Inspection and Test Plan For Bus Duct PDF
Inspection and Test Plan For Bus Duct PDF
Inspection and Test Plan For Bus Duct PDF
com
Inspection and Test Plan for Bus Duct
Activity By Remark
No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document
Manuf. TPI Client ‐
Before Manufacturing
IEC, NEC, NEMA,
DWG, Design, IEC, NEC, NEMA, DWG,
2 FDF, ISO ANSI, CI, H R A ‐
Calculation Document FDF, ISO ANSI, CI, IPCEA Calculation book
IPCEA
3 WPS&PQR ASME IX ASME IX Welding Book H R A ‐
Welder Qualification
4 ASME IX ASME IX Certificates H R ‐ ‐
Certificates
5 NDT procedures ASME V ASME V Procedures H R A ‐
NDE Personnel
6 ASME IX ASME IX Certificates H R ‐ ‐
Certificates
IEC, NEC, NEMA,
Bus Duct Insulation IEC, NEC, NEMA,
7 FDF, ISO ANSI, CI, Procedure H R A
Resistance Test Procedure FDF, ISO ANSI, CI, IPCEA
IPCEA
IEC, NEC, NEMA,
Bus Duct Withstand IEC, NEC, NEMA,
8 FDF, ISO ANSI, CI, Procedure H R A
Voltage Test FDF, ISO ANSI, CI, IPCEA
IPCEA
9 Painting Procedure SSPC SSPC Procedure H R A ‐
Materials
Original Material
10 Raw Material Inspection ASTM ASTM H H ‐ ‐
Certificates
1
www.inspection‐for‐industry.com
11 Review of Certificates ASTM ASTM Certificates H H ‐ ‐
During Fabrication
Welding Inspection for
14 Required Welding WPS WPS Report H SW ‐
Components
Checking of Outline
Dimensions, Interface
Dimensions, Bus Bar
15 DWG DWG Report H SW ‐
Dimensions and
Clearances and other
Specified Dimensions
Checking that all
Instruments,
Compartments, Control
16 Switches etc. are Correctly DWG DWG Report H SW ‐
Rated and are Correctly
Located, with Specified
Labeling.
Tightness/Torque of
17 Terminals and Degree of DWG/Spec DWG/Spec Report H SW ‐
Protection
2
www.inspection‐for‐industry.com
18 Insulation Resistance Test Procedure Procedure Report H
Withstand Voltage Test
19 Procedure Procedure Report H
(Dielectric Test)
Final Inspection
Final Visual &
20 DWG DWG Report H H ‐ ‐
Dimensional Check
Surface Preparation and
21 Procedure Procedure Report H W ‐ ‐
Painting
22 Check of Final Book Spec. Spec. DWG/ P.O H R ‐
Documentation
Pre‐Inspection Inspection
H: Hold Point = Hold on the production till TPI Inspector performs inspection and supervise the required test
3
www.inspection‐for‐industry.com
W: Witness Point = Manufacture shall notify client and TPI Inspector but there is no hold on the production;
Client can waive this inspection based on his discretion and informs TPI Inspector accordingly.
R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT Procedures and etc.
A: Approval
SW: Spot Witness = for items with spot witness manufacture shall notify TPI inspector as fulfilling the monitoring;
For example one random visit for whole UT tests or one or two visits for whole surface preparation works for painting.
MOM: Minute of Meeting
P.O: Purchase Order
for more information review following articles:
http://www.inspection‐for‐industry.com/third‐party‐inspection‐for‐bus‐duct.html
http://www.inspection‐for‐industry.com/inspection‐and‐test‐plan‐for‐bus‐duct.html