URR - Ved Mittal PDF
URR - Ved Mittal PDF
URR - Ved Mittal PDF
Implications and
Development Perspectives
Ved Mittal
Consultant – UNDP
Ex Chief Architect & Town Planner
UP Development Authorities
Urbanization in India: Implications and
Development Perspectives
India is the second most populous
country.. The average growth rate is
country
almost 2% per annum annum.. The total
population in 1981 was about 683 million
which has reached over 1000 million by
the year 2001
2001..
Based on
Model Town & Country Planning Act, 1960
Model Regional & Town Planning & Development Law,
1985
Urban Development Plans Formulation &
Implementation Guidelines, 1996
WITHIN THE BROAD INVESTMENT &
DEVELOPMENT POLICY OF THE STATES
Perspective plans at State level
Broad Structure plan
— At Regional level
— District level
— Metropolitan level
ONLY REASON
BUT OF – OWNERSHIP OF LAND
NO AVAIL?
(D) PREVENTIVE MEASURES
HIGH
HIGH--TECH TOWNSHIPS
INTEGRATED TOWNSHIPS
SALIENT FEATURES
HIGH--TECH TOWNSHIPS
HIGH
CRITERION..
750 CRORES MINIMUM PRIVATE CAPITAL INVESTMENT
MINIMUM 1500 ACRES – MAXIMUM 5000 ACRES
ACRES..
NO L.A. COST (10
10%% REBATE)
NO STAMP DUITY ON INITIAL PURCHASE OR TRANSFER
TRANSFER..
TO BE GIVEN ON LEASE HOLD FOR 90 YEARS
MINIMUM 60
60%% TO BE ASSEMBLED
ASSEMBLED..
BALANCE CAN BE ACQUIRED BY GOVERNMENT
GOVERNMENT..
SUBSEQUENTLY 12
12%% FREEHOLD CHARGES AND STAMP DUTY
DUTY..
G.S. LAND TO BE RESERVED AND TRANSFERRED
CONVERSION OF LAND USES @ 100 SQ
SQ..M.
..CRITERION
EDC @ 400 SQ
SQ..M.
CITY WIDE DEVELOPMENT CHARGES @ RS 37
37// SQ M
LOW DENSITY OF 150 – 200 PPH
PPH..
PREVAILING DENSITY NORMS NOT FOR EWS/LIG CATEGORY
CATEGORY..
DPR IN 180 DAYS AND APPLY IN 30 DAYS
DAYS..
FIVE YEAR COMPLETION
COMPLETION..
10% EWS AND 10
10% 10%
% LIG AT PREDETERMINED PRICE AND
ALLOTMENT BY DC OR VC
VC..
PUBLIC FACILITY LAND E.G. PS/FS/PO/TELEPHONE EXCHANGE
TO BE TRANSFERED FREE OF COST
COST..
NO MUNICIPAL TAXES TILL HANDING OVER
OVER..
RIGHT TO RECOVER MAINTENANCE CHARGES
CHARGES..
INTEGRATED TOWNSHIP DEVELOPMENT
PRIVATE DEVELOPERS ARE TO BE REGISTERED WITH THE AUTHORITYAUTHORITY..
BASED ON THE CRITERION OF TURNOVER IN REAL ESTATE DEVELOPMENT
(Rs.. 20 CRORES, Rs
(Rs Rs.. 10 CRORES AND RsRs.. 5 CRORES PER YEAR FOR THE LAST
THREE YEARS) CATAGORIES A, B AND C TO BE DECIDEDDECIDED..
TWO MODELS
BULK LAND ALLOTMENT MODEL
LICENCE MODEL
LAND IS EITHER TO BE ALLOTTED BY DEVELOPMENT AUTHORITY
AUTHORITY..
PD TO PURCHASE LAND DIRECTLY
DIRECTLY..
FOR CATEGORY A – UPTO 500 ACRES, B-UPTO 100 ACRES AND C-UPTO 25
ACRES..
ACRES
PRIVATE DEVELOPER WILL ASSEMBLE LAND UPTO 25 25% % FOR GETTING
LICENCE..
LICENCE
LICENCE VALID FOR 2 YEARS
YEARS..
LICENCEE TO PURCHASE 60 60%
% LAND
LAND.. BALANCE CAN BE ACQUIRED BY THE DA
FOR THE LICENSEE
LICENSEE..
PD SHALL BEAR THE COST OF STAMP DUTY AND ANY ENHANCEMENT IN THE
RATES..
RATES
PROPOSED FACILITIES IN M.P. AND FALLING IN THE LICENSEE’S AREA HAS
TO BE COMPLETED BY PD PD..
CASE OF NATIONAL CAPITAL REGION
Development policies
Futuristic population projection
Land requirement for different land uses
— Residential
— Commercial
— Industrial
— Public & Semi Public
— Parks & Open Space
— Circulation/Traffic and Transport
Preparation
Physical
Usage of remote sensing Social Secondary Information
Obtain satellite imageries Economic
Usage of GIS techniques
Continued….
Exiting land use map
Under ground water potential ,propensities and quality
Natural Hazard Prone Areas
Flood prone
Land slide prone
Soil structure mapping
Land capability mapping
Singly crop/double crop
Land for pastures/forest
Contouring & slope
Water bodies, rivers, drains, ponds
Rain temperature, wind
Quality of Air…
Socio-economic data , charts etc
Govt. Approval
Notification
TECHNO-LEGAL REGIME - ACTION REQUIRED
Amendment in Bye-laws
To enforce-earthquake resistant designs and construction
of buildings including the extension/modifications in the
existing buildings.
Tools to implement Development Plans
Land as a resource
Accommodation Reservation
Potential of plot in the form of built space is offered to
plot owner in lieu of any social amenity which the owner
would built at his cost on his land & transfer free of cost
to the local authority
authority..
Provision that any land less than one hectare can not be
registered by the Registrar, of properties unless NOC
from the Director, Town Planning is obtained
obtained..