A multi-discipline approach
6th European Sand Management Forum
26th March 2014
ETAP (Eastern Trough Area Project)
Overview
• Location- 240km east of Aberdeen in Central North Sea
• 9 Fields, 6 BP operated (Mungo, Machar, Monan, Madoes, Mirren,
Marnock) , 3 Shell Operated (Heron, Egret, Skua).
• Facilities- Central Processing facility (CPF) two bridge linked
platforms, Mungo NUI, 7 subsea tiebacks.
• Start Up- 1998
• Peak Rate-+200mbd and +300mmscf (ca. 2000)
• Produced volumes: ca. 0.6bn boe has been produced to date.
• Export route- oil via Forties Pipeline System to Kinneil; gas via
CATS pipeline to Teesside.
• JV comprise of BP, Shell, Exxon, JX, First Oil.
2
Why does ETAP need a Sand Management
Strategy?
• ETAP designed for sand-free production
• Significant deferrals, costs and POB demand
− 1 mmbbls/yr
− £2m cash costs
− 600 POB demand per year
• Increasing deferrals and integrity risk expected to continue, and potentially
accelerate, through field life due to:
− Increasing water cut
− Reservoir depletion
− Increased drawdown
− Increased GOR
What is the effect of sand production?
Choke
choke
valve
Xmas erosion
tree
Deposition
Well in vessels
restriction /
erosion
Oil Export
Control
equipment
Blocked / $
Eroded Eroded isolation
control valves Choke
valves
valve
Isolations
erosion
Eroded pumps
pumps and
/ recycle valves equipment Produced Water
Reinjection
4
ETAP Sand Management Strategy Overview
choke Sand Management Team
LEGEND
UT
Xmas
inspection
1. Organisation
tree Condition pigging
Monitoring / • Competence / training 2. Monitoring / Data
Sparing • Sand Management Meetings
S • Governance
3. Prevention
Acoustic Sampling 4. Removal
monitoring
5. Mitigation
6. Compliance
Manual
dig out Separation
Well Management
• Performance monitoring Project: Sand
• bean-up (conditioning) wash facilities pig
• drawdown
• shut-off
(mechanical & chemical) Disposal
• cleanout Permit
Oil Export
Control Deferrals
Condition tracked
equipment
Monitoring /
Completion Sparing $
• type
• effectiveness Planned
Sparing
Overhaul Condition
Reservoir
Monitoring /
• rock properties & stresses
Sparing
• fluid types & properties Isolations
• pressures Performance
monitoring pumps and
Produced Water
equipment
Reinjection
5
Examples of strategy in practice
• Acknowledgements
− Kanu Kelechi
− Giuseppe Tizzano
− Marie Bavidge
− Innis MacLeod
Questions?
− Aymeric Housez
− Audrey Madden
− Mike Killeen
− Niels Nouwens
− Mike Power
− James Carnell
Sand Management on ETAP:
A multi-discipline approach
6th European Sand Management Forum
26th March 2014