separator vessels
3 phase separators are commonly used in upstream oil and gas industry to separate oil,
gas and water stream coming from the oil wells. This typical P&ID arrangement can be
modified and used for other separator vessels as well.
1. Proper vessel symbol should be selected first of all, as shown in the presented
drawing. This should be selected from the list of equipment symbols on the
legend sheets of a particular project.{adinserter 1}
2. Separator vessel internals should then be indicated as per proper symbols on the
legend sheets. These internals can be inlet vane, vortex breaker on the outlet
lines, demister pads on gas outlets, weir plate separating the oil and water
compartments etc.
3. All the nozzles on the separator vessel should then be correctly represented with
size and flanges. This includes inlet and outlet nozzles, drains, vents, PSV
connection and instrument nozzles, as shown in the sample drawing presented
here. Typical instrumentation on the vessel would be level gauges and
transmitters on oil and water compartments of the vessel plus pressure gauge
and transmitters linked to pressure control or alarms as applicable.
4. Inlet and outlet lines are the next to be drawn up. Line number, material class,
size etc. is to be correctly assigned to each of the lines.{adinserter 1}
5. Isolation valves, spectacle blinds, spacers etc. to be used for maintenance should
be drawn up next on the inlet / outlet lines. The spectacle blinds, spacers etc. are
usually connected right next to the isolation valves and equipment nozzles, as
indicated in the sample drawing presented here.
6. Instrumentation on the vessel should be drawn up next. Typically this would
include level gauges, level transmitters, pressure gauges, pressure transmitters as
per requirement for control, alarm and trip if applicable. The sample drawing
presented here only indicates transmitters, but generally they are accompanied
by gauges for local indication and also transmitters for alarms and trips.
7. Various control valves should be drawn up next wherever applicable. Sample
drawing indicates level control on oil and water outlet lines. Plus pressure control
is indicated on the vapor outlet to flare. These control valves should be equipped
with either a bypass or handwheel as per project standards, to continue vessel
operation in case of control valve maintenance.
8. Drains should be provided either on the vessel or on the bottom outlet lines for
complete draining of the vessel and associated piping for maintenance purpose.
Sample drawing has indicated drains on the outlet lines through which the vessel
and piping can be completely drained. Usually the vessel also has nozzles
connecting it directly to the draining system.{adinserter 2}
9. Vents can be present either on the vessel itself or on the vapor outlet line, so that
the vessel and associated piping can be completely vented for maintenance. Vent
connected directly to vessel is indicated in the sample drawing.
10. In most cases the vessel is provided with a blanketing gas connection. This
blanketing connection can be with or without pressure control. Although not
indicated in the sample drawing, it is important to consider the blanketing gas
connection to the vessel.
11. For purging the vessel with nitrogen, a connection can be provided directly on
the vessel. In some cases purging can be done with steam.
12. All the guidelines given here are very general and may be modified as per specific
requirements of any particular project.
Typical arrangement for Centrifugal
Compressor P&ID
1. Proper tank symbol should be selected first of all, as shown in the presented
drawing. This should be selected from the list of equipment symbols on the
legend sheets of a particular project.{adinserter 1}
2. Tank internals should then be indicated as per proper symbols on the legend
sheets. These internals can be inlet pipe, vortex breaker on the outlet lines etc.
3. All the nozzles on the storage tank should then be correctly represented with size
and flanges. This includes inlet and outlet nozzles, overflow line, minimum
recirculation line, blanketing gas line, drains, vents, PSV connection and
instrument nozzles, as shown in the sample drawing presented here. Normally for
large enough tanks a manway has to be provided as indicated in the sample
drawing for maintenance access.
4. Inlet and outlet lines are the next to be drawn up. Line number, material class,
size etc. is to be correctly assigned to each of the lines.
5. Typical instrumentation on the tank would be level gauges and transmitters
plus pressure gauge and transmitters. For tank under continuous operation a
level control valve has to be provided as indicated in the sample drawing. For
tank with blanketing gas a self regulating pressure valve has to be provided on
the blanketing gas inlet line. Normally alarms / trips are provided for High High
Pressure, High High Level, Low Low Pressure and Low Low Level.{adinserter 1}
6. Isolation valves, spectacle blinds, spacers etc. to be used for maintenance should
be drawn up next on the inlet / outlet lines. The spectacle blinds, spacers etc. can
be connected right next to the isolation valves and equipment nozzles, as
indicated in the sample drawing presented here.
7. Drains should be provided on the tank bottom and on the bottom outlet lines for
complete draining of the tank and associated piping for maintenance purpose.
8. Vent has to be provided on top of the tank for complete venting of the tank for
maintenance purpose. In some cases the tank may be open to atmosphere
through vent during normal operation. In such cases a bird screen has to be
provided on the vent line.
9. For purging the tank with nitrogen or steam, a utility connection can be provided
directly on the tank.{adinserter 2}
10. All the guidelines given here are very general and may be modified as per specific
requirements of any particular project.
Note that they may differ slightly from one project to another.
Manual (handwheel)
Diaphragm actuator
{adinserter 1}
Motor actuator
{adinserter 1}
Spring actuator
Pilot actuator
Solenoid actuator
Solenoid actuator with manual reset
{adinserter 1}
Digital actuator
Weight actuator
Key actuator
Electro-hydraulic actoator
oler
Generic heat exchanger
{adinserter 1}
{adinserter 1}
Electric signal
Capillary connection
Software signal
{adinserter 1}
Mechanical link
Hydraulic signal
Pneumatic signal
{adinserter 1}
Electric binary signal
Flange set
{adinserter 1}
Blind Flange
Flow orifice
Removable pipe spool
{adinserter 1}
Y type strainer
{adinserter 1}
End cap
Reducer / Expander
Hose connection
Open spacer
Closed spacer
Mixing Tee
Sight glass
Breather
Gooseneck vent
Sample cooler
{adinserter 1}
Motor
Dosing pump
Gear pump
{adinserter 1}
Vane pump
Vertical pump
Metering pump
Centrifugal compressor
{adinserter 1}
{adinserter 1}
Vacuum Relief Valve
{adinserter 1}
{adinserter 1}
{adinserter 1}
Man way
{adinserter 1}
Vortex breaker
Valve P&ID symbols
Commonly used P&ID symbols (Piping and Instrumentation Diagram symbols) for
manual valves. Note that they may differ slightly from one project to another.
Gate Valve
{adinserter 1}
Ball Valve
Globe Valve
Butterfly Valve
Check Valve
Plug Valve
{adinserter 1}
Needle Valve
3-way Valve
Y Blowdown Valve