Aace International Scheduling: Critical Path Method (CPM)
Aace International Scheduling: Critical Path Method (CPM)
Project Evaluation Review Technique (PERT) Two basic methods of critical path scheduling are the following:
Project evaluation review technique (PERT) is a probabilistic
technique, used mostly by government agencies, for calculat- • the arrow diagramming method (ADM) (also called
ing the “most likely” durations for network activities. activity-on-arrow, or the “i” - “j” method), and
• the precedence diagramming method (PDM) (also called
During development of the Navy’s Polaris Missile Program activity-on-node).
in the late 1950s, the team had no historical basis to draw
upon when estimating the length of time it would take to Arrow Diagramming Method (ADM)
accomplish certain tasks. For each of the activities, the devel- In arrow diagramming, the nodes in the network are the