.5 m depth
21-01-c-04 Excavate well in dry & dispose of soil within 50m in hard strata like shingle : 4.5 to 6 m depth
21-02-a-01 Dry sinking of well & disposal of soil within 50m in ordinary soil : 3 to 4.5 m depth
21-02-a-02 Dry sinking of well & disposal of soil within 50m in ordinary soil : 4.5 to 6 m depth
21-02-a-03 Dry sinking of well & disposal of soil within 50m in ordinary soil : 6 to 7.5 m depth
21-02-a-04 Dry sinking of well & disposal of soil within 50m in ordinary soil : 7.5 to 9 m depth
21-02-a-05 Dry sinking of well & disposal of soil within 50m in ordinary soil : 9 to 10.5 m depth
21-02-a-06 Dry sinking of well & disposal of soil within 50m in ordinary soil : 10.5 to 12 m depth
21-02-a-07 Dry sinking of well & disposal of soil within 50m in ordinary soil : 12 to 13.5 m depth
21-02-a-08 Dry sinking of well & disposal of soil within 50m in ordinary soil : Exceeding 13.5 m depth
21-02-b-01 Dry sinking of well & disposal of soil within 50m in hard soil : 3 to 4.5 m depth
21-02-b-02 Dry sinking of well & disposal of soil within 50m in hard soil : 4.5 to 6 m depth
21-02-b-03 Dry sinking of well & disposal of soil within 50m in hard soil : 6 to 7.5 m depth
21-02-b-04 Dry sinking of well & disposal of soil within 50m in hard soil : 7.5 to 9 m depth
21-02-b-05 Dry sinking of well & disposal of soil within 50m in hard soil : 9 to 10.5 m depth
21-02-b-06 Dry sinking of well & disposal of soil within 50m in hard soil : 10.5 to 12 m depth
21-02-b-07 Dry sinking of well & disposal of soil within 50m in hard soil : 12 to 13.5 m depth
21-02-b-08 Dry sinking of well & disposal of soil within 50m in hard soil : Exceeding 13.5 m depth
21-02-c-01 Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 3 to 4.5 m depth
21-02-c-02 Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 4.5 to 6 m depth
21-02-c-03 Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 6 to 7.5 m depth
21-02-c-04 Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 7.5 to 9 m depth
21-02-c-05 Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 9 to 10.5 m depth
21-02-c-06 Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 10.5 to 12 m depth
21-02-c-07 Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 12 to 13.5 m depth
21-02-c-08 Dry sinking of well & disposal of soil within 50m in hard strata like shingle : Over 13.5 m depth
21-03-a-01 Wet sinking of well for depths below spring level Upto 1.5 m depth
21-03-a-02 Wet sinking of well for depths below spring level Above 1.5 to 3 m depth
21-03-a-03 Wet sinking of well for depths below spring level Above 3 to 4.5 m depth
21-03-a-04 Wet sinking of well for depths below spring level Above 4.5 to 6 m depth
21-03-a-05 Wet sinking of well for depths below spring level Above 6 to 7.5 m depth
21-03-a-06 Wet sinking of well for depths below spring level Above 7.5 to 9 m depth
21-03-a-07 Wet sinking of well for depths below spring level Above 9 to 10.5 m depth
21-03-a-08 Wet sinking of well for depths below spring level Above 10.5 to 12 m depth
21-03-a-09 Wet sinking of well for depths below spring level Above 12 to 13.5 m depth
21-03-a-10 Wet sinking of well for depths below spring level Exceeding 13.5 m depth
21-03-b-01 Wet sinking of well for depths below spring level in cohesive soil : Upto 1.5 m depth
21-03-b-02 Wet sinking of well for depths below spring level in cohesive soil : 1.5 to 3 m depth
21-03-b-03 Wet sinking of well for depths below spring level in cohesive soil : Above 3 to 4.5 m depth
21-03-b-04 Wet sinking of well for depths below spring level in cohesive soil : Above 4.5 to 6 m depth
21-03-b-05 Wet sinking of well for depths below spring level in cohesive soil : Above 6 to 7.5 m depth
21-03-b-06 Wet sinking of well for depths below spring level in cohesive soil : Above 7.5 to 9 m depth
21-03-b-07 Wet sinking of well for depths below spring level in cohesive soil : Above 9 to 10.5 m depth
21-03-b-08 Wet sinking of well for depths below spring level in cohesive soil : Above 10.5 to 12 m depth
21-03-b-09 Wet sinking of well for depths below spring level in cohesive soil : Above 12 to 13.5 m depth
21-03-b-10 Wet sinking of well for depths below spring level in cohesive soil : Exceeding 13.5 m depth
21-03-c-01 Wet sinking of well for depths below spring level in shingle/gravel etc : Upto 1.5 m depth
21-03-c-02 Wet sinking of well for depths below spring level in shingle/gravel etc : 1.5 to 3 m depth
21-03-c-03 Wet sinking of well for depths below spring level in shingle/gravel etc : 3 to 4.5 m depth
21-03-c-04 Wet sinking of well for depths below spring level in shingle/gravel etc : 4.5 to 6 m depth
21-03-c-05 Wet sinking of well for depths below spring level in shingle/gravel etc : 6 to 7.5 m depth
21-03-c-06 Wet sinking of well for depths below spring level in shingle/gravel etc : 7.5 to 9 m depth
21-03-c-07 Wet sinking of well for depths below spring level in shingle/gravel etc : 9 to 10.5 m depth
21-03-c-08 Wet sinking of well for depths below spring level in shingle/gravel etc : 10.5 to 12 m depth
21-03-c-09 Wet sinking of well for depths below spring level in shingle/gravel etc : 12 to 13.5 m depth
21-03-c-10 Wet sinking of well for depths below spring level in shingle/gravel etc : Exceeding 13.5 m depth
21-04 Making & fixing in position, kikar wood well curb
21-05 Laying well curb in position only
21-06-a Providing & laying RCC well curb in position, using coarse sand : Ratio 1:1.5:3
21-06-b Providing & laying RCC well curb in position, using coarse sand : Ratio 1:2:4.
21-07 Providing and fixing structural steel for cutting edge
22-01-a-01 Tega formed of pacca bricks on end, laid in and over c/s mortar : 3" thick : Ratio 1:3
22-01-a-02 Tega formed of pacca bricks on end, laid in and over c/s mortar : 3" thick : Ratio 1:5
22-01-b-01 Tega formed of pacca bricks on end, laid in and over c/s mortar : 4.5" thick : Ratio 1:3
22-01-b-02 Tega formed of pacca bricks on end, laid in and over c/s mortar : 4.5" thick : Ratio 1:5
22-02-a Pacca flat brick 3" thick, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:3
22-02-b Pacca flat brick 3" thick, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:5
22-02-c Pacca flat brick 3" thick, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:6
22-03-a Pacca brick on edge, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:3
22-03-b Pacca brick on edge, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:5
22-03-c Pacca brick on edge, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:6
22-04-a Pacca flat brick, Herring bond pitching in c/s mortar laid to line, grade, slope etc : Ratio 1:3
22-04-b Pacca flat brick, Herring bond pitching in c/s mortar laid to line, grade, slope etc : Ratio 1:5
22-04-c Pacca flat brick, Herring bond pitching in c/s mortar laid to line, grade, slope etc : Ratio 1:6
22-05-a Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type I.
22-05-b Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type II
22-05-c Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type III
22-05-d Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type IV
22-05-e Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type V
22-05-f Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type VI
22-05-g Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type VII
22-05-h Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type VIII
22-05-i Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type IX
22-05-j Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type X
22-05-k Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type XI
22-05-l Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type XII
22-06-a Laying RC hume pipes in position including jointing 6" to 12" dia
22-06-b Laying RC hume pipes in position including jointing 12" to 24" dia
22-06-c Laying RC hume pipes in position including jointing 24" to 36" dia
23-01-a Providing and Laying RCC pipe, moulded with cement concrete 1:1.5:3, including cost of reinforcement, testing etc : 4" dia:
23-01-b Providing and Laying RCC pipe, moulded with cement concrete 1:1.5:3, including cost of reinforcement, testing etc : 6" dia:
23-01-c Providing and Laying RCC pipe, moulded with cement concrete 1:1.5:3, including cost of reinforcement, testing etc : 9" dia:
23-02-a Providing and Laying non-reinforced concrete pipe, moulded with cement concrete 1:1.5:3 complete : 4" internal diameter
23-02-b Providing and Laying non-reinforced concrete pipe, moulded with cement concrete 1:1.5:3 complete : 6" i/d
23-02-c Providing and Laying non-reinforced concrete pipe, moulded with cement concrete : 9" i/d wall thickness 1".
23-03-a-01 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 12" i/d, Wall B
23-03-a-02 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 15" i/d, Wall B
23-03-a-03 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 18" i/d, Wall B
23-03-a-04 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 21" i/d, Wall B
23-03-a-05 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 24" i/d, Wall B
23-03-a-06 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 27" i/d, Wall B
23-03-a-07 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 30" i/d, Wall B
23-03-a-08 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 33" i/d, Wall B
23-03-a-09 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 36" i/d, Wall B
23-03-a-10 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 42" i/d, Wall B
23-03-a-11 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 48" i/d, Wall B
23-03-a-12 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 54" i/d, Wall B
23-03-a-13 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 60" i/d, Wall B
23-03-a-14 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 66" i/d, Wall B
23-03-a-15 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 72" i/d, Wall B
23-03-b-01 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 12" i/d, Wall B
23-03-b-02 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 15" i/d, Wall B
23-03-b-03 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 18" i/d, Wall B
23-03-b-04 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 21" i/d, Wall B
23-03-b-05 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 24" i/d, Wall B
23-03-b-06 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 27" i/d, Wall B
23-03-b-07 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 30" i/d, Wall B
23-03-b-08 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 33" i/d, Wall B
23-03-b-09 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 36" i/d, Wall B
23-03-b-10 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 42" i/d, Wall B
23-03-b-11 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 48" i/d, Wall B
23-03-b-12 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 54" i/d, Wall B
23-03-b-13 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 60" i/d, Wall B
23-03-b-14 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 66" i/d, Wall B
23-03-b-15 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 72" i/d, Wall B
23-03-c-01 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 12" i/d, Wall B
23-03-c-02 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 15" i/d, Wall B
23-03-c-03 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 18" i/d, Wall B
23-03-c-04 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 21" i/d, Wall B
23-03-c-05 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 24" i/d, Wall B
23-03-c-06 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 27" i/d, Wall B
23-03-c-07 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 30" i/d, Wall B
23-03-c-08 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 33" i/d, Wall B
23-03-c-09 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 36" i/d, Wall B
23-03-c-10 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 42" i/d, Wall B
23-03-c-11 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 48" i/d, Wall B
23-03-c-12 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 54" i/d, Wall B
23-03-c-13 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 60" i/d, Wall B
23-03-c-14 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 66" i/d, Wall B
23-03-c-15 Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 72" i/d, Wall B
23-04-a Lowering of sub-soil water table by tubewells Upto 1 ft below SSWL.
23-04-b Lowering of sub-soil water table by tubewells 0 - 2 ft below SSWL.
23-04-c Lowering of sub-soil water table by tubewell 0 - 3 ft below SSWL
23-04-d Lowering of sub-soil water table by tubewells 0 - 4 ft below SSWL
23-04-e Lowering of sub-soil water table by tubewells 0 - 5 ft below SSWL
23-04-f Lowering of sub-soil water table by tubewells 0 - 6 ft below SSWL
23-04-g Lowering of sub-soil water table by tubewells 0 - 7 ft below SSWL
23-04-h Lowering of sub-soil water table by tubewells 0 - 8 ft below SSWL
23-04-i Lowering of sub-soil water table by tubewells 0 - 9 ft below SSWL
23-04-j Lowering of sub-soil water table by tubewells 0 - 10 ft below SSWL
23-04-k Lowering of sub-soil water table by tubewells 0 - 11 ft below SSWL
23-04-l Lowering of sub-soil water table by tubewells 0 - 12 ft below SSWL
23-05-a Constructing gully grating chamber complete With CI gully trap,weighing 81 lbs. frame hinged.
23-05-b Constructing gully grating chamber complete Concrete gully trap
23-06 Fixing manhole frame and cover in RCC slab, including carriage to site
23-07 Providing and Fixing 3" thick RCC manhole cover, 22" dia with tee shaped CI frame of 20" clear i/d complete
23-08-a RCC manhole cover 22" dia with: Tee shaped CI frame, 22" i/d complete
23-08-b RCC manhole cover 22" dia with: 3"x3"x1/4" angle iron frame, 22" i/d complete
23-09-a Providing and Fixing CI ventilating shaft of 9" i/d, painted with bitumenous paint complete : 18 ft. long
23-09-b Providing and Fixing CI ventilating shaft of 9" i/d, painted with bitumenous paint complete : 24 ft. long
23-09-c Providing and Fixing CI ventilating shaft of 9" i/d, painted with bitumenous paint complete : 30 ft. long
23-09-d Providing and Fixing CI ventilating shaft of 9" i/d, painted with bitumenous paint complete : 36 ft. long
23-10 Septic Tank (int.Size: 7'x2'x5') complete
23-11 Soakage Pit (6'dia x 15' deep) complete
24-01 Mobilization of plant, equipment and camping arrangements etc & demobilization after completion
24-02-a-01 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 3" i/d
24-02-a-02 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 4" i/d
24-02-a-03 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 5" i/d
24-02-a-04 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 6" i/d
24-02-a-05 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 8" i/d
24-02-a-06 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 10" i/d
24-02-a-07 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 12" i/d
24-02-a-08 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 15" i/d
24-02-a-09 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 18" i/d
24-02-b-01 Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 5" i/d
24-02-b-02 Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 6" i/d
24-02-b-03 Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 8" i/d
24-02-b-04 Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 10" i/d
24-02-b-05 Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 12" i/d
24-02-b-06 Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 15" i/d
24-02-b-07 Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 18" i/d
24-02-c-01 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 5" i/d
24-02-c-02 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 6" i/d
24-02-c-03 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 8" i/d
24-02-c-04 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 10" i/d
24-02-c-05 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 12" i/d
24-02-c-06 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 15" i/d
24-02-c-07 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 18" i/d
24-02-d-01 Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 8" i/d
24-02-d-02 Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 10" i/d
24-02-d-03 Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 12" i/d
24-02-d-04 Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 15" i/d
24-02-d-05 Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 18" i/d
24-03-a-01 Rotary drilling except in shingle, gravel & rock From ground to 250' below ground : 5"-18" i/d
24-03-a-02 Rotary drilling except in shingle, gravel & rock From ground to 250' below ground : 20"-26" i/d
24-03-b-01 Rotary drilling except in shingle, gravel & rock Exceeding 250' below ground : 5"-18" i/d
24-03-b-02 Rotary drilling except in shingle, gravel & rock Exceeding 250' below ground : 20"-26" i/d
24-04-a-01 Boring for tubewell in shingle, gravel & rock From ground to 200' below ground : 12"-18" i/d
24-04-a-02 Boring for tubewell in shingle, gravel & rock From ground to 200' below ground : 20"-26" i/d
24-04-b-01 Boring for tubewell in shingle, gravel & rock Over 200' depth below ground : 12"-18" i/d
24-04-b-02 Boring for tubewell in shingle, gravel & rock Over 200' depth below ground : 20"-26" i/d
24-05 Providing strong substantially built box of deodar 4'x2«'x9", with compartments & lock
24-06 Furnishing sample of water from bore hole
24-07-a Providing and installing brass strainer in tubewell bore hole 6" i/d, 3/16" thick
24-07-b Providing and installing brass strainer in tubewell bore hole 8" i/d, 3/16" thick
24-07-c Providing and installing brass strainer in tubewell bore hole 10" i/d 3/16" thick
24-07-d Providing and installing brass strainer in tubewell bore hole 10" i/d, 1/4" thick
24-07-e Providing and installing brass strainer in tubewell bore hole 12" i/d, 1/4" thick
24-08-a Providing and installing MS bail plug in tubewell bore hole 6" i/d, 2 ft. long
24-08-b Providing and installing MS bail plug in tubewell bore hole 8" i/d, 2 ft. long
24-08-c Providing and installing MS bail plug in tubewell bore hole 10" i/d, 2 ft. long
24-08-d Providing and installing MS bail plug in tubewell bore hole 12" i/d, 2 ft. long
24-09-a-01 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'B' working pressure : 6" i/d
24-09-a-02 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'B' working pressure : 8" i/d
24-09-a-03 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'B' working pressure : 10" i/d
24-09-a-04 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'B' working pressure : 12" i/d
24-09-b-01 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'C' working pressure : 6" i/d
24-09-b-02 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'C' working pressure : 8" i/d
24-09-b-03 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'C' working pressure : 10" i/d
24-09-b-04 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'C' working pressure : 12" i/d
24-09-c-01 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'D' working pressure : 6" i/d
24-09-c-02 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'D' working pressure : 8" i/d
24-09-c-03 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'D' working pressure : 10" i/d
24-09-c-04 Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'D' working pressure : 12" i/d
24-10-a-01 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'B' working pressure : 6" i/d : 2' long
24-10-a-02 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'B' working pressure : 8" i/d : 2' long
24-10-a-03 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'B' working pressure : 10" i/d : 2' long
24-10-a-04 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'B' working pressure : 12" i/d : 2' long
24-10-b-01 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'C' working pressure : 6" i/d : 2' long
24-10-b-02 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'C' working pressure : 8" i/d : 2' long
24-10-b-03 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'C' working pressure : 10" i/d : 2' long
24-10-b-04 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'C' working pressure : 12" i/d : 2' long
24-10-c-01 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'D' working pressure : 6" i/d : 2' long
24-10-c-02 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'D' working pressure : 8" i/d : 2' long
24-10-c-03 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'D' working pressure : 10" i/d : 2' long
24-10-c-04 Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'D' working pressure : 12" i/d : 2' long
24-11-a Providing and installing MS blind pipe socket/welded joint MS reducer in tubewell borehole : 6" i/d, 3/16" thick
24-11-b Providing and installing MS blind pipe socket/welded joint MS reducer in tubewell borehole : 8" i/d, 3/16" thick
24-11-c Providing and installing MS blind pipe socket/welded joint MS reducer in tubewell borehole : 10" i/d 3/16" thick
24-11-d Providing and installing MS blind pipe socket/welded joint MS reducer in tubewell borehole : 12" i/d, 1/4" thick
24-12-a-01 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'B' working pressure : 6" i/d
24-12-a-02 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'B' working pressure : 8" i/d
24-12-a-03 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'B' working pressure : 10" i/d
24-12-a-04 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'B' working pressure : 12" i/d
24-12-b-01 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'C' working pressure : 6" i/d
24-12-b-02 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'C' working pressure : 8" i/d
24-12-b-03 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'C' working pressure : 10" i/d
24-12-b-04 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'C' working pressure : 12" i/d
24-12-c-01 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'D' working pressure : 6" i/d
24-12-c-02 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'D' working pressure : 8" i/d
24-12-c-03 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'D' working pressure : 10" i/d
24-12-c-04 Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'D' working pressure : 12" i/d
24-13-a Test & develop tubewell of size 6" i/d & above continuously : Upto 1.5 cusecs discharge.
24-13-b Test & develop tubewell of size 6" i/d & above continuously : Over 1.5 cusecs discharge with DNT unit
24-14 Shrouding with graded pack grave 3/8" to 1/8" around tubewell in bore hole.
24-15-a Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 3" i/d.
24-15-b Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 4" i/d.
24-15-c Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 6" i/d
24-15-d Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches. complete : 8" i/d
24-15-e Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 10" i/d
24-15-f Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 12" i/d
24-16-a-01 Providing and Laying cut, joint, test & disinfect GI pipeline Using heavy quality GI Pipe : 4" Dia
24-16-a-02 Providing and Laying cut, joint, test & disinfect GI pipeline Using heavy quality GI Pipe : 6" Dia
24-16-a-03 Providing and Laying cut, joint, test & disinfect GI pipeline Using heavy quality GI Pipe : 8" Dia
24-16-b-01 Providing and Laying cut, joint, test & disinfect GI pipeline Using medium quality GI Pipe : 4" Dia
24-16-b-02 Providing and Laying cut, joint, test & disinfect GI pipeline Using medium quality GI Pipe : 6" Dia
24-16-b-03 Providing and Laying cut, joint, test & disinfect GI pipeline Using medium quality GI Pipe : 8" Dia
24-16-c-01 Providing and Laying cut, joint, test & disinfect GI pipeline Using light quality GI Pipe : 1/2" i/d
24-16-c-02 Providing and Laying cut, joint, test & disinfect GI pipeline Using light quality GI Pipe : 3/4" i/d
24-16-c-03 Providing and Laying cut, joint, test & disinfect GI pipeline Using light quality GI Pipe : 1" i/d
24-16-c-04 Providing and Laying cut, joint, test & disinfect GI pipeline Using light quality GI Pipe : 1.25" i/d
24-16-c-05 Providing and Laying cut, joint, test & disinfect GI pipeline Using light quality GI Pipe : 1.5" i/d
24-16-c-06 Providing and Laying cut, joint, test & disinfect GI pipeline Using light quality GI Pipe : 2" i/d
24-16-c-07 Providing and Laying cut, joint, test & disinfect GI pipeline Using light quality GI Pipe : 2.5" i/d
24-16-c-08 Providing and Laying cut, joint, test & disinfect GI pipeline Using light quality GI Pipe : 3" i/d
24-16-c-09 Providing and Laying cut, joint, test & disinfect GI pipeline Using light quality GI Pipe : 4" i/d
24-17-a-01 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 3" i/d
24-17-a-02 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 4" i/d
24-17-a-03 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 6" i/d
24-17-a-04 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 8" i/d
24-17-a-05 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 10" i/d
24-17-a-06 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 12" i/d
24-17-a-07 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 14" i/d
24-17-a-08 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 16" i/d
24-17-a-09 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 18" i/d
24-17-a-10 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 20" i/d
24-17-a-11 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'B'working pressure : 24" i/d
24-17-b-01 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 3" i/d
24-17-b-02 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 4" i/d
24-17-b-03 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 6" i/d
24-17-b-04 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 8" i/d
24-17-b-05 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 10" i/d
24-17-b-06 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 12" i/d
24-17-b-07 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 14" i/d
24-17-b-08 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 16" i/d
24-17-b-09 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 18" i/d
24-17-b-10 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 20" i/d
24-17-b-11 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'C'working pressure : 24" i/d
24-17-c-01 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 3" i/d
24-17-c-02 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 4" i/d
24-17-c-03 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 6" i/d
24-17-c-04 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 8" i/d
24-17-c-05 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 10" i/d
24-17-c-06 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 12" i/d
24-17-c-07 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 14" i/d
24-17-c-08 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 16" i/d
24-17-c-09 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 18" i/d
24-17-c-10 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 20" i/d
24-17-c-11 Providing and Laying cut, joint, test & disinfect AC pipeline BSS Class 'D'working pressure : 24" i/d
24-18-a-01 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'B'working pressure : 3" i/d
24-18-a-02 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'B'working pressure : 4" i/d
24-18-a-03 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'B'working pressure : 6" i/d
24-18-a-04 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'B'working pressure : 8" i/d
24-18-a-05 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'B'working pressure : 10" i/d
24-18-a-06 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'B'working pressure : 12" i/d
24-18-b-01 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'C'working pressure : 2.5" i/d
24-18-b-02 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'C'working pressure : 3" i/d
24-18-b-03 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'C'working pressure : 4" i/d
24-18-b-04 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'C'working pressure : 6" i/d
24-18-b-05 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'C'working pressure : 8" i/d
24-18-b-06 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'C'working pressure : 10" i/d
24-18-b-07 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'C'working pressure : 12" i/d
24-18-c-01 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 1.25" i/d
24-18-c-02 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 1.5" i/d
24-18-c-03 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 2" i/d
24-18-c-04 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 2.5" i/d
24-18-c-05 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 3" i/d
24-18-c-06 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 4" i/d
24-18-c-07 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 6" i/d
24-18-c-08 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 8" i/d
24-18-c-09 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 10" i/d
24-18-c-10 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'D' working pressure : 12" i/d
24-18-d-01 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'E' working pressure : 3/4" i/d
24-18-d-02 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'E' working pressure : 1" i/d
24-19-a-01 Providing and Fixing CI specials of BSS class 'B', 'C' & 'D'CISS specials, with spigot & socket : 3"-6" i/d
24-19-a-02 Providing and Fixing CI specials of BSS class 'B', 'C' & 'D'CISS specials, with spigot & socket : 8"-12" i/d
24-19-b-01 Providing and Fixing CI specials of BSS class 'B', 'C' & 'D'CI flanged specials with flanged joint : 3"-6" i/d
24-19-b-02 Providing and Fixing CI specials of BSS class 'B', 'C' & 'D'CI flanged specials with flanged joint : 8"-12" i/
24-19-c-01 Providing and Fixing CI specials of BSS class 'B', 'C' & 'D'CI specials with tyton joints : 3"-6" i/d
24-19-c-02 Providing and Fixing CI specials of BSS class 'B', 'C' & 'D'CI specials with tyton joints : 8"-12" i/d
24-20-a Providing and Fixing CI specials of BSS Class 'B', 'C' & 'D'working pressure for AC pipe line : 3" to 6" i/d
24-20-b Providing and Fixing CI specials of BSS Class 'B', 'C' & 'D'working pressure for AC pipe line : 8" to 18" i/d
24-21-a Providing and Fixing sluice valve, BSS quality/weight,Class 'B' working pressure for CI & AC pipe line : 3" i/d
24-21-b Providing and Fixing sluice valve, BSS quality/weight,Class 'B' working pressure for CI & AC pipe line : 4" i/d
24-21-c Providing and Fixing sluice valve, BSS quality/weight,Class 'B' working pressure for CI & AC pipe line : 6" i/d
24-21-d Providing and Fixing sluice valve, BSS quality/weight,Class 'B' working pressure for CI & AC pipe line : 8" i/d
24-21-e Providing and Fixing sluice valve, BSS quality/weight,Class 'B' working pressure for CI & AC pipe line : 10" i/d
24-21-f Providing and Fixing sluice valve, BSS quality/weight,Class 'B' working pressure for CI & AC pipe line : 12" i/d
24-22-a Providing and Fixing sluice valve of BSS quality weightfor GI & PVC pipe line including jointing material : 3" i/d
24-22-b Providing and Fixing sluice valve of BSS quality weightfor GI & PVC pipe line including jointing material : 4" i/d
24-22-c Providing and Fixing sluice valve of BSS quality weightfor GI & PVC pipe line including jointing material : 6" i/d
24-22-d Providing and Fixing sluice valve of BSS quality weightfor GI & PVC pipe line including jointing material : 8" i/d
24-22-e Providing and Fixing sluice valve of BSS quality weightfor GI & PVC pipe line including jointing material : 10" i/d
24-22-f Providing and Fixing sluice valve of BSS quality weightfor GI & PVC pipe line including jointing material : 12" i/d
24-22-g Providing and Fixing sluice valve of BSS quality weight for GI & PVC pipe line including jointing material : 15" i/d
24-22-h Providing and Fixing sluice valve of BSS quality weight for GI & PVC pipe line including jointing material : 18" i/d
24-23 Providing and Fixing fire hydrants BSS quality and weightof 2.5" dia (including cost of jointing material)
24-24-a Providing and Fixing air valve 2«" i/d of BSS quality andweight complete with jointing material : Single
24-24-b Providing and Fixing air valve 2«" i/d of BSS quality andweight complete with jointing material : Double
24-25-a Providing and Fixing CI flanges 5/8" thick on pipesincluding turning, facing & fitting etc complete : 3" to 6"i/d
24-25-b Providing and Fixing CI flanges 5/8" thick on pipesincluding turning, facing & fitting etc complete : 8" to 12"i/d
24-26-a-01 Providing and installing PVC bends BSS Class 'B'workingpressure : 2" i/d
24-26-a-02 Providing and installing PVC bends BSS Class 'B'workingpressure : 3" i/d
24-26-a-03 Providing and installing PVC bends BSS Class 'B'workingpressure : 4" i/d
24-26-a-04 Providing and installing PVC bends BSS Class 'B'workingpressure : 6" i/d
24-26-a-05 Providing and installing PVC bends BSS Class 'B'workingpressure : 8" i/d
24-26-a-06 Providing and installing PVC bends BSS Class 'B'workingpressure : 10" i/d
24-26-a-07 Providing and installing PVC bends BSS Class 'B'workingpressure : 12" i/d
24-26-b-01 Providing and installing PVC bends BSS Class 'C'workingpressure : 2" i/d
24-26-b-02 Providing and installing PVC bends BSS Class 'C'workingpressure : 3" i/d
24-26-b-03 Providing and installing PVC bends BSS Class 'C'workingpressure : 4" i/d
24-26-b-04 Providing and installing PVC bends BSS Class 'C'workingpressure : 6" i/d
24-26-b-05 Providing and installing PVC bends BSS Class 'C'workingpressure : 8" i/d
24-26-b-06 Providing and installing PVC bends BSS Class 'C'workingpressure : 10" i/d
24-26-b-07 Providing and installing PVC bends BSS Class 'C'workingpressure : 12" i/d
24-26-c-01 Providing and installing PVC bends BSS Class 'D'workingpressure : 2" i/d
24-26-c-02 Providing and installing PVC bends BSS Class 'D'workingpressure : 3" i/d
24-26-c-03 Providing and installing PVC bends BSS Class 'D'workingpressure : 4" i/d
24-26-c-04 Providing and installing PVC bends BSS Class 'D'workingpressure : 6" i/d
24-26-c-05 Providing and installing PVC bends BSS Class 'D'workingpressure : 8" i/d
24-26-c-06 Providing and installing PVC bends BSS Class 'D'workingpressure : 10" i/d
24-26-c-07 Providing and installing PVC bends BSS Class 'D'workingpressure : 12" i/d
24-27-a-01 Providing and installing PVC tees BSS Class 'B'workingpressure : 2" i/d
24-27-a-02 Providing and installing PVC tees BSS Class 'B'workingpressure : 3" i/d
24-27-a-03 Providing and installing PVC tees BSS Class 'B'workingpressure : 4" i/d
24-27-a-04 Providing and installing PVC tees BSS Class 'B'workingpressure : 6" i/d
24-27-a-05 Providing and installing PVC tees BSS Class 'B'workingpressure : 8" i/d
24-27-a-06 Providing and installing PVC tees BSS Class 'B'workingpressure : 10" i/d
24-27-a-07 Providing and installing PVC tees BSS Class 'B'workingpressure : 12" i/d
24-27-b-01 Providing and installing PVC tees BSS Class 'C'workingpressure : 2" i/d
24-27-b-02 Providing and installing PVC tees BSS Class 'C'workingpressure : 3" i/d
24-27-b-03 Providing and installing PVC tees BSS Class 'C'workingpressure : 4" i/d
24-27-b-04 Providing and installing PVC tees BSS Class 'C'workingpressure : 6" i/d
24-27-b-05 Providing and installing PVC tees BSS Class 'C'workingpressure : 8" i/d
24-27-b-06 Providing and installing PVC tees BSS Class 'C'workingpressure : 10" i/d
24-27-b-07 Providing and installing PVC tees BSS Class 'C'workingpressure : 12" i/d
24-27-c-01 Providing and installing PVC tees BSS Class 'D'workingpressure : 2" i/d
24-27-c-02 Providing and installing PVC tees BSS Class 'D'workingpressure : 3" i/d
24-27-c-03 Providing and installing PVC tees BSS Class 'D'workingpressure : 4" i/d
24-27-c-04 Providing and installing PVC tees BSS Class 'D'workingpressure : 6" i/d
24-27-c-05 Providing and installing PVC tees BSS Class 'D'workingpressure : 8" i/d
24-27-c-06 Providing and installing PVC tees BSS Class 'D'workingpressure : 10" i/d
24-27-c-07 Providing and installing PVC tees BSS Class 'D'workingpressure : 12" i/d
24-28-a-01 Providing and installing PVC sockets BSS ClassB'working pressure : 2" i/d
24-28-a-02 Providing and installing PVC sockets BSS ClassB'working pressure : 3" i/d
24-28-a-03 Providing and installing PVC sockets BSS ClassB'working pressure : 4" i/d
24-28-a-04 Providing and installing PVC sockets BSS ClassB'working pressure : 6" i/d
24-28-a-05 Providing and installing PVC sockets BSS ClassB'working pressure : 8" i/d
24-28-a-06 Providing and installing PVC sockets BSS ClassB'working pressure : 10" i/d
24-28-a-07 Providing and installing PVC sockets BSS ClassB'working pressure : 12" i/d
24-28-b-01 Providing and installing PVC sockets BSS ClassC'working pressure : 2" i/d
24-28-b-02 Providing and installing PVC sockets BSS ClassC'working pressure : 3" i/d
24-28-b-03 Providing and installing PVC sockets BSS ClassC'working pressure : 4" i/d
24-28-b-04 Providing and installing PVC sockets BSS ClassC'working pressure : 6" i/d
24-28-b-05 Providing and installing PVC sockets BSS ClassC'working pressure : 8" i/d
24-28-b-06 Providing and installing PVC sockets BSS ClassC'working pressure : 10" i/d
24-28-b-07 Providing and installing PVC sockets BSS ClassC'working pressure : 12" i/d
24-28-c-01 Providing and installing PVC sockets BSS ClassD'working pressure : 2" i/d
24-28-c-02 Providing and installing PVC sockets BSS ClassD'working pressure : 3" i/d
24-28-c-03 Providing and installing PVC sockets BSS ClassD'working pressure : 4" i/d
24-28-c-04 Providing and installing PVC sockets BSS ClassD'working pressure : 6" i/d
24-28-c-05 Providing and installing PVC sockets BSS ClassD'working pressure : 8" i/d
24-28-c-06 Providing and installing PVC sockets BSS ClassD'working pressure : 10" i/d
24-28-c-07 Providing and installing PVC sockets BSS ClassD'working pressure : 12" i/d
24-29-a-01 Providing and installing PVC tappered core BSS ClassB'working pressure : 2" i/d
24-29-a-02 Providing and installing PVC tappered core BSS ClassB'working pressure : 3" i/d
24-29-a-03 Providing and installing PVC tappered core BSS ClassB'working pressure : 4" i/d
24-29-a-04 Providing and installing PVC tappered core BSS ClassB'working pressure : 6" i/d
24-29-a-05 Providing and installing PVC tappered core BSS ClassB'working pressure : 8" i/d
24-29-a-06 Providing and installing PVC tappered core BSS ClassB'working pressure : 10" i/d
24-29-a-07 Providing and installing PVC tappered core BSS ClassB'working pressure : 12" i/d
24-29-b-01 Providing and installing PVC tappered core BSS ClassC'working pressure : 2" i/d
24-29-b-02 Providing and installing PVC tappered core BSS ClassC'working pressure : 3" i/d
24-29-b-03 Providing and installing PVC tappered core BSS ClassC'working pressure : 4" i/d
24-29-b-04 Providing and installing PVC tappered core BSS ClassC'working pressure : 6" i/d
24-29-b-05 Providing and installing PVC tappered core BSS ClassC'working pressure : 8" i/d
24-29-b-06 Providing and installing PVC tappered core BSS ClassC'working pressure : 10" i/d
24-29-b-07 Providing and installing PVC tappered core BSS ClassC'working pressure : 12" i/d
24-29-c-01 Providing and installing PVC tappered core BSS ClassD'working pressure : 2" i/d
24-29-c-02 Providing and installing PVC tappered core BSS ClassD'working pressure : 3" i/d
24-29-c-03 Providing and installing PVC tappered core BSS ClassD'working pressure : 4" i/d
24-29-c-04 Providing and installing PVC tappered core BSS ClassD'working pressure : 6" i/d
24-29-c-05 Providing and installing PVC tappered core BSS ClassD'working pressure : 8" i/d
24-29-c-06 Providing and installing PVC tappered core BSS ClassD'working pressure : 10" i/d
24-29-c-07 Providing and installing PVC tappered core BSS ClassD'working pressure : 12" i/d
24-30-a-01 Providing and Laying HDPE pipe Din-/Din-/ISO-4427incl testing & disinfect complete (20mm dia)
24-30-a-02 Providing and Laying HDPE pipeDin-8074/Din-8075/ISO-4427 including testing & disinfectcomplete (25mm dia)
24-30-a-03 Providing and Laying HDPE pipeDin-8074/Din-8075/ISO-4427 incl testing & disinfectcomplete (32mm dia)
24-30-a-04 Providing and Laying HDPE pipeDin-8074/Din-8075/ISO-4427 including testing & disinfectcomplete (40mm dia)
24-30-a-05 Providing and Laying HDPE pipeDin-8074/Din-8075/ISO-4427 including testing & disinfectcomplete (50mm dia)
24-30-a-06 Providing and Laying HDPE pipeDin-8074/Din-8075/ISO-4427 incl testing & disinfectcomplete (75mm dia)
24-30-a-07 Providing and Laying HDPE pipeDin-8074/Din-8075/ISO-4427 including testing & disinfectcomplete (110mm dia)
24-30-b-01 Providing and installing HDPE Socket 20mm dia
24-30-b-02 Providing and installing HDPE Socket 25mm dia
24-30-b-03 Providing and installing HDPE Socket 32mm dia
24-30-b-04 Providing and installing HDPE Socket 40mm dia
24-30-b-05 Providing and installing HDPE Socket 50mm dia
24-30-b-06 Providing and installing HDPE Socket 75mm dia
24-30-b-07 Providing and installing HDPE Socket 110mm dia
24-30-c-01 Providing and installing HDPE Tee 20mm dia
24-30-c-02 Providing and installing HDPE Tee 25mm dia
24-30-c-03 Providing and installing HDPE Tee 32mm dia
24-30-c-04 Providing and installing HDPE Tee 40mm dia
24-30-c-05 Providing and installing HDPE Tee 50mm dia
24-30-c-06 Providing and installing HDPE Tee 75mm dia
24-30-c-07 Providing and installing HDPE Tee 110mm dia
24-30-d-01 Providing and installing HDPE bend 20mm dia
24-30-d-02 Providing and installing HDPE bend 25mm dia
24-30-d-03 Providing and installing HDPE bend 32mm dia
24-30-d-04 Providing and installing HDPE bend 40mm dia
24-30-d-05 Providing and installing HDPE bend 50mm dia
24-30-d-06 Providing and installing HDPE bend 75mm dia
24-30-d-07 Providing and installing HDPE bend 110mm dia
24-30-e-01 Providing and installing HDPE adaptor 20mm
24-30-e-02 Providing and installing HDPE adaptor 25mm
24-30-e-03 Providing and installing HDPE adaptor 32mm
24-30-e-04 Providing and installing HDPE adaptor 40mm
24-30-e-05 Providing and installing HDPE adaptor 50mm
24-30-e-06 Providing and installing HDPE adaptor 75mm
24-30-e-07 Providing and installing HDPE adaptor 110mm
24-31-a S/H/J G.I. Flanged Pipe 18" i/d 6.35mm thick
24-31-b S/H/J G.I. Flanged Pipe 16" i/d 6.35mm thick
24-31-c S/H/J G.I. Flanged Pipe 12" i/d 6.35mm thick
24-31-d S/H/J G.I. Flanged Pipe 10" i/d 6.35mm thick
24-31-e S/H/J G.I. Flanged Pipe 8" i/d 5mm thick
24-31-f S/H/J G.I. Flanged Pipe 6" i/d 5mm thick
24-31-g S/H/J G.I. Flanged Pipe 4" i/d 5mm thick
24-32-a S/H/J MS Flanged Pipe 18" i/d 6.35mm thick
24-32-b S/H/J MS Flanged Pipe 16" i/d 6.35mm thick
24-32-c S/H/J MS Flanged Pipe 12" i/d 6.35mm
24-32-d S/H/J MS Flanged Pipe 10" i/d 6.35mm thick
24-32-e S/H/J MS Flanged Pipe 8" i/d 5mm thick
24-32-f S/H/J MS Flanged Pipe 6" i/d 5mm thick
24-32-g S/H/J MS Flanged Pipe 4" i/d 5mm thick
24-33 Supplying and Fixing MS manhole cover of 0.25" thicksheet & angle iron frame 2"x2"x0.25" with lock complete
24-34 Supplying and Fixing flat iron (2"x3/8") ladder for OHR,holes @ 15" c/c, steps of MS bars 5/8" i/d & paint compl
24-35 Supplying and Fixing C.I. vent pipe for storage tanksincluding jally etc
24-36-a Supplying and Fixing MS cap of 3/16" thick sheet : 10" i/d
24-36-b Supplying and Fixing MS Cap of 3/16" thick sheet : 8" i/d
24-36-c Supplying and Fixing MS Cap of 3/16" thick sheet : 6" i/d
24-38-a Supplying and Fixing Flanged Expansion Joints BSS2035: 18" i/d
24-38-b Supplying and Fixing Flanged Expansion Joint BS-2035 :16" i/d
24-38-c Supplying and Fixing Flanged Expansion Joint BS-2035 :12" i/d
24-38-d Supplying and Fixing Flanged Expansion Joint BSS-2035: 10" i/d
24-38-e Supplying and Fixing Flanged Expansion Joint BSS 2035: 8" i/d
24-38-f Supplying and Fixing Flanged Expansion Joints BSS 2035: 6" i/d
24-38-g Supplying and Fixing Flanged Expansion Joint BSS-2035: 4" i/d
24-39-a Supplying and Fixing MS Suspension Clamp 3/8" thickfor housing pipe : 18" i/d
24-39-b Supplying and Fixing MS Suspension Clamp 3/8" thickfor housing pipe : 16" i/d
24-39-c Supplying and Fixing MS Suspension Clamp 3/8" thickfor housing pipe : 12" i/d
24-39-d Supplying and Fixing MS Suspension Clamp 3/8" thickfor housing pipe : 10" i/d
24-39-e Supplying and Fixing MS Suspension Clamp 3/8" thickfor housing pipe : 8" i/d
24-39-f Supplying and Fixing MS Suspension Clamp 3/8" thickfor housing pipe : 6" i/d
24-39-g Supplying and Fixing MS Suspension Clamp 3/8" thickfor housing pipe : 4" i/d
24-40 Supplying and Fixing PVC Water Stopper 8" wide 3/8"thick
24-41 Conducting Elec: Resistivity survey of the area andfurnishing its reports.
24-42 Logging of bore hole with electrical equipment andfurnishing reports.
24-43 Providing and lowering pezu meter 1.25" GI pipe includingall accessories.
24-44 P&L Reflux valves (C.I) of BSS quality/weight includingjointing material 3" i/d-6" i/d.
24-45-a Laying cut, joint, test & disinfect of 8"i/d of GI pipe lineincluding cost of welding, excavation and fillingcompaction etc complete.
24-45-b Laying cut, joint, test & disinfect of 6"i/d of GI pipe lineincluding cost of welding, excavation and fillingcompaction etc complete.
24-45-c Laying cut, joint, test & disinfect of 4"i/d of GI pipe lineincluding cost of welding, excavation and fillingcompaction etc complete.
24-45-d Laying cut, joint, test & disinfect of 3"i/d of GI pipe lineincluding cost of welding, excavation and fillingcompaction etc complete.
24-46 Testing of soil for bearing capacity & chemical contentsupto any depth.
24-47 Supply and Fixing Affridev type hand pump upto 170 Feet
24-48-a Supply and Fixing Voltage Regulator 20 KVA
24-48-b Supply and Fixing Voltage Regulator 25 KVA
24-48-c Supply and Fixing Voltage Regulator 30 KV
24-48-d Supply and Fixing Voltage Regulator 50 KVA
24-48-e Supply and Fixing Voltage Regulator 75 KVA
24-48-f Supply and Fixing Voltage Regulator 100 KVA
24-49-a Providing and Fixing Brass peet / gate valve 1" dia
24-49-b Providing and Fixing Brass peet / gate valve 1.25" dia
24-49-c Providing and Fixing Brass peet / gate valve 1.5" dia
24-49-d Providing and Fixing Brass peet / gate valve 2" dia
24-49-e Providing and Fixing Brass peet / gate valve 2.5" dia
24-49-f Providing and Fixing Brass peet / gate valve 3" dia
24-49-g Providing and Fixing Brass peet / gate valve 4" dia
25-01 Laying, linking and packing tramway line
25-02 Dismantling tramway track
25-03 Laying, linking of BG track, including packing,straightening and levelling
25-04 Linking points and crossings, complete with fastenings
25-05 Bending or straightening BG rail with jim crow
25-06 Fixing street lamp posts
25-07 Binding ends of sleepers and timbers of all sizes & kinds,including spreading & restacking
25-08 Opening stacks of sleepers & timber of all kinds and sizes,including spreading for inspection
25-09 Small iron work, such as gusset plates, knees, bends,stirrups, straps, rings etc excluding erection
25-10 Fabrication of heavy steel work with angle, tees, sheet ironetc for making trusses, girders etc
25-11 Erection and fitting in position iron trusses, staging ofwater tanks, etc
25-12 Fixing corrugated iron sheet including rivetting, etc
25-13 Erecting corrugated iron sheet tanks, upto 20' height
25-14 Erecting rolled steel beams or old rails, in roof etc, erection& fixing in position
25-15 Erecting rolled steel beams or rails, erection for posts etc(other than in roofs)
25-16 Making bolts & nuts of iron rods
25-17-a Cutting rails,rolled steel joist & beams, with hacksaw :Upto 6" size
25-17-b Cutting rails,rolled steel joist & beams, with hacksaw :Above 6" size
25-18 Cutting rails or rolled steel beams of size below 6" with jim
25-19 Bending rolled steel beams or rails
25-20 Drilling holes,in plates upto 1/2" thick per inch dia. or partthereof
25-21 Extra for drilling holes in plates over 1/2" thick per inchdia, or part thereof
25-22 Rivetting 1/8" dia
25-23 Cutting out Rivets, all sizes.
25-24 Fitting and erection of gutters of sheet iron
25-25 Cutting and fixing iron bars, for barred windows
25-26 Cutting GI sheets of 2'-8" wide.
25-27 Notching web or foot of rail posts for housing rail beams
25-28 Hoop iron netted trellis work fixed with nails
25-29 Fixing zinc, iron or GI sheet on table tops
25-30 Making and fixing steel grated doors, complete withlocking arrangements & angle iron frame
25-31 Making and fixing steel grated door, with 1/16" thicksheeting, including angle iron frame & lock
25-32 Making and fixing grating in opening, including fixing atsite with flat iron 2"x3/8" and 3/4" sq. bars
25-33 Providing and Fixing terrace railing of 2" i/d conduit pipe16 SWG welded with 5/8"x5/8" sq bar 2.75' high complete
25-34 Providing and Fixing collapsible gate made of 2"x2"x1/4"tee iron at top & bottom, lock etc complete
25-35 Providing and Fixing 24 SWG GI sheet rolling shutter ofsteel frame of MS channel 2"x1.25"x1/8" complete
25-36 Providing and Fixing MS angle iron 1«"x1«"x1/4" edgeprotector nozing of steps of stairs, complete
25-37 Providing and Fixing stair railing of 2.5" i/d GI pipe,welded with 5/8"x5/8" MS bars 2'-9" high, fixed in eachstep
25-38 Providing and Fixing GI wire gauze 24 SWG, 12x12meshes per sq.in., fixed to steel windows or doors etc
25-39-a-01 Providing and Fixing steel windows with openable glazedpanels Without wire guaze : Glass pane 2mm thick
25-39-a-02 Providing and Fixing steel windows with openable glazedpanels Without wire gauze : Glass pane 2.5mm thick
25-39-a-03 Providing and Fixing steel windows with openable glazedpanels Without wire gauze : Glass pane 3mm thick
25-39-a-04 Providing and Fixing steel windows with openable glazedpanels Without wire gauze : Glass pane 4mm thick
25-39-a-05 Providing and Fixing steel windows with openable glazedpanels Without wire gauze : Glass pane 5mm thick
25-39-b-01 Providing and Fixing steel windows with openable glazedpanels With 22 SWG wire gauze : Glass pane 2mm
25-39-b-02 Providing and Fixing steel windows with openable glazedpanels With 22 SWG wire gauze : Glass pane 2.5mm
25-39-b-03 Providing and Fixing steel windows with openable glazedpanels With 22 SWG wire gauze : Glass pane 3mm
25-39-b-04 Providing and Fixing steel windows with openable glazedpanels With 22 SWG wire gauze : Glass pane 4mm
25-39-b-05 Providing and Fixing steel windows with openable glazedpanels With 22 SWG wire gauze : Glass pane 5mm
25-40 Supply and Fixing iron grating for fire place
25-41 Providing and Fixing angle iron railing, using2.5"x2.5"x3/8" angle iron post 4.5'long, 5'to 6" apart,complete
25-42 Providing and Fixing barbed wire fencing of1.5"x1.5"x3/16" angle iron post 3.25' long, 5 to 6 ft. centreto centre
25-43 Providing and Fixing barbed wire fencing on compoundwall of 1.5"x1.5"x3/16" angle iron post 3' long, 4' apart
25-46 Supplying and Fixing 18SWG Steel Almirah, 12" maxdepth including box shelves, back, shelves, lock, spraypaint complete.
25-47-a Supplying and Fixing 18 SWG MS Sheet Door with angleiron frame (1.5"x1.5"x1/8"), bolt, hinges, paint etccomplete
25-47-b Supplying and Fixing 18 SWG MS Sheet Gate with angleiron frame (2"x2"x3/16") with side window, lock, paintingetc
26-01 Supplying bamboo jhandies 10' to 12' with iron shoes andflags 15" square
26-02 Supplying wooden pegs for levelling 1.5" square 6" long
26-03 Supplying wooden pegs for alignment, 2" to 3" square, 9"long
26-04 Fixing enamelled iron gauges flush with masonry includingcost of hooks
26-05 Supply & fix boundry pillars in position, including diggingpits
26-06 Fixing main line type distance mark in position includingmaking 1:3:6 cement concrete base block
26-07-a Boring and fixing 1.5" dia pressure pipe in ordinary soil
26-07-b Boring and fixing 1.5 dia pressure pipe in clay
26-07-c Boring and fixing 1.5" dia pressure pipe in shingle
26-08 Repairs to hand pump, pulling out & refitting
26-09 Fixing hand pump (machine only)
26-10-a Washing of Durries / Synthetic Matting
26-10-b Washing of Bed Sheets
26-10-c Washing of Table Cloth / Napkins / Dusters etc
26-11-a Recaning of chairs/stools : With plastic cane.
26-11-b Recaning of chairs/stools : With willow cane.
26-12 Sweeping chimneys
26-13 Cleaning of water tanks upto 400 gallons capacity
26-14 Supplying manure
26-15 Spraying anti-termite liquid mixed with water in the ratioof 1:40
26-16-a Providing and Fixing barbed wire fencing with 4 horizontal& 2 cross wires : Without PCC base
26-16-b Providing and Fixing barbed wire fencing with 4 horizontal& 2 cross wires : With PCC 1:4:8 base 12"x12"x21"
26-17 Making notice board 1/2" thick of c/s mortar 1:3 with2"x1/2" beading
26-18 Binding office books/registers.
26-19 Cutting of Pipes upto 2" Dia
26-20 Cutting of Pipes above 2" Dia upto 4" dia
50 Meter 0 71.39 50 m 0 71.39
50 Meter 0 11.15 50 m 0 11.15
50 Meter 0 7.76 50 m 0 7.76
250 Meter 0 34.56 250 m 0 34.56
km 0 123.88 km 0 123.88
km 0 28.31 km 0 28.31
km 0 24.2 km 0 24.2
km 0 19.97 km 0 19.97
50 Meter 0 44.98 50 m 0 44.98
50 Meter 0 7.03 50 m 0 7.03
50 Meter 0 4.89 50 m 0 4.89
50 Meter 0 21.77 250 m 0 21.77
km 0 78.04 km 0 78.04
km 0 17.84 km 0 17.84
km 0 15.25 km 0 15.25
km 0 12.58 km 0 12.58
Tonne/50 M 0 14.28 tonne/50 0 14.28
Tonne/50 M 0 2.23 tonne/50 0 2.23
Tonne/50 M 0 1.55 tonne/50 0 1.55
Tonne/250 M 0 6.91 t/250m 0 6.91
Tonne/1 K 0 24.78 tonne/km 0 24.78
Tonne/1 K 0 5.66 tonne/km 0 5.66
Tonne/1 K 0 4.84 tonne/km 0 4.84
Tonne/1 K 0 3.99 tonne/km 0 3.99
50 Meter 0 42.83 50 m 0 42.83
50 Meter 0 6.69 50 m 0 6.69
50 Meter 0 4.65 50 m 0 4.65
250 Meter 0 20.73 250 m 0 20.73
km 0 74.33 km 0 74.33
km 0 16.99 km 0 16.99
km 0 14.52 km 0 14.52
km 0 11.98 km 0 11.98
50 Meter 0 3.57 50 m 0 3.57
50 Meter 0 0.56 50 m 0 0.56
50 Meter 0 0.39 50 m 0 0.39
250 Meter 0 1.73 250 m 0 1.73
km 0 6.19 km 0 6.19
km 0 1.42 km 0 1.42
km 0 1.21 km 0 1.21
km 0 1 km 0 1
km 37.2 37.2 km 37.2 37.2
km 0 36.3 km 0 36.3
km 0 31.76 km 0 31.76
km 0 54.45 km 0 54.45
Day 0 8417.39 Day 0 8417.39
Day 0 7014.98 Day 0 7014.98
Day 0 5260.6 Day 0 5260.6
Each 558 558 Each 558 558
Each 837 837 Each 837 837
Each 1023 1023 Each 1023 1023
Each 465 465 Each 465 465
Each 279 279 Each 279 279
Each 418.5 418.5 Each 418.5 418.5
Each 511.5 511.5 Each 511.5 511.5
Each 232.5 232.5 Each 232.5 232.5
100 cft 372 372 m3 131.37 131.37
1000 No. 465 465 1000 No. 465 465
1000 No. 372 372 1000 No. 372 372
100 No. 465 465 100 No. 465 465
1000 No. 416.64 416.64 1000 No. 416.64 416.64
tonne 93 93 tonne 93 93
tonne 223.2 223.2 tonne 223.2 223.2
Each 29.76 29.76 Each 29.76 29.76
Each 26.04 26.04 Each 26.04 26.04
100 No. 930 930 100 No. 930 930
- - - - - -
tonne 122.76 122.76 tonne 122.76 122.76
tonne 279 279 tonne 279 279
tonne 186 186 tonne 186 186
100 cft 137.64 137.64 m3 48.61 48.61
100 cft 178.56 178.56 m3 63.06 63.06
1000 ltr 111.6 111.6 1000 ltr 111.6 111.6
1000 ltr 111.6 111.6 1000 ltr 111.6 111.6
Ton 21.2 21.2 Ton 21.2 21.2
- - - - - -
- - - - - -
100 No. 465 465 100 No. 465 465
100 No. 0 211.75 100 No. 0 211.75
100 cft 186 186 m3 65.69 65.69
1000 No. 539.4 539.4 1000 No. 539.4 539.4
100 No. 297.6 297.6 100 No. 297.6 297.6
100 No. 170 170 100 No. 170 170
tonne 85.56 85.56 tonne 85.56 85.56
100 No. 993.24 993.24 100 No. 993.24 993.24
tonne 238.08 238.08 tonne 238.08 238.08
tonne 93 93 tonne 93 93
100 No. 744 744 100 No. 744 744
100 No. 372 372 100 No. 372 372
100 No. 409.2 409.2 100 No. 409.2 409.2
100 No. 197.16 197.16 100 No. 197.16 197.16
100 No. 372 372 100 No. 372 372
100 No. 186 186 100 No. 186 186
tonne 186 186 tonne 186 186
1000 Cft 1395 1395 m3 49.26 49.26
1000 Cft 1674 1674 m3 59.12 59.12
1000 Cft 2046 2046 m3 72.25 72.25
1000 Cft 2604 2604 m3 91.96 91.96
1000 Cft 2879.28 2879.28 m3 101.68 101.68
1000 Cft 2604 2604 m3 91.96 91.96
1000 Cft 3199.2 3199.2 m3 112.98 112.98
1000 Cft 6324 6324 m3 223.33 223.33
1000 Cft 714.24 7620.92 m3 25.22 269.13
1000 Cft 706.8 7497.32 m3 24.96 264.77
1000 Cft 699.36 7373.72 m3 24.7 260.4
1000 Cft 1860 1860 m3 65.69 65.69
1000 Cft 3534 3534 m3 124.8 124.8
1000 Cft 2604 2604 m3 91.96 91.96
1000 Cft 3255 3255 m3 114.95 114.95
1000 Cft 3385.2 3385.2 m3 119.55 119.55
1000 Cft 3775.8 3775.8 m3 133.34 133.34
1000 Cft 3720 3720 m3 131.37 131.37
1000 Cft 4203.6 4203.6 m3 148.45 148.45
1000 Cft 4836 4836 m3 170.78 170.78
1000 Cft 8332.8 8332.8 m3 294.27 294.27
1000 Cft 7068 7068 m3 249.6 249.6
1000 Cft 8184 8184 m3 289.02 289.02
1000 Cft 10416 10416 m3 367.84 367.84
1000 Cft 2976 2976 m3 105.1 105.1
1000 Cft 3571.2 3571.2 m3 126.12 126.12
1000 Cft 4203.6 4203.6 m3 148.45 148.45
1000 Cft 7812 7812 m3 275.88 275.88
1000 Cft 9672 9672 m3 341.56 341.56
1000 Cft 11282.76 11827.26 m3 398.45 417.68
1000 Cft 6913 7457.5 m3 244.13 263.36
1000 Cft 7564 8471.5 m3 267.12 299.17
1000 Cft 9114 10203 m3 321.86 360.32
1000 Cft 10199 11469.5 m3 360.17 405.04
1000 Cft 11284 12736 m3 398.49 449.77
1000 Cft 12183 13816.5 m3 430.24 487.93
1000 Cft 13826 13826 m3 488.26 488.26
1000 Cft 15128 15128 m3 534.24 534.24
1000 Cft 18228 18228 m3 643.72 643.72
1000 Cft 20398 20398 m3 720.35 720.35
1000 Cft 22568 22568 m3 796.98 796.98
1000 Cft 24366 24366 m3 860.48 860.48
1000 Cft 930 930 m3 32.84 32.84
1000 Cft 1302 1302 m3 45.98 45.98
1000 Cft 3720 3720 m3 131.37 131.37
1000 Cft 1860 1860 m3 65.69 65.69
1000 Cft 3906 3906 m3 137.94 137.94
1000 Cft 111.6 111.6 m3 3.94 3.94
1000 Cft 148.8 148.8 m3 5.25 5.25
1000 Cft 2641.2 2641.2 m3 93.27 93.27
1000 Cft 409.2 409.2 m3 14.45 14.45
1000 Cft 372 372 m3 13.14 13.14
1000 Cft 260.4 260.4 m3 9.2 9.2
1000 Cft 119.04 119.04 m3 4.2 4.2
1000 Cft 230.64 230.64 m3 8.14 8.14
1000 Cft 558 558 m3 19.71 19.71
1 Chain 130.2 130.2 m 4.27 4.27
1000 Sft 465 465 m2 5 5
1000 Sft 502.2 502.2 m2 5.4 5.4
1000 Cft 3348 3348 m3 118.23 118.23
1000 Cft 3906 3906 m3 137.94 137.94
1000 Cft 4371 4371 m3 154.36 154.36
1000 Cft 4947.6 4947.6 m3 174.72 174.72
1000 Cft 23436 37777.09 m3 827.64 1334.09
1000 Cft 558 800 m3 19.71 28.25
1000 Cft 364.56 364.56 m3 12.87 12.87
1000 Cft 930 930 m3 32.84 32.84
1000 Cft 1116 1116 m3 39.41 39.41
1000 Cft 1566.12 1566.12 m3 55.31 55.31
1000 Cft 2756.52 2756.52 m3 97.35 97.35
1000 Cft 558 558 m3 19.71 19.71
1000 Cft 744 744 m3 26.27 26.27
1000 Cft 1488 5844 m3 52.55 206.38
1000 Cft 1116 4750.36 m3 39.41 167.76
1000 Cft 930 3834 m3 32.84 135.4
1000 Cft 1302 1302 m3 45.98 45.98
1000 Cft 2976 3460 m3 105.1 122.19
1000 Cft 2325 2325 m3 82.11 82.11
Rft 3.72 3.72 m 12.2 12.2
1000 Cft 3348 3348 m3 118.23 118.23
2500 Rft 520.8 520.8 km 682.25 682.25
1000 Sft 1488 1488 m2 16.01 16.01
1000 Cft 1674 1674 m3 59.12 59.12
1000 Cft 2604 2604 m3 91.96 91.96
Mile 5208 5208 km 3236.25 3236.25
Mile 6882 6882 km 4276.47 4276.47
Mile 10974 10974 km 6819.24 6819.24
Acre 2232 2232 ha 5515.27 5515.27
Acre 3340.56 3340.56 ha 8254.52 8254.52
Chain 558 558 50 m 915.12 915.12
Chain 744 744 50 m 1220.16 1220.16
Chain 651 651 50 m 1067.64 1067.64
Chain 926.28 926.28 50 m 1519.1 1519.1
1000 Cft 2790 2790 m3 98.53 98.53
1000 Cft 3720 3720 m3 131.37 131.37
1000 Cft 248 248 m3 8.76 8.76
1000 Cft 1302 1302 m3 45.98 45.98
1000 Cft 1116 1116 m3 39.41 39.41
1000 Cft 2604 2604 m3 91.96 91.96
1000 Cft 1674 1674 m3 59.12 59.12
1000 Cft 14880 14880 m3 525.48 525.48
1000 Cft 3348 3348 m3 118.23 118.23
1000 Cft 4464 4464 m3 157.64 157.64
1000 Cft 5952 5952 m3 210.19 210.19
1000 Cft 4774 8116.22 m3 168.59 286.62
1000 Cft 5890 10636.22 m3 208 375.61
1000 Cft 8494 17502.45 m3 299.96 618.09
1000 Cft 2641.2 2641.2 m3 93.27 93.27
Each 930 930 Each 930 930
Each 1302 1528.88 Each 1302 1528.88
Each 930 1695.28 Each 930 1695.28
Each 1302 2682.78 Each 1302 2682.78
Decare 2001.36 2001.36 Decare 2001.36 2001.36
Decare 4002.72 4002.72 Decare 4002.72 4002.72
1000 Sft 483.6 483.6 m2 5.2 5.2
ha 6431.88 6431.88 ha 6431.88 6431.88
1000 Sft 3720 3720 m2 40.03 40.03
1000 Sft 3720 14105.83 m2 40.03 151.78
1000 Cft 7068 7068 m3 249.6 249.6
100 Ft 18600 18600 m 610.24 610.24
100 Ft 33480 33480 m 1098.43 1098.43
1000 Sft 321.41 2052.43 m2 3.46 22.08
No 24.92 416.82 No 24.92 416.82
No 49.85 833.64 No 49.85 833.64
No 149.54 2039.61 No 149.54 2039.61
1000 Sft 286.81 1595.52 m2 3.09 17.17
1000 Cft 210.55 8570.44 m3 7.44 302.66
1000 Cft 1783.74 12253.39 m3 62.99 432.72
1000 Cft 3475.97 6688.52 m3 122.75 236.2
1000 Cft 14747.2 29712.78 m3 520.79 1049.3
1000 Cft 5266.78 8375.99 m3 185.99 295.8
1000 Cft 1316.88 23302.1 m3 46.51 822.91
1000 Cft 210.55 9588.79 m3 7.44 338.63
1000 Cft 3160.14 17248.12 m3 111.6 609.11
1000 Cft 210.92 12468.46 m3 7.45 440.32
1000 Cft 372 9750.24 m3 13.14 344.33
1000 Sft 286.81 2970.36 m2 3.09 31.96
1000 Sft 860.81 7552.18 m2 9.26 81.26
1000 Sft 573.62 4387.01 m2 6.17 47.2
1000 Cft 93 2249.22 m3 3.28 79.43
1000 Cft 93 2410.94 m3 3.28 85.14
1000 Cft 137.64 2847.29 m3 4.86 100.55
1000 Cft 137.64 3253.7 m3 4.86 114.9
1000 Cft 186 3098.86 m3 6.57 109.44
1000 Cft 93 2606.63 m3 3.28 92.05
1000 Cft 372 4302.2 m3 13.14 151.93
100 Cft 0 1056.72 m3 0 373.18
100 Cft 0 959.92 m3 0 338.99
100 Cft 372 3347.15 m3 131.37 1182.04

100 Cft 1023 2012.54 m3 361.27 710.72

100 Cft 0 642.85 m3 0 227.02

100 Cft 0 670.97 m3 0 236.95

100 Cft 0 1643.18 m3 0 580.28

100 Cft 0 2532.53 m3 0 894.36

100 Cft 0 3421.88 m3 0 1208.43


100 Cft 316.2 316.2 m3 111.67 111.67
100 Cft 465 465 m3 164.21 164.21
100 Cft 1116 1116 m3 394.11 394.11
100 Cft 558 558 m3 197.06 197.06
100 Cft 744 744 m3 262.74 262.74
100 Cft 930 930 m3 328.43 328.43
100 Cft 1116 1116 m3 394.11 394.11
100 Cft 744 744 m3 262.74 262.74
100 Cft 930 930 m3 328.43 328.43
100 Cft 558 558 m3 197.06 197.06
100 Cft 186 186 m3 65.69 65.69
100 Cft 465 465 m3 164.21 164.21
100 Cft 316.2 316.2 m3 111.67 111.67
100 Cft 651 651 m3 229.9 229.9
100 Cft 1581 1581 m3 558.33 558.33
100 Cft 1395 1395 m3 492.64 492.64
100 Cft 372 372 m3 131.37 131.37
100 Cft 744 744 m3 262.74 262.74
100 Cft 1023 1023 m3 361.27 361.27
100 Cft 3906 3906 m3 1379.39 1379.39
100 Cft 2046 2046 m3 722.54 722.54
100 Cft 3348 3348 m3 1182.34 1182.34
100 Cft 4092 4092 m3 1445.08 1445.08
100 Cft 1116 1116 m3 394.11 394.11
100 Sft 505.55 505.55 m2 54.4 54.4
100 Cft 6696 6696 m3 2364.67 2364.67
100 Sft 223.2 223.2 m2 24.02 24.02
100 Sft 558 558 m2 60.04 60.04
100 Sft 459.79 459.79 m2 49.47 49.47
100 Sft 372 372 m2 40.03 40.03
100 Sft 297.6 297.6 m2 32.02 32.02
100 Sft 1110.05 1110.05 m2 119.44 119.44
100 Sft 744 744 m2 80.05 80.05
100 Sft 930 930 m2 100.07 100.07
100 Sft 310.99 310.99 m2 33.46 33.46
100 Sft 461.28 461.28 m2 49.63 49.63
100 Sft 837 837 m2 90.06 90.06
100 Sft 744 744 m2 80.05 80.05
100 Sft 316.2 316.2 m2 34.02 34.02
100 Sft 465 465 m2 50.03 50.03
100 Rft 4650 4650 m 152.56 152.56
100 Rft 6510 6510 m 213.58 213.58
100 Rft 8370 8370 m 274.61 274.61
100 Rft 11160 11160 m 366.14 366.14
Each 204.6 204.6 Each 204.6 204.6
Each 148.8 148.8 Each 148.8 148.8
Each 74.4 74.4 Each 74.4 74.4
Each 93 93 Each 93 93
Each 186 186 Each 186 186
600 Sft 1430.34 1430.34 m2 25.65 25.65
5 Cwt 1674 1674 100 Kg 652.86 652.86
50 Rft 1116 1116 m 73.23 73.23
5 Cwt 1860 1860 100 Kg 725.4 725.4
12 Cwt 1860 1860 100 Kg 305.04 305.04
Each 744 744 Each 744 744
Each/25mm 11.16 11.16 Ea/25mm D 11.16 11.16
Each 5208 5208 Each 5208 5208
Each 3534 3534 Each 3534 3534
230 Rft 744 744 m 10.61 10.61
100 Sft 148.8 148.8 m2 16.01 16.01
100 Sft 279 279 m2 30.02 30.02
100 Cft 744 744 m3 262.74 262.74
100 Sft 4880.64 4880.64 m2 525.16 525.16
500 Sft 372 372 m2 8.01 8.01
250 Sft 372 372 m2 16.01 16.01
100 Sft 93 93 m2 10.01 10.01
100 Sft 279 279 m2 30.02 30.02
100 Sft 1116 1116 m2 120.08 120.08
100 Cft 1264.43 1264.43 m3 446.53 446.53
100 Cft 1302 1302 m3 459.8 459.8
Point 44.64 44.64 Point 44.64 44.64
Point 37.2 37.2 Point 37.2 37.2
Rft 8.62 8.62 m 28.28 28.28
Rft 13.61 13.61 m 44.65 44.65
100 Cft 1395 9288.52 m3 492.64 3280.21
100 Cft 1395 8109.08 m3 492.64 2863.7
100 Cft 1395 7465.13 m3 492.64 2636.29
100 Cft 1395 6491.89 m3 492.64 2292.59
100 Cft 1395 5274.17 m3 492.64 1862.56
100 Cft 1395 7252.17 m3 492.64 2561.08
100 Cft 1395 6420.32 m3 492.64 2267.32
100 Cft 1395 18732.8 m3 492.64 6615.43
100 Cft 1395 16340.76 m3 492.64 5770.69
100 Cft 1395 14643.57 m3 492.64 5171.33
100 Cft 1395 13373.83 m3 492.64 4722.93
100 Cft 1395 12450.82 m3 492.64 4396.97
100 Cft 1395 11440.71 m3 492.64 4040.25
100 Cft 1395 10966.08 m3 492.64 3872.64
100 Cft 1395 10474.91 m3 492.64 3699.18
100 Cft 1395 12617.52 m3 492.64 4455.84
100 Cft 1395 11345.74 m3 492.64 4006.71
100 Cft 1116 32961.17 m3 394.11 11640.14
100 Cft 1116 27533.93 m3 394.11 9723.52
100 Cft 1116 24060.11 m3 394.11 8496.76
100 Cft 1116 21075.96 m3 394.11 7442.91
100 Cft 1116 18646.39 m3 394.11 6584.92
100 Cft 1116 15583.83 m3 394.11 5503.38
100 Cft 1116 13858.24 m3 394.11 4894
100 Cft 1116 12329.14 m3 394.11 4354
100 Cft 1116 11348.95 m3 394.11 4007.85
100 Cft 1116 10505.11 m3 394.11 3709.85
100 Cft 1953 2354.32 m3 689.7 831.42
100 Cft 1953 2386.84 m3 689.7 842.9
200 Cft 2046 6513.17 m3 361.27 1150.05
100 Cft 1116 27446.11 m3 394.11 9692.51
100 Cft 1116 97589.56 m3 394.11 34463.46
100 Cft 1116 36129.86 m3 394.11 12759.15
100 Cft 1116 97589.56 m3 394.11 34463.46
100 Cft 1677.72 3610.7 m3 592.48 1275.11
100 Cft 1116 2793.06 m3 394.11 986.36
100 Cft 2232 11467.2 m3 788.22 4049.61
100 Cft 2232 9423.76 m3 788.22 3327.97
100 Cft 2232 8829.89 m3 788.22 3118.25
100 Cft 2232 8227.31 m3 788.22 2905.45
100 Cft 2232 7346.91 m3 788.22 2594.54
100 Cft 2232 7115.08 m3 788.22 2512.67
100 Cft 1116 1116 m3 394.11 394.11
100 Cft 1674 1674 m3 591.17 591.17
100 Cft 2057.16 23505.74 m3 726.48 8300.98
100 Cft 2057.16 23266.16 m3 726.48 8216.38
100 Cft 2057.16 19084.4 m3 726.48 6739.6
100 Cft 2057.16 18325.73 m3 726.48 6471.68
100 Cft 2057.16 16469.59 m3 726.48 5816.19
100 Cft 2057.16 16709.17 m3 726.48 5900.79
100 Cft 2057.16 14919.58 m3 726.48 5268.8
100 Cft 2057.16 14490.03 m3 726.48 5117.11
100 Cft 2057.16 12583.07 m3 726.48 4443.67
100 Cft 4166.4 27110.98 m3 1471.35 9574.16
100 Cft 4166.4 23557.21 m3 1471.35 8319.16
100 Cft 4166.4 21181.98 m3 1471.35 7480.35
100 Cft 4092 25439.18 m3 1445.08 8983.77
100 Cft 4092 21986.81 m3 1445.08 7764.58
100 Cft 4092 18746.67 m3 1445.08 6620.33
100 Cft 4836 30745.08 m3 1707.82 10857.53
100 Cft 4836 27191.31 m3 1707.82 9602.53
100 Cft 4836 23948.52 m3 1707.82 8457.35

100 Cft 7068 29923.14 m3 2496.04 10567.27

100 Cft 7068 26146.74 m3 2496.04 9233.64

100 Cft 7068 23771.51 m3 2496.04 8394.84


100 Cft 1581 1581 m3 558.33 558.33
Cwt 279 4847.11 Tonne 5491.89 95411.55
Cwt 279 6014.84 Tonne 5491.89 118397.4
Cwt 279 5556.33 Tonne 5491.89 109372
Cwt 558 10330.08 Tonne 10983.78 203339.4
100 Cft 3348 16858.86 m3 1182.34 5953.66
100 Cft 7254 15034.3 m3 2561.73 5309.32
100 Sft 2976 5268.95 m2 320.22 566.94
100 Cft 1488 1488 m3 525.48 525.48
100 Cft 744 744 m3 262.74 262.74
100 Cft 372 372 m3 131.37 131.37
Each 279 696.59 Each 279 696.59
Each 781.2 781.2 Each 781.2 781.2
100 Cft 5394 5394 m3 1904.87 1904.87
100 Sft 372 372 m2 40.03 40.03
100 Sft 122.76 122.76 m2 13.21 13.21
100 Sft 279 279 m2 30.02 30.02
100 Sft 465 465 m2 50.03 50.03
100 Sft 139.5 139.5 m2 15.01 15.01
Rft 5.81 83.1 m 19.07 272.64
Rft 3.72 20.08 m 12.2 65.89
Rft 37.2 58.98 m 122.05 193.5
Rft 37.2 37.2 m 122.05 122.05
100 Sft 1320.6 3678.39 m2 142.1 395.79
100 Sft 1320.6 4206.43 m2 142.1 452.61
100 Sft 1320.6 4206.43 m2 142.1 452.61
100 Sft 1395 5402.62 m2 150.1 581.32
100 Sft 1060.2 3853.59 m2 114.08 414.65
100 Sft 1320.6 4642.03 m2 142.1 499.48
100 Sft 1313.16 5756.38 m2 141.3 619.39
100 Sft 1209 2381.71 m2 130.09 256.27
100 Sft 1209 2609.07 m2 130.09 280.74
100 Sft 1209 2471.86 m2 130.09 265.97
100 Sft 1209 2743.86 m2 130.09 295.24
100 Sft 1209 2606.65 m2 130.09 280.48
100 Sft 1209 2972.31 m2 130.09 319.82
100 Sft 1209 2819.49 m2 130.09 303.38
100 Sft 1209 3044.67 m2 130.09 327.61
100 Sft 1209 2907.46 m2 130.09 312.84
100 Sft 1209 3179.46 m2 130.09 342.11
100 Sft 1209 3042.25 m2 130.09 327.35
100 Sft 1209 3407.91 m2 130.09 366.69
100 Sft 1209 2394.3 m2 130.09 257.63
100 Sft 1209 2609.07 m2 130.09 280.74
100 Sft 1209 2487.47 m2 130.09 267.65
100 Sft 1209 2743.86 m2 130.09 295.24
100 Sft 1209 2606.65 m2 130.09 280.48
100 Sft 1209 2972.31 m2 130.09 319.82
100 Sft 1209 2829.9 m2 130.09 304.5
100 Sft 1209 3044.67 m2 130.09 327.61
100 Sft 1209 2928.27 m2 130.09 315.08
100 Sft 1209 3179.46 m2 130.09 342.11
100 Sft 1209 3042.25 m2 130.09 327.35
100 Sft 1209 3407.91 m2 130.09 366.69
100 Cft 4836 4836 m3 1707.82 1707.82
1000 Sft 1860 1860 m2 20.01 20.01
100 Sft 4497.48 4497.48 m2 483.93 483.93
100 No 5825.52 5825.52 No 58.26 58.26
100 Cft 1116 1116 m3 394.11 394.11
100 Cft 1302 1302 m3 459.8 459.8
100 Cft 1488 1488 m3 525.48 525.48
100 Cft 1674 1674 m3 591.17 591.17
100 Rft 1183.33 8443.33 m 38.82 277.01
100 Cft 1052.76 1052.76 m3 371.78 371.78
100 Cft 1302 1302 m3 459.8 459.8
100 Cft 1488 1488 m3 525.48 525.48
100 Cft 1674 1674 m3 591.17 591.17
100 Cft 2232 2232 m3 788.22 788.22
100 Cft 3720 3720 m3 1313.71 1313.71
100 Cft 372 372 m3 131.37 131.37
100 Cft 372 372 m3 131.37 131.37
Each 260.4 260.4 Each 260.4 260.4
100 Cft 2328.72 8963.37 m3 822.38 3165.39
100 Cft 2325 9883.29 m3 821.07 3490.25
100 Cft 2325 10818.64 m3 821.07 3820.57
100 Cft 2325 7842.6 m3 821.07 2769.59
100 Cft 2325 8546.82 m3 821.07 3018.28
100 Cft 2325 9251.04 m3 821.07 3266.98
100 Sft 2976 3366.83 m2 320.22 362.27
100 Sft 3348 3779.97 m2 360.24 406.72
100 Sft 372 7307.84 m2 40.03 786.32
100 Sft 297.6 7197.14 m2 32.02 774.41
100 Cft 3162 17504.49 m3 1116.65 6181.66
100 Cft 3162 18259.17 m3 1116.65 6448.17
100 Cft 3162 20452.05 m3 1116.65 7222.58
100 Cft 3162 16117.83 m3 1116.65 5691.96
100 Cft 3162 17071.31 m3 1116.65 6028.68
100 Cft 3162 21405.53 m3 1116.65 7559.3
100 Cft 3162 22879.31 m3 1116.65 8079.76
100 Cft 3162 24302.56 m3 1116.65 8582.38
100 Cft 3162 19732.95 m3 1116.65 6968.63
100 Cft 3162 13143.29 m3 1116.65 4641.51
100 Cft 2272.92 12359.78 m3 802.67 4364.82
100 Cft 3020.64 13234.55 m3 1066.73 4673.74
100 Cft 558 685.05 m3 197.06 241.92
100 Cft 1302 1429.05 m3 459.8 504.66
100 Cft 2046 2173.05 m3 722.54 767.41
100 Cft 2790 2917.05 m3 985.28 1030.15
100 Cft 3162 13248.86 m3 1116.65 4678.79
100 Cft 558 558 m3 197.06 197.06
100 Cft 3005.76 17404.76 m3 1061.48 6146.44
100 Cft 3005.76 16418.61 m3 1061.48 5798.18
100 Cft 3005.76 15826.92 m3 1061.48 5589.23
100 Cft 3005.76 15388.9 m3 1061.48 5434.54
100 Cft 3005.76 15156.34 m3 1061.48 5352.42
100 Cft 3005.76 14944.83 m3 1061.48 5277.72
100 Cft 3005.76 14771.63 m3 1061.48 5216.56
100 Cft 3005.76 15478.44 m3 1061.48 5466.16
100 Cft 3005.76 15258 m3 1061.48 5388.32
100 Cft 3935.76 16013.5 m3 1389.9 5655.12
100 Cft 3005.76 14935.39 m3 1061.48 5274.39
100 Cft 3005.76 14824.53 m3 1061.48 5235.24
100 Cft 3005.76 14727.56 m3 1061.48 5200.99
100 Cft 3005.76 14383.66 m3 1061.48 5079.55
100 Cft 3005.76 14975.08 m3 1061.48 5288.4
100 Cft 3005.76 14518.55 m3 1061.48 5127.18
100 Cft 3005.76 14239.2 m3 1061.48 5028.53
100 Cft 3005.76 13887.74 m3 1061.48 4904.41
100 Cft 3861.36 18387.41 m3 1363.63 6493.46
100 Cft 3861.36 17401.26 m3 1363.63 6145.2
100 Cft 3861.36 16809.57 m3 1363.63 5936.25
100 Cft 3861.36 16415.11 m3 1363.63 5796.95
100 Cft 3861.36 16138.99 m3 1363.63 5699.44
100 Cft 3861.36 15927.48 m3 1363.63 5624.74
100 Cft 3861.36 15754.28 m3 1363.63 5563.58
100 Cft 3935.76 16545.9 m3 1389.9 5843.13
100 Cft 3935.76 16315.05 m3 1389.9 5761.61
100 Cft 3935.76 16140.55 m3 1389.9 5699.99
100 Cft 3935.76 15992.44 m3 1389.9 5647.68
100 Cft 3935.76 15881.58 m3 1389.9 5608.53
100 Cft 3935.76 15784.61 m3 1389.9 5574.29
100 Cft 3935.76 15313.66 m3 1389.9 5407.97
100 Cft 3935.76 15905.08 m3 1389.9 5616.83
100 Cft 3935.76 15448.55 m3 1389.9 5455.61
100 Cft 3935.76 15169.2 m3 1389.9 5356.96
100 Cft 3935.76 14817.74 m3 1389.9 5232.84
100 Cft 558 685.05 m3 197.06 241.92
100 Cft 1302 1429.05 m3 459.8 504.66
100 Cft 2046 2173.05 m3 722.54 767.41
100 Cft 3348 3475.05 m3 1182.34 1227.2
100 Cft 3534 18060.05 m3 1248.02 6377.85
100 Cft 3720 17259.9 m3 1313.71 6095.28
100 Cft 3534 16482.21 m3 1248.02 5820.64
100 Cft 3534 16087.75 m3 1248.02 5681.34
100 Cft 3534 15811.63 m3 1248.02 5583.83
100 Cft 3534 15600.12 m3 1248.02 5509.14
100 Cft 3534 15426.92 m3 1248.02 5447.97
100 Cft 3534 16133.73 m3 1248.02 5697.58
100 Cft 3534 15914.16 m3 1248.02 5620.04
100 Cft 3534 15738.79 m3 1248.02 5558.11
100 Cft 3534 15590.68 m3 1248.02 5505.8
100 Cft 3534 15479.82 m3 1248.02 5466.65
100 Cft 3534 15382.85 m3 1248.02 5432.41
100 Cft 5208 16712.96 m3 1839.19 5902.13
100 Cft 3534 15630.37 m3 1248.02 5519.82
100 Cft 3534 15173.84 m3 1248.02 5358.6
100 Cft 2976 14336.49 m3 1050.97 5062.89
100 Cft 3935.76 14944.79 m3 1389.9 5277.71
100 Cft 558 583.41 m3 197.06 206.03
100 Cft 1488 1551.53 m3 525.48 547.92
100 Cft 930 1438.2 m3 328.43 507.9
100 Cft 1116 1116 m3 394.11 394.11
100 Cft 744 744 m3 262.74 262.74
100 Cft 1302 1302 m3 459.8 459.8
100 Sft 744 744 m2 80.05 80.05
100 Cft 9675.72 24176.48 m3 3416.95 8537.85
100 No 2418 2418 100 No. 2418 2418
100 No 1674 1674 100 No. 1674 1674
100 Sft 1510.32 3446.73 m2 162.51 370.87
100 Sft 1971.6 5113.1 m2 212.14 550.17
100 Sft 1971.6 4866.02 m2 212.14 523.58
100 Sft 1971.6 4718.64 m2 212.14 507.73
100 Sft 1971.6 4620.02 m2 212.14 497.11
100 Sft 1971.6 4550.45 m2 212.14 489.63
100 Sft 1971.6 4498.66 m2 212.14 484.06
100 Sft 1971.97 4457.84 m2 212.18 479.66
100 Sft 1971.6 5220.45 m2 212.14 561.72
100 Sft 1971.6 5170.4 m2 212.14 556.34
100 Sft 1971.6 5124.74 m2 212.14 551.42
100 Sft 1971.6 5083.6 m2 212.14 547
100 Sft 1971.6 5060.44 m2 212.14 544.5
100 Sft 1971.6 5027.99 m2 212.14 541.01
100 Sft 279 304.41 m2 30.02 32.75
100 Sft 651 676.41 m2 70.05 72.78
100 Sft 1023 1054.76 m2 110.07 113.49
100 Sft 1674 1718.47 m2 180.12 184.91
100 Sft 2265.48 7435.96 m2 243.77 800.11
100 Sft 2909.04 10235.59 m2 313.01 1101.35
100 Sft 2909.04 9742.51 m2 313.01 1048.29
100 Sft 2909.04 9446.67 m2 313.01 1016.46
100 Sft 2909.04 9249.44 m2 313.01 995.24
100 Sft 2909.04 9110.29 m2 313.01 980.27
100 Sft 2909.04 9003.01 m2 313.01 968.72
100 Sft 2909.04 8919.13 m2 313.01 959.7
100 Sft 2909.04 9272.43 m2 313.01 997.71
100 Sft 2909.04 9160.04 m2 313.01 985.62
100 Sft 2909.04 9082.1 m2 313.01 977.23
100 Sft 2909.04 9000.91 m2 313.01 968.5
100 Sft 2909.04 8946.99 m2 313.01 962.7
100 Sft 2909.04 8865.34 m2 313.01 953.91
100 Sft 420.36 420.36 m2 45.23 45.23
100 Sft 1302 1302 m2 140.1 140.1
100 Sft 2325 2325 m2 250.17 250.17
100 Sft 3348 3348 m2 360.24 360.24
100 Cft 3906 20683.26 m3 1379.39 7304.23
100 Cft 558 621.53 m3 197.06 219.49
100 Sft 1351.85 6644.44 m2 145.46 714.94
100 Sft 1351.85 6636.67 m2 145.46 714.11
100 Sft 1054.25 4688.9 m2 113.44 504.53
100 Sft 1078.8 4705.68 m2 116.08 506.33
100 Cft 4278 11913.25 m3 1510.76 4207.13
100 Cft 1488 11724.6 m3 525.48 4140.51
100 Cft 2511 7670.14 m3 886.75 2708.69
100 Cft 1116 2177.77 m3 394.11 769.07
100 Rft 2046 4968.15 m 67.13 163
100 Rft 2325 6415.4 m 76.28 210.48
100 Rft 1953 6123.43 m 64.07 200.9
100 Rft 2325 3832.66 m 76.28 125.74
100 Rft 3441 8068.04 m 112.89 264.7
100 Rft 4586.76 12626 m 150.48 414.24
100 Rft 5766 17234.38 m 189.17 565.43
1000 No. 372 372 1000 No. 372 372
1000 No. 744 744 1000 No. 744 744
100 Cft 114.2 2510 m3 40.33 886.4
100 Rft 5766 7204.29 m 189.17 236.36
100 Sft 1525.2 6195.6 m2 164.11 666.65
100 Sft 1525.2 6041.52 m2 164.11 650.07
100 Sft 4459.54 4459.54 m2 479.85 479.85
Each 22.32 29.58 Each 22.32 29.58
Each 279 279 Each 279 279
100 Rft 3333.49 3333.49 m 109.37 109.37
Each 145.08 145.08 Each 145.08 145.08
100Cft 4028.76 23836.59 m3 1422.74 8417.82
100Cft 3935.76 22757.53 m3 1389.9 8036.75
100Cft 3935.76 22165.62 m3 1389.9 7827.72
100Cft 199.02 207.28 m3 70.28 73.2
100Cft 6956.4 27754.58 m3 2456.63 9801.45
100Cft 2046 17304.1 m3 722.54 6110.89
100Cft 2046 16816.47 m3 722.54 5938.69
100Cft 2046 16515.18 m3 722.54 5832.29
100Cft 2046 16317.95 m3 722.54 5762.64
100Cft 2046 16196.59 m3 722.54 5719.78
100Cft 2046 16075.22 m3 722.54 5676.92
100Cft 2046 15986.77 m3 722.54 5645.68
100Cft 2377.08 19565.13 m3 839.46 6909.37
100Cft 2377.08 18973.44 m3 839.46 6700.41
100Cft 2377.08 18618.43 m3 839.46 6575.04
100Cft 2377.08 18381.75 m3 839.46 6491.46
100Cft 2377.08 18213.56 m3 839.46 6432.06
100Cft 2377.08 18089.17 m3 839.46 6388.14
100Cft 2377.08 17987.29 m3 839.46 6352.16
100Cft 2745.36 25190.26 m3 969.52 8895.87
100Cft 2745.36 24501.04 m3 969.52 8652.47
100Cft 2745.36 24085.77 m3 969.52 8505.82
100Cft 2745.36 23809.64 m3 969.52 8408.3
100Cft 2745.36 23617.62 m3 969.52 8340.49
100Cft 2745.36 23469.39 m3 969.52 8288.14
100Cft 2745.36 23346.7 m3 969.52 8244.82
100Cft 2046 16275.6 m3 722.54 5747.68
100Cft 2046 15787.97 m3 722.54 5575.47
100Cft 2046 15486.68 m3 722.54 5469.07
100Cft 2046 15289.45 m3 722.54 5399.42
100Cft 2046 15168.09 m3 722.54 5356.57
100Cft 2046 15046.72 m3 722.54 5313.7
100Cft 2046 14958.27 m3 722.54 5282.47
100Cft 2377.08 18203.88 m3 839.46 6428.65
100Cft 2377.08 17612.19 m3 839.46 6219.69
100Cft 2377.08 17257.18 m3 839.46 6094.32
100Cft 2377.08 17020.5 m3 839.46 6010.74
100Cft 2377.08 16852.31 m3 839.46 5951.34
100Cft 2377.08 16727.92 m3 839.46 5907.41
100Cft 2377.08 16626.04 m3 839.46 5871.44
100Cft 2745.36 22277.18 m3 969.52 7867.12
100Cft 2745.36 21587.96 m3 969.52 7623.72
100Cft 2745.36 21172.69 m3 969.52 7477.07
100Cft 2745.36 20896.57 m3 969.52 7379.56
100Cft 2745.36 20704.54 m3 969.52 7311.75
100Cft 2745.36 20556.32 m3 969.52 7259.4
100Cft 2745.36 20433.63 m3 969.52 7216.08
100 Cft 2604 6984.2 m3 919.59 2466.45
100 Cft 3255 8125.25 m3 1149.49 2869.41
100 Cft 5022 11870.6 m3 1773.5 4192.07
100 Cft 5022 11556.61 m3 1773.5 4081.18
100 Cft 5022 11242.61 m3 1773.5 3970.29
100 Cft 5022 14819.97 m3 1773.5 5233.63
100 Cft 5022 13932.44 m3 1773.5 4920.2
100 Cft 5022 12916.6 m3 1773.5 4561.46
100 Cft 5022 12354.6 m3 1773.5 4362.99
100 Cft 3348 7728.2 m3 1182.34 2729.19
100 Cft 4650 9520.25 m3 1642.13 3362.05
100 Cft 5673 12246.4 m3 2003.4 4324.78
100 Cft 5673 12529.79 m3 2003.4 4424.86
100 Cft 5673 12250.76 m3 2003.4 4326.32
100 Cft 5673 15431.65 m3 2003.4 5449.64
100 Cft 5673 14642.73 m3 2003.4 5171.04
100 Cft 5673 13734.14 m3 2003.4 4850.17
100 Cft 5673 13243.49 m3 2003.4 4676.9
100 Cft 2976 7356.2 m3 1050.97 2597.82
100 Cft 3906 8653.74 m3 1379.39 3056.04
100 Cft 5487 12335.6 m3 1937.72 4356.28
100 Cft 5487 12021.61 m3 1937.72 4245.4
100 Cft 5487 11707.61 m3 1937.72 4134.51
100 Cft 5487 15284.97 m3 1937.72 5397.84
100 Cft 5487 14397.44 m3 1937.72 5084.41
100 Cft 5487 13381.6 m3 1937.72 4725.67
100 Cft 5487 12819.6 m3 1937.72 4527.2
100 Cft 3906 8286.2 m3 1379.39 2926.25
100 Cft 6138 10885.74 m3 2167.62 3844.27
100 Cft 6417 12988.22 m3 2266.14 4586.75
100 Cft 6417 13273.79 m3 2266.14 4687.6
100 Cft 6417 12994.68 m3 2266.14 4589.03
100 Cft 6417 16175.65 m3 2266.14 5712.38
100 Cft 6417 15386.73 m3 2266.14 5433.78
100 Cft 6417 14482.5 m3 2266.14 5114.45
100 Cft 6417 14009.27 m3 2266.14 4947.33
100 Cft 17856 27676.26 m3 6305.79 9773.79
100 Cft 17856 27466.93 m3 6305.79 9699.86
100 Cft 17856 27257.6 m3 6305.79 9625.94
100 Cft 17856 29642.51 m3 6305.79 10468.16
100 Cft 17856 29050.82 m3 6305.79 10259.21
100 Cft 17856 28380.24 m3 6305.79 10022.4
100 Cft 34782 46379.81 m3 12283.16 16378.89
100 Cft 34782 46275.15 m3 12283.16 16341.93
100 Cft 34782 46170.48 m3 12283.16 16304.97
100 Cft 34782 47362.94 m3 12283.16 16726.08
100 Cft 34782 47067.09 m3 12283.16 16621.6
100 Cft 34782 46736.79 m3 12283.16 16504.96
100 Cft 799.8 799.8 m3 282.45 282.45
100 Cft 1860 1860 m3 656.85 656.85
100 Cft 2938.8 2938.8 m3 1037.83 1037.83
100 Cft 4687.2 4687.2 m3 1655.27 1655.27
100 Cft 744 744 m3 262.74 262.74
100 Cft 2976 2976 m3 1050.97 1050.97
100 Cft 14880 14880 m3 5254.83 5254.83
100 Cft 14880 14880 m3 5254.83 5254.83
100 Sft 4650 4650 m2 500.34 500.34
100 Sft 8928 8928 m2 960.65 960.65
100 Sft 10788 10788 m2 1160.79 1160.79
100 Sft 23436 23436 m2 2521.71 2521.71
100 Sft 6993.6 15275.65 m2 752.51 1643.66
100 Cft 26164 30520 m3 9239.74 10778.05
100 Cft 12276 16632 m3 4335.23 5873.54
100 Cft 744 5644.5 m3 262.74 1993.34
100 Sft 5412.6 14590.35 m2 582.4 1569.92
100 Sft 4092 9019.79 m2 440.3 970.53
844.86
100 Sft 182.28 954.68 m2 19.61 102.72
100 Sft 558 2538.77 m2 60.04 273.17
100 Sft 792.36 1200.73 m2 85.26 129.2
100 Sft 226.92 679.46 m2 24.42 73.11
100 Sft 1674 9041.43 m2 180.12 972.86
832.31 (09-05)-(12-26-b)-(09-10-c)
100 Sft 5952 16269.13 m2 640.44 1750.56
100 Sft 5952 17437.26 m2 640.44 1876.25
100 Sft 4836 14980.28 m2 520.35 1611.88
100 Sft 4836 16039.27 m2 520.35 1725.83
100 Sft 1488 1488 m2 160.11 160.11
100 Sft 4836 9389.71 m2 520.35 1010.33
100 Sft 505.92 1063.91 m2 54.44 114.48
100 Sft 528.24 1167.91 m2 56.84 125.67
100 Sft 111.6 149.26 m2 12.01 16.06
100 Sft 372 1793.15 m2 40.03 192.94
100 Sft 1116 15993.19 m2 120.08 1720.87
100 Sft 1116 13873.27 m2 120.08 1492.76
100 Sft 1116 11488.36 m2 120.08 1236.15
Rft 65.1 89.03 m 213.58 292.09
Each 241.8 485.01 Each 241.8 485.01
Each 241.8 813.28 Each 241.8 813.28
Rft 56.71 169.38 m 186.05 555.72
Rft 56.71 193.22 m 186.05 633.91
100 Sft 7052.79 13406.24 m2 758.88 1442.51
Rft 37.83 600.49 m 124.12 1970.1
Rft 37.83 490.37 m 124.12 1608.82
Each 167.4 1584.53 Each 167.4 1584.53
Each 93 1510.13 Each 93 1510.13
Each 186 387.32 Each 186 387.32
100 Sft 4092 19608.23 m2 440.3 2109.85
100 Sft 2883 15900.03 m2 310.21 1710.84
100 Sft 2883 14403.43 m2 310.21 1549.81
100 Sft 1488 12587.18 m2 160.11 1354.38
100 Sft 260.4 260.4 m2 28.02 28.02
100 RFT 1860 6915.77 m 61.02 226.9
Rft 68.05 461.17 m 223.26 1513.01
Rft 68.05 457.74 m 223.26 1501.76
Rft 68.05 523.98 m 223.26 1719.1
Rft 34.02 215.7 m 111.63 707.67
Each 279 279 Each 279 279
Each 1116 1597.56 Each 1116 1597.56
Rft 8.05 9.3 m 26.42 30.5
100 Sft 2205.96 22577.41 m2 237.36 2429.33
Sft 16.8 78.8 m2 180.79 847.91
Sft 16.8 85.89 m2 180.79 924.19
Sft 16.8 94.36 m2 180.79 1015.33
Rft 37.2 626.93 m 122.05 2056.86
Rft 19.51 45.33 m 64 148.73
Rft 53.13 56.77 m 174.3 186.24
Each 204.6 231.05 Each 204.6 231.05
Each 83.7 98.89 Each 83.7 98.89
Each 219.48 219.48 Each 219.48 219.48
Each 36.83 36.83 Each 36.83 36.83
Each 31.25 31.25 Each 31.25 31.25
Each 46.5 46.5 Each 46.5 46.5
Each 61.75 61.75 Each 61.75 61.75
Each 74.4 74.4 Each 74.4 74.4
Each 93 93 Each 93 93
Each 93 93 Each 93 93
Each 124.25 124.25 Each 124.25 124.25
Each 154.75 154.75 Each 154.75 154.75
Each 168.14 168.14 Each 168.14 168.14
Each 186 186 Each 186 186
Each 204.6 204.6 Each 204.6 204.6
Each 232.5 232.5 Each 232.5 232.5
Each 264.86 264.86 Each 264.86 264.86
Each 310.25 310.25 Each 310.25 310.25
Each 372 372 Each 372 372
Each 465 465 Each 465 465
Each 74.03 74.03 Each 74.03 74.03
Each 148.06 148.06 Each 148.06 148.06
Each 185.63 185.63 Each 185.63 185.63
Each 223.2 223.2 Each 223.2 223.2
Each 245.52 245.52 Each 245.52 245.52
Each 279 279 Each 279 279
Each 372.74 372.74 Each 372.74 372.74
Each 558 558 Each 558 558
Each 390.6 613.54 Each 390.6 613.54
100 Sft 3598.17 32684.56 m2 387.16 3516.86
Sft 31.81 178.58 m2 342.24 1921.53
100 Sft 1674 5216.88 m2 180.12 561.34
100 Sft 558 1320.3 m2 60.04 142.06
100 Cft 2200.75 2970.68 m3 777.19 1049.08
100 Cft 4403.36 8857.74 m3 1555.03 3128.08
100 Sft 1023 2106.44 m2 110.07 226.65
100 Sft 762.6 3461.5 m2 82.06 372.46
100 Sft 1078.8 5069.98 m2 116.08 545.53
100 Sft 744 1211.42 m2 80.05 130.35
100 Sft 1302 4747.6 m2 140.1 510.84
100 Sft 1674 6637.54 m2 180.12 714.2
100 Sft 1302 5150.53 m2 140.1 554.2
100 Sft 1488 5452.69 m2 160.11 586.71
- - - - - -
- - - - - -
- - - - - -
- - - - - -
100 Sft 1982.76 8736.01 m2 213.34 939.99
100 Sft 1153.2 2589.07 m2 124.08 278.58
100 Sft 1357.8 3237.33 m2 146.1 348.34
100 Sft 1357.8 3486.43 m2 146.1 375.14
100 Sft 1357.8 4000.24 m2 146.1 430.43
100 Sft 1543.8 4417.47 m2 166.11 475.32
100 Sft 2232 5519.57 m2 240.16 593.91
100 Sft 2325 5926.35 m2 250.17 637.67
100 Sft 2790 6705.56 m2 300.2 721.52
100 Sft 2604 6856.06 m2 280.19 737.71
100 Sft 2418 4086.54 m2 260.18 439.71
100 Sft 1674 3509.33 m2 180.12 377.6
100 Sft 1860 3868.21 m2 200.14 416.22
100 Sft 558 1186.35 m2 60.04 127.65
100 Sft 279 279 m2 30.02 30.02
100 Sft 3366.6 5060.52 m2 362.25 544.51
100 Sft 3132.24 5047.79 m2 337.03 543.14
100 Sft 1116 13380.08 m2 120.08 1439.7
100 Sft 967.2 7099.24 m2 104.07 763.88
100 Sft 677.04 3747.42 m2 72.85 403.22
100 Sft 4464 8063.31 m2 480.33 867.61
100 Sft 4464 7792.63 m2 480.33 838.49
100 Sft 4575.6 7751.29 m2 492.33 834.04
100 Sft 4575.6 8279.33 m2 492.33 890.86
100 Sft 2473.8 9553.83 m2 266.18 1027.99
100 Sft 3162 8771.08 m2 340.23 943.77
100 Sft 3162 8812.82 m2 340.23 948.26
100 Sft 6324 13797.81 m2 680.46 1484.64
100 Sft 6324 17228.16 m2 680.46 1853.75
100 Sft 6324 13416.66 m2 680.46 1443.63
100 Sft 6324 16379.1 m2 680.46 1762.39
100 Sft 6324 16379.1 m2 680.46 1762.39
100 Rft 595.2 15775.26 m 19.53 517.56
100 Rft 595.2 15775.26 m 19.53 517.56
100 Rft 595.2 15775.26 m 19.53 517.56
100 Sft 3162 3223.91 m2 340.23 346.89
100 Sft 1052.76 1253.42 m2 113.28 134.87
100 Sft 130.2 242.04 m2 14.01 26.04
100 Sft 9300 41761.32 m2 1000.68 4493.52

100 Sft 6696 48604.45 m2 720.49 5229.84


100 Sft 9300 50466.32 m2 1000.68 5430.18
100 Sft 6696 39693.89 m2 720.49 4271.06
100 Sft 9300 76556.63 m2 1000.68 8237.49
100 Sft 2604 23006.43 m2 280.19 2475.49
100 Sft 2604 14586.65 m2 280.19 1569.52
100 Sft 2168.76 10018.88 m2 233.36 1078.03
100 Sft 2511 24482.3 m2 270.18 2634.3
100 Sft 2540.76 3266.88 m2 273.39 351.52
100 Sft 2540.76 3147.7 m2 273.39 338.69
100 Sft 186 1018.78 m2 20.01 109.62
100 Sft 3534 9143.08 m2 380.26 983.79
100 Sft 3534 9039.02 m2 380.26 972.6
100 Sft 3534 9143.08 m2 380.26 983.79
100 Sft 3534 9294.33 m2 380.26 1000.07
100 Sft 4464 6718.27 m2 480.33 722.89
100 Sft 4464 7233.25 m2 480.33 778.3
100 Sft 4464 6912.88 m2 480.33 743.83
100 Sft 4464 7635.01 m2 480.33 821.53
100 Sft 2046 5045.59 m2 220.15 542.91
100 Sft 2046 8353.13 m2 220.15 898.8
100 Sft 1484.28 19285.92 m2 159.71 2075.17
100 Rft 49.48 557.68 m 1.62 18.3
100 Rft 49.48 557.68 m 1.62 18.3
100 Rft 49.48 557.68 m 1.62 18.3
100 Rft 49.48 811.78 m 1.62 26.63
100 Sft 1488 20025.2 m2 160.11 2154.71
100 Sft 1488 6204.99 m2 160.11 667.66
100 Sft 2976 10566.57 m2 320.22 1136.96
100 Sft 2976 14373.23 m2 320.22 1546.56
100 Sft 1674 5817.65 m2 180.12 625.98
100 Sft 3162 10064.57 m2 340.23 1082.95
100 Sft 3162 12678.17 m2 340.23 1364.17
100 Sft 3162 24148.97 m2 340.23 2598.43
100 Sft 3162 20934.24 m2 340.23 2252.52
100 Sft 3720 35726.56 m2 400.27 3844.18
100 Sft 3720 11526.56 m2 400.27 1240.26
100 Sft 3720 17576.56 m2 400.27 1891.24
100 Sft 3720 13946.56 m2 400.27 1500.65
100 Sft 744 2182.89 m2 80.05 234.88
Sft 31.25 143.17 m2 336.23 1540.54
100 Sft 331.08 451.99 m2 35.62 48.63
100 Sft 453.84 695.66 m2 48.83 74.85
100 Sft 297.6 418.51 m2 32.02 45.03
100 Sft 561.72 803.54 m2 60.44 86.46
100 Sft 1023 1201.41 m2 110.07 129.27
100 Sft 1023 1380.13 m2 110.07 148.5
100 Sft 1023 1543.32 m2 110.07 166.06
100 Sft 1023 1917.96 m2 110.07 206.37
100 Sft 2343.6 4565.28 m2 252.17 491.22
100 Sft 791.12 2253.66 m2 85.12 242.49
100 Sft 798.56 2159.59 m2 85.93 232.37
100 Sft 813.44 2122.92 m2 87.53 228.43
100 Sft 1023 1587.34 m2 110.07 170.8
100 Sft 1023 1749.12 m2 110.07 188.21
100 Sft 1302 2425.49 m2 140.1 260.98
100 Sft 1023 1427.14 m2 110.07 153.56
100 Sft 1023 1560.12 m2 110.07 167.87
100 Sft 1302 2110.28 m2 140.1 227.07
100 Sft 1023 1390.11 m2 110.07 149.58
100 Sft 1023 1486.43 m2 110.07 159.94
100 Sft 1302 2025.34 m2 140.1 217.93
100 Sft 1302 1735.79 m2 140.1 186.77
100 Sft 1302 1732.18 m2 140.1 186.38
100 Sft 1302 1593.61 m2 140.1 171.47
100 Sft 1023 1353.69 m2 110.07 145.66
100 Sft 1023 1458.72 m2 110.07 156.96
100 Sft 1302 1963.39 m2 140.1 211.26
100 Sft 1023 1301.66 m2 110.07 140.06
100 Sft 1023 1391.08 m2 110.07 149.68
100 Sft 1302 1854.12 m2 140.1 199.5
100 Sft 688.2 901.52 m2 74.05 97
100 Sft 744 886.05 m2 80.05 95.34
100 Sft 1023 1442.02 m2 110.07 155.16
100 Sft 1209 1538.72 m2 130.09 165.57
100 Sft 744 1163.02 m2 80.05 125.14
100 Sft 1209 1628.02 m2 130.09 175.18
100 Sft 1209 1538.72 m2 130.09 165.57
100 Sft 1023 1202.69 m2 110.07 129.41
100 Sft 1953 2132.69 m2 210.14 229.48
100 Sft 1526.75 1786.3 m2 164.28 245.62
100 Sft 465 465 m2 50.03 50.03
100 Sft 111.6 134.72 m2 12.01 14.5
100 Sft 279 431.55 m2 30.02 46.43
100 Sft 279 458.36 m2 30.02 49.32
100 Sft 217 390.71 m2 23.35 51.27
100 Sft 78.12 187.65 m2 8.41 20.19
100 Sft 111.6 242.81 m2 12.01 26.13
100 Sft 55.8 100.27 m2 6 10.79
100 Sft 148.8 220.92 m2 16.01 23.77
100 Sft 63.24 97.33 m2 6.8 10.47
100 Sft 115.32 171.13 m2 12.41 18.41
100 Sft 52.08 67.93 m2 5.6 7.31
100 Sft 152.52 176.3 m2 16.41 18.97
100 Sft 193.44 229.91 m2 20.81 24.74
100 Sft 63.24 91.56 m2 6.8 9.85
100 Sft 115.32 134.78 m2 12.41 14.5
100 Sft 111.6 123.73 m2 12.01 13.31
100 Sft 111.6 138.28 m2 12.01 14.88
100 Sft 260.4 260.4 m2 28.02 28.02
100 Sft 182.28 182.28 m2 19.61 19.61
100 Sft 372 877.75 m2 40.03 94.45
100 Sft 372 469.84 m2 40.03 50.55
100 Sft 55.8 318.1 m2 6 34.23
100 Sft 911.4 1340.95 m2 98.07 144.29
100 Sft 911.4 1451.18 m2 98.07 156.15
100 Sft 6696 8104.73 m2 720.49 872.07
100 Sft 6026.4 8452.52 m2 648.44 909.49
Rft 5.44 29.82 m 17.86 97.84
Each 167.4 469.9 Each 167.4 469.9
Each 241.8 477.75 Each 241.8 477.75
Each 167.4 530.4 Each 167.4 530.4
Each 279 605.7 Each 279 605.7
m3 / coat 1.12 1.12 m3 / coat 1.12 1.12
100 Sft 2604 8380.73 m2 280.19 901.77
100 Sft 1581 8815.47 m2 170.12 948.54
100 Sft 3255 11464.37 m2 350.24 1233.57
100 Sft 2604 6772.45 m2 280.19 728.72
100 Sft 2604 7619.45 m2 280.19 819.85
Cft 465 3977.63 m3 16421.34 140468.8
Cft 651 2790.28 m3 22989.87 98537.9
Cft 338.52 3817.27 m3 11954.73 134805.8
Cft 539.4 2644.8 m3 19048.75 93400.32
Sft 172.71 1477.65 m2 1858.41 15899.55
Sft 172.71 1380.42 m2 1858.41 14853.33
Sft 172.71 1283.18 m2 1858.41 13807.06
Sft 107.6 770.92 m2 1157.81 8295.12
Sft 107.6 790.92 m2 1157.81 8510.32
Sft 107.6 669.68 m2 1157.81 7205.81
Sft 107.6 691.17 m2 1157.81 7437.01
Sft 38.75 218.95 m2 416.95 2355.93
Sft 58.13 546 m2 625.42 5874.93
Sft 38.75 245.39 m2 416.95 2640.37
Sft 38.75 245.39 m2 416.95 2640.37
Sft 106.29 920.66 m2 1143.63 9906.35
Sft 106.29 812.63 m2 1143.63 8743.88
Sft 86.36 771.09 m2 929.2 8296.96
Sft 124 920.36 m2 1334.24 9903.04
Sft 95.38 752.92 m2 1026.34 8101.41
Sft 71.54 565.31 m2 769.75 6082.75
Sft 106.29 924.91 m2 1143.63 9952.01
Sft 49.41 395.56 m2 531.61 4256.26
Sft 49.41 402.58 m2 531.61 4331.81
Sft 34.88 276.43 m2 375.26 2974.42
Sft 49.41 204.46 m2 531.61 2199.96
Sft 91.27 490.65 m2 982.08 5279.35
Sft 91.27 513.41 m2 982.08 5524.25
Sft 91.27 445.66 m2 982.08 4795.35
Sft 91.27 468.43 m2 982.08 5040.25
Sft 38.75 143.52 m2 416.95 1544.23
Sft 38.75 123.35 m2 416.95 1327.24
Sft 82.67 500.73 m2 889.49 5387.84
Sft 26.55 106.44 m2 285.7 1145.28
Sft 26.69 113.23 m2 287.18 1218.4
Sft 26.57 81.62 m2 285.91 878.28
Each 55.8 244.84 Each 55.8 244.84
Each 111.6 1321.6 Each 111.6 1321.6
Each 55.8 191.56 Each 55.8 191.56
Each 55.8 215.76 Each 55.8 215.76
Each 55.8 207.7 Each 55.8 207.7
Each 55.8 260.13 Each 55.8 260.13
Each 55.8 911.51 Each 55.8 911.51
Each 55.8 1153.51 Each 55.8 1153.51
Sft 1.24 13.85 m2 13.39 149.03
Sft 1.35 13.31 m2 14.51 143.25
Each 241.8 1165.43 Each 241.8 1165.43
Each 241.8 1048.47 Each 241.8 1048.47
Each 170 1077.5 Each 170 1077.5
Each 170 1017 Each 170 1017
Sft 19.37 203.28 m2 208.48 2187.26
Sft 16.27 323.09 m2 175.12 3476.4
Sft 173.66 1217.22 m2 1868.61 13097.33
Sft 124.04 679.3 m2 1334.72 7309.32
Sft 186.03 800.96 m2 2001.73 8618.29
Sft 186.03 899.52 m2 2001.73 9678.85
Sft 33.21 389 m2 357.39 4185.61
Sft 26.57 170.5 m2 285.91 1834.54
Sft 16.61 237.35 m2 178.69 2553.84
100 Sft 3348 33880.44 m2 360.24 3645.54
100 Sft 3348 26680.89 m2 360.24 2870.86
100 Sft 3348 19511.64 m2 360.24 2099.45
100 Sft 3348 33710.99 m2 360.24 3627.3
100 Sft 3348 48094.71 m2 360.24 5174.99
100 Sft 3348 62478.45 m2 360.24 6722.68
Each 46.5 105.23 Each 46.5 105.23
1 No 46.5 133.86 no 46.5 133.86
Each 27.9 132.77 Each 27.9 132.77
Each 33.48 75.83 Each 33.48 75.83
Rft 158.84 1185.29 m 521.14 3888.76
Rft 158.84 717.33 m 521.14 2353.45
Rft 65.47 360.06 m 214.8 1181.29
100 Sft 1116 1116 m2 120.08 120.08
100 Sft 2232 2232 m2 240.16 240.16
100 Sft 737.18 737.18 m2 79.32 79.32
100 Sft 795.09 795.09 m2 85.55 85.55
100 Sft 4278 40250.09 m2 460.31 4330.91
Sft 51.67 65.35 m2 555.93 703.16
Each 389.48 8460.18 Each 389.48 8460.18
Rft 18.6 18.6 m 61.02 61.02
Rft 186 2334.14 m 610.24 7657.95
100 Sft 1116 8418.21 m2 120.08 905.8
100 Sft 1116 8224.75 m2 120.08 884.98
100 Sft 1116 11054.13 m2 120.08 1189.42
100 Sft 2046 11012.43 m2 220.15 1184.94
100 Sft 2046 10569.84 m2 220.15 1137.31
100 Sft 2046 15710.93 m2 220.15 1690.5
100 Sft 2976 10278.21 m2 320.22 1105.94
100 Sft 2976 13210.58 m2 320.22 1421.46
100 Sft 2976 10034.54 m2 320.22 1079.72
100 Sft 2976 13599.8 m2 320.22 1463.34
100 Sft 2232 12704.55 m2 240.16 1367.01
100 Sft 2232 14422.75 m2 240.16 1551.89
100 Sft 2232 8130.75 m2 240.16 874.87
100 Sft 2232 9231.85 m2 240.16 993.35
100 Sft 1785.6 20722.1 m2 192.13 2229.7
Each 465 465 Each 465 465
Each 232.5 232.5 Each 232.5 232.5
Sft 19.93 67.07 m2 214.43 721.63
Sft 26.57 93.16 m2 285.91 1002.37
Sft 26.57 93.16 m2 285.91 1002.37
100 Sft 279 430.01 m2 30.02 46.27
Sft 5.08 18.05 m2 54.65 194.24
Sft 31.75 152.73 m2 341.6 1643.38
Sft 31.75 152.16 m2 341.6 1637.28
Sft 132.86 814.23 m2 1429.6 8761.14
Sft 146.14 781.58 m2 1572.44 8409.82
Sft 112.71 572.58 m2 1212.72 6160.96
Sft 111.39 532.86 m2 1198.58 5733.56
Sft 186.07 547.69 m2 2002.08 5893.14
Rft 28.65 38.75 m 93.99 127.13
Rft 28.49 105.52 m 93.46 346.19
Sft 0 170.26 m2 307.51 1832.05
Sft 0 140.27 m2 446.4 1509.34
Sft 0 493.09 m2 235.95 5305.65
Sft 0 493.09 m2 235.95 5305.65
Sft 0 507.58 m2 235.7 5461.55
Sft 0 456.78 m2 235.96 4914.98
Sft 0 405.44 m2 456.69 4362.57
Sft 0 544.59 m2 456.69 5859.83
Sft 0 616.48 m2 456.69 6633.27
Sft 0 471.99 m2 456.69 5078.65
Sft 0 447.79 m2 456.69 4818.26
Sft 0 484.09 m2 456.69 5208.85
Sft 0 338.89 m2 456.69 3646.49
Sft 0 338.89 m2 456.69 3646.49
Sft 0 555.98 m2 456.69 5982.37
Sft 0 518.68 m2 456.69 5580.97
Sft 0 632.66 m2 456.69 6807.43
Sft 0 646.03 m2 456.69 6951.25
Sft 0 632.66 m2 456.69 6807.43
Sft 0 583.26 m2 456.69 6275.83
Sft 0 496.19 m2 456.69 5339.04
Sft 0 508.29 m2 456.69 5469.24
Sft 0 363.09 m2 456.69 3906.89
Sft 0 363.09 m2 456.69 3906.89
Sft 0 542.85 m2 456.69 5841.07
Sft 0 592.28 m2 456.69 6372.96
Sft 0 656.71 m2 456.69 7066.25
Sft 0 614.22 m2 456.69 6609.06
Sft 0 605.72 m2 456.69 6517.58
Sft 0 399.39 m2 456.69 4297.47
Sft 0 433.08 m2 456.69 4659.95
Sft 0 628.97 m2 456.69 6767.74
Sft 0 628.58 m2 456.69 6763.55
Sft 0 693.16 m2 456.69 7458.41
Sft 0 727.39 m2 456.69 7826.75
Sft 0 792.19 m2 456.69 8524.01
Sft 0 153.88 m2 93.4 1655.75
Sft 0 153.88 m2 93.4 1655.75
Sft 0 153.88 m2 93.4 1655.75
Sft 0 544.59 m2 456.69 5859.83
Sft 0 544.59 m2 456.69 5859.83
Sft 0 616.48 m2 456.69 6633.35
Sft 0 555.98 m2 456.69 5982.37
Sft 0 447.79 m2 456.69 4818.26
Sft 0 484.09 m2 456.69 5208.85
Sft 0 338.89 m2 456.69 3646.49
Sft 0 447.79 m2 456.69 4818.26
Sft 0 555.98 m2 456.69 5982.37
Sft 0 518.68 m2 456.69 5580.97
Sft 0 568.08 m2 456.69 6112.57
Sft 0 583.26 m2 456.69 6275.83
Sft 0 670.85 m2 456.69 7218.34
Sft 0 716.65 m2 456.69 7711.15
Sft 0 496.19 m2 456.69 5339.04
Sft 0 508.29 m2 456.69 5469.24
Sft 0 363.09 m2 456.69 3906.89
Sft 0 520.39 m2 456.69 5599.43
Sft 0 542.88 m2 456.69 5841.36
Sft 0 531.78 m2 456.69 5721.98
Sft 0 596.36 m2 456.69 6416.84
Sft 0 544.59 m2 456.69 5859.83
Sft 0 544.59 m2 456.69 5859.83
Sft 0 399.39 m2 456.69 4297.47
Sft 0 544.59 m2 456.69 5859.83
Sft 0 579.18 m2 456.69 6231.95
Sft 0 628.58 m2 456.69 6763.55
Sft 0 693.16 m2 456.69 7458.41
Sft 0 727.39 m2 456.69 7826.75
Sft 0 791.97 m2 456.69 8521.61
Sft 0 153.88 m2 93.4 1655.75
Sft 0 153.88 m2 93.4 1655.75
Sft 0 153.88 m2 93.4 1655.75
Sft 0 158.76 m2 640.7 1708.21
Sft 0 159.16 m2 482.29 1712.52
Sft 0 128.51 m2 640.54 1382.75
Rft 0 216.8 m 130.46 711.27
Rft 0 454.17 m2 571.82 4886.88
Rft 0 495.66 m2 571.82 5333.27
Sft 0 1056.27 m2 494.47 11365.42
Sft 0 1056.27 m2 494.47 11365.42
Sft 0 1450.28 m2 494.47 15605.03
Sft 0 1450.28 m2 494.47 15605.03
Sft 0 1450.28 m2 494.47 15605.03
Sft 0 1450.28 m2 494.47 15605.03
Sft 0 1450.28 m2 494.47 15605.03
Sft 0 902.48 m2 216.91 9710.71
Sft 0 945.92 m2 216.15 10178.13
Sft 0 339.04 m2 320.22 3648.03
Sft 0 357.91 m2 320.22 3851.13
Rft 0 387.31 m 146.46 1270.71
Sft 0 84.57 m 146.46 277.46
Sft 0 128.86 m 146.46 422.76
Sft 0 804.05 m2 1501.02 8651.53
Sft 0 623.24 m2 1200.82 6706.11
Each 0 7255.32 Each 1674 7255.32
Sft 0 917.5 m2 1216.83 9872.26
Sft 0 1099.54 m2 1456.99 11831.01
Sft 0 1440.76 m2 1456.99 15502.53
Sft 0 990.56 m2 1424.97 10658.47
Sft 0 954.26 m2 1424.97 10267.88
Sft 0 652.4 m2 848.58 7019.87
Sft 0 591.42 m2 848.58 6363.68
Sft 0 833.03 m2 1104.75 8963.38
Sft 0 519.91 m2 688.47 5594.25
Sft 0 928.32 m2 864.59 9988.72
Sft 0 849.91 m2 864.59 9145.05
Sft 0 1139.4 m2 1104.75 12259.94
Sft 0 795.79 m2 688.47 8562.72
Sft 0 1050.95 m2 1481.01 11308.2
100 Sft 74.4 143.98 m2 8.01 15.49
100 Sft 74.4 162.13 m2 8.01 17.44
100 Sft 186 186 m2 20.01 20.01
100 Sft 744 744 m2 80.05 80.05
100 Sft 368.28 746.41 m2 39.63 80.31
100 Sft 279 577.27 m2 30.02 62.11
100 Sft 223.2 437.98 m2 24.02 47.13
100 Sft 189.72 364.57 m2 20.41 39.23
100 Sft 368.28 746.41 m2 39.63 80.31
100 Sft 279 577.27 m2 30.02 62.11
100 Sft 223.2 437.98 m2 24.02 47.13
100 Sft 189.72 364.57 m2 20.41 39.23
100 Rft 189.72 379.81 m 6.22 12.46
100 Rft 133.92 284.08 m 4.39 9.32
100 No. 837 1541.82 100 No. 837 1541.82
100 No. 651 1108.98 100 No. 651 1108.98
100 No. 1674 3026.78 100 No. 1674 3026.78
100 No. 930 1738.28 100 No. 930 1738.28
100 Sft 416.64 958.11 m2 44.83 103.09
100 Sft 215.76 677.38 m2 23.22 72.89
100 Sft 249.24 587.43 m2 26.82 63.21
100 Sft 133.92 414.04 m2 14.41 44.55
100 Sft 416.64 958.11 m2 44.83 103.09
100 Sft 215.76 677.38 m2 23.22 72.89
100 Sft 249.24 556.58 m2 26.82 59.89
100 Sft 133.92 383.18 m2 14.41 41.23
100 Rft 189.72 443.09 m 6.22 14.54
100 Rft 89.28 295.46 m 2.93 9.69
100 No. 837 1873.97 100 No. 837 1873.97
100 No. 420.36 1257.68 100 No. 420.36 1257.68
100 No. 1674 3685.63 100 No. 1674 3685.63
100 No. 744 2247.43 100 No. 744 2247.43
100 Sft 44.64 149.18 m2 4.8 16.05
100 Sft 1116 4084.96 m2 120.08 439.54
2000 Sft 5580 12375.42 m2 30.02 66.58
2000 Sft 4240.8 9010.83 m2 22.82 48.48
100 Sft 3720 4804.64 m2 400.27 516.98
100 Sft 1860 2417.02 m2 200.14 260.07
100 Sft 223.2 762.62 m2 24.02 82.06
100 Sft 111.6 520.62 m2 12.01 56.02
100 Sft 111.6 445.12 m2 12.01 47.9
100 Sft 111.6 1049.87 m2 12.01 112.97
100 Sft 669.6 1350.89 m2 72.05 145.36
100 Sft 446.4 956.24 m2 48.03 102.89
Each 6.7 8.05 Each 6.7 8.05
100 Sft 122.76 820.9 m2 13.21 88.33
100 Sft 74.4 602.08 m2 8.01 64.78
100 Sft 245.52 786.99 m2 26.42 84.68
100 Sft 126.48 1010.99 m2 13.61 108.78
100 Sft 245.52 610.82 m2 26.42 65.72
100 Sft 126.48 374.23 m2 13.61 40.27
100 Sft 465 861.59 m2 50.03 92.71
100 Sft 186 240.45 m2 20.01 25.87
Each 33.48 87.63 Each 33.48 87.63
100 RFT 7485.37 8939.95 m 245.58 293.31
100 RFT 3742.68 4243.28 m 122.79 139.22
100 RFT 11114.63 11813.41 m 364.65 387.58
Each 279 413.61 Each 279 413.61
Each 34.93 51.79 Each 34.93 51.79
Each 368.28 502.89 Each 368.28 502.89
100 Sft 372 372 m2 40.03 40.03
100 Sft 4.65 125.65 m2 0.5 13.52
100 Sft 93 214 m2 10.01 23.03
letter 17.86 25.22 letter 17.86 25.22
100 Sft 558 679 m2 60.04 73.06
100 Sft 744 865 m2 80.05 93.07
100 Sft 372 493 m2 40.03 53.05
100 Sft 186 198.64 m2 20.01 21.37
Each 372 400.74 Each 372 400.74
100 Sft 446.4 1025.99 m2 48.03 110.4
100 Sft 223.2 455.4 m2 24.02 49
100 Sft 744 3470.98 m2 80.05 373.48
Job 52.08 178.66 Job 52.08 178.66
Job 372 452.46 Job 372 452.46
100 RFT 226.83 505.32 m 7.44 16.58
100 RFT 340.24 833.65 m 11.16 27.35
100 RFT 453.66 1047.15 m 14.88 34.36
Job 55.8 114.03 Job 55.8 114.03
100/coat 66.96 66.96 m2 7.2 7.2
100/coat 558 1004.01 m2 60.04 108.03
100/coat 279 520.4 m2 30.02 55.99
Each 368.28 4058.78 Each 368.28 4058.78
Each 368.28 4542.78 Each 368.28 4542.78
Each 7.44 476.32 Each 7.44 476.32
Each 7.44 592.27 Each 7.44 592.27
Each 334.8 1363.3 Each 334.8 1363.3
Each 334.8 1706.13 Each 334.8 1706.13
Each 334.8 1248.35 Each 334.8 1248.35
Each 446.4 2057.72 Each 446.4 2057.72
Each 446.4 1724.97 Each 446.4 1724.97
Each 334.8 1410.69 Each 334.8 1410.69
Each 334.8 1471.19 Each 334.8 1471.19
Each 446.4 3034.79 Each 446.4 3034.79
Each 446.4 3049.92 Each 446.4 3049.92
Each 334.8 1698.07 Each 334.8 1698.07
Each 334.8 1879.57 Each 334.8 1879.57
Each 446.4 4743.92 Each 446.4 4743.92
Each 446.4 2172.67 Each 446.4 2172.67
Each 446.4 1839.92 Each 446.4 1839.92
Each 446.4 7345.42 Each 446.4 7345.42
Each 446.4 8434.42 Each 446.4 8434.42
- - - - - -
- - - - - -
- - - - - -
Each 446.4 1765.3 Each 446.4 1765.3
Each 446.4 1879.24 Each 446.4 1879.24
Each 446.4 1951.84 Each 446.4 1951.84
- - - - - -
- - - - - -
- - - - - -
Each 52.08 505.83 Each 52.08 505.83
Each 52.08 278.95 Each 52.08 278.95
Each 52.08 475.58 Each 52.08 475.58
Each 52.08 378.78 Each 52.08 378.78
Each 52.08 505.83 Each 52.08 505.83
Each 52.08 306.18 Each 52.08 306.18
Each 139.5 774.75 Each 139.5 774.75
Each 59.52 634.27 Each 59.52 634.27
Each 22.32 415.57 Each 22.32 415.57
Each 59.52 422.52 Each 59.52 422.52
Each 59.52 543.52 Each 59.52 543.52
Each 52.08 191.23 Each 52.08 191.23
Each 52.08 185.18 Each 52.08 185.18
Each 52.08 188.21 Each 52.08 188.21
Each 52.08 203.33 Each 52.08 203.33
Each 52.08 672.21 Each 52.08 672.21
Each 52.08 588.11 Each 52.08 588.11
Each 52.08 747.83 Each 52.08 747.83
Each 52.08 439.28 Each 52.08 439.28
Each 59.52 485.44 Each 59.52 485.44
Each 52.08 651.03 Each 52.08 651.03
Each 52.08 520.96 Each 52.08 520.96
Each 52.08 747.83 Each 52.08 747.83
Each 52.08 384.83 Each 52.08 384.83
Each 52.08 505.83 Each 52.08 505.83
Each 52.08 5981.08 Each 52.08 5981.08
Each 59.52 1148.52 Each 59.52 1148.52
Each 59.52 1269.52 Each 59.52 1269.52
Each 59.52 1844.27 Each 59.52 1844.27
Each 59.52 4022.27 Each 59.52 4022.27
Each 59.52 3447.52 Each 59.52 3447.52
Each 52.08 778.08 Each 52.08 778.08
Each 59.52 2165.52 Each 59.52 2165.52
Each 74.4 2494.4 Each 74.4 2494.4
Each 52.08 294.08 Each 52.08 294.08
Each 52.08 445.33 Each 52.08 445.33
Each 111.6 371.75 Each 111.6 371.75
Each 111.6 671.22 Each 111.6 671.22
Each 100.44 826.44 Each 100.44 826.44
Each 100.44 300.09 Each 100.44 300.09
Each 167.4 580.82 Each 167.4 580.82
Rft 34.02 628 m 111.63 2060.36
Rft 17.01 332.62 m 55.81 1091.27
Rft 34.02 591.7 m 111.63 1941.26
Rft 17.01 282.61 m 55.81 927.19
Rft 8.51 93.75 m 27.91 307.59
Rft 10.21 182.31 m 33.49 598.12
Rft 17.01 229.77 m 55.81 753.83
Rft 27.22 358.96 m 89.3 1177.69
Each 139.5 723.61 Each 139.5 723.61
Each 139.5 559.37 Each 139.5 559.37
Each 63.24 938.47 Each 63.24 938.47
Each 63.24 1878.24 Each 63.24 1878.24
Each 63.24 3330.24 Each 63.24 3330.24
Each 279 2565.9 Each 279 2565.9
Rft 91.87 247.53 m 301.4 812.12
Each 52.08 177.52 Each 52.08 177.52
Each 52.08 248.91 Each 52.08 248.91
Each 279 279 Each 279 279
Each 59.52 310.8 Each 59.52 310.8
Each 59.52 440.67 Each 59.52 440.67
Each 2.23 81.49 Each 2.23 81.49
Each 2.23 23.41 Each 2.23 23.41
Each 52.08 115.61 Each 52.08 115.61
Each 52.08 133.76 Each 52.08 133.76
Each 37.2 103.75 Each 37.2 103.75
Each 37.2 115.85 Each 37.2 115.85
Each 59.52 1148.52 Each 59.52 1148.52
Each 59.52 1390.52 Each 59.52 1390.52
Each 59.52 219.85 Each 59.52 219.85
Each 59.52 220.45 Each 59.52 220.45
Each 22.32 143.32 Each 22.32 143.32
Each 22.32 185.67 Each 22.32 185.67
Each 22.32 179.62 Each 22.32 179.62
Each 52.08 274.11 Each 52.08 274.11
Each 52.08 320.1 Each 52.08 320.1
Each 52.08 512.69 Each 52.08 512.69
Each 52.08 577.22 Each 52.08 577.22
Each 52.08 844.63 Each 52.08 844.63
Each 52.08 1110.83 Each 52.08 1110.83
Rft 139.54 381.54 m 457.81 1251.77
Rft 111.63 329.43 m 366.25 1080.82
Each 558 12083.25 Each 558 12083.25
Each 223.2 4155.7 Each 223.2 4155.7
Each 167.4 2315.15 Each 167.4 2315.15
Each 186 2001 Each 186 2001
Each 186 1154 Each 186 1154
Each 186 887.8 Each 186 887.8
Each 558 12053 Each 558 12053
Each 223.2 5668.2 Each 223.2 5668.2
Each 111.6 2289.6 Each 111.6 2289.6
Each 22.32 43.49 Each 22.32 43.49
Each 111.6 982.8 Each 111.6 982.8
Each 111.6 953.76 Each 111.6 953.76
Rft 42.87 237 m 140.65 777.57
Rft 42.87 196.04 m 140.65 643.19
Rft 42.87 162.76 m 140.65 533.98
Rft 25.18 115.79 m 82.61 379.9
Rft 25.06 84.91 m 82.23 278.56
Rft 21.44 63.19 m 70.33 207.32
Each 18.6 521.96 Each 18.6 521.96
Each 18.6 292.06 Each 18.6 292.06
Each 18.6 258.79 Each 18.6 258.79
Each 3.72 177.96 Each 3.72 177.96
Each 3.72 335.26 Each 3.72 335.26
Each 22.32 107.02 Each 22.32 107.02
Each 37.2 182.4 Each 37.2 182.4
Each 59.52 241.02 Each 59.52 241.02
Each 744 2034.67 Each 744 2034.67
Each 744 2922 Each 744 2922
Each 744 3406 Each 744 3406
Each 744 4132 Each 744 4132
- - - - - -
- - - - - -
Each 744 17006.4 Each 744 17006.4
Each 744 17006.4 Each 744 17006.4
Each 744 17369.4 Each 744 17369.4
Each 744 12432.6 Each 744 12432.6
Each 744 19499 Each 744 19499
Each 744 21888.75 Each 744 21888.75
Each 93 355.17 Each 93 355.17
Each 93 849.25 Each 93 849.25
Each 93 909.75 Each 93 909.75
Each 223.2 1052.05 Each 223.2 1052.05
Each 223.2 1493.7 Each 223.2 1493.7
Each 223.2 2007.95 Each 223.2 2007.95
Each 223.2 2431.45 Each 223.2 2431.45
Each 74.4 270.02 Each 74.4 270.02
Each 223.2 2078.53 Each 223.2 2078.53
Pair 93 365.25 Pair 93 365.25
Each 558 3220 Each 558 3220
Each 837 3759.15 Each 837 3759.15
Each 837 3378 Each 837 3378
Each 1116 17273.5 Each 1116 17273.5
Each 1116 20641.67 Each 1116 20641.67
Each 1116 13199.83 Each 1116 13199.83
Each 2232 21060.88 Each 2232 21060.88
Each 2232 27615.62 Each 2232 27615.62
Each 2976 53456.56 Each 2976 53456.56
Each 4464 79739.01 Each 4464 79739.01
Rft 34.02 358.36 m 111.63 1175.73
Rft 34.02 231.05 m 111.63 758.03
Rft 21.44 105.87 m 70.33 347.34
Rft 21.44 96.19 m 70.33 315.58
20 Rft 14.18 29.92 m 2.33 4.91
20 Rft 14.18 37.79 m 2.33 6.2
20 Rft 14.18 45.66 m 2.33 7.49
20 Rft 14.18 53.53 m 2.33 8.78
20 Rft 14.18 61.4 m 2.33 10.07
20 Rft 14.18 69.27 m 2.33 11.36
20 Rft 37.2 369.95 m 6.1 60.69
20 Rft 37.2 393.24 m 6.1 64.51
20 Rft 37.2 469.77 m 6.1 77.06
20 Rft 37.2 513.03 m 6.1 84.16
20 Rft 37.2 529.67 m 6.1 86.89
20 Rft 37.2 609.53 m 6.1 99.99
20 Rft 37.2 696.04 m 6.1 114.18
Each 744 19952.75 Each 744 19952.75
Each 744 21888.75 Each 744 21888.75
Each 186 21022.2 Each 186 21022.2
Each 186 19062 Each 186 19062
Each 186 21663.5 Each 186 21663.5
Each 186 26322 Each 186 26322
Each 111.6 1037.65 Each 111.6 1037.65
Each 446.4 4203.89 Each 446.4 4203.89
Each 446.4 14189.42 Each 446.4 14189.42
Each 446.4 14189.42 Each 446.4 14189.42
Each 446.4 14975.92 Each 446.4 14975.92
Each 446.4 17975.25 Each 446.4 17975.25
Each 446.4 12409.25 Each 446.4 12409.25
Each 446.4 15772.87 Each 446.4 15772.87
Each 446.4 23904.37 Each 446.4 23904.37
Each 446.4 23479.74 Each 446.4 23479.74
Each 446.4 26785.34 Each 446.4 26785.34
Each 744 31507.52 Each 744 31507.52
Each 446.4 25842.79 Each 446.4 25842.79
Each 744 27300.54 Each 744 27300.54
Each 446.4 33628.23 Each 446.4 33628.23
Each 446.4 33086.51 Each 446.4 33086.51
Each 1488 15393.22 Each 1488 15393.22
Each 1488 19628.22 Each 1488 19628.22
Each 1488 23258.22 Each 1488 23258.22
Each 1488 25980.72 Each 1488 25980.72
Each 1116 33060 Each 1116 33060
Rft 9.07 32.09 m 29.77 105.29
Rft 9.07 39.62 m 29.77 129.98
Rft 9.07 48.52 m 29.77 159.17
Rft 9.07 55.33 m 29.77 181.54
Rft 9.07 61.97 m 29.77 203.33
Rft 9.07 83.02 m 29.77 272.39
Rft 22.68 56.77 m 74.42 186.25
Rft 22.68 64.3 m 74.42 210.94
Rft 22.68 73.19 m 74.42 240.13
Rft 22.68 80.01 m 74.42 262.5
Rft 22.68 86.65 m 74.42 284.29
Rft 22.68 103.69 m 74.42 340.2
Rft 4.54 22.1 m 14.88 72.52
Rft 4.54 23.02 m 14.88 75.51
Rft 4.54 27.73 m 14.88 90.99
Rft 6.7 32.81 m 21.97 107.66
Rft 9.07 42.14 m 29.77 138.26
Rft 5.78 37.04 m 18.98 121.51
Rft 6.92 64.25 m 22.7 210.78
Rft 8.93 76.44 m 29.29 250.78
Rft 13.61 31.18 m 44.65 102.29
Rft 13.61 43.16 m 44.65 141.59
Rft 13.61 48.49 m 44.65 159.1
Rft 13.61 51.22 m 44.65 168.04
Rft 18.15 63.12 m 59.54 207.1
Rft 22.68 66.51 m 74.42 218.2
Rft 27.22 95.61 m 89.3 313.69
Rft 34.02 113.93 m 111.63 373.78
Rft 5.28 29.48 m 17.32 96.72
Rft 5.21 39.09 m 17.09 128.24
Rft 8.93 39.18 m 29.29 128.54
Rft 9.67 52.02 m 31.73 170.68
Rft 9.67 58.07 m 31.73 190.52
Rft 15.88 76.38 m 52.09 250.58
Rft 16.37 301.93 m 53.7 990.58
Rft 2.34 6.59 m 7.69 21.61
Rft 2.34 10.22 m 7.69 33.52
Rft 2.34 16.99 m 7.69 55.74
Rft 3.16 9.62 m 10.37 31.57
Rft 3.18 11.15 m 10.42 36.57
Rft 2.98 15.69 m 9.76 51.47
Rft 2.98 22.58 m 9.76 74.09
Rft 7.44 36.44 m 24.42 119.56
Rft 11.16 85.64 m 36.61 280.97
Rft 18.6 173.31 m 61.04 568.6
Rft 5.21 11.44 m 17.09 37.52
Rft 5.21 14.18 m 17.09 46.53
Rft 5.95 19.35 m 19.53 63.49
Rft 5.95 27.85 m 19.53 91.36
Rft 9.67 39.81 m 31.73 130.61
Rft 14.88 65.7 m 48.83 215.57
Rft 14.88 72.96 m 48.83 239.38
Rft 25.3 144.94 m 82.99 475.53
Rft 25.3 122.1 m 82.99 400.58
Rft 37.21 230.81 m 122.08 757.25
Rft 93.03 359.23 m 305.21 1178.57
Rft 93.03 407.63 m 305.21 1337.37
Rft 93.03 673.83 m 305.21 2210.73
Rft 3.72 14.91 m 12.2 48.93
Rft 3.72 19.45 m 12.2 63.81
Rft 5.21 28.2 m 17.09 92.51
Rft 5.21 45.14 m 17.09 148.09
Rft 5.21 56.03 m 17.09 183.82
Rft 5.21 99.59 m 17.09 326.73
Each 55.8 110.25 Each 55.8 110.25
Each 74.4 147 Each 74.4 147
Each 93 187.38 Each 93 187.38
Each 111.6 311.25 Each 111.6 311.25
Each 133.92 395.28 Each 133.92 395.28
Each 156.24 555.54 Each 156.24 555.54
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Each 37.2 138.84 Each 37.2 138.84
Each 334.8 697.8 Each 334.8 697.8
Each 334.8 697.8 Each 334.8 697.8
Each 334.8 1496.4 Each 334.8 1496.4
Each 334.8 2875.8 Each 334.8 2875.8
Each 334.8 697.8 Each 334.8 697.8
Each 334.8 1569 Each 334.8 1569
Each 446.4 2116.2 Each 446.4 2116.2
Each 558 3171.6 Each 558 3171.6
Each 186 3211 Each 186 3211
Each 186 3755.5 Each 186 3755.5
Each 297.6 5440.1 Each 297.6 5440.1
Each 297.6 7134.1 Each 297.6 7134.1
Each 297.6 9977.6 Each 297.6 9977.6
Each 7.44 220.25 Each 7.44 220.25
Each 13.95 64.77 Each 13.95 64.77
Each 29.76 66.06 Each 29.76 66.06
Each 18.6 98.46 Each 18.6 98.46
Each 5.58 169.48 Each 5.58 169.48
Each 11.16 59.56 Each 11.16 59.56
Each 11.16 107.96 Each 11.16 107.96
Each 18.6 85.15 Each 18.6 85.15
Each 18.6 142.63 Each 18.6 142.63
Each 18.6 157.75 Each 18.6 157.75
Each 18.6 177.11 Each 18.6 177.11
Each 18.6 103.3 Each 18.6 103.3
Each 9.3 39.55 Each 9.3 39.55
Each 9.3 63.75 Each 9.3 63.75
Each 18.6 91.2 Each 18.6 91.2
Each 18.6 91.2 Each 18.6 91.2
Each 18.6 221.88 Each 18.6 221.88
Each 18.6 279.96 Each 18.6 279.96
Each 18.6 381.6 Each 18.6 381.6
Set 74.4 1886.38 Set 74.4 1886.38
Set 55.8 999.6 Set 55.8 999.6
Each 40.92 246.62 Each 40.92 246.62
Each 18.6 110.56 Each 18.6 110.56
Each 55.8 488.98 Each 55.8 488.98
Each 55.8 658.38 Each 55.8 658.38
Rft 6.7 137.68 m 21.97 451.71
Rft 8.93 213.65 m 29.29 700.96
Each 18.6 469.33 Each 18.6 469.33
kg 9.3 900.67 kg 9.3 900.67
kg 9.3 136.35 kg 9.3 136.35
Rft 5.21 55.02 m 17.09 180.52
Rft 5.21 67.52 m 17.09 221.53
Rft 5.21 81.31 m 17.09 266.76
Rft 8.93 103.82 m 29.29 340.61
Each 167.4 778.45 Each 167.4 778.45
Each 297.6 6831.6 Each 297.6 6831.6
Each 297.6 2023.06 Each 297.6 2023.06
Each 297.6 3594.85 Each 297.6 3594.85
Each 74.4 697.55 Each 74.4 697.55
Each 74.4 2216.1 Each 74.4 2216.1
Each 74.4 4648.2 Each 74.4 4648.2
Each 74.4 1707.9 Each 74.4 1707.9
Each 74.4 382.95 Each 74.4 382.95
Each 4464 20194 Each 4464 20194
Each 1116 33834.4 Each 1116 33834.4
Each 1116 37666.07 Each 1116 37666.07
Each 1116 44321.07 Each 1116 44321.07
Each 1116 21734.4 Each 1116 21734.4
Each 167.4 26962.85 each 167.4 26962.85
Job 1488 4782.09 Job 1488 4782.1
Each 372 6998.77 Each 372 6998.77
Rft 5.21 156.49 m 17.09 513.4
Rft 5.21 244.24 m 17.09 801.31
Job 930 3350 Job 930 3350
Each 22.32 724.46 Each 22.32 724.46
Each 22.32 522.5 Each 22.32 522.5
Rft 4.65 31.02 m 15.26 101.78
Rft 4.65 54.62 m 15.26 179.19
Rft 7.44 116.61 m 24.41 382.56
Rft 13.39 209.68 m 43.94 687.92
Rft 3.16 14.05 m 10.37 46.1
Rft 2.98 20.12 m 9.76 65.99
Rft 2.98 39.5 m 9.76 129.6
Rft 5.21 87.21 m 17.09 286.14
Each 35.71 1199.43 Each 35.71 1199.43
Each 33.48 1005.07 Each 33.48 1005.07
Each 16.37 530.02 Each 16.37 530.02
Each 50.59 1801.1 Each 50.59 1801.1
Each 595.2 10033.99 Each 595.2 10033.99
Each 37.2 347.11 Each 37.2 347.11
Each 29.76 453.26 Each 29.76 453.26
Each 29.76 755.76 Each 29.76 755.76
Each 37.2 308.24 Each 37.2 308.24
Each 37.2 320.34 Each 37.2 320.34
Each 37.2 417.14 Each 37.2 417.14
Each 37.2 320.34 Each 37.2 320.34
Each 37.2 417.14 Each 37.2 417.14
Each 37.2 477.64 Each 37.2 477.64
Each 37.2 714.8 Each 37.2 714.8
Each 74.4 776.2 Each 74.4 776.2
Each 93 964.2 Each 93 964.2
Each 74.4 945.6 Each 74.4 945.6
Each 74.4 1090.8 Each 74.4 1090.8
Each 55.8 600.3 Each 55.8 600.3
Each 74.4 1272.3 Each 74.4 1272.3
Each 74.4 1272.3 Each 74.4 1272.3
Each 74.4 1453.8 Each 74.4 1453.8
Each 186 2448.7 Each 186 2448.7
Each 186 1601.7 Each 186 1601.7
Each 186 2146.2 Each 186 2146.2
Each 186 2031.25 Each 186 2031.25
Each 186 3108.15 Each 186 3108.15
Each 186 3180.75 Each 186 3180.75
Each 186 2485 Each 186 2485
Each 186 4045.9 Each 186 4045.9
Each 111.6 184.2 Each 111.6 184.2
Each 93 2755 Each 93 2755
Each 93 2916.33 Each 93 2916.33
Each 93 3017.17 Each 93 3017.17
Each 74.4 1768.4 Each 74.4 1768.4
Each 74.4 2010.4 Each 74.4 2010.4
Each 74.4 2252.4 Each 74.4 2252.4
Each 297.6 3032.2 Each 297.6 3032.2
Each 297.6 4360.78 Each 297.6 4360.78
Each 353.4 5798.4 Each 353.4 5798.4
Each 55.8 394.6 Each 55.8 394.6
Each 55.8 539.8 Each 55.8 539.8
Each 55.8 584.57 Each 55.8 584.57
Each 55.8 781.8 Each 55.8 781.8
Each 744 6515.7 Each 744 6515.7
Each 744 6533.85 Each 744 6533.85
Each 1302 7352 Each 1302 7352
Each 1581 7649.15 Each 1581 7649.15
Each 1860 8188.3 Each 1860 8188.3
Each 141.36 413.17 Each 141.36 413.17
Each 178.56 667.45 Each 178.56 667.45
Rft 5.67 85.17 m 18.6 279.43
SFT 1860 4401 m2 20013.6 47354.76
SFT 2157.6 4698.6 m2 23215.78 50556.94
Each 186 3386.45 Each 186 3386.45
each 186 2775.4 Each 186 2775.4
each 260.4 2107.41 Each 260.4 2107.41
each 260.4 2236.3 Each 260.4 2236.3
each 96.72 2326.62 Each 96.72 2326.62
each 148.8 3052.8 Each 148.8 3052.8
Rft 6.8 12.25 m 22.33 40.19
Rft 6.8 13.82 m 22.33 45.35
Rft 6.8 21.93 m 22.33 71.95
Rft 6.8 28.58 m 22.33 93.78
each 74.4 253.88 Each 74.4 253.88
each 74.4 169.18 Each 74.4 169.18
each 74.4 189.35 Each 74.4 189.35
each 74.4 124.82 Each 74.4 124.82
each 37.2 91.65 Each 37.2 91.65
each 46.5 244.13 Each 46.5 244.13
each 8.18 69.89 Each 8.18 69.89
each 8.18 73.93 Each 8.18 73.93
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
100 Cft 2890.44 13170.6 m3 1020.75 4651.16
100 Cft 1116 3369.52 m3 394.11 1189.94
100 Cft 567.92 2674.65 m3 200.56 944.55
100 Cft 344.72 4787.93 m3 121.74 1690.84
100 Cft 344.72 5370.13 m3 121.74 1896.45
100 Cft 344.72 5427.56 m3 121.74 1916.73
100 Rft 1116 4020 m 36.61 131.89
100 Sft 8.64 1229.54 m2 0.93 132.3
100 Sft 25.92 475.62 m2 2.79 51.18
100 Sft 17.6 1855.9 m2 1.89 199.7
100 Sft 26.78 3862.32 m2 2.88 415.59
100 Sft 44.27 4684.96 m2 4.76 504.1
100 Sft 46.5 1181.3 m2 5 127.11
100 Sft 63.3 1095.49 m2 6.81 117.87
100 Sft 186 186 m2 20.01 20.01
100 Sft 193.44 2711.46 m2 20.81 291.75
100 Sft 277.14 3968.2 m2 29.82 426.98
100 Sft 360.84 5256.45 m2 38.83 565.59
100 Cft 421.34 44441.54 m3 148.8 15694.4
100 Cft 421.34 50583.34 m3 148.79 17863.36
Mile/Ton 0 6.43 km/Ton 0 3.99
- - - - - -
100 Rft/3ro 5516.76 76054.75 m/3rows 180.95 2494.6
Each 1227.6 2806.73 Each 1227.6 2806.73
Each 293.88 513.85 Each 293.88 513.85
Each 182.28 887.2 Each 182.28 887.2
100 Sft 9797.74 72172.77 m2 1054.24 7765.79
100 Sft 8241.47 63885.73 m2 886.78 6874.1
100 Sft 14168.59 109541.1 m2 1524.54 11786.62
100 Sft 12163.02 94025.61 m2 1308.74 10117.16
100 Sft 1382.4 61882.4 m2 148.75 6658.55
100 Sft 1382.4 49782.4 m2 148.75 5356.59
100 Sft 1382.4 7432.4 m2 148.75 799.73
Each 33.48 674.78 Each 33.48 674.78
Each 33.48 892.58 Each 33.48 892.58
Each 33.48 450.93 Each 33.48 450.93
Each 33.48 577.98 Each 33.48 577.98
Each 33.48 335.98 Each 33.48 335.98
Each 33.48 420.68 Each 33.48 420.68
Each 33.48 311.78 Each 33.48 311.78
Cwt 1322.83 6098.9 kg 25.93 119.54
100 Cft 1488 12375.12 m3 525.48 4370.24
100 Cft 5.58 1591.11 m3 1.97 561.9
100 Rft 11334.84 60879.98 m 371.88 1997.37
100 Rft 14172.75 92748.75 m 464.99 3042.94
100 Rft 17007.77 131370.8 m 558 4310.07
100 Rft 19840.25 173498.1 m 650.93 5692.19
100 Rft 22675.59 252589.8 m 743.95 8287.07
100 Rft 25514.73 304780.3 m 837.1 9999.35
100 Rft 28345.96 436147.6 m 929.99 14309.3
100 Cft 347.6 3054.54 m3 122.75 1078.7
100 Rft 90768 211768 m 2977.95 6947.77
100 Rft 90768 284368 m 2977.95 9329.66
Job 0 401022.4 Job 0 401022.4
Job 0 437322.4 Job 0 437322.4
Job 0 473622.4 Job 0 473622.4
Job 0 485722.4 Job 0 485722.4
100 Rft 0 121000 m 0 3969.82
100 Rft 0 133100 m 0 4366.8
100 Cft 0 169400 m 0 5557.74
100 Rft 0 193600 m 0 6351.71
100 Rft 0 217800 m 0 7145.67
Cwt 450.12 7765.08 kg 8.82 152.2
Cubic Inch 3.12 23.09 cm3 0.19 1.41
Cwt 1133.86 9739.71 kg 22.22 190.9
100 Rft 680.31 3874.71 m 22.32 127.12
Set 111.6 898.1 Set 111.6 898.1
Ft 283.53 357.28 m 930.22 1172.18
Each 669.6 1274.6 Each 669.6 1274.6
100 Rft 566.91 2737.71 m 18.6 89.82
Each 109 190.22 Each 109 190.22
Cwt 1133.86 5909.92 kg 22.22 115.83
Each 111.6 366.06 Each 111.6 366.06
Each 55.8 533.17 Each 55.8 533.17
100 Cft 2814.55 2981.53 m3 993.95 1052.92
100 Rft 3742.32 15250.87 m 122.78 500.36
100 Rft 1705 2585.27 m 55.94 84.82
100 Sft 372 372 m2 40.03 40.03
100 Sft 901.85 4561.49 m2 97.04 490.82
100 Sft 622.85 4282.49 m2 67.02 460.8
100 Sft 913.38 6028.37 m2 98.28 648.65
100 Sft 634.38 5749.37 m2 68.26 618.63
100 Sft 1165.23 8647.1 m2 125.38 930.43
100 Sft 886.23 8368.1 m2 95.36 900.41
100 Sft 25.26 2626.46 m2 2.72 282.61
10 Rft 37.2 3739.8 m 12.2 1226.97
100 Cft 863.04 3041.04 m3 304.78 1073.93
1000 Cft 1235.04 23862.04 m3 43.62 842.68
100 Sft 55.8 1286.97 m2 6 138.48
100 Sft 37.2 893.28 m2 4 96.12
100 Sft 22.32 503.3 m2 2.4 54.15
100 Sft 145.08 997.31 m2 15.61 107.31
100 Cft 2232 17379.38 m3 788.22 6137.48
100 Sft 223.2 223.2 m2 24.02 24.02
100 Sft 474.3 897.8 m2 51.03 96.6
100 Rft 1488 17755.12 m 48.82 582.52
100 Rft 1488 15819.12 m 48.82 519
100 Rft 1488 15335.12 m 48.82 503.12
100 Cft 7.44 31.64 m3 2.63 11.17
100 Rft 204.6 3326.4 m 6.71 109.13
100 Rft 204.6 4387.81 m 6.71 143.96
100 Rft 204.6 1874.4 m 6.71 61.5
100 Rft 204.6 2442.13 m 6.71 80.12
100 Rft 204.6 1293.6 m 6.71 42.44
100 Rft 204.6 1663.86 m 6.71 54.59
100 Rft 204.6 1003.2 m 6.71 32.91
100 Rft 204.6 1274.72 m 6.71 41.82
100 Cft 744 5312.96 m3 262.74 1876.26
100 Sft 186 186 m2 20.01 20.01
100 Cft 367.91 37533.31 m3 129.93 13254.78
Each 111.6 11606.6 Each 111.6 11606.6
Each 111.6 9791.6 Each 111.6 9791.6
Each 111.6 7976.6 Each 111.6 7976.6
Each 111.6 8581.6 Each 111.6 8581.6
Each 111.6 5556.6 Each 111.6 5556.6
Each 111.6 4951.6 Each 111.6 4951.6
Each 111.6 3499.6 Each 111.6 3499.6
Rft 6.8 127.8 m 22.31 419.29
Rft 6.8 110.86 m 22.31 363.71
Rft 6.8 96.34 m 22.31 316.08
Rft 6.8 81.82 m 22.31 268.44
Rft 6.8 79.4 m 22.31 260.5
Rft 6.8 70.93 m 22.31 232.71
Rft 6.8 57.62 m 22.31 189.04
Each 837 2531 Each 837 2531
Each 558 2252 Each 558 2252
Each 399.9 2093.9 Each 399.9 2093.9
Tonne 0 145200 ton 0 147530
tonne 0 174240 ton 0 177036
Tonne 0 137940 ton 0 140153.5
Rft 6.8 170.15 m 22.31 558.24
Rft 6.8 145.95 m 22.31 478.84
Rft 6.8 127.8 m 22.31 419.29
Rft 6.8 103.6 m 22.31 339.9
Rft 6.8 91.5 m 22.31 300.2
Rft 6.8 79.4 m 22.31 260.5
Rft 6.8 69.72 m 22.31 228.74
8 Rft 0 14925.83 m 0 6121.16
8 Rft 0 10391.46 m 0 4261.59
100 Sft 1223.88 4169.21 m2 131.69 448.61
Rft 26.41 765.48 m 86.65 2511.42
Each 33.48 1836.86 Each 33.48 1836.86
Each 111.6 7264.15 Each 111.6 7264.15
100 Sft 401.76 401.76 m2 43.23 43.23
100 Sft 558 558 m2 60.04 60.04
100 Sft 1116 1768.19 m2 120.08 190.26
100 Sft 803.52 1071.9 m2 86.46 115.34
100 Sft 1023 1291.38 m2 110.07 138.95
100 Sft 1023 2136.32 m2 110.07 229.87
100 Sft 1302 2415.32 m2 140.1 259.89
100 Sft 803.52 1227.38 m2 86.46 132.07
100 Sft 1023 1446.86 m2 110.07 155.68
100 Cft 3999 24014.58 m3 1412.23 8480.68
100 Cft 4557 24572.58 m3 1609.29 8677.73
100 Cft 3999 25276.86 m3 1412.23 8926.45
100 Cft 4557 25834.86 m3 1609.29 9123.5
100 Cft 3999 16149.58 m3 1412.23 5703.18
100 Cft 4557 16707.58 m3 1609.29 5900.23
100 Cft 3999 17411.85 m3 1412.23 6148.94
100 Cft 4557 17969.85 m3 1609.29 6346
100 Cft 3162 16162.97 m3 1116.65 5707.9
100 Cft 3162 13933.42 m3 1116.65 4920.55
100 Cft 3162 12026.46 m3 1116.65 4247.11
100 Cft 3720 16720.97 m3 1313.71 5904.96
100 Cft 3720 14491.42 m3 1313.71 5117.6
100 Cft 3720 12584.46 m3 1313.71 4444.16
Rft 150.66 595.86 m 494.29 1954.91
Rft 100.44 292.37 m 329.53 959.22
Rft 81.84 215.75 m 268.5 707.83
Rft 81.84 186.54 m 268.5 612
Rft 75.64 157.11 m 248.16 515.46
Rft 75.64 141.54 m 248.16 464.39
Each 186 186 Cut 186 186
Each 200.88 200.88 Cut 200.88 200.88
Rft 55.01 55.01 m 180.47 180.47
Rft 73.15 73.15 m 240 240
Rft 76.21 76.21 m 250.05 250.05
Each 148.8 148.8 Each 148.8 148.8
Each 22.32 22.32 Each 22.32 22.32
Each 6513.72 6513.72 Each 6513.72 6513.72
Job 3720 3720 Job 3720 3720
Job 4650 4650 Job 4650 4650
Job 5952 5952 Job 5952 5952
50 meter 5803.2 5803.2 50 m 5803.2 5803.2
tonne 137.64 137.64 tonne 137.64 137.64
50 meter 3069 3069 50 m 3069 3069
Each 19790.4 19790.4 Each 19790.4 19790.4
Each 19790.4 19790.4 Each 19790.4 19790.4
100 Cft 706.8 706.8 m3 249.6 249.6
100 Sft 1339.2 1339.2 m2 144.1 144.1
Each 30.13 38.6 Each 30.13 38.6
Each 37.57 46.04 Each 37.57 46.04
Each 30.13 80.55 each 30.13 80.55
Each 37.57 87.99 each 37.57 87.99
Each 120.53 137.47 Each 120.53 137.47
Each 150.29 167.23 Each 150.29 167.23
Each 120.53 253.63 Each 120.53 253.63
Each 150.29 283.39 Each 150.29 283.39
100 No. 152.52 152.52 100 No. 152.52 152.52
100No/50m 115.32 115.32 100No/50 115.32 115.32
100No/50m 12.65 12.65 100No/50 12.65 12.65
100 No. 610.08 610.08 100 No. 610.08 610.08
100No/50m 461.28 461.28 100No/50 461.28 461.28
100No/50m 50.59 50.59 100No/50 50.59 50.59
100 Sft 409.2 409.2 m2 44.03 44.03
100 Sft 651 651 m2 70.05 70.05
100 Sft 777.48 777.48 m2 83.66 83.66
100 No. 539.4 704.57 100 No. 539.4 704.57
100 Cft 725.4 725.4 m3 256.17 256.17
100 Cft 446.4 446.4 m3 157.64 157.64
100 Cft 1346.64 1346.64 m3 475.56 475.56
100 Cft 900.24 900.24 m3 317.92 317.92
100 Cft 1063.92 1063.92 m3 375.72 375.72
Each 93 133.52 Each 93 133.52
100 Sft 837 1330.68 m2 90.06 143.18
100 Sft 837 2437.76 m2 90.06 262.3
100 Sft 837 2730.65 m2 90.06 293.82
100 Sft 1004.4 1384.53 m2 108.07 148.98
100 Sft 1004.4 2272.36 m2 108.07 244.51
100 Sft 1004.4 3475.22 m2 108.07 373.93
100 Sft 1116 1687.43 m2 120.08 181.57
100 Sft 1116 3017.94 m2 120.08 324.73
100 Sft 1116 3955.87 m2 120.08 425.65
100 Cft 372 1582 m3 131.37 558.68
100 Cft 744 4676.5 m3 262.74 1651.49
100 Cft 744 2740.5 m3 262.74 967.8
100 Cft 744 1954 m3 262.74 690.05
100 Cft 558 4067 m3 197.06 1436.25
100 Cft 2852 4848.5 m3 1007.18 1712.23
100 Cft 2852 4062 m3 1007.18 1434.48
- - - - - -
- - - - - -
- - - - - -
100 Cft 803.52 2800.02 m3 283.76 988.82
- - - - - -
100 Cft 74.4 74.4 m3 26.27 26.27
100 Cft 744 744 m3 262.74 262.74
100 Sft 372 2037.77 m2 40.03 219.26
100 Sft 0 43.56 m2 0 4.69
100 Sft 744 7589.13 m2 80.05 816.59
100 Sft 744 6991.48 m2 80.05 752.28
100 Sft 1302 8420.68 m2 140.1 906.07
100 Cft 1116 4746 m3 394.11 1676.04
100 Cft 1116 4746 m3 394.11 1676.04
100 Cft 2604 6960 m3 919.59 2457.9
100 Cft 3348 7704 m3 1182.34 2720.64
100 Cft 2604 6960 m3 919.59 2457.9
100 Cft 558 4551 m3 197.06 1607.17
100 Cft 465 4458 m3 164.21 1574.33
100 Cft 4092 10456 m3 1445.08 3692.51
100 Cft 3348 9712 m3 1182.34 3429.76
100 Cft 2790 9154 m3 985.28 3232.71
100 Sft 1581 5192.85 m2 170.12 558.75
100 Sft 1581 3545.65 m2 170.12 381.51
100 Sft 558 1483.65 m2 60.04 159.64
100 Cft 465 1445.1 m3 164.21 510.33
100 Cft 2604 2604 m3 919.59 919.59
100 Cft 1116 1116 m3 394.11 394.11
100 Cft 558 921 m3 197.06 325.25
100 Cft 930 1910.1 m3 328.43 674.55
100 Cft 558 558 m3 197.06 197.06
100 Cft 3534 7890 m3 1248.02 2786.33
100 Cft 4092 10427.8 m3 1445.08 3682.55
100 Cft 1488 1488 m3 525.48 525.48
100 Cft 744 744 m3 262.74 262.74
- - - - - -
- - - - - -
100 Cft 465 4458 m3 164.21 1574.33
100 Cft 558 4551 m3 197.06 1607.17
Each 18.6 18.6 Each 18.6 18.6
Each 26.41 26.41 Each 26.41 26.41
Each 37.2 37.2 Each 37.2 37.2
Each 74.4 74.4 Each 74.4 74.4
100 No. 1212.72 1503.12 100 No. 1212.72 1503.12
100 No. 558 558 100 No. 558 558
100 No. 465 465 100 No. 465 465
100 Rft 186 208.38 100 Rft 186 208.38
100 Rft 1302 1737.6 100 Rft 1302 1737.6
100 No. 1398.72 1834.32 100 No. 1398.72 1834.32
100 No. 558 558 100 No. 558 558
100 No. 651 651 100 No. 651 651
100 Rft 186 208.38 100 Rft 186 208.38
100 Rft 1581 2016.6 100 Rft 1581 2016.6
100 No. 1674 1964.4 100 No. 1674 1964.4
100 No. 595.2 595.2 100 No. 595.2 595.2
100 No. 494.76 494.76 100 No. 494.76 494.76
100 Rft 186 208.38 100 Rft 186 208.38
100 Rft 1934.4 2370 100 Rft 1934.4 2370
100 No. 2046 2336.4 100 No. 2046 2336.4
100 No. 691.92 691.92 100 No. 691.92 691.92
100 No. 582.92 582.92 100 No. 582.92 582.92
100 Rft 186 208.38 100 Rft 186 208.38
100 Rft 2418 2853.6 100 Rft 2418 2853.6
100 No. 4278 4568.4 100 No. 4278 4568.4
100 No. 870.48 870.48 100 No. 870.48 870.48
100 No. 644.68 644.68 100 No. 644.68 644.68
100 Rft 186 212.86 100 Rft 186 212.86
100 Rft 2790 3225.6 100 Rft 2790 3225.6
100 No. 0 21780 100 No. 0 21780
100 No. 744 744 100 No. 744 744
100 No. 744 744 100 No. 744 744
100 Rft 372 398.86 100 Rft 372 398.86
100 Rft 3534 4230.96 100 Rft 3534 4230.96
100 No. 0 26136 100 No. 0 26136
100 No. 870.48 870.48 100 No. 870.48 870.48
100 No. 781.2 781.2 100 No. 781.2 781.2
100 Rft 186 2148.38 100 Rft 186 2148.38
100 Rft 4389.6 5260.8 100 Rft 4389.6 5260.8
100 No. 0 30492 100 No. 0 30492
100 No. 982.08 982.08 100 No. 982.08 982.08
100 No. 867.88 867.88 100 No. 867.88 867.88
100 Rft 186 2148.38 100 Rft 186 2148.38
100 Rft 5122.44 6342.12 100 Rft 5122.44 6342.12
100 No. 0 34848 100 No. 0 34848
100 No. 1116 1116 100 No. 1116 1116
100 No. 967.2 967.2 100 No. 967.2 967.2
100 Rft 186 2148.38 100 Rft 186 2148.38
100 Rft 5208 6601.92 100 Rft 5208 6601.92
100 No. 0 43560 100 No. 0 43560
100 No. 1309.44 1309.44 100 No. 1309.44 1309.44
100 No. 1165.48 1165.48 100 No. 1165.48 1165.48
100 Rft 186 2148.38 100 Rft 186 2148.38
100 Rft 5580 7148.16 100 Rft 5580 7148.16
100 Cft 372.06 677.28 m3 131.39 239.18
100 Cft 185.4 185.4 m3 65.47 65.47
100 Rft 222.46 222.46 50 m 364.83 364.83
100 Sft 2420.07 2420.07 m2 260.4 260.4
100 Sft 2046.69 2046.69 m2 220.22 220.22
100 Cft 744 3121.65 m3 262.74 1102.04
Job 930 930 Job 930 930
Job 1227.6 1227.6 Job 1227.6 1227.6
Job 1860 1860 Job 1860 1860
Job 2511 2511 Job 2511 2511
Job 3720 3720 Job 3720 3720
Each 930 930 Each 930 930
Each 1395 1395 Each 1395 1395
Each 1860 1860 Each 1860 1860
Each 2325 2325 Each 2325 2325
Each 1395 1395 Each 1395 1395
Each 1860 1860 Each 1860 1860
Each 2325 2325 Each 2325 2325
Each 368.28 665.34 Each 368.28 665.34
Job 930 930 Job 930 930
Each 930 930 Each 930 930
Each 1860 1860 Each 1860 1860
Each 2511 2511 Each 2511 2511
Each 576.6 994.05 Each 576.6 994.05
Each 1116 1782.71 Each 1116 1782.71
Each 1116 1241.84 Each 1116 1241.84
Each 837 962.84 Each 837 962.84
Each 669.6 795.44 Each 669.6 795.44
Each 558 657.83 Each 558 657.83
Each 446.4 520.21 Each 446.4 520.21
Each 368.28 532.24 Each 368.28 532.23
Rft 29.85 29.85 m 97.94 97.94
Each 465 465 Each 465 465
Each 390.6 390.6 Each 390.6 390.6
Rft 77.46 87.98 m 254.14 288.65
Rft 35.73 46.24 m 117.21 151.72
Rft 62.04 62.04 m 203.54 203.54
Rft 23.25 23.25 m 76.28 76.28
Rft 90.05 100.57 m 295.44 329.95
Rft 44.91 55.43 m 147.35 181.86
100 Cft 275.99 275.99 m3 97.46 97.46
100 Cft 288.63 288.63 m3 101.93 101.93
100 Cft 325.5 325.5 m3 114.95 114.95
100 Cft 371.85 371.85 m3 131.32 131.32
100 Cft 337.08 337.08 m3 119.04 119.04
100 Cft 351.83 351.83 m3 124.25 124.25
100 Cft 384.49 384.49 m3 135.78 135.78
100 Cft 432.94 432.94 m3 152.89 152.89
100 Cft 725.78 725.78 m3 256.31 256.31
100 Cft 752.12 752.12 m3 265.61 265.61
100 Cft 783.72 783.72 m3 276.77 276.77
100 Cft 841.66 841.66 m3 297.23 297.23
100 Cft 1488.43 1488.43 m3 525.64 525.64
100 Cft 1860.28 1860.28 m3 656.95 656.95
100 Cft 2232.12 2232.12 m3 788.27 788.27
100 Cft 2603.97 2603.97 m3 919.58 919.58
100 Cft 2975.81 2975.81 m3 1050.9 1050.9
100 Cft 3347.66 3347.66 m3 1182.22 1182.22
100 Cft 3720.56 3720.56 m3 1313.9 1313.9
100 Cft 4092.4 4092.4 m3 1445.22 1445.22
100 Cft 2045.68 2045.68 m3 722.42 722.42
100 Cft 2417.52 2417.52 m3 853.74 853.74
100 Cft 2790.42 2790.42 m3 985.43 985.43
100 Cft 3162.26 3162.26 m3 1116.74 1116.74
100 Cft 3534.11 3534.11 m3 1248.06 1248.06
100 Cft 3905.95 3905.95 m3 1379.38 1379.38
100 Cft 4277.8 4277.8 m3 1510.69 1510.69
100 Cft 4649.64 4649.64 m3 1642.01 1642.01
100 Cft 2789.37 2789.37 m3 985.06 985.06
100 Cft 3162.26 3162.26 m3 1116.74 1116.74
100 Cft 3534.11 3534.11 m3 1248.06 1248.06
100 Cft 3905.95 3905.95 m3 1379.38 1379.38
100 Cft 4277.8 4277.8 m3 1510.69 1510.69
100 Cft 4649.64 4649.64 m3 1642.01 1642.01
100 Cft 5022.54 5022.54 m3 1773.7 1773.7
100 Cft 5394.39 5394.39 m3 1905.01 1905.01
100 Cft 1996.87 1996.87 m3 705.19 705.19
100 Cft 3967.4 3967.4 m3 1401.08 1401.08
100 Cft 6105.77 6105.77 m3 2156.24 2156.24
100 Cft 8265.22 8265.22 m3 2918.84 2918.84
100 Cft 10896.22 10896.22 m3 3847.97 3847.97
100 Cft 13922.6 13922.6 m3 4916.72 4916.72
100 Cft 16886.83 16886.83 m3 5963.53 5963.53
100 Cft 20881.27 20881.27 m3 7374.16 7374.16
100 Cft 24796 24796 m3 8756.63 8756.63
100 Cft 29834.34 29834.34 m3 10535.91 10535.91
100 Cft 2569.56 2569.56 m3 907.43 907.43
100 Cft 4960.74 4960.74 m3 1751.87 1751.87
100 Cft 7487.82 7487.82 m3 2644.3 2644.3
100 Cft 9920.44 9920.44 m3 3503.37 3503.37
100 Cft 13682.08 13682.08 m3 4831.79 4831.79
100 Cft 17253.05 17253.05 m3 6092.86 6092.86
100 Cft 21162.17 21162.17 m3 7473.36 7473.36
100 Cft 26456.13 26456.13 m3 9342.9 9342.9
100 Cft 30996.22 30996.22 m3 10946.22 10946.22
100 Cft 37081.63 37081.63 m3 13095.27 13095.27
100 Cft 5158.08 5158.08 m3 1821.56 1821.56
100 Cft 12282.48 12282.48 m3 4337.52 4337.52
100 Cft 16747.78 16747.78 m3 5914.43 5914.43
100 Cft 23190.99 23190.99 m3 8189.83 8189.83
100 Cft 34853.73 34853.73 m3 12308.49 12308.49
100 Cft 45094.04 45094.04 m3 15924.83 15924.83
100 Cft 56556.29 56556.28 m3 19972.68 19972.68
100 Cft 73262.97 73262.97 m3 25872.6 25872.6
100 Cft 92115.06 92115.07 m3 32530.16 32530.16
100 Cft 117206.7 117206.7 m3 41391.2 41391.2
100 Cft 122976.4 259101.4 m3 43428.75 91500.88
Each 744 744 Each 744 744
100 Cft 9868.12 25553.32 m3 3484.9 9024.08
100 Cft 9868.12 23455.08 m3 3484.9 8283.09
Ton 18600 149731.8 tonne 18306.12 147366
100 Rft 744.45 2825.48 m 24.42 92.7
100 Rft 744.45 2575.66 m 24.42 84.5
100 Rft 818.63 3296.31 m 26.86 108.15
100 Rft 818.63 3154.53 m 26.86 103.5
100 Sft 1023.38 4380.21 m2 110.12 471.31
100 Sft 1023.38 4127.12 m2 110.12 444.08
100 Sft 1023.38 4054.25 m2 110.12 436.24
100 Sft 1145.97 6170.91 m2 123.31 663.99
100 Sft 1145.97 5799.26 m2 123.31 624
100 Sft 1145.97 5688.25 m2 123.31 612.06
100 Sft 960.15 4740.36 m2 103.31 510.06
100 Sft 960.15 4455.38 m2 103.31 479.4
100 Sft 960.15 4392.43 m2 103.31 472.63
100 Rft 954.47 6041.43 m 31.31 198.21
100 Rft 2426.56 14211.93 m 79.61 466.27
100 Rft 3084.62 18014.77 m 101.2 591.04
100 Rft 3323.02 21733.58 m 109.02 713.04
100 Rft 4456.56 28998.65 m 146.21 951.4
100 Rft 5036.76 33029.64 m 165.25 1083.65
100 Rft 5113.88 34738.28 m 167.78 1139.71
100 Rft 7702.34 51835.54 m 252.7 1700.64
100 Rft 8781.5 58015.35 m 288.11 1903.39
100 Rft 9473.75 70121.38 m 310.82 2300.57
100 Rft 10355.78 74059.74 m 339.76 2429.78
100 Rft 10585.7 75924.91 m 347.3 2490.97
100 Rft 5581.82 5967.17 m 183.13 195.77
100 Rft 8377.26 9158.47 m 274.84 300.47
100 Rft 11183.45 12363.26 m 366.91 405.62
Rft 65.21 170.83 m 213.95 560.48
Rft 73.72 190.96 m 241.86 626.5
Rft 82.23 241.29 m 269.77 791.64
Rft 56.71 117.21 m 186.05 384.54
Rft 73.72 174.15 m 241.86 571.36
Rft 107.74 228.74 m 353.49 750.47
Rft 184.3 490.17 m 604.65 1608.18
Rft 226.83 575.15 m 744.19 1886.96
Rft 276.45 712.66 m 906.99 2338.12
Rft 336.42 897.86 m 1103.73 2945.72
Rft 368.6 1057.54 m 1209.31 3469.6
Rft 496.08 1703.05 m 1627.55 5587.44
Rft 552.9 1593.79 m 1813.96 5228.98
Rft 602.52 1820.99 m 1976.76 5974.36
Rft 658.77 2056.23 m 2161.32 6746.16
Rft 850.61 2987.72 m 2790.71 9802.24
Rft 978.21 3585.98 m 3209.34 11765.03
Rft 1275.91 4697.19 m 4186.07 15410.73
Rft 1757.93 5630.46 m 5767.48 18472.63
Rft 2413.18 8100.18 m 7917.26 26575.4
Rft 3281.94 10826.29 m 10767.51 35519.32
Rft 184.3 486.07 m 604.65 1594.73
Rft 226.83 570.71 m 744.19 1872.41
Rft 276.45 711.57 m 906.99 2334.53
Rft 335.99 932.52 m 1102.34 3059.46
Rft 368.6 1042.33 m 1209.31 3419.7
Rft 496.25 1534.91 m 1628.1 5035.79
Rft 552.9 1754.38 m 1813.96 5755.83
Rft 602.52 1963.77 m 1976.76 6442.8
Rft 659.17 2273.31 m 2162.62 7458.35
Rft 850.61 3363.05 m 2790.71 11033.64
Rft 978.66 4101.67 m 3210.83 13456.93
Rft 1275.91 5154.93 m 4186.07 16912.51
Rft 1757.93 7051.68 m 5767.48 23135.42
Rft 2402.97 9299.97 m 7883.77 30511.73
Rft 3281.94 12001.1 m 10767.51 39373.69
Rft 184.3 562.7 m 604.65 1846.14
Rft 226.83 708.49 m 744.19 2324.46
Rft 276.45 884.99 m 906.99 2903.53
Rft 335.99 1117.8 m 1102.34 3667.31
Rft 368.6 1253.75 m 1209.31 4113.35
Rft 496.02 1822.42 m 1627.36 5979.07
Rft 552.9 1958.07 m 1813.96 6424.11
Rft 602.52 2493.14 m 1976.76 8179.6
Rft 658.49 2805.34 m 2160.39 9203.87
Rft 850.61 3840.21 m 2790.71 12599.1
Rft 978.66 4113.57 m 3210.83 13495.95
Rft 1275.91 6349.93 m 4186.07 20833.1
Rft 1757.93 7013.5 m 5767.48 23010.17
Rft 2402.97 11114.97 m 7883.77 36466.44
Rft 3281.94 14251.07 m 10767.51 46755.48
Rft 0 147.56 m 0 484.12
Rft 0 313.57 m 0 1028.76
Rft 0 494.33 m 0 1621.82
Rft 0 686.16 m 0 2251.18
Rft 0 900.12 m 0 2953.16
Rft 0 1121.46 m 0 3679.34
Rft 0 1328.05 m 0 4357.12
Rft 0 1519.88 m 0 4986.48
Rft 0 1726.46 m 0 5664.25
Rft 0 2036.34 m 0 6680.91
Rft 0 2154.39 m 0 7068.21
Rft 0 2360.98 m 0 7745.98
Each 1053.13 5315.13 Each 1053.13 5315.13
Each 1053.13 3766.55 Each 1053.13 3766.55
Set 781.2 781.2 Set 781.2 781.2
Set 1754.24 4891.25 Set 1754.24 4891.25
Set 2439.2 15497.54 Set 2439.2 15497.54
Set 2437.34 14040.32 Set 2437.34 14040.32
100 Kg 223.2 12952.4 100 Kg 223.2 12952.4
100 Kg 297.6 13026.8 100 Kg 297.6 13026.8
100 Kg 372 13101.2 100 Kg 372 13101.2
100 Kg 446.4 13175.6 100 Kg 446.4 13175.6
Each 1860 14024 Each 1860 14024
Each 1860 14332.24 Each 1860 14332.24
Job 0 24200 Job 0 24200
Rft 66.98 124.97 m 219.75 410.01
Rft 99.79 186.78 m 327.41 612.8
Rft 150.4 276.53 m 493.43 907.26
Rft 226.06 402.65 m 741.66 1321.01
Rft 339.09 577.48 m 1112.5 1894.63
Rft 508.63 806.63 m 1668.74 2646.41
Rft 635.79 993.38 m 2085.93 3259.13
Rft 794.75 1205.98 m 2607.45 3956.63
Rft 993.44 1445.8 m 3259.33 4743.43
Rft 256.2 470.63 m 840.56 1544.07
Rft 361.7 760.22 m 1186.67 2494.17
Rft 440.82 750.73 m 1446.25 2463.02
Rft 474.26 831.85 m 1555.98 2729.18
Rft 675.79 1087.02 m 2217.16 3566.34
Rft 913.95 1386.86 m 2998.52 4550.08
Rft 1142.43 1662.64 m 3748.15 5454.86
Rft 345.94 635.42 m 1134.96 2084.7
Rft 452.19 805.36 m 1483.55 2642.27
Rft 437.77 825.16 m 1436.27 2707.23
Rft 732.43 1161.54 m 2402.99 3810.83
Rft 877.39 1370.87 m 2878.58 4497.59
Rft 1005.34 1525.55 m 3298.37 5005.08
Rft 1258.61 1830.84 m 4129.3 6006.68
Rft 661.22 1126.09 m 2169.36 3694.52
Rft 878.92 1393.85 m 2883.59 4573
Rft 1052.87 1645.04 m 3454.29 5397.11
Rft 1206.94 1831.18 m 3959.76 6007.82
Rft 1508.01 2194.69 m 4947.55 7200.41
Rft 0 1004.29 m 0 3294.91
Rft 0 1210 m 0 3969.82
Rft 0 1255.36 m 0 4118.65
Rft 0 1512.5 m 0 4962.27
Rft 0 2510.73 m 0 8237.29
Rft 0 3025 m 0 9924.54
Rft 0 3143.43 m 0 10313.08
Rft 0 3787.3 m 0 12425.53
Job 837 8163.55 Job 837 8163.55
Per set 1488 1691.28 Per set 1488 1691.28
Rft 283.54 2945.54 m 930.24 9663.84
Rft 411.13 4283.13 m 1348.85 14052.26
Rft 425.3 4478.8 m 1395.36 14694.24
Rft 425.3 5507.3 m 1395.36 18068.59
Rft 453.66 6503.66 m 1488.38 21337.46
Rft 190.54 3215.54 m 625.12 10549.66
Rft 192.8 4548.8 m 632.56 14923.9
Rft 192.8 5516.8 m 632.56 18099.75
Rft 206.41 7224.41 m 677.21 23702.15
Rft 204.15 494.33 m 669.77 1621.83
Rft 255.18 691.82 m 837.21 2269.75
Rft 272.2 952.56 m 893.03 3125.18
Rft 306.22 1221.7 m 1004.66 4008.2
Rft 204.15 625.68 m 669.77 2052.74
Rft 255.18 911.17 m 837.21 2989.4
Rft 272.2 1258.61 m 893.03 4129.3
Rft 306.22 1585.5 m 1004.66 5201.76
Rft 204.15 767.1 m 669.77 2516.74
Rft 255.18 1129.76 m 837.21 3706.58
Rft 272.2 1584.39 m 893.03 5198.14
Rft 306.22 1970.46 m 1004.66 6464.76
Each 223.2 694.69 Each 223.2 694.69
Each 279 1007.67 Each 279 1007.67
Each 279 1445.83 Each 279 1445.83
Each 334.8 1927.88 Each 334.8 1927.88
Each 223.2 944.73 Each 223.2 944.73
Each 279 1424.4 Each 279 1424.4
Each 279 2031.62 Each 279 2031.62
Each 334.8 2620.83 Each 334.8 2620.83
Each 223.2 1216.19 Each 223.2 1216.19
Each 279 1841.12 Each 279 1841.12
Each 279 2650.75 Each 279 2650.75
Each 334.8 3344.74 Each 334.8 3344.74
Rft 382.77 1108.77 m 1255.82 3637.71
Rft 446.57 1414.57 m 1465.13 4640.98
Rft 531.63 1741.63 m 1744.2 5714.01
Rft 612.44 2064.44 m 2009.31 6773.09
Rft 357.26 596.84 m 1172.1 1958.12
Rft 425.3 795.56 m 1395.36 2610.12
Rft 606.77 1199.67 m 1990.71 3935.92
Rft 574.16 1383.65 m 1883.73 4539.54
Rft 361.51 728.14 m 1186.05 2388.91
Rft 425.3 1007.31 m 1395.36 3304.84
Rft 467.84 1358.4 m 1534.89 4456.68
Rft 574.16 1735.76 m 1883.73 5694.76
Rft 361.51 866.08 m 1186.05 2841.47
Rft 425.3 1219.06 m 1395.36 3999.56
Rft 467.84 1673 m 1534.89 5488.83
Rft 574.16 2103.6 m 1883.73 6901.58
Hour 0 508.2 Hour 0 508.2
Hour 0 595.32 Hour 0 595.32
Rft 141.77 350.12 m 465.12 1148.7
Rft 31.9 429.1 m 104.65 1407.82
Rft 42.53 548.18 m 139.54 1798.48
Rft 63.8 968.86 m 209.3 3178.69
Rft 106.33 2285.65 m 348.84 7498.84
Rft 138.22 2041.76 m 453.49 6698.69
Rft 138.22 2838.59 m 453.49 9312.96
Rft 40.4 512.3 m 132.56 1680.79
Rft 57.42 747.12 m 188.37 2451.17
Rft 74.43 873.03 m 244.19 2864.27
Rft 40.4 578.83 m 132.56 1899.05
Rft 57.42 714.83 m 188.37 2345.25
Rft 74.43 1197.07 m 244.19 3927.38
Rft 10.63 52.39 m 34.88 171.88
Rft 12.76 72.6 m 41.86 238.19
Rft 14.18 104.79 m 46.51 343.81
Rft 17.01 136.9 m 55.81 449.14
Rft 19.14 172.31 m 62.79 565.33
Rft 21.29 215.43 m 69.86 706.78
Rft 23.39 294.55 m 76.74 966.38
Rft 31.9 357.51 m 104.65 1172.93
Rft 40.4 501.57 m 132.56 1645.58
Rft 17.01 162.55 m 55.81 533.3
Rft 19.14 205.33 m 62.79 673.67
Rft 27.64 332.82 m 90.7 1091.95
Rft 38.28 564.43 m 125.58 1851.8
Rft 46.64 669.82 m 153.02 2197.58
Rft 63.8 1013.2 m 209.3 3324.14
Rft 74.43 1264.87 m 244.19 4149.85
Rft 85.06 1607.72 m 279.07 5274.67
Rft 97.82 2028.67 m 320.93 6655.73
Rft 114.83 2487.36 m 376.75 8160.62
Rft 136.1 3388.57 m 446.51 11117.36
Rft 17.01 162.55 m 55.81 533.3
Rft 19.14 226.94 m 62.79 744.57
Rft 27.64 393.22 m 90.7 1290.1
Rft 38.28 635.36 m 125.58 2084.53
Rft 48.91 883.82 m 160.47 2899.68
Rft 85.06 1258.08 m 279.07 4127.55
Rft 74.43 1836.66 m 244.19 6025.79
Rft 85.06 2386.47 m 279.07 7829.64
Rft 97.82 2921.31 m 320.93 9584.34
Rft 114.83 3497.42 m 376.75 11474.49
Rft 136.1 4770.88 m 446.51 15652.5
Rft 17.01 162.55 m 55.81 533.3
Rft 25.52 263.43 m 83.72 864.27
Rft 36.86 482.3 m 120.93 1582.36
Rft 51.04 856.39 m 167.44 2809.69
Rft 72.02 1275.1 m 236.28 4183.41
Rft 85.06 1850.43 m 279.07 6070.96
Rft 99.24 2690.34 m 325.58 8826.59
Rft 113.41 3481.39 m 372.1 11421.88
Rft 130.43 4248.02 m 427.91 13937.08
Rft 153.11 5174.28 m 502.33 16975.97
Rft 181.46 7905.17 m 595.35 25935.61
Rft 22.68 107.38 m 74.42 352.31
Rft 25.52 152.57 m 83.72 500.55
Rft 36.86 276.44 m 120.93 906.95
Rft 51.04 421.3 m 167.44 1382.21
Rft 65.21 658.11 m 213.95 2159.16
Rft 85.06 894.55 m 279.07 2934.88
Rft 22.68 72.29 m 74.42 237.18
Rft 22.68 126.74 m 74.42 415.82
Rft 25.52 196.13 m 83.72 643.47
Rft 36.86 403.49 m 120.93 1323.79
Rft 51.04 633.05 m 167.44 2076.92
Rft 65.21 955.77 m 213.95 3135.74
Rft 85.06 1246.66 m 279.07 4090.1
Rft 18.15 50.61 m 59.54 166.03
Rft 21.1 60.42 m 69.21 198.23
Rft 21.1 81.6 m 69.21 267.7
Rft 22.68 101.33 m 74.42 332.46
Rft 22.68 154.57 m 74.42 507.13
Rft 25.52 249.37 m 83.72 818.14
Rft 36.86 541.43 m 120.93 1776.34
Rft 51.04 844.8 m 167.44 2771.64
Rft 65.21 1270.37 m 213.95 4167.89
Rft 85.06 1614.5 m 279.07 5296.92
Rft 19.51 35.24 m 64 115.61
Rft 10.43 35.84 m 34.23 117.6
kg 37.2 196.92 kg 37.2 196.92
kg 44.64 204.36 kg 44.64 204.36
kg 18.6 178.32 kg 18.6 178.32
kg 29.76 189.48 kg 29.76 189.48
kg 8.56 168.28 kg 8.56 168.28
kg 15.62 175.34 kg 15.62 175.34
kg 47.99 207.71 kg 47.99 207.71
kg 74.4 234.12 kg 74.4 234.12
Each 1134.6 4159.6 Each 1134.6 4159.6
Each 297.6 4532.6 Each 297.6 4532.6
Each 1190.4 5788.4 Each 1190.4 5788.4
Each 1190.4 9539.4 Each 1190.4 9539.4
Each 1488 14193 Each 1488 14193
Each 2232 20382 Each 2232 20382
Each 1209 4536.5 Each 1209 4536.5
Each 1209 5867.5 Each 1209 5867.5
Each 1488 6545.8 Each 1488 6545.8
Each 1860 11043.9 Each 1860 11043.9
Each 2418 16393.5 Each 2418 16393.5
Each 2976 22941 Each 2976 22941
Each 2976 90096 Each 2976 90096
Each 2976 130752 Each 2976 130752
Each 2232 8282 Each 2232 8282
Each 1488 3666 Each 1488 3666
Each 2232 6588 Each 2232 6588
Each 911.4 1637.4 Each 911.4 1637.4
Each 1339.2 2587.92 Each 1339.2 2587.92
Each 127.41 232 Each 127.41 232
Each 139.5 367.9 Each 139.5 367.9
Each 186 478.42 Each 186 478.42
Each 269.7 1031.03 Each 269.7 1031.03
Each 372 3672.88 Each 372 3672.88
Each 348.75 5406.55 Each 348.75 5406.55
Each 418.5 6807.3 Each 418.5 6807.3
Each 95.79 200.38 Each 95.79 200.38
Each 104.63 397.23 Each 104.63 397.23
Each 139.5 511.94 Each 139.5 511.94
Each 202.27 929 Each 202.27 929
Each 279 4538.2 Each 279 4538.2
Each 348.75 6737.55 Each 348.75 6737.55
Each 418.5 7339.7 Each 418.5 7339.7
Each 95.79 200.38 Each 95.79 200.38
Each 104.63 397.23 Each 104.63 397.23
Each 186 558.44 Each 186 558.44
Each 269.7 996.43 Each 269.7 996.43
Each 372 5962.2 Each 372 5962.2
Each 465 8184.8 Each 465 8184.8
Each 558 9076.4 Each 558 9076.4
Each 186 341.86 Each 186 341.86
Each 223.2 649.92 Each 223.2 649.92
Each 297.6 1020.6 Each 297.6 1020.6
Each 409.2 2593.64 Each 409.2 2593.64
Each 604.5 3905.38 Each 604.5 3905.38
Each 697.5 4091.55 Each 697.5 4091.55
Each 837 4696.9 Each 837 4696.9
Each 186 286.69 Each 186 286.69
Each 223.2 490.6 Each 223.2 490.6
Each 297.6 683.32 Each 297.6 683.32
Each 409.2 1689.36 Each 409.2 1689.36
Each 604.5 9442.34 Each 604.5 9442.34
Each 693.78 8679.78 Each 693.78 8679.78
Each 837 11485 Each 837 11485
Each 186 286.69 Each 186 286.69
Each 223.2 490.6 Each 223.2 490.6
Each 297.6 683.32 Each 297.6 683.32
Each 409.2 1689.36 Each 409.2 1689.36
Each 604.5 5396.1 Each 604.5 5396.1
Each 697.5 8683.5 Each 697.5 8683.5
Each 837 10020.9 Each 837 10020.9
Each 62.31 165.91 Each 62.31 165.91
Each 65.1 269.23 Each 65.1 269.23
Each 93 388.66 Each 93 388.66
Each 716.21 2015.27 Each 716.21 2015.27
Each 186 1410.52 Each 186 1410.52
Each 232.31 1829.51 Each 232.31 1829.51
Each 279 2275.5 Each 279 2275.5
Each 62.31 129.86 Each 62.31 129.86
Each 358.05 488.55 Each 358.05 488.55
Each 93 250.99 Each 93 250.99
Each 130.2 642.64 Each 130.2 642.64
Each 186 1809.82 Each 186 1809.82
Each 232.5 2428.65 Each 232.5 2428.65
Each 279 3393.54 Each 279 3393.54
Each 62.31 129.86 Each 62.31 129.86
Each 65.1 195.6 Each 65.1 195.6
Each 93 250.99 Each 93 250.99
Each 130.2 642.64 Each 130.2 642.64
Each 186 2115.95 Each 186 2115.95
Each 232.5 3000.98 Each 232.5 3000.98
Each 279 3872.7 Each 279 3872.7
Each 127.41 220.85 Each 127.41 220.85
Each 139.5 253.7 Each 139.5 253.7
Each 186 325.12 Each 186 325.12
Each 269.7 452.42 Each 269.7 452.42
Each 372 683.45 Each 372 683.45
Each 465 984.09 Each 465 984.09
Each 550.56 1131.94 Each 550.56 1131.94
Each 127.41 231.23 Each 127.41 231.23
Each 139.5 264.08 Each 139.5 264.08
Each 186 335.5 Each 186 335.5
Each 270.07 463.17 Each 270.07 463.17
Each 372 693.84 Each 372 693.84
Each 465 1017.31 Each 465 1017.31
Each 559.12 1213.17 Each 559.12 1213.17
Each 127.41 210.46 Each 127.41 210.46
Each 139.5 247.47 Each 139.5 247.47
Each 186 358.34 Each 186 358.34
Each 269.7 529.24 Each 269.7 529.24
Each 372 808.04 Each 372 808.04
Each 465 1274.78 Each 465 1274.78
Each 558 1619.02 Each 558 1619.02
Rft 17.01 30.55 m 55.81 100.22
Rft 17.01 34.73 m 55.81 113.96
Rft 17.01 40.16 m 55.81 131.77
Rft 22.68 58.7 m 74.42 192.58
Rft 22.68 79.28 m 74.42 260.1
Rft 22.68 160.82 m 74.42 527.61
Rft 25.52 296.78 m 83.72 973.7
Each 44.64 175.32 Each 44.64 175.32
Each 44.64 203.15 Each 44.64 203.15
Each 44.64 217.67 Each 44.64 217.67
Each 62.31 442.25 Each 62.31 442.25
Each 338.52 967.72 Each 338.52 967.72
Each 65.1 1774.83 Each 65.1 1774.83
Each 93 2079.82 Each 93 2079.82
Each 148.8 315.78 Each 148.8 315.78
Each 148.8 375.07 Each 148.8 375.07
Each 148.8 444.04 Each 148.8 444.04
Each 186 890.22 Each 186 890.22
Each 186 1037.84 Each 186 1037.84
Each 223.2 2824.7 Each 223.2 2824.7
Each 297.6 4544.7 Each 297.6 4544.7
Each 100.44 200.87 Each 100.44 200.87
Each 100.44 231.12 Each 100.44 231.12
Each 100.44 279.52 Each 100.44 279.52
Each 127.41 517.03 Each 127.41 517.03
Each 127.41 720.31 Each 127.41 720.31
Each 139.5 1773 Each 139.5 1773
Each 186 2339.8 Each 186 2339.8
Each 52.08 136.78 Each 52.08 136.78
Each 52.08 160.98 Each 52.08 160.98
Each 52.08 227.53 Each 52.08 227.53
Each 62.31 364.81 Each 62.31 364.81
Each 62.31 548.73 Each 62.31 548.73
Each 65.1 1396.1 Each 65.1 1396.1
Each 93 2573.5 Each 93 2573.5
Rft 816.59 6686.61 m 2679.09 21937.7
Rft 317.56 5195.17 m 1041.87 17044.52
Rft 408.29 5023.69 m 1339.54 16481.93
Rft 340.24 3902.75 m 1116.29 12804.3
Rft 272.2 3235.79 m 893.03 10616.1
Rft 204.15 1745.81 m 669.77 5727.71
Rft 136.1 1010.87 m 446.51 3316.49
Rft 680.49 6141.52 m 2232.57 20149.35
Rft 453.66 5124.38 m 1488.38 16812.27
Rft 340.24 3843.74 m 1116.29 12610.69
Rft 272.2 3000.5 m 893.03 9844.17
Rft 226.83 2435.5 m 744.19 7990.5
Rft 181.46 1599.83 m 595.35 5248.77
Rft 113.41 926.22 m 372.1 3038.78
Sft 55.32 532.23 m2 595.2 5726.81
Rft 31.76 514.44 m 104.19 1687.8
Rft 2.27 46.54 m 7.44 152.68
Each 14.88 3644.88 Each 14.88 3644.88
Each 14.88 3402.88 Each 14.88 3402.88
Each 14.88 3039.88 Each 14.88 3039.88
Each 20832 93432 Each 20832 93432
Each 14880 72960 Each 14880 72960
Each 7142.4 36182.4 Each 7142.4 36182.4
Each 4761.6 22185.6 Each 4761.6 22185.6
Each 3868.8 16356 Each 3868.8 16356
Each 2083.2 10795.2 Each 2083.2 10795.2
Each 1785.6 8319.6 Each 1785.6 8319.6
Each 1785.6 4689.6 Each 1785.6 4689.6
Each 1190.4 3005.4 Each 1190.4 3005.4
Each 744 1712 Each 744 1712
Each 446.4 1172.4 Each 446.4 1172.4
Each 297.6 781.6 Each 297.6 781.6
Each 223.2 586.2 Each 223.2 586.2
Each 148.8 511.8 Each 148.8 511.8
Rft 9.07 238.97 m 29.77 784.03
No 930 36020 no 930 36020
Job 1116 15636 job 1116 15636
Rft 40.38 160.26 m 132.47 525.8
Rft 340.24 1801.1 m 1116.29 5909.11
No 132.43 1177.87 joint 132.43 1177.87
joint 132.43 947 joint 132.43 947
joint 132.43 716.14 joint 132.43 716.14
Joint 132.43 486.72 joint 132.43 486.72
Rft 453.66 5618.29 m 1488.38 18432.72
Each 558 18647.5 Each 558 18647.5
Each 744 63260.67 Each 744 63260.67
Each 744 77377.33 Each 744 77377.33
Each 744 87259 Each 744 87259
Each 744 114887.3 Each 744 114887.3
Each 744 162077.3 Each 744 162077.3
Each 744 228627.3 Each 744 228627.3
Each 59.52 1097.7 Each 59.52 1097.7
Each 59.52 1874.52 Each 59.52 1874.52
Each 59.52 2179.44 Each 59.52 2179.44
Each 59.52 3326.52 Each 59.52 3326.52
Each 59.52 4401 Each 59.52 4401
Each 59.52 7653.48 Each 59.52 7653.48
Each 59.52 13998.72 Each 59.52 13998.72
Rft 11.16 11.16 m 36.63 36.63
Rft 3.72 3.72 m 12.2 12.2
Rft 29.77 29.77 m 97.67 97.67
Each 2976 2976 Each 2976 2976
Each 372 372 Each 372 372
Each 1116 1116 Each 1116 1116
Each 44.64 44.64 Each 44.64 44.64
Each 4.58 4.58 Each 4.58 4.58
tonne 35712 125252 tonne 35712 125252
tonne 22320 111860 tonne 22320 111860
tonne 7085.48 7085.48 tonne 7085.48 7085.48
Sft 8.89 8.89 m2 95.67 95.67
tonne 8035.2 8035.2 tonne 8035.2 8035.2
tonne 461.28 461.28 tonne 461.28 461.28
tonne 230.64 230.64 tonne 230.64 230.64
kg 78.12 144.38 kg 78.12 144.38
Each cut 185.99 185.99 Each cut 185.99 185.99
Each cut 279 279 Each cut 279 279
Each cut 93 93 Each cut 93 93
Per Bend 159.43 937.29 Per Bend 159.43 937.29
Each hole 37.19 37.19 Each hole 37.19 37.19
Each hole 16.74 16.74 Each hole 16.74 16.74
Each 5.58 5.58 Each 5.58 5.58
Each 15.49 15.49 Each 15.49 15.49
Rft 26.05 26.05 m 85.47 85.47
Each 37.19 37.19 Each 37.19 37.19
Each 18.59 18.59 Each 18.59 18.59
Each cut 372 402.25 Each cut 372 402.25
Sft 31.01 32.91 m2 333.68 354.15
Sft 14.89 15.6 m2 160.17 167.81
Sft 276.58 505.5 m2 2976 5439.15
Sft 271.39 668.89 m2 2920.2 7197.31
Sft 74.41 152.93 m2 800.62 1645.54
Sft 52.18 280.36 m2 561.45 3016.62
Sft 178.46 562.64 m2 1920.26 6054.06
Sft 22.33 231.07 m2 240.25 2486.34
Rft 24.19 180.63 m 79.35 592.62
Rft 85.59 412.44 m 280.79 1353.14
Sft 60.29 133.37 m2 648.68 1435.02
Sft 18.61 475.92 m2 200.21 5120.92
Sft 18.61 477.74 m2 200.21 5140.45
Sft 18.61 488.02 m2 200.21 5251.11
Sft 18.61 486.33 m2 200.21 5232.89
Sft 18.61 500.12 m2 200.21 5381.31
Sft 20.47 553.59 m2 220.23 5956.6
Sft 20.47 555.4 m2 220.23 5976.13
Sft 20.47 565.69 m2 220.23 6086.8
Sft 20.47 563.99 m2 220.23 6068.57
Sft 20.47 577.79 m2 220.23 6216.99
Sft 372.14 659.49 m2 4004.21 7096.11
Rft 195.38 925.59 m 641.01 3036.73
Rft 37.43 124.83 m 122.79 409.54
Rft 40.26 139.95 m 132.09 459.14
Sft 75.56 656.91 m2 813.04 7068.4
Sft 83.03 448.04 m2 893.43 4820.91
Sft 129.16 593.09 m2 1389.79 6381.66
Each 55.8 389.96 Each 55.8 389.96
100 No. 232.5 940.35 100 No. 232.5 940.35
100 No. 837 2234.55 100 No. 837 2234.55
Each 1116 1195.86 Each 1116 1195.86
Each 186 580.34 Each 186 580.34
Each 111.6 388.91 Each 111.6 388.91
Rft 62.38 62.38 m 204.65 204.65
Rft 113.41 113.41 m 372.1 372.1
Rft 164.45 164.45 m 539.54 539.54
Rft 41.66 41.66 m 136.69 136.69
Each 297.6 297.6 Each 297.6 297.6
100 Sft 1296.68 1296.68 m2 139.52 139.52
Each 28.01 28.01 Each 28.01 28.01
Each 13.99 13.99 Each 13.99 13.99
kg 124 408.35 kg 124 408.35
kg 173.6 899.6 kg 173.6 899.6
Each 93 140.63 Each 93 140.63
Each 93.74 93.74 Each 93.74 93.74
Cart load 148.8 35045.61 Cart load 148.8 35045.61
100 Sft/spr 9.3 355.84 m2 1 38.29
Rft 5.88 166.73 m 19.29 547.02
Rft 5.88 170.6 m 19.29 559.71
100 Sft 6483.38 7205.56 m2 697.61 775.32
Each 24.8 82.72 Each 24.8 82.72
Per Cut 81.84 81.84 Per Cut 81.84 81.84
Per Cut 148.8 148.8 Per Cut 148.8 148.8
GMS Tamray Obah, North Waziristan.
Construction of one Class Room (25' X 16 ') and Veranda (25' x 9')

ABSTRACT OF COST

Construction of 01 new
Sub Head No. 1 Rs. 1,087,738.00 /-
additional class Room

Internal & External


Sub Head No. 2 Rs. 50,204.06 /-
Electrification

Sub Head No. 3 Sanitation work Rs. 94,699.85 /-

Sub Head No. 4 Boundary wall Rs. 390,046.73 /-

Installation of Dust Bin,


Sub Head No. 5 Signboard and Writing Rs. 36,305.25 /-
Proverbs

Sub Head No. 6 Latrine Block Rs. 231,331.00 /-

Total Cost: Rs. 1,890,324.88 /-


Add 7% Cost Factor Rs. 132,322.74 /-
Grand Total Rs. 2,022,647.63 /-
Say in Millions Rs. 2.023 /-
Detailed Estimate of One Class Room + Veranda (Standard)

GMS Tamray Obah, North Waziristan.

Sub Depth/
Length Breadt
Head Description Ref: MRS Code No of Units height Qty Unit MRS Rate Total Cost Remarks
(Ft) h (Ft)
No. (Ft)
Civil Work

1 Excavation in foundation of building, bridges etc complete : in ordinary soil 03-23-b

Room L/W 2.00 29.13 3.00 3.00 524 cft

Room S/W 2 14.125 3 3 254 cft

Verenda L/W 1 29.125 3 3 262 cft

Verenda S/W 2 7 3 3 126 cft

Sub Total 1166 Cft

Total Qty 33.012 m3 137.94 Rs.4,554

Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded


1 06-03-b
and cleaned) in foundation & plinth (Ratio 1:4:8)

Room L/W 2 29.125 3 1 175 cft

Room S/W 2 14.125 3 1 85 cft

Verenda L/W 1 29.125 3 1 87 cft

Verenda S/W 2 7 3 1 42 cft

Sub Total 389.00 Cft

Total Qty 11.014 m3 3327.97 Rs.36,654

1 Pacca brick work in foundation and plinth in Cement, sand mortar 1:6 07-04-a-05

1st Step Room L/W 2 28.375 2.25 0.5 64 cft

Room S/W 2 14.875 2.25 0.5 33 cft

Verenda L/W 1 28.375 2.25 0.5 32 cft

Verenda S/W 2 8.125 2.25 0.5 18 cft

2nd Step Room L/W 2 28 1.875 0.5 53 cft

Room S/W 2 15.25 1.875 0.5 29 cft

Verenda L/W 1 28 1.875 0.5 26 cft

Verenda S/W 2 8.5 1.875 0.5 16 cft

3rd Step Room L/W 2 27.625 1.5 0.5 41 cft

Room S/W 2 15.625 1.5 0.5 23 cft

Verenda L/W 1 27.625 1.5 0.5 21 cft

Verenda S/W 2 8.875 1.5 0.5 13 cft

Up to Plinth Room L/W 2 27.25 1.125 2.16 132 cft

Room S/W 2 16 1.125 2.16 78 cft

Verenda L/W 1 27.25 1.125 2.16 66 cft

Verenda S/W 2 9.25 1.125 2.16 45 cft

1st Step 1 31.75 0.75 0.5 12 cft

9
Detailed Estimate of One Class Room + Veranda (Standard)

GMS Tamray Obah, North Waziristan.

Sub Depth/
Length Breadt
Head Description Ref: MRS Code No of Units height Qty Unit MRS Rate Total Cost Remarks
(Ft) h (Ft)
No. (Ft)

2nd Step 1 27.25 0.75 0.5 10 cft

Back side Plinth Protection 1 33.25 0.75 0.75 19 cft

Sides Plinth Protection 2 28.625 0.75 0.75 32 cft

Sub Total 763.00 Cft

Total Qty 21.602 m3 5352.42 Rs.115,623

1 Pacca brick work in foundation and plinth in Cement, sand mortar 1:6 07-04-a-05

Room L/W 2 27.25 1.125 10.5 644 cft

Room S/W 2 16 1.125 10.5 378 cft

Veranda Pillars 3 1.125 1.125 8.5 32 cft

Bressumer L/W 1 27.25 1.125 1 31 cft

Bressumer S/W 2 9.25 1.125 1 21 cft

1 106 0.75 1 80 cft

Total 1186 cft

D/d opening

Door 1 4 1.125 8.5 38 cft

Windows 5 4 1.125 6 135 cft

Total 173 cft

Net 1013.00 Cft

Total Qty 28.681 m3 5352.42 Rs.153,513

RCC in roof slab, beam, column & other structural members, insitu or
1 06-06-a-03
precast. Type C (1:2:4)

Plinth Beam

Room L/W 2 27.25 1.125 1 61 cft

Room S/W 2 16 1.125 1 36 cft

Verenda L/W 1 27.25 1.125 1 31 cft

Verenda S/W 2 7 1.125 1 16 cft

Lintle Beam

Room L/W 2 27.25 1.125 0.75 46 cft

Room S/W 2 16 1.125 0.75 27 cft

Verenda L/W 1 27.25 1.125 1 31 cft

Verenda S/W 2 7 1.125 1 16 cft

Shades Front & Back 2 27.25 2 0.25 27 cft

Sub Total 291.00 Cft

Total Qty 8.239 m3 7480.35 Rs.61,631

Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled
1 06-07-c
deformed bars Grade 40)

Plinth Beam

9
Detailed Estimate of One Class Room + Veranda (Standard)

GMS Tamray Obah, North Waziristan.

Sub Depth/
Length Breadt
Head Description Ref: MRS Code No of Units height Qty Unit MRS Rate Total Cost Remarks
(Ft) h (Ft)
No. (Ft)
Room L/W 1/2" Ø (2x4) 27.25 0.667 145 Lbs

Stirrups 3/8" Ø @ 9"c/c (2x36) 4 0.375 108 Lbs

Room S/W 1/2" Ør (2x4) 16 0.667 85 Lbs

Stirrups 3/8" Ø @ 9"c/c (2x21) 4 0.375 63 Lbs

Verenda L/W 1/2" Ø (1x4) 27.25 0.667 73 Lbs

Stirrups 3/8" Ø @ 9"c/c (2x36) 4 0.375 108 Lbs

Verenda S/W 1/2" Ø (2x4) 9.25 0.667 49 Lbs

Stirrups 3/8" Ø @ 9"c/c (2x12) 4 0.375 36 Lbs

Lintle Beam

Room L/W 1/2" Ø (2x4) 27.25 0.667 145 Lbs

Stirrups 3/8" Ø @ 9"c/c (2x36) 3.583 0.375 97 Lbs

Room S/W 1/2" Ø (2x4) 16 0.667 85 Lbs

Stirrups 3/8" Ø @ 9"c/c (2x21) 3.583 0.375 56 Lbs

Verenda L/W Bressmuer Bottom 5/8" Ø (1x3) 27.25 1.04 85 Lbs

Verenda L/W Bressmuer Bentup 5/8" Ø (1x2) 28.167 1.04 59 Lbs

Verenda L/W Bressmuer Top 1/4" Ø (1x2) 27.25 0.667 36 Lbs

Stirrups 3/8" Ø @ 9"c/c (2x36) 3.583 0.375 97 Lbs

Verenda S/W Bressmuer Bottom 5/8" Ø bar (2x3) 10.084 1.04 63 Lbs

Verenda S/W Bressmuer Bottom 5/8" Ø bar (2*2) 9.5 1.04 40 Lbs

Verenda S/W Bressmuer Top 1/4" Ø bar (2x2) 9.25 0.667 25 Lbs

Stirrups 3/8" Ø @ 9"c/c (2x12) 3.583 0.375 32 Lbs

Shades Lbs

Front & Back Shade 1/2" Ø Main Bars 8" c/c (2X46) 2.875 0.667 176 Lbs

Front & Back Shade 3/8" Ø Temp. Bars 6" c/c (2X4) 27 0.375 81 Lbs

Sub Total 1744.00 Lbs

Or 0.791 Tonne

Total Qty 0.791 Tonne 109371.99 Rs.86,513

Fabrication of heavy steel work with angle, tees, sheet ironetc for making
1 25-10
trusses, girders etc

Room Girder 3 17.125 8.66 445 Lbs

Room T-Iron 16 26.125 2.99 1250 Lbs

Ver: Girder 3 10.125 8.66 263 Lbs

Ver: T-iron 9 26.125 2.99 703 Lbs

Sub Total 1958 Lbs

Or 0.888 Tonne

Total Qty 0.888 tonne 111860.00 Rs.99,332

Second class tile roofing consisting of 4" earth and 1" mud plaster with
1 09-02
gobri leeping etc.

Room Roof 1 25 16 400 Sft

Ver: Roof 1 25 9 225 Sft

Sub Total 625.000 Sft

9
Detailed Estimate of One Class Room + Veranda (Standard)

GMS Tamray Obah, North Waziristan.

Sub Depth/
Length Breadt
Head Description Ref: MRS Code No of Units height Qty Unit MRS Rate Total Cost Remarks
(Ft) h (Ft)
No. (Ft)
Total Qty 58.086 m2 970.53 Rs.56,374

Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1" mud plaster on
1 09-05
top of RCC roof slab.

Roof Tiles 1 26 26 676 Sft


Sub Total 676 Sft
Total Qty 62.825 m2 972.86 Rs.61,120
Supply and Fixing MS Sheet 16 guage(10x20 feet) box type chowkats
1 including fixing in position with all charges for Hold fast, Hinges and 12-56-a
Painting etc

1 25 25 Rft

5 30 150 Rft

Sub Total 175 Rft

Total Qty 53.337 m 711.27 Rs.37,937

Panelled door of MS sheet with forged door leaves of MS sheet 22 SWG etc
1 12-47
complete

Door 1 3.5 8.33 29 Rft

Windows 5 3.5 5.5 96 Rft

Sub Total 125 Rft

Total Qty 38.098 m2 5893.14 Rs.224,517

1 Cement pointing struck joints, on walls, upto 20' height : Ratio 1:2 11-18-a

Class Room Back 1 27.25 12 327 Sft

Class Room Side 2 18.25 12 438 Sft

Bressumer L/W 1 27.25 1.125 31 Sft

Bressumer S/W 2 9.25 1.125 21 Sft

Total 817 Sft

D/d Opening

Window 5 4 6 120 Sft

Total 120 Sft

Net 697 Sft

Total Qty 64.777 m2 175.18 Rs.11,348

9
Detailed Estimate of One Class Room + Veranda (Standard)

GMS Tamray Obah, North Waziristan.

Sub Depth/
Length Breadt
Head Description Ref: MRS Code No of Units height Qty Unit MRS Rate Total Cost Remarks
(Ft) h (Ft)
No. (Ft)

1 Cement plaster 1:4 upto 20' height 1/2" thick 11-09-b

Class Room 2 (25+16) 10.5 861 Sft

Verenda 1 25 10.5 263 Sft

Above Bressumer L/W 1 25 1 25 Sft

Above Bressumer S/W 2 9.25 1 19 Sft

1 106 1 106 Sft

Total 1274 Sft

D/d Opening

Door 1 4 8.5 34 Sft

Window 5 4 6 120 Sft

Total 154 Sft

Net 1120 Sft

Total Qty 104.089 m2 159.94 Rs.16,648

Filling, watering and ramming earth under floor with surplus earth from
1 03-16-a
foundation, etc

1/3% of Item No 1 1/3 100 1166 3697 Cft

Converted into solid 3697 0.89 3290 Cft

Total 3290 Cft

Total Qty 93.148 m3 65.69 Rs.6,119

Plain Cement Concrete including placing, compacting, finishing & curing


1 06-05-i
(Ratio 1:4:8)

Class room 1 25 16 0.33 133 Cft

Ver: 1 25 8.125 0.33 68 Cft

Back side Plinth Protection 1 33.25 2.25 0.25 19 Cft

Sides Plinth Protection 2 28.625 2.25 0.25 32 Cft

Total 252 Cft

Total Qty 7.135 m3 4443.67 Rs.31,706

Provide & lay topping of concrete 1:2:4, including surface finishing &
1 10-15-e
dividing in panels : 2" thick

Class room 1 25 16 400 Sft

9
Detailed Estimate of One Class Room + Veranda (Standard)

GMS Tamray Obah, North Waziristan.

Sub Depth/
Length Breadt
Head Description Ref: MRS Code No of Units height Qty Unit MRS Rate Total Cost Remarks
(Ft) h (Ft)
No. (Ft)

Ver: 1 25 8.25 206 Sft

Total 606 Sft

Total Qty 56.320 m2 475.32 Rs.26,770

Provide & lay marble fine dressed and polished stone dado or skirting in
1 white cement complete : 1/2" thick (Badel, Silky black, Sunny white, Sunny 10-41-b
Grey or eq)

Class Room 2 (25+16) 0.5 41 Sft

Ver Front 1 27.25 0.5 14 Sft

Pillars 3 4.5 0.5 7 Sft

Total 62 Sft

Total Qty 5.762 m2 898.80 Rs.5,179

Plain Cement Concrete including placing, compacting, finishing & curing


1 06-05-h
(Ratio 1:3:6)

Para Pit Wall 1 106 0.75 0.25 20 Cft

Plinth Protection 1 85 3 0.33 84 Cft

Total 104 Cft

Total Qty 2.945 m3 5117.11 Rs.15,070

limpet etc. complete : 24 BWG Khassi parnalas in c/s mortar 1:2, 12"
1 09-14
outside width

Parnala 2 12 24 Rft

Total 24 Rft

Total Qty 7.315 m 292.09 Rs.2,137

1 Making notice board 1/2" thick of c/s mortar 1:3 with2"x1/2" beading 26-17

1 6 4 24 Sft

Total 24 Sft

Total Qty 2.230 m2 775.32 Rs.1,729

9
Detailed Estimate of One Class Room + Veranda (Standard)

GMS Tamray Obah, North Waziristan.

Sub Depth/
Length Breadt
Head Description Ref: MRS Code No of Units height Qty Unit MRS Rate Total Cost Remarks
(Ft) h (Ft)
No. (Ft)

MS flat 1/2"x1/8" grill in windows of approved design including painting 3


1 12-50
coats, complete

Windows 4 4 6 96 Sft

Total 96 Sft

Total Qty 8.922 m2 1832.05 Rs.16,346

Providing and Fixing GI wire gauze 24 SWG, 12x12meshes per sq.in., fixed
1 25-38
to steel windows or doors etc

Windows 4 4 6 96 Sft

Total 96 Sft

Total Qty 8.922 m2 1435.02 Rs.12,803

1 White washing: New surface : Three coats 11-25-a-03

As per Plaster Qty 1120 1120 Sft

Total 1120 Sft

Total Qty 104.089 m2 24.74 Rs.2,575

1 Colour washing: New surface : Two coats 11-24-a-02

As per Pointing Qty 697 697 Sft

Total 697 Sft

Total Qty 64.777 m2 23.77 Rs.1,540

Grand Total 1,087,738

9
GMS Tamray Obah, North Waziristan.

Detailed BoQ of Electrification

Sub
No of
Head Description Ref: MRS Code 15 Length (Ft) Qty Unit MRS Rate Total Cost Remarks
Units
No.

Wiring of light/fan/call-bell point in 3/0.029 PVC insulated bare cable in PVC pipe
1 15-50 18 18 Each 850.55 15309.9
recessed

Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, asia, breeze, Climax, Millat, National
2 15-68-c 6 6 Each 3845.5 23073.2
blades & regulator : 56" sweep and pak fan are the approved makes

Supply and erection energy sever 24 watts including all necessory fittings as per
3 15-61-a 12 12 Each 211.05 2532.6
direction of engineer Philips or any approved makes
Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick Bakelite
4 15-09-f 1 1 Each 395.63 395.63
sheet top etc. complete : 12"x14"

5 Supply and erection girder clamp hook, 5/8" dia for hanging ceiling fans 15-25 6 6 Each 318.11 1908.66

6 Supplying and erection single phase imported auto circuit breaker 6 AMP 15-71-a 1 1 Each 536.49 536.49

7 Supplying and erection single phase imported auto circuit breaker 30 AMP 15-71-d 1 1 Each 624.94 624.94

Special earthling of iron/metal clade witches etc. with copper wire no 8 SWG in GI
8 15-41 1 1 Each 5822.66 5822.66
pipe 1/2" dia

TOTAL COST OF ELECTRIFICATION 50,204.06

9
GMS Tamray Obah, North Waziristan.

Bill of Quantities of sanitation fixtures

Estimated Estimated Cost


S# Description Ref: MRS Quantity Unit Unit Rate (PKR) Remarks

Providing and Fixing glazed earthen


1 ware WC squatting type with built-in 14-03-a 2 Each 1628.3 3256.56
foot rests : White

2 Providing and Fixing CP soap dish. 14-13 2 Each 537.0 1074.06

Providing and Laying cut, joint, test,


3 disinfect PVC pipe BSS Class 'D' 24-18-c-03 2 Rf 87.6 175.18
working pressure : 2" i/d as vent pipe

Providing and Fixing glazed earthen


4 ware low down flushing cistern 3 14-10-a 2 Each 2110.0 4220.00
gallons capacity : White
Providing and Fixing CI floor trap
5 including CI grating & concrete 14-31-b 3 Each 793.8 2381.40
chamber all round : 4"x3"

6 Providing and installing PVC bends 24-26-a-03 5 Each 438.3 2191.45


BSS Class 'B'working pressure : 4" i/d
Providing and Laying cut, joint, test,
disinfect PVC pipe line BSS Class
7 'B'working pressure : 4" i/d as a sewer 24-18-a-02 45 Rf 155.0 6975.00
line
Providing and Laying HDPE pipe Din-
8 8074/Din-8075/ISO-4427 incl testing 24-30-a-03 50 Rf 39.0 1949.50
& disinfect complete (32mm dia)

9 Providing and Fixing brass ball float 14-48-g 2 Each 665.1 1330.26
valve 1.25" dia
Excavation
Earth excavation in open cut upto (600x1x1)
1.5m depth for drains etc For Pipe
10 03-07-b 600 Cf 5.2 3120.00 Line as per
& disposal : in Hard Soil
ground
conditions.
Providing and Laying HDPE pipe
11 Din-/Din-/ISO-4427 24-30-a-01 600 Rf 32.9 19734.00
incl testing & disinfect complete
(20mm dia)

12 Providing and Fixing CP bib-cock, heavy 14-24-b 6 Each 567.5 3405.18

P/F polyethylene Water Tank 500


13 gallons (vertical) 14-69-b-03 1 Each 12553.8 12553.79

Septic Tank (int.Size: 7'x2'x5')


14 complete 23-10. 1 Each 15957.2 15957.22

15 Soakage Pit (6'dia x 15' deep) 23-11. 1 Each 16376.3 16376.25


complete

Total Estimated Cost (PKR) 94,699.85


GMS Tamray Obah, North Waziristan.

Bill of Quantities of Boundary Wall


Length Width Depth Estimated Estimated
S# Description Ref: MRS No Unit Unit Rate Remarks
(ft) (ft) (ft) Quantity Cost (PKR)

Pacca brick work other than building upto


1 10 ft. height : 07-07-a-04
Cement, sand mortar 1:5

570 0.375 2 427.5

Total 427.5 Cft 224.71 96063.525 Plaster will


be done of
Cement plaster 1:4 upto 20' height 1/2"
2 11-09-b 570 6 2 6840 the newly as
thick
well as of old
Total 6840 Sft 19.98 136663.2 BW

Both sides of
Preparing surface & painting with snowcem
the wall,
3 / weathershield 570 6 2 6840
Internal &
paint : First coat and subequent coat
external

6840 Sft 23 157320

Total Estimated Cost (PKR) 390046.725


GMS Tamray Obah, North Waziristan.

Bill of Quantities of Dust Bin, Proverbs writng and Signboard

Estimated
S# Description Ref: MRS Length (ft) Width (ft) Depth (ft) No's Unit
Quantity

Excavation for
1 foundation of building in 03-23-b
ordinary soil

Foundation 1 1 1 3 3 Cf

Total Excavation 3 Cf

PCC (1:2:4) including


2 placing,compaction,finis 06-05-f
hing and curing

Foundation 1 1 0.5 3 1.5 cf

S/F Dust bin, 18 SWG GI


Sheet 1.5' Dia 3' high Total PCC cf
Custom made Drum
with 2'' Dia 18 SWG MS 1.5
Pipe supports including
3 delivery, fixing, painting NSI 2 2 No
(each dustbin different
color) and writing etc..
as to specified for
categorised wastesand
as Total 2.00 No
Painting Cartoons
per engineer
Writing direction
Proverbs on
Walls, complete in all
4 Supply
respectandor asfixing Sign by
directed NSI 1 Nos
Board
Engineer4'x3' size with
18gauge iron sheet,
painting etc, Completed
5 in all respect as shown NSI 1 Nos
in Drawing

Total Estimated Cost (PKR)


oard

Estimated Cost
Unit Rate Remarks
(PKR)

6.07 18.21

191.4 287.0

7000 14000.00

15000 15000.00

7000 7000.00

36,305.25
GMS Tamray Obah, North Waziristan.

Bill of Quantities of Toilet Block

Estimated Estimated
S# Description Ref: MRS Length (ft) Width (ft) Depth (ft) No Quantity Unit Unit Rate Cost (PKR) Remarks

Excavation for foundation of


1 building in ordinary soil 03-23-b

Wash room (Long wall) 14.5 3 2 2 174 Cf

Wash room (Short wall) 2.5 3 2 3 45 Cf

Total Excavation 219 6.07 1329.33

Spraying anti-termite liquid


2 mixed with water in ration 26-15 220 Sft 1.27 279.40
of 1:40
Structural backfill using
common material available 03-60-c
at site

Refilling of foundation (Long


wall) 14.5 1 2 2 58 cf

Refilling of foundation (Short


wall) 2.5 1 2 3 15.0 cf

Filling under floor 5 5 2 2 100 cf

Total Filling 173.00 12.32 2131.36

PCC (1:2:4) including


3 placing,compaction,finishing 06-05-f
and curing

In foundation (Long wall) 14 2.5 0.5 2 35 cf

In foundation (Short wall) 3.25 2.5 0.5 3 12.19 cf

Plinth Protection arround


T/Block 47.5 2.5 0.5 1 59.38 cf

DPC & Flooring 12.25 6.5 0.34 1 27.07 cf

Total PCC 191.4 25572.39


133.635
RCC in roof slab, beam,
column, & other structural
3 members, insitu or precast
(1:2:4) 06-06-a-03

Lintel (both ventilators) 3 0.75 0.5 2 2.25 cf

Chajja & Beam 8 1 1 8.00 cf

Slab 12.25 7 0.42 1 33.44 cf

Total RCC 246.6 10776.32


43.6925
Pacca brick work in
4 foundation and plinth in 07-04-a-05
Cement, sand mortar 1:6

13.5 2 0.5 2 27 cf
1st Step long wall
3.25 2 0.5 3 9.75 cf
1st Step Short wall

13 1.5 0.5 2 19.5 cf


2nd Step long wall

4.25 1.5 0.5 3 9.56 cf


2nd Step short wall

12.25 0.75 1.5 2 27.56 cf


3rd Step Long wall

5 0.75 1.5 3 16.88 cf


3rd Step short wall

Total 110.25 210.5 23206.52

Brick Work in super


5 structure and plinth in 07-04-a-03
cement sand mortar(1:4)

12.25 0.75 9.5 2 174.56 cf


Both wash room (Long Wall)

5 0.75 9.5 3 106.88 cf


Both wash room (Short Wall)

12 1 0.5 2 12.00 cf
Steps

293.44
Total 218.11

Deduction

2.5 7 0.75 2 26.25 cf


Doors

1.5 1.5 0.75 2 3.38 cf


Ventilators

29.63
Total Deduction

218.11 57540.14
Total Brick work 263.81

6 Roof proofing
Single layer of tiles 10-26-c
10"x5"x1.25" laid over 4" 10.75 5 0 1 53.75 Sf 117.72 6327.45
earth and 1" mud plaster on
top of RC roof slab
Supplying and Fixing 18 SWG
7 MS Sheet Door with angle 25-47-a
iron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc
complete
Both Wash rooms Door 2.5 0 7 2 35
Sf

Both wash room Ventilators 1.5 0 1.5 2 5


Sf

TOTAL 40 495.59 19575.81

Suuply and Fabricate M.S


reinforcement for cement
8 06-07-c
concrete(hot rolled
deformed bars Grade 40)
1 1 1 1 156 Kgs 103.50 16146.00

P/F Ceramic Exterior finish


tiles over 1/2" cement sand 11--38
9 morter 1:1 including curing
complete
5 5 2 50 sf
Both Wash room Floor

5 5 4 100 sf
Both wash room Long Wall

5 5 4 100 sf
Both wash room Short Wall

10 1.5 2 30 sf
Steps

44298.8
Total 280 Sft 158.21

Cement plastring 1:4 upto 11-09-b


10 20' height 1/2" thick

Both wash room Long Wall 5 0 9 4 180 Sf

Both wash rooms Short Wall 5 0 9 4 180 Sf

Both wash room ceiling 5 0 5 2 50 Sf

Total 410 Sft 19.98

Deduction

Doors 2.5 0 7 2 35 Sf

Ventilators 1.5 0 1.5 2 5 Sf

Total 40 Sft

Total Plaster 371 Sft 19.98 7402.59

Three coat of Weather sheet


13-38-
11 on external side. a+13-38-b

Long Wall (extrernal ) 12.25 0 9.42 2 231 Sf

Short Wall (external) 6.5 0 9.42 2 122 Sf

Total 353 Sft

Deduction Sf

Doors 2.5 0 7 2 35 Sf

Ventilators 1.5 0 1.5 2 5 Sf

Total 40 Sft

Total 313.75 Sft 23.45 7357.4375

Distempering new 11-23-a-03


12 surface:three coat

Long Wall (intrernal ) 5 0 9 4 180 Sf


Short Wall (internal) 5 0 9 4 180 Sf

Roof 5 5 0 2 50 Sf

Total 410 Sft

Deduction Sf

Doors 2.5 0 7 2 35 Sf

Ventilators 1.5 0 1.5 2 5 Sf

Total 40 Sft

Total 370.5 Sft 7.37 2730.585

Cement Pointing Struck


joints, on wall upto 20' 11-18-b
13 height: Ratio 1:3

Long Wall 12.25 0 9 2 221 Sf

Short Wall 6.5 0 9 2 117 Sf

Total 338 Sft

Deduction

Doors 2.5 0 7 1 18
Sf

Ventilators 1.5 0 1.5 1 2


Sf

Total 20
Sft

Total 318 20.95 6656.8625


Sft

Total Estimated Cost (PKR) 231,331.00