SECTION 600
STRUCTURES
Intentionally Left Blank
TABLE OF CONTENTS - 600
Section 602 CONCRETE STRUCTURES
602.01 DESCRIPTION.
602.02 REQUIRED TESTS AND FREQUENCY.
A. Acceptance Samples and Tests--Field Laboratory Testing
B. Independent Assurance Samples and Tests.
1. District Laboratory Testing.
2. Materials and Research Division Testing.
C. Miscellaneous Testing.
Section 650 REPAIR AND OVERLAY OF PORTLAND CEMENT CONCRETE BRIDGE
DECKS WITH LOW SLUMP CONCRETE OR LATEX-MODIFIED
CONCRETE.
650.01 DESCRIPTION.
650.02 REQUIRED TESTS AND FREQUENCY.
A. Acceptance Samples and Tests--Field Laboratory Testing.
B. Independent Assurance Samples and Tests.
1. District Laboratory Testing.
2. Materials and Research Division Testing.
1
Intentionally Left Blank
602.02 A
Section 602
CONCRETE STRUCTURES
602.01 DESCRIPTION.
Perform one slump and one air test the first load each day (see
Sections 802.03 A and 802.03 B. of this manual for procedure). After the initial
load, perform air, slump, and yield tests each time a set of compression test
cylinders are cast.
Perform sieve analysis tests (see Section 816.04 of this manual for test
procedures) on both the coarse and fine aggregate at the following
frequencies: three tests for the first 250 cubic yards (C.Y.) of concrete, two
tests for the next 250 C.Y., and one test for each 250 C.Y. thereafter. If
aggregate sources change, the testing frequency reverts back to the initial
frequency of three tests for the first 250 C.Y. of concrete, two tests for the next
250 C.Y., and one test for each 250 C.Y. thereafter. Perform a minimum of
two tests per project. Perform additional sieve analysis tests as directed by
the project engineer/manager.
Revised 5-99
602.02 B.1.
Obtain one sieve analysis and physical properties sample of both coarse
and fine aggregate for the first 250 C.Y. of concrete and one sample for
each 500 C.Y. thereafter (see Sections 816.01 and 816.04 of this manual for
procedure). Obtain a minimum of one sample per project.
If this criteria is met, perform an initial shale test at the beginning of the
construction season with three more random tests performed during the
remainder of the construction season. If any shale test exceeds 50% of
the specification limit or a new portion of the pit is utilized, revert testing to
the frequency mentioned previously. The Department requires Materials
Coordinators to keep a file on pits utilizing this testing procedure.
Document the testing performed each year in the file.
Record the results of air, slump, 28-day cylinder and yield tests on SFN
10069 (see Section 802.03 of this manual for procedure). The frequency
for air, slump, and yield tests is one test for every five field tests with a
minimum of one test per project. Cast one set of 28-day cylinders for
each 250 C.Y. of concrete with a minimum of one set per project.
Additionally, perform a minimum of one set of tests per bridge deck.
2. Materials and Research Division Testing. Submit one sample from every
source of water used. If the water is known to be of potable quality, it
may be used without testing.
Submit one sample of both coarse and fine aggregate per project.
C. Miscellaneous Testing. Cast one set of seven-day cylinders from the first pour
of a plant setup for each mix design. In addition to the following cylinder
frequency for each pour, cast additional cylinders from the last deck pour for
determining when the deck can be opened to traffic.
Revised 5-99
602.02 C.
TABLE 1
Revised 5-99
Intentionally Left Blank
650.02 B.1.
Section 650
650.01 DESCRIPTION.
Obtain one sieve analysis sample of each coarse and fine aggregate per
75 C.Y. of concrete.
Perform one slump, air, and yield test from the first load each day (see
Sections 802.03 A., 802.03 B., and 802.03 C. of this manual for procedure).
After the initial load, perform two air, slump, and yield tests per day. Cast
one set of each seven- and 28-day compression test cylinders per lane or per
500 S.Y. of overlay, whichever is less (see Section 802.03 E. of this manual for
procedure). A set is defined as two cylinders. Cast these cylinders from
concrete placed at approximately the 1/3 and the 2/3 points of the
placement area.
Submit one random sample of cement per project to the Materials and
Research Division (see Section 804.02 of this manual for procedure).
Submit one sieve analysis and physical properties sample of both coarse
and fine aggregate for every 1,000 S.Y. of overlay.
Revised 5-99
650.02 B.1.
Revised 5-99