Running Casing
Running Casing
Running Casing
RUNNING CASING
ENSURE THAT ALL TOOLS AND EQUIPMENT ARE IN A CLEAN AND SERVICEABLE
CONDITION.
ENSURE THAT THE WORK FORCE HAVE BEEN FULLY INSTRUCTED ON THE
CORRECT PROCEDURES TO BE FOLLOWED AND THE SAFETY PRECAUTIONS TO
BE OBSERVED.
DO NOT STAND BEHIND THE RIG OR CASING TONGS WHILE THEY ARE IN USE.
DRILLER WILL NOT LIFT ANY JOINT OF CASING WITH THE SINGLE JOINT
ELEVATOR, UNTIL HE CAN SEE THE SAFETY PIN IS INSTALLED CORRECTLY.
ENSURE SOFT CONTACT BETWEEN SINGLE JOINT ELEVATOR AND CASING
COLLAR. WHILE JOINT IS BEING PICKED UP DERRICKMAN AND FLOORMAN TO
KEEP SIGHT OF SAFETY PIN. ENSURE SAFETY PIN AND CHAIN ARE ATTACHED
PROPERLY, AND PIN IS A SNUG FIT THROUGH THE LATCH.
START THE JOB SLOWLY UNTIL EACH CREW MEMBER IS FULLY AWARE OF THE
SEQUENCE OF EVENTS AND WHAT HIS DUTIES AND RESPONSIBILITIES ARE.
FOR NIGHT SHIFT OPERATIONS ENSURE THAT THE STABBING BOARD IS FULLY
ILLUMINATED.
ENSURE THAT THE WORK AREA IS CLEAN AND FREE OF OBSTRUCTION. ENSURE
THAT ADEQUATE NON-SLIP FLOOR MATTING IS LAID TO PROVIDE SAFE FOOTING.
______________________________________________________________
PPC Manual Sept'95 Rev/1 Page 1
1-07
RUNNING CASING
NOTE : DO A TOTAL PIPE COUNT AND CHECK AGAINST THE RUNNING
LIST, THE CORRECT AMOUNT OF PIPE TO BE RUN AND THE NUMBER OF
JOINTS TO BE LEFT OUT . THERE SHOULD BE A MINIMUM OF THREE
RUNNING LISTS USED AND CHECKED OFF . EG : DRILLER; AIR HOIST
OPERATOR; DECK CREW.
3. PROCEDURES
3.1 FOR RIGGING UP
IF IT IS NECESSARY TO CHANGE TO CASING RAMS, REFER TO CHAPTER 1-25.
2. ENSURE CASING JOINTS TO BE LIFTED ARE LEVEL AT THE PIN ENDS AND
ATTACH SLINGS. ( DECK CREW )
5. RELEASE SLINGS AND RETURN HIGH LINE TO TENDER FOR THE NEXT
BUNDLE OF CASING JOINTS.
6. USING THE SINGLE JOINT ELEVATOR ON THE MAIN BLOCK, LIFT THE
CASING. ATTACH A ROPE ACROSS THE V-DOOR POSTS TO PREVENT
CASING FROM SWINGING.
8. MOVE SHOE JOINT OVER THE ROTARY TABLE AND RUN THE JOINT IN 10'
+/-, SET THE SLIPS. INSTALL SAFETY CLAMP.
10. LIFT CASING AND PULL SLIPS. OPEN RAMS, CLOSE HCR, INCREASE
MANIFOLD TO CORRECT PRESSURE.
11. LOWER CASING AND INSTALL SLIPS. FILL CASING WITH MUD. LIFT
______________________________________________________________
PPC Manual Sept'95 Rev/1 Page 2
1-07
RUNNING CASING
CASING UNTIL SHOE CIRCULATING PORTS ARE VISIBLE AND CHECK MUD
IS FLOWING FREELY FROM ALL PORTS.
12. RUN JOINT DOWN AND INSTALL THE SLIPS. INSTALL THE SAFETY CLAMP
AND RELEASE THE ELEVATORS. FILL CASING WITH MUD.
13. ATTACH SINGLE JOINT ELEVATOR TO THE NEXT JOINT OF CASING IN THE
V-DOOR AND INSERT THE LOCK PIN THROUGH THE LATCH.
14. THE DRILLER LIFTS THE CASING THROUGH THE V-DOOR USING THE
TRAVELLING BLOCK. CAREFULLY TAIL/GUIDE CASING PIN END FROM V-
DOOR TO MOUSEHOLE USING MANILA TAIL ROPE ATTACHED TO V-DOOR
POSTS.
15. HOLD CASING AWAY FROM ROTARY TABLE WITH ROPE, AND REMOVE
PROTECTOR. APPLY THREADLOK OR THREAD DOPE TO THE PIN END AS
PER INSTRUCTIONS.
16. STAB THE CASING PIN INTO THE COLLAR OF THE JOINT IN THE ROTARY
TABLE.
17. INSTALL BACK UP TONG BELOW CASING COLLAR AND LATCH CASING
TONG ON UPPER JOINT.
19. THE TONG OPERATOR SLOWLY ROTATES JOINT WHILE MONITORING THE
DERRICKMAN. WHEN SUFFICIENT THREADS HAVE ENGAGED,
DERRICKMAN RELEASES SINGLE JOINT ELEVATOR.
20. LOWER THE TRAVELLING BLOCK AND CLOSE SIDE DOOR ELEVATOR
AROUND THE CASING JOINT. TIGHTEN THE JOINT TO THE REQUIRED
TORQUE.
21. REMOVE SAFETY CLAMP, LIFT THE CASING OUT OF THE SLIPS AND RUN
THE NEW JOINT IN THE HOLE. RESET THE SLIPS.
______________________________________________________________
PPC Manual Sept'95 Rev/1 Page 3
1-07
RUNNING CASING
22. CONTINUE RUNNING CASING, REPEATING STEPS 12 TO 21 FOR EACH
ADDITIONAL JOINT, AND FILLING EACH ONE WITH MUD, UNTIL THE
OVERALL WEIGHT NECESSITATES THE USE OF SPIDER ELEVATORS AND
SLIPS OR BEFORE THE OPEN HOLE SECTION IS ENTERED.
(B) LATCH SPIDER SLIPS ON CASING JOINT IN THE ROTARY TABLE AND
LIFT CASING 15' +/-, REMOVE HAND SLIPS AND ROTARY INNER
BUSHING. LOWER CASING AND SET SPIDER INTO ROTARY TABLE.
(D) INSTALL AIR LINES, ERECT STAGING AROUND THE SLIPS, INSTALL
ELEVATOR SKIRT SAFETY SLINGS AND ADJUST CASING TONG
HEIGHT.
______________________________________________________________
PPC Manual Sept'95 Rev/1 Page 4
1-07
RUNNING CASING
- CHAIN & BINDERS TO FIX SPIDER - USE RATCHET TYPE BINDER
- HAND SLIPS [7" CSG 12 SEGMENTS]-[9 5/8"CSG 14 SEGS.]
- [13 3/8"CSG 18 SEGS.]-[20"CSG 26 SEGMENTS]
- BAR FOR OPENING & CLOSING ELEVATOR / SPIDER
- 1 SET 500 TON X 15' ELEVATOR LINKS
- MAKE UP & BREAK OUT MANUAL TONGS WITH RIGHT SIZE JAWS
- POWER TONGS FITTED WITH RIGHT SIZE JAWS AND RUN
- LINE PULL INDICATOR INSTALLED AND WORKING CONDITION
- TORQUE GAUGE AND CYLINDER CHECKED AND CALIBRATED
- DIES OK AND SPARE DIES AVAILABLE
- RETENTION LINE READY
- TONGS GREASED AND IN GOOD WORKING ORDER
- CHECK CAM ROLLERS ON JAWS ARE CORRECT SIZE
MISCELLANEOUS
- FLASHLIGHT
- PLATFORM FOR CASING TONG OPERATOR
- CASING FILL UP LINE READY AND FRANKS FILL UP/CIRCULATING TOOL
- CLAMP ON THREAD PROTECTORS READY AND IN WORKING CONDITION
MINIMUM OF 3-EA
- STABBING BOARD TESTED - SAFETY BELT OK, READY WITH X/O SUB
- BAKER LOCK OR EQUIVALENT READY
- WIRE BRUSH, BARITE, RAGS AND AIR HOSE READY
- V-DOOR ROPE READY
______________________________________________________________
PPC Manual Sept'95 Rev/1 Page 5
1-07
RUNNING CASING
- CASING DOPE ON RIG FLOOR
- CIRCULATING AND CEMENT HEAD READY WITH LOW TORQUE GAUGE
- CEMENTING LINE WITH SAFETY CABLE OR CHAIN READY
- HOOK WITH CHAIN TO HOLD CASING ON V-DOOR
- CASING RAMS READY ON BOP DECK
- TOOLS READY FOR RAM CHANGE (HAMMER WRENCHES ETC)
- PROPER TEST PLUG OR TEST CUP READY FOR TESTING BOP AFTER RAM CHANGE
- SAFETY CLAMP FOR CASING SIZE READY
- CEMENT RETURN HOSES FROM WELLHEAD TO MUD DITCH
DRILLER NAME:_________________________
COMMENTS:_____________________________________________________
______________________________________________________________
PPC Manual Sept'95 Rev/1 Page 6