RESIDENTIAL LAYOUT
PROJECT REPORT
SUBMITTED TO THE FACULTY OF CIVIL
ENGINEERING IN PARTIAL FULFILLMENT OF THE
REQURIMENTS FOR THE AWARD OF
DIPLOMA
IN
CIVIL ENGINEERING
Submitted by
15012-C-002,003,004,006,009,011,012,032,041,043,402,403
Under the Guidance of
T.V.S. SURYA NARAYANA
(senior lecturer in Civil Engineering)
DEPARTMENT OF CIVIL ENGINEERING
S.M.V.M POLYTECHNIC
TANUKU
2015 -2018
S.M.V.M POLYTECHNIC
TANUKU
CERTIFICATE
This is to Certify that this project work entitled
PROJECT REPORT ON RESIDENTIAL LAYOUT
is the bonafied work of
15012-C-002,003,004,006,009,011,012,032,041,043,402,403
Students of final year D.C.E (2017-2018) along with batch in
partial fulfillment of the requirements for the award of Diploma
in Civil Engineering of the State Board of Technical Education and
Training, Andhra Pradesh during the study period 2015-2018.
EXTERNAL EXAMINER
ACKNOWLEDGEMENT
PROJECT REPORT
SUBMITTED TO THE FACULTY OF CIVIIL ENGINEERING IN PARTIAL FULFILLMENT OF
REQUIREMENTS
FOR THE AWARD OF
A.TARUN.S.S.K 15012-C-003
A.BHUVAN.S.D.PATHRUDU 15012-C-004
A.RAVITEJA 15012-C-006
B.RAMAKRISHNA 15012-C-011
P.YOGENDRA.V.R.SAI 15012-C-043
A.RAVITEJA 15012-C-402
K.PAVAN 15012-C-403
CONTENTS
1. INTRODUCTION
2. SURVEY REPORT
3. DESIGN AND DETAILING
TWO WAY CONTINUOUS SLABS
BEAMS
COLUMNS
PLINTH BEAMS
LINTEL CUM SUN SHADE
FOOTING
STAIR CASE
4. DETAILED ESTIMATE
5. LEAD STATEMENT
6. DATA SHEET
7. ABSTRACT ESTIMATE
8. REFERENCE
INTRODUCTION
Site Location:
The proposed site is located in TANUKU.which is a rural town
surrounded by rich cultivated lands and having number of recognized educational institutions
and health care centres .
Master bedroom
Children Bed room
Hall
Kitchen
Dining
Store room
Prayer room
Common toilet
MATERIALS:
M20grade of concrete and HYSD bars (Fe 415 grade of steel ) for all RCC works
Traditional bricks are used for construction which are available in Velpur
Ordinary Portland cement of 53 grade is used which is available from local dealers
20mm and 40mm HBG aggregates are used which are available from Pangidi quarry
Seasonal wood is used for doors and windows and teak wood for main doors
Good quality plumbing and electrical fixtures are used in all rooms
Doors and windows are so located that there is free and better flow of
air through the building and there is sufficient natural lighting .
PVC pipe conduits are used for electrical fittings ,normal water supply
and drainage arrangements and GI pipes for hot water supply.
INSTRUMENTS REQUIRED:
CHAIN
RANGING RODS
TAPE
CROSS STAFF
ARROWS
OFFSET ROD
FEASIBILITY REPORT
LOW COST HOUSING is a new concept which deals with effective budgeting
and following of techniques which help in reducing the construction through the
use locally available materials along with improved skills and technology without
sacrificing the strength, performance and life of the structure. There is huge
misconception that low cost housing is suitable for only sub standard works and
they are constructed by utilizing cheap building materials of low quality. The fact
is that low cost housing is done by proper management of resources. Economy is
also achieved by postponing finishing works or implementing them in phase.
In INDIA, majority of population come under low and medium income group, so it
is necessary to provide cost of construction in reasonable price. Rapidly growing
population effects the economic growth of country. Therefore we have to search
for alternative techniques to reduce the cost of the construction by proper
utilisation of materials, manpower and machinery.
DETAILED INVESTIGATION
LAYOUT PLAN :
A structural layout of the whole area is projected to a small screen with all
proposed number of plots showing their sizes, location, orientation etc.,
DRAWINGS OF ALL WORKS:
Plans, elevations, sections, reinforcements details, general specifications and
detailed specifications are drawn and given to prepare detailed estimate and
abstract estimates of selected buildings of different types for comparison study
of costs.
PLANNING OF HOUSING PROJECT:
The housing colonies must be planned in a economic way to achieve the low cost
for various types of buildings that is LIG,MIG,HIG. The planning should be clear
and roads must be placed without dead ends and give sufficient space amenities,
reactions, shopping complex etc., the water treatment and supply arrangements
are provided by means of intermittent systems by providing over head tanks and
pumps and other units required. The sanitary arrangements achieved by
providing drains for sullage and individual septic tank seawage. Electricity is
taken from tanuku municipality and electric poles provided along the sides of
roads which are 5m width.
The planning of buildings with respective geography, directions,
wind, altitude, azimuth is known as orientation. The inflow of fresh air into the
building is known as ventilation. Sufficient number of windows, ventilators are
to provided to have cross ventilation the area of windows should not be less than
¼ the floor area windows are placed at a height of 50.75 above floor level.
As the soil at the selected sit is black cotton soil, under reamed pile
foundations are preferable.
ABOUT ESTIMATION
DETAILED ESTIMATE:-
A detailed estimate of the cost of the project is prepared by
determining the quantities and the cost of every thing that a contractor is
required to provide and do for the satisfactory completion of the work. it
the best and most reliable from of estimate.
BAR BENDING SCHEDULE:
Total steel required for the construction is calculated as per
specifications and tabulated in a statement which shows that total
description of steel such as size, shape & length of the bar it is most
helpful to the bar bender while preparing reinforcement.
LEAD STATEMENT:
The distance between the source of availability of materials
and construction site is known as lead and is calculated in Km and
calculation of rate of conveyance of materials to the site from source is
tabulated as a statement is known as lead statement.
DATA SHEET:
Data sheet is a document that summarizes the performance
and other technical characteristics of a product, machines, component,
material, a sub system in sufficient in detailed to be used by a design
engineer to integrate the component in to a system. A data sheet is
usually used for technical communication to describe technical
characteristics of an item or product.
ABSTRACT ESTIMATE:
This is the third and final stage in a detailed estimate. The
quantities and rates of each item of work arrived in the first two stages,
are entered in abstract form. The total cost of each item of work is now
calculated by multiplying the quantities and respective rates.
ABOUT DESIGN AND DETAILING
The design and detailing of reinforced concrete frames is a
complex process that requires intensive real time information exchange
between various design tasks.
By Stiffness consideration :-
𝑙
= 37
𝑑
3500
Effective Depth (d) = = 94.59 𝑚𝑚
37
= 120 - 25 = 95 mm
EFFECTIVE SPAN :-
For Longer Span
1. Ly = Longer span + effective depth
= 5540 + 95
= 5635 mm
2. Ly = longer span + centre to centre distance
230 230
= 5540 + +
2 2
= 5770 mm
For Shorter Span
1. Lx = Shorter span + Effective depth
= 3500 + 95
= 3595 mm
2. Lx = shorter span + c/c distance
230 230
= 3500 + +
2 2
= 3730 mm
provide whichever is least, therefore
Longer Span ( Ly) = 5635 mm
Shorter Span (Lx) = 3595 mm
Total depth = Effective depth+ effective cover
= 95 + 25 =120mm
LOADING:
for 1 m length
live Load = 2.0 KN/M
Floor Finish load = 1.0 KN/M
Dead load = 25 x 1 x 0.12 = 3 KN/M
Total load =2.0 + 1.0 +3 = 6.0 KN/M
Factored load = 1.5 x 6.0 = 9.00 KN/M
DESIGN COEFFICIENTS
Lx =3.595 m
Ly = 5.635 m
𝐿𝑦 5.635
= = 1.567
𝐿𝑥 3.595
=300mm
Spacing = 250mm c /c
Positive reinforcement for Shorter span (+my)
fy Ast
Mu = 0.87 fy Ast d (1- )
fck bd
415 x Ast
5.0 x 10⁶ = 0.87 x 415 x Ast x 95 (1- )
20 x 1000x95
Ast =150.73𝑚𝑚2 .
Assume dia of bar = 10mm
155.11
Number of bars = π = 2 no’s
×102
4
= 3d = 3x95 = 285mm
=300mm
Spacing = 285mm c/c
Positive reinforcement along shorter span (+mx)
fyAst
Mu = 0.87 fy Ast d (1- )
fck bd
415 x Ast
7.595x 10⁶ = 0.87 x 415 x Ast x 95 (1- )
20 x 1000x95
= 330 mm
3d = 3x95
=285 mm
300mm
Provide 10mm dia bars @ 285mm c/c
Torsion reinforcement
3
steel for torsion = max Ast
4
3
= × 312.26 =234.195 mm2
4
DEFELECTION CHECK:
From fig 4 of modification factor for tension reinforcement.
Area of cross−section of steel required
fs = 0.58 fy
Area of cross−section of steel provided
312.26
fs = 0.58 x 415×
312.26
= 240.70 N/𝑚𝑚2
37.0<39.0
Hence the section is safe under deflection
Shear Check :-
Nominal Shear Stress
𝑉𝑢
τv =
𝑏𝑑
16.17 𝑥 103
= 0.170 N/mm2
1000 𝑥 95
% of Ast At Supports
312.26
= 𝑥 100
1000 𝑥 95 𝑥 2
= 0.164 %
Design strength of concrete
τc = % Ast - τc
0.36 - 0.25
0.28 - 0.15
0.08
τc = 0.28 + [ + 0.014 ]
0.1
= 0.291 N/mm2
τcmax = 2.8 N/mm2
Conditions
1. τv < k τc
= 0.170 < 1.3 x 0.29 = 0.170 < 0.377
1
2. τv < τcmax
2
For panel 1
Torsion steel
For panel 2
Torsion steel
For panel 3
Torsion steel
DESIGN OF T – BEAM
BASED ON STIFFNESS CONSIDERATION:
Assume
Effective depth (d) = 120 mm
Effective cover = 30 mm
Overall depth (D) =120 + 30 =150 mm
2
Breadth (B) = x150
3
= 100 mm
CLEAR SPANS:
For Bm1 &Bm 2 = 5700 mm
EFFECTIVE LENGTH:
Effective length Bm1 & Bm2
230 230
(1) Centre to Centre distance = 5700 + + = 5930mm
2 2
13.295 𝑥 9
=
5820
= 20.7374 KN/m
Total Load = Dead Load +Live Load = 1.29 + 20.7374
= 22.0274 KN/m
BREADTH OF THE FLANGE:
AS PER IS 456:2000 CLAUSE: 23.1.2
L0
For T- beam bf = + bw+ 6Df
6
5770
For Bm10= ( ) + 230 + 6 x120
6
=1911.6 mm
Effective breadth (b) = 1911.6 mm
MOMENT FOR Bm 1 :-
𝑤𝑙 2
Mu =
10
22.0274 𝑥 5.772
= = 73.336 KN-m
10
Mu = 0.87fyAst[d-0.42Xu)
73.336x106 = 0.87 x 415 x Ast x[240-0.42x0.02623Ast]
Ast = 882.027 mm2
No. of bars
Assume diameter of bar = 16 mm
𝐴𝑠𝑡 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
No. of bars = 𝜋
𝑋𝑑 2
4
882.027
= 𝜋 = 4.78 No's
162
4
≅ 5 no's
𝜋
Ast provided = 5x x 162
4
= 1005.30 mm2
For xu:
Assume xu lies within the flange
Equate compressive forces to tensile forces
0.36fck bf xu = 0.87fy Ast
0.36 x 20 x1911.6 x Xu = 0.87 x415 x Ast
0.87 𝑥 415 𝑥 𝐴𝑠𝑡
Xu = = 0.02623 Ast
0.36 𝑥 20 𝑥 1911.6
MOMENT OF RESISTANCE:
MR = 0.36fck bf Xu [d-0.42Xu]
= 0.36X20X1911.36X23.135 [240-0.42x23.135]
=73.336 > 73.328 KN-m
Hence the section is safe
SHEAR REINFORCEMENT : -
For Bm1:
Vu =0.4wd l+0.45wl l
=0.4 X 1.29 X 5.77 + 0.45 X 20.7374 X 5.77
=56.822 KN
Nominal shear stress
𝑉𝑢 56.822 𝑥 103
τv = =
𝑏𝑑 230 𝑥 240
= 1.029 N/mm2
Percentage of steel:
𝜋
2𝑋 𝑋 102
4
% % of AST = = 0.798 %
230 𝑋 320
= 0.571 n/mm2
𝜏v > 𝜏c
The nominal shear stress is greater than design shear stress
VUS = VU - 𝜏c bd
= 44.56 – 0.51(0.23 X 0.32)
= 44.52 KN
For stirrups:
Vus = Vu - τc bd
= 25.3 KN
Spacing:
Assume two legged vertical stirrups of 8 mm dia
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82 𝑋 320
4
=
22.26 𝑋 103
= 344.27 mm ≅ 345 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82
= 4
0.4 𝑋 230
= 394.52 mm ≅ 395 mm
0.75 x d = 0.75 X 240
= 168 mm =160 mm
300 mm
Depth Required :-
The minimum depth required to resist the Bending Moment .
Equate Mu to Mu limit
51.65 x 106 = Qbd2
51.65 x 106 = 0.138 x 20 x 230 x d2
d = 285.25 mm
Hence provide an Effective Depth = 295 mm
Tension Reinforcement :-
𝑓𝑦 𝐴𝑠𝑡
51.65 x 106 = 0.87 x fy x d x Ast [1 - ]
𝑓𝑐𝑘𝑏𝑑
415 𝐴𝑠𝑡
51.65 x 106 = 0.87 x 415 x 295 x Ast [1- ]
230 𝑥 295 𝑥 20
= 236.52 N/mm2
592.174
% of Ast = 𝑥 100
230 𝑥295
= 0.87 %
𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 = modification factor x basic value
𝑑
= 1.1 x 20 = 22
22 > 19
𝑙 𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 > 𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑
𝑑 𝑑
Hence the section is safe under Deflection
Shear Check :-
𝑉𝑢
τv =
𝑏𝑑
35.80 𝑥 103
= 0.527 N/mm2
230 𝑥 295
𝜋
2𝑥 𝑥 162
4
% of steel = 𝑥 100
230 𝑥 295
= 0.592 %
Design strength of concrete
τc = % Ast - τc
0.50 - 0.48
0.75 - 0.56
0.08
τc = 0.48 + [ + 0.092 ]
0.25
= 0.892 N/mm2
τv < k τc
The nominal shear stress is greater than design shear stress
= 0.527 < 1.3 x 0.892
= 0.527 < 1.15
τcmax = 2.8 N/mm2
1 1
τcmax < τcmax = 0. 527 < 𝑥 2.8
2 2
3. Sv = 300 mm
4. Sv = 0.75 x d = 221 mm = 220 mm
Hence Provide 6 mm Dia Bars @ 220 mm c/c As Stirrups.
BAR BENDING SCHEDULE FOR SIMPLY SUPPORTED BEAM
-1
SNO NAME SHAPE DIA IN NO 'S LENGTH TOTAL UNIT WEIGHT
OF BAR OF BAR MM IN M LENGTH WEIGHT IN KG
IN M IN KG/M
Depth Required :-
The minimum depth required to resist the Bending Moment .
Equate Mu to Mu limit
58.40 x 106 = Qbd2
58.40 x 106 = 0.138 x 20 x 230 x d2
d = 303.31 mm
Hence provide an Effective Depth = 310 mm
Tension Reinforcement :-
𝑓𝑦 𝐴𝑠𝑡
58.40 x 106 = 0.87 x fy x d x Ast [1 - ]
𝑓𝑐𝑘𝑏𝑑
415 𝐴𝑠𝑡
58.40 x 106 = 0.87 x 415 x 310 x Ast [1- ]
230 𝑥 310 𝑥 20
= 192 N/mm2
641.54
% of Ast = 𝑥 100
230 𝑥310
= 0.89 %
𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 = modification factor x basic value
𝑑
= 1.1 x 20 = 22
22 > 19
𝑙 𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 > 𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑
𝑑 𝑑
Hence the section is safe under Deflection
SHEAR CHECK:-
𝑉𝑢
τv =
𝑏𝑑
14.03 𝑥 5.77
Vu = = 40.47 KN
2
40.47 𝑥 103
= 0.567 N/mm2
230 𝑥 310
𝜋
2𝑥 𝑥 162
4
% of steel = 𝑥 100
230 𝑥 310
= 0.563 %
Design strength of concrete
τc = % Ast - τc
0.50 - 0.48
0.75 - 0.56
0.08
τc = 0.48 + [ + 0.063 ]
0.25
= 0.863 N/mm2
τv < k τc
The nominal shear stress is greater than design shear stress
= 0.563 < 1.3 x 0.863
= 0.563 < 1.12
τcmax = 2.8 N/mm2
1
τcmax < τmax
2
1
0. 563 < 𝑥 2.8 = 0.563 < 1.4
2
Vus = Vu - τcbd
40.47 x 103 – 0.563 x 230 x310 = 32.81 KN
Spacing
Assume 6 mm dia Two Legged Vertical Stirrups.
Asv = 56.54 mm2
56.54 𝑥 0.87 𝑥 415
1. Sv = = 221 mm = 220 mm
0.4 𝑥 230
0.87 𝑥 415 𝑥 56.54 𝑥 310
2. Sv = = 385.75 mm = 380 mm
16.405 𝑥 103
3. Sv = 300 mm
4. Sv = 0.75 x d = 221 mm = 220 mm
Hence Provide 6 mm Dia Bars @ 220 mm c/c As Stirrups.
= 345 mm
Loads : -
Dead Load (Wd) = 0.23 x 0.38 x 25 x 1.5 = 3.2775 KN/M
3.7348 𝑥 9
Live Load For Span 1 (Wl1) = = 9.033 KN/M
3.73
1.8632 𝑥 9
Live Load for Span 2 (Wl2) = = 6.14 KN/M
2.73
1.974 𝑥 9
Live Load For Span 3 (Wl3) = = 6.322 KN/M
2.81
Span Moments : -
1 . At The Middle Of End Span -1 :-
𝑊𝑙 2 𝑊𝑙 2
+
12 10
3.275 𝑥 3.732 9.033 𝑥 3.732
= +
12 10
= 16.36 KN-M
2 . At The Middle Of End Span – 2 : -
𝑊𝑙 2 𝑊𝑙 2
+
12 10
3.275 𝑥 2.812 6.322 𝑥 2.812
= + = 7.418 KN-M
12 10
= 4.93 KN-M
4. Support Next To End Support – 1 :-
𝑊𝑙 2 𝑊𝑙 2
+
10 9
3.275 𝑥 3.732 9.033 𝑥 3.732
= +
10 9
= 18.52 KN-M
5 . Support Next To End Support – 2 :-
𝑊𝑙 2 𝑊𝑙 2
+
10 9
= 8.13 KN – M
The Minimum Depth Required :-
The Minimum Depth Required To Resist Bending Moment
Mu = Mu limit
18.52 x 106 = 0.138 x 20 x 230 x d2
d = 170 mm
Hence Provide Effective Depth =345 mm
Tension Reinforcement :-
Positive Bending Moment
415𝐴𝑠𝑡
16.36 x 106 = 0.87 x 415 x Ast x 345 [1- ]
20 𝑥 230 𝑥 345
= 1.2 = 2 No 's
Assume 50 % of Bars Are Cranked . So Assume 3 no's are used.
Negative Bending Moment
415𝐴𝑠𝑡
18.52 x 106 = 0.87 x 415 x Ast x 345 [1 − ]
20 𝑥 230 𝑥 345
= 1.37 = 2 No's
Check For Shear : -
𝜋
𝑥 2 𝑥 122
4
% of Ast At Support = x 100 = 0.28 %
230 𝑥 345
46.2 𝑥 103
τv = = 0.58 N/mm2
230 𝑥 345
τv > τc
Vus = Vu - τcbd
= 46.2 x 103 - 0.398 x 230 x 345 = 14.61 KN
Assume 6 mm dia Two Legged Vertical Bars Used
𝜋
Asv = 2 x x 62 = 56.54 mm2
4
Spacing Of Stirrups
0.87 𝑓𝑦 𝐴𝑠𝑣 𝑑 0.87 𝑥 415 𝑥 56.54 𝑥 345
1. Sv = 𝑉𝑢𝑠 = = 482.12 mm ≅ 480 mm
7.305 𝑥 103
2
4. Sv = 300 mm
= 0.611 KN - m
Factored Bending Moment (Mud) = 1.5 x 0.611 = 0.9165 KN –m
𝑊𝑚 𝑊𝑙
Shear Force = ( + )
2 2
= 1.6295 KN
Factored Shear Force (Vu) = 1.5 x 1.6295 = 2.44 KN
Depth Required :-
The minimum Depth required to resist Bending Moment ,
Equate Mu to Mu limit
0.916 x 103 = 0.138 x 20 x d2 x 0.23 = 37.98 mm
Hence Provide An Effective Depth Of 120 mm
Tension Reinforcement :-
𝑓𝑦 𝐴𝑠𝑡
0.916 x 103 = 0.87 x 415 x 120 x Ast(1 – )
𝑓𝑐𝑘 𝑏𝑑
= 34.31 N/mm2
150.72
% of Ast = 𝑥 100
230 𝑥120
= 0.54 %
𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 = modification factor x basic value
𝑑
= 2 x 20 = 40
40 > 10
𝑙 𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 > 𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑
𝑑 𝑑
Hence the section is safe under Deflection
Shear Check :-
𝑉𝑢
τv =
𝑏𝑑
1.625 𝑥 103
= 0.058 N/mm2
230 𝑥 120
𝜋
2𝑥 𝑥 82
4
% of steel = 𝑥 100
230 𝑥 120
= 0.36 %
Design strength of concrete
τc = % Ast - τc
0.25 - 0.36
0.50 - 0.48
0.12
τc = 0.36 + [ + 0.011 ]
0.25
= 0.853 N/mm2
τv < k τc
The nominal shear stress is greater than design shear stress
= 0.058 < 1.3 x 0.853
= 0.058 < 1.10
≅ Vus = Vu - τcbd
1.625 x 103 – 0.853 x 230 x120 = 16.08 KN
Spacing
Assume 6 mm dia Two Legged Vertical Stirrups.
Asv = 56.54 mm2
56.54 𝑥 0.87 𝑥 415
1. Sv = = 221.81 mm ≅ 220 mm
0.4 𝑥 120
0.87 𝑥 415 𝑥 56.54 𝑥 120
2. Sv = = 304 mm ≅ 300 𝑚𝑚
8.04 𝑥 103
3. Sv = 300 mm
4. Sv = 0.75 x 120 = 90 mm
Hence Provide 6 mm Dia Bars @ 90 mm c/c As Stirrups.
= 0.834 KN - m
Factored Bending Moment (Mud) = 1.5 x 0.834 = 1.25 KN –m
𝑊𝑚 𝑊𝑙
Shear Force = ( + )
2 2
= 2.04 KN
Factored Shear Force (Vu) = 1.5 x 2.04 = 3.07 KN
Depth Required :-
The minimum Depth required to resist Bending Moment ,
Equate Mu to Mu limit
1.25 x 103 = 0.138 x 20 x d2 x 0.23 = 51.40 mm
Hence Provide An Effective Depth Of 120 mm
Tension Reinforcement :-
𝑓𝑦 𝐴𝑠𝑡
1.25 x 103 = 0.87 x 415 x 120 x Ast(1 – )
𝑓𝑐𝑘 𝑏𝑑
= 89.73 N/mm2
15072
% of Ast = 𝑥 100
230 𝑥120
= 0.54 %
𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 = modification factor x basic value
𝑑
= 2 x 20 = 40
40 > 10
𝑙 𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 > 𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑
𝑑 𝑑
Hence the section is safe under Deflection
Shear Check :-
𝑉𝑢
τv =
𝑏𝑑
3.07 𝑥 103
= 0.112 N/mm2
230 𝑥 120
𝜋
2𝑥 𝑥 82
4
% of steel = 𝑥 100
230 𝑥 120
= 0.36 %
Design strength of concrete
τc = % Ast - τc
0.25 - 0.36
0.50 - 0.48
0.12
τc = 0.36 + [ + 0.011 ]
0.25
= 0.851 N/mm2
τv < k τc
The nominal shear stress is greater than design shear stress
= 0.112 < 1.3 x 0.853
= 0.112 < 1.10
≅ Vus = Vu - τcbd
3.07 x 103 – 0.851 x 230 x120 = 11.49 KN
Spacing
Assume 6 mm dia Two Legged Vertical Stirrups.
Asv = 56.54 mm2
56.54 𝑥 0.87 𝑥 415
1. Sv = = 221.81 mm ≅ 220 mm
0.4 𝑥 120
0.87 𝑥 415 𝑥 56.54 𝑥 120
2. Sv = =320 mm
5.74 𝑥 103
3. Sv = 300 mm
4. Sv = 0.75 x 120 = 90 mm
Hence Provide 6 mm Dia Bars @ 90 mm c/c As Stirrups.
BAR BENDING SCHEDULE FOR LINTEL
SNO NAME SHAPE DIA IN NO 'S LENGTH TOTAL UNIT WEIGHT
OF BAR OF BAR MM IN M LENGTH WEIGHT IN KG
IN M IN KG/M
= 1.53 KN - m
Factored Bending Moment (Mud) = 1.5 x 1.53 = 2.29 KN –m
𝑊𝑚 𝑊𝑙
Shear Force = ( + )
2 2
= 3.64 KN
Factored Shear Force (Vu) = 1.5 x 3.64 = 5.46 KN
Depth Required :-
The minimum Depth required to resist Bending Moment ,
Equate Mu to Mu limit
1.53 x 103 = 0.138 x 20 x d2 x 0.23 = 69.46 mm
Hence Provide An Effective Depth Of 120 mm
Tension Reinforcement :-
𝑓𝑦 𝐴𝑠𝑡
1.53 x 103 = 0.87 x 415 x 120 x Ast(1 – )
𝑓𝑐𝑘 𝑏𝑑
= 89.73 N/mm2
15072
% of Ast = 𝑥 100
230 𝑥120
= 0.54 %
𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 = modification factor x basic value
𝑑
= 2 x 20 = 40
40 > 10
𝑙 𝑙
𝑝𝑒𝑟𝑚𝑖𝑡𝑡𝑒𝑑 > 𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑
𝑑 𝑑
Hence the section is safe under Deflection
Shear Check :-
𝑉𝑢
τv =
𝑏𝑑
5.46 𝑥 103
= 0.198 N/mm2
230 𝑥 120
𝜋
2𝑥 𝑥 82
4
% of steel = 𝑥 100
230 𝑥 120
= 0.832 %
Design strength of concrete
τc = % Ast - τc
0.75 - 0.56
1.00 - 0.62
0.06
τc = 0.56 + [ + 0.083 ]
0.25
= 0.883 N/mm2
τv < k τc
The nominal shear stress is greater than design shear stress
= 0.198 < 1.3 x 0.883
= 0.198 < 1.14
≅ Vus = Vu - τcbd
5.46 x 103 – 0.883 x 230 x120 = 11.49 KN
Spacing
Assume 6 mm dia Two Legged Vertical Stirrups.
Asv = 56.54 mm2
56.54 𝑥 0.87 𝑥 415
1. Sv = = 221.81 mm ≅ 220 mm
0.4 𝑥 120
0.87 𝑥 415 𝑥 56.54 𝑥 120
2. Sv = =320 mm
2.73 𝑥 103
3. Sv = 300 mm
4. Sv = 0.75 x 120 = 90 mm
Hence Provide 6 mm Dia Bars @ 90 mm c/c As Stirrups.
DESIGN OF SUNSHADE
Projection ofSunShade = 600 mm
Top Cover = 20 mm
Stifness Factor = 8
Assume Breadth = 1000 mm
By Stiffness Factor :-
𝑙
Assume = 8
𝑑
= 0.614 KN - m
Factored Bending Moment (Mud) = 1.5 x 0.614 = 0.921 KN –m
Depth Required :-
The minimum Depth required to resist Bending Moment ,
Equate Mu to Mu limit
0.921 x 103 = 0.138 x 20 x d2 x 1.0 = 44 mm
Hence Provide An Effective Depth Of 80 mm
Overall depth = 100 mm
Tension Reinforcement :-
𝑓𝑦 𝐴𝑠𝑡
0.921 x 103 = 0.87 x 𝑓𝑦 x Ast x d(1 – )
𝑓𝑐𝑘 𝑏𝑑
415𝐴𝑠𝑡
0.921 x 103 = 0.87 x 415 x Ast x 80(1 – )
20 𝑥 1000 𝑥 80
3.14
1. 𝜋 = 306.68 mm
𝑥 82
4
2. 5 𝑥 𝑑 = 5 x 80 = 40 mm
3. 300 mm
DESIGN OF A COLUMN
Length of column = 3900 mm
Size of column = 230 x 230 mm
M20 grade concrete , Fe415 grade steel
Both ends are retrained against rotation and translation
FOR SUNSHADE
= 12.73 < 20 mm
Hence The column is designed as axially loaded column
Loads
From BM 10 = 0.5w10l10 =0.5×5.77×6.37 =18.377 KN
From BM9 = 0.6w9l9 = (0.6×3.27×3.73)+(0.6x9.03x3.73) = 27.5274 KN
From BM6 = 0.55w6l6 = (0.55x3.27x2.73)+(0.6x6.14x2.73) =14.9672 KN
Total load = 18.377 + 27.5274 + 14.9672
P = 60.872 KN
Assume 1%of steel in Ag
Asc =1/100 Ag
= 0.01 Ag
Ag=Ac + Asc
Ac=Ag - 0.01Ag
Ac=0.99Ag
Load carrying capacity of column
Pu = 0.4fckAc + 0.67fyAsc
Ag = 100x1341.7
= 134170 mm2
DIA OF BAR:-
𝜋
6x x𝑑 2 =1341.70
4
d = 16.87 mm ≅ 20 mm
Ast provided
π
Ast =6× ×162 = 804.25mm2
4
Lateral ties
Pitch
Least lateral dimension = 230mm
16d = 16×16 = 256mm
300mm
Diameter
1
0.25×largest diameter = 4mm
4
6mm
Span Moments :-
𝑤𝑙 2
For End Spans =
12
𝑤𝑙 2
For Mid Spans =
16
23.285 𝑥 3.732
For 3730 mm Span = = 26.99 KN - m
12
32.103 𝑥 2.732
For 2730 mm Span = = 14.35 KN – m
16
33.708 𝑥 2.812
For 2810 mm Span = = 22.180 KN – m
12
Support Moments :-
𝑤 𝑥 𝑙2
Next to End Support = −
10
23.285 𝑥 3.732
1. - = 32.396 KN-m
10
33.708 𝑥 2.812
2. - = 26.61 KN – m
10
= 4 Bars
Hence provide 12 mm dia Bars as Main Reinforcement
Check For Shear : -
𝜋
𝑥 2 𝑥 122
4
% of Ast At Support = x 100 = 0.364 %
230 𝑥 270
τv > τc
Vus = Vu - τcbd
= 52.11 x 103 - 0.41 x 230 x 270 = 26.649 KN
Assume 6 mm dia Two Legged Vertical Bars Used
𝜋
Asv = 2 x x 62 = 56.54 mm2
4
Spacing Of Stirrups
0.87 𝑓𝑦 𝐴𝑠𝑣 𝑑 0.87 𝑥 415 𝑥 56.54 𝑥 270
5. Sv = 𝑉𝑢𝑠 = = 413 mm
13.3245
2
0.87 𝑓𝑦𝐴𝑠𝑣 0.87 𝑥 415 𝑥 56.54
6. Sv = = = 220 mm
0.4𝑏 0.4 𝑥 230
8. Sv = 300 mm
Bending moment :-
As per clause 34.2.3.2 (a) the greatest Bending Moment is occurred at the face of
the Column
So BM @section X-X =
Total load acting on hatched area x distance between c.g of the force from
face of the column
𝐵−𝑏 𝐵−𝑏
=2[ ]xBx[ ]
2 4
1100−230 1100−230
= 0.184 [ ] 𝑥 1100 𝑥 [ ]
2 4
= 19.14 KN-M
Depth required : -
The minimum depth required to resist Bending Moment
Mud = Qbd2
= 19.14 x 106 = 0.138 x 1100 x 20 x d2
= 79.39 mm = 80 mm
In Footing the depth required for Bending moment is very less than the depth
required for shear .
Hence provide an effective depth of twice the required depth .
d = 160 mm
Overall Depth (D) = Effective Depth + Cover = 160 + 50 = 210 mm
Tension Reinforcement :-
Equate factored bending moment (Mud) to Mu for under reinforcement section
415 𝑥 𝐴𝑠𝑡
19.14 x 106 = 0.87 x 415 x 160 x Ast [1 - ]
20 𝑥 1100 𝑥 160
a) The critical section for this condition at a distance equal to effective depth
1100−230
=( – 160) = 275 mm
2
Shear force Vu = 0.184 x 275 x 1100 = 55.66 KN
𝑉𝑢 55660
τv = = = 0.316 N/mm2
𝐵𝑑 1100 𝑥 160
345.38
% of Ast = 𝑥 100
1100 𝑥 160
= 0.196 %
From table 19 of IS 800 – for 0.196% of Ast
τc = 0.15 - 0.28
0.25 - 0.36
= 0.10 - 0.12
0.12
τc = 0.28 + [ 𝑥 (0.196 − 0.15)]
0.1
τc = 0.335 N/mm2
For 210 mm thick
K = 1.2
τc > K τv
0.335 > 0.235
Hence the section is safe
Check for Two way Shear or Punching shear :-
Hatched area = B2 – (b + d )2
= 11002 – (230 + 100)2
= 1.0579 x 106 mm2
Vu = q x hatched area
= 0.184 x 1.0579 x 106 = 194.65 KN
194.65 𝑥 103
τv = = 0.779 N/mm2
4 (230+160)160
149.04 𝑥 103
= = 2.81 N/mm2
230 𝑥 230
𝐴1
Permissible Bearring stress = 0.45 fck √
𝐴2
0.409 𝑥 106
√ = 2.78
0.52 𝑥 106
A FOR COLUMN
B FOR FOOTING
BOTH
DIRECTIONS
=1.28
By Stiffness consideration
Lx
Let we assume as 43
𝑑
Lx
43 =
𝑑
4240
𝑑=
43
d =98.60mm~ 100mm
EFFECTIVE SPAN:
Ly = Longer span + effective depth
= 5440 + 100
= 5540mm
= loner span + centre to centre distance
= 5440 + 230/2 +230/2
Ly = 5670mm
Lx = Shorter span + Effective depth
= 4240 + 100
= 4340mm
= shorter span + c/c distance
= 4310 + 230/2 +230/2
= 4470mm
Provide whichever is least
Total depth = Effective depth +Effective cover
= 100 + 20 =120mm
LOADING:
Roof slab = 2 KN/M
Floor Finish = 0.6 KN/M
Dead load = 25 x 1 x 0.12 = 3 KN/M
Total load = 2 + 0.6 +3 = 5.6 KN/M
Factored load = 1.5 x 5.6 = 8.4 KN/M
DESIGN COEFFICIENTS
Lx =4.47m
Ly = 5.67m
Ly/Lx = 5.67/4.47 = 1.27
From table 26 of IS-456:2000
Positive moment:
αx = 0.038
αy = 0.028
Negative moment:
αx = 0.050
αy = 0.037
Moment per unit width is given by the following equation:
Mx = αx w 𝑙𝑥 2
My= αy w 𝑙𝑥 2
Positive moments:
Along shorter direction: Mx = αx w 𝑙𝑥 2
= 0.038 x 8.4 x 4.472
= 6.055 KN-M
Along longer direction: My= αy w 𝑙𝑥 2
= 0.028 x 8.4 x 4.472
= 4.427 KN-M
Negative moments:
Along shorter direction: Mx = αx w 𝑙𝑥 2
= 0.050 x 8.4 x 4.472
= 7.95 KN-M
Along longer direction: My= αy w 𝑙𝑥 2
= 0.037 x 8.4 x 4.472
= 5.850 KN-M
By knowing the limiting depth by equating maximum moment to mu limit
Mu = mu limit
7.95 x 10⁶ = 0.138 x fck x 𝑏𝑑 2
7.95 x 10⁶ = 0.138 x 20 x 1000 x 𝑑 2
d = 53.67 mm
The limiting depth = 100mm
Ast = 231.38𝑚𝑚2 .
Assume dia of bar = 10mm
231.38
Number of bars = π
×102
4
= 3 nos
Ast provided = 235.61𝑚𝑚2 .
Spacing of bars:
𝑎𝑠𝑡 𝑜𝑓 𝑏𝑎𝑟
= x 1000 = 295.81 mm ≅ 290 mm
ast required
=300mm
Spacing = 290mm c /c
(-my)
fy ast
Mu = 0.87 fy ast d (1- )
fck bd
415 x ast
5.85 x 10⁶ = 0.87 x 415 x ast x 100 (1- )
20 x 100x1000
Ast = 195.34𝑚𝑚2 .
Assume dia of bar = 10mm
195.34
Number of bars = π = 3 no’s
×102
4
= 3d = 3x100 = 300mm
=300mm
Spacing = 210mm c/c
Positive reinforcement (+mx)
fy ast
Mu = 0.87 fy ast d (1- )
fck bd
415 x ast
6.05x 10⁶ = 0.87 x 415 x ast x 100 (1- )
20 x 100x1000
Ast= 195.13𝑚𝑚2 .
Assume dia of bar = 10mm
235.70
Number of bars = = 3 no’s
78.53
= 265.9 mm ≅ 260mm
= 3d
= 3x100
=300mm
Ast = 168.47𝑚𝑚2 .
Provide minimum ast = 0.12% of gross cross sectional area
= 0.12/100 x 120x1000
= 144𝑚𝑚2 .
Assume dia of bar = 10mm
168
Number of bars = ( )
78.53
= 3nos
Ast provided = 235.61𝑚𝑚2
Spacing of bars:
𝑎𝑠𝑡 𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑
x 1000
ast required
= 265.81 mm ≅ 260mm
= 3d
= 3x100
=300mm
300mm
= 240.70 N/𝑚𝑚2
=0.261%
Maximum permitted value = 2 x Basic value (From figure 4 of IS 456:2000)
= 1.7 x 26
=44
Here 43<44
Hence the section is safe
BAR BENDING SCHEDULE :-
TOTAL
TOTAL UNIT WEIGHT IN
S.No. DESCRIPTION DIAMETER LENGTH NUMBERS LENGTH WEIGHT KG
1 LONGER SPAN
(a)Main straight
bar 10 11.05 18 198.9 0.62 123.32
(b)Main cranked
bar 10 11.47 18 206.46 0.62 128.01
Assume cover as 25 mm
Overall depth =282.67 + 25 = 307.67mm ≅ 310 mm
LOADS
Dead load = 0.23 × 0.31 × 25 = 1.78 KN/m
Factored Dead load =1.78 x 1.5 = 2.67 KN/m
Factored Live load = 8.4 KN/m
Total factored load = 2.67 + 8.4 = 11.07 KN/m
BENDING MOMENT
𝑤𝑙 2 11.07 𝑋 4.472
=
8 8
= 27.65 KN.m
SHEAR FORCE
𝑤𝑙 11.07 𝑋 4.47
=
2 2
= 24.74 KN
DEPTH OF SECTION:-
Equate greater Mud to Mu(limit)
Mud = Mu(limit)
27.65 × 106 = Qubd2
27.65 × 106 = 2.76 × 230 × d2
27.65×106
d= √
2.76×230
REINFORCEMENT
fy Ast
Mu = 0.87fyAstd[1 − ]
fckbd
415×𝐴𝑠𝑡
27.65 × 106 = 0.87× 415 × 𝐴𝑠𝑡 × 285 [1 − ]
20×230×285
Ast = 296.54 mm2
Assume # 12mm
A𝑠𝑡 296.54
No. of bars = =𝜋 = 2.62 ≅ 3 nos
𝑎𝑠𝑡 ×122
4
𝜋
Ast = 3× × 122 = 339.29mm2
4
So provide 3 # 12mm
DEFLECTION CHECK
339.29
% of Ast @ mid span = × 100 = 0.52%
230×285
Required A𝑠𝑡
fs =0.58fy
𝑃𝑟𝑜𝑣𝑖𝑑𝑒𝑑𝐴𝑠𝑡
296.54
fs =0.58 fy = 210.37 N/mm2
339.29
M.F. = 1.5
B.V. = 20
l 4470
= = 15.68
d 285
l
< Maximum Permissible value
d
𝑉𝑢
Nominal shear stress (𝜏v) =
𝑏𝑑
24.74 𝑥103
=
230𝑥285
= 0.377 N/mm2
Percentage of steel:
𝜋
2𝑋 𝑋 122
4
% Of AST = X 100
230 𝑋 285
= 0.34 %
= 0.403
𝜏v < 𝜏c
= 221.92 ≅ 220 mm
0.75 x d = 0.75 X 285
= 213.75 mm ≅ 210 mm
300 mm
Provide stirrups 6 mm ∅ @ 210 mm c/c
No of Total
Description Dia of bar Length of bars length Wt/meter `Total weight
of bars in
of bar in mm bar in m m in Kg/m Kg
1 Main straight bar 12 11.06 2 22.12 0.89 19.68
`
5440
text here54jij
5440
= 362.67𝑚𝑚
15
Assume cover as 25 mm
Overall depth = 362.67 + 25 = 387.67mm ≅ 390 mm
BENDING MOMENT
𝑤𝑙 2 11.76 𝑋 5.672
=
8 8
= 47.26 KN.m
SHEAR FORCE
𝑤𝑙 11.76 𝑋 4.47
=
2 2
= 33.34 KN
DEPTH OF SECTION:-
Equate greater Mud to Mu(limit)
Mud = Mu(limit)
47.26 × 106 = Qubd2
47.26 × 106 = 2.76 × 230 × d2
47.26×106
d= √
2.76×230
415×𝐴𝑠𝑡
47.26 × 106 = 0.87× 415 × 𝐴𝑠𝑡 × 365 [1 − ]
20×230×365
Assume # 12mm
A𝑠𝑡 397.72
No. of bars = =𝜋 = 3.51≅ 4 nos
𝑎𝑠𝑡 ×122
4
𝜋
Ast = 4× × 122 =452.39mm2
4
So provide 4 # 12mm
DEFLECTION CHECK
352.39
% of Ast @ mid span = × 100 = 0.54%
230×365
Required A𝑠𝑡
fs =0.58fy
𝑃𝑟𝑜𝑣𝑖𝑑𝑒𝑑𝐴𝑠𝑡
397.72
fs =0.58 fy = 211.61 N/mm2
452.39
M.F. = 1.5
B.V. = 20
l 5670
= = 15.53
d 365
l
< Maximum Permissible value
d
𝑉𝑢
Nominal shear stress (𝜏v) =
𝑏𝑑
33.34 𝑥103
=
230𝑥365
= 0.4 N/mm2
Percentage of steel:
𝜋
2𝑋 𝑋 122
4
% Of AST = X 100
230 𝑋 285
= 0.34 %
= 0.403
𝜏v < 𝜏c
= 221.92 ≅ 220 mm
0.75 x d = 0.75 X 365
= 273.75 mm ≅ 270 mm
300 mm
Provide stirrups 6 mm ∅ @ 220 mm c/c
BAR BENDING SCHEDULE :-
No of Total `Total
Description Dia of bar Length of bars length Wt/meter weight
of bars
of bar in mm bar in m in m in Kg/m kg
1 Main straight bar 12 8.96 2 17.92 0.89 15.95
`
2 Main cranked bar 12 9.52 2 19.04 0.89 16.95
CLEAR SPANS:
For Bm14 = 2070 mm
For Bm13 = 4240 mm
For Bm12 = 3870 mm
EFFECTIVE LENGTHS:
Effective length Bm14
230 230
(2) Centre to Centre distance =2070+ + = 2300 mm
2 2
= 9.65KN/m
= 17.89 KN/m
Area effected on Bm12 = 8.152 𝑚2
𝑒𝑓𝑓𝑒𝑐𝑡𝑒𝑑 𝑎𝑟𝑒𝑎×𝑓𝑎𝑐𝑡𝑜𝑟𝑒𝑑 𝑙𝑜𝑎𝑑 𝑜𝑛 𝑠𝑙𝑎𝑏
Load on Bm8 (wl) =
𝑒𝑓𝑓𝑒𝑐𝑡𝑖𝑣𝑒 𝑙𝑒𝑛𝑔𝑡ℎ
8.152×8.4
=
4.1
= 16.705 KN/m
BREADTH OF THE FLANGE:
AS PER IS 456:2000 CLAUSE: 23.1.2
L0
For T- beam bf = + bw+ 6Df
6
4470
For Bm14 = + 230 + 6 x120
6
= 1695 mm
Effective breadth =1695 mm
For xu:
Assume xu lies within the flange
Equate compressive forces to tensile forces
0.36fck bf xu = 0.87fy Ast
0.36 x 20 x 1695 x Xu = 0.87 x415 x Ast
0.87 x415 x Ast
Xu =
0.36 x 20 x 1695
= 0.029 Ast
MOMENTS:
For Bm14:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
12 10
2.67 𝑋2.32 9.65𝑋 2.32
= + = 6.28 KN-m
12 10
For Bm13:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
16 12
2.67𝑋4.472 17.89𝑋4.472
= +
16 12
= 33.12 KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = − −
10 9
2.67𝑋4.472 17.89𝑋 4.472
= − −
10 9
= - 38.74 KN-m
For Bm12:
POSITIVE MOMENT AT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
12 10
= 31.81 KN-m
Max Positive Moment = 33.12 KN-m
Max Negative Moment = 38.74 KN-m
Mu = 0.87fyAst[d-0.42Xu]
38.74x106=0.87 x 415 x Ast x[280-0.42x0.029Ast]
Ast = 389.92 mm2
No. of bars:
Assume diameter of bar = 12 mm
𝐴𝑠𝑡 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
No. of bars= 𝜋
𝑋𝑑 2
4
389.92
=𝜋
𝑋122
4
=3.44≅4 No’s
𝜋
Ast provided = 4x x122=452.39 mm2
4
MOMENT OF RESISTANCE:
MR = 0.36fck bf Xu [d-0.42Xu]
= 0.36X20X1695X13.12[310-0.42X13.12]
=39.14 KN-m > 38.74 KN-m
Hence the section is safe
CHECK FOR DEFLECTION:
𝑙 4470
Provided = = 15.96
𝑑 280
230
Ratio of web width to flange width =
1695
=0.14
From fig – 6 of IS 456 2000, reduction factor =0.8
Max. permitted value = reduction factor X basic value
= 0.8 X 26
= 20.8
15.96 < 20.8
Hence the section is safe
SHEAR REINFORCEMENT:
For Bm14:
Vu (end)=0.4 wdl +0.45 wl l
=0.4 X 2.67 X 2.3 + 0.45 X 9.65 X 2.3 = 12.44 KN
Vu(outer) =0.6wd l+0.6wl l
=0.6 X 2.67 X 2.3 + 0.6 X 9.65 X 2.3
= 17 KN
For Bm13:
Vu=0.55 wd l+0.6wl l
=0.55 X 2.67 X 4.47 + 0.6 X 17.89 X 4.47
= 54.54 KN
For Bm12:
Vu(outer) =0.6wd l+0.6wl l
=0.6 X 2.67 X 4.1 + 0.6 X 16.705 X4.1
=47.66 KN
Vu(end) =0.4wd l+0.45wl l
=0.4 X 2.67 X 4.1 + 0.45 X 16.705 X 4.1
= 35.2 KN
= 0.846 N/mm2
Percentage of steel:
𝜋
2𝑋 𝑋 122
4
% of AST = X 100
230 𝑋 280
=0.35%
= 0.43
𝜏v > 𝜏c
The nominal shear stress is greater than design shear stress
VUS = VU - 𝜏c bd
= 54.54X103 – 0.43(230 X 280)
= 26.78 KN
For stirrups:
26.78
Vus =
2
= 13.39 KN
Spacing:
Assume two legged vertical stirrups of 6 mm dia
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62 𝑋 280
4
=
13.39 𝑋 103
= 213.47 mm ≅ 210 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62
4
=
0.4 𝑋 230
= 221.92 ≅ 220 mm
0.75 x d = 0.75 X 280
= 210 mm
300 mm
CLEAR SPANS:
For Bm3 = 2870 mm
For Bm4 = 5440 mm
EFFECTIVE LENGTHS:
Effective length Bm14
230 230
(4) Centre to Centre distance =2870+ + = 3100 mm
2 2
= 22.35KN/m
= 13.01 KN/m
= 1895 mm
Effective breadth =1895 mm
For xu:
Assume xu lies within the flange
Equate compressive forces to tensile forces
0.36fck bf xu = 0.87fy Ast
0.36 x 20 x 1895 x Xu = 0.87 x415 x Ast
0.87 x415 x Ast
Xu =
0.36 x 20 x 1895
= 0.026 Ast
MOMENTS:
For Bm4:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
10 10
3.53 𝑋5.672 22.35𝑋 2.32
= + = 83.25KN-m
10 10
For Bm3:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
10 10
3.53𝑋3.12 13.01𝑋3.12
= +
10 10
= 15.89 KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = − −
8 8
= - 104.0 KN-m
Mu = 0.87fyAst[d-0.42Xu]
104.0x106=0.87 x 415 x Ast x[410-0.42x0.026Ast]
Ast = 716.22 mm2
No. of bars:
Assume diameter of bar = 16 mm
𝐴𝑠𝑡 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
No. of bars= 𝜋
𝑋𝑑 2
4
716.22
=𝜋
𝑋162
4
=3.56≅4 No’s
𝜋
Ast provided = 4x x162=804.24 mm2
4
MOMENT OF RESISTANCE:
MR = 0.36fck bf Xu [d-0.42Xu]
= 0.36X20X1895X23.32[410-0.42X23.42]
=127.32 KN-m > 104.0 KN-m
Hence the section is safe
SHEAR REINFORCEMENT:
For Bm4:
Vu (end)=0.4 wdl +0.45 wl l
=0.4 X 3.53 X 5.67 + 0.45 X 22.36 X 5.67
= 65.07 KN
Vu(outer) =0.5wd l+0.6wl l
=0.5 X 3.53 X 5.67 + 0.6 X 22.36 X 5.67
= 22.01 KN
For Bm3:
Vu=0.4 wd l+0.6wl l
=0.4 X 3.53 X 3.1 + 0.45 X 13.017 X 3.1
= 22.54 KN
= 0.69 N/mm2
Percentage of steel:
𝜋
2𝑋 𝑋 162
4
% of AST = X 100
230 𝑋 410
=0.43%
= 0.45
𝜏v > 𝜏c
The nominal shear stress is greater than design shear stress
VUS = VU - 𝜏c bd
= 65.07 – 0.45(0.23 X 0.41)
= 22.64 KN
For stirrups:
22.64
Vus =
2
= 11.32 KN
Spacing:
Assume two legged vertical stirrups of 6 mm dia
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62 𝑋 410
4
=
11.32 𝑋 103
= 739.48 mm ≅ 730 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62
4
=
0.4 𝑋 230
= 221.92 ≅ 220 mm
0.75 x d = 0.75 X 410
= 300 mm
300 mm
Slenderness ratio
effective length kl
= =
least lateral dimension D
2145
= = 9.32 < 12
230
Minimum eccentricity
kl D
emin = +
500 30
2145 230
= + = 11.95 < 20 𝑚𝑚
500 30
Loads
From Bm3 = 0.5w10l10 =0.5×13.017×3.1 = 20.18 KN
From Bm4 = 0.5w9l9 = 0.5×22.367×5.67 = 63.4 KN
From Bm 12= 0.6w6l6 = 0.6×16.705×4.1 = 41.08 KN
From Bm13 = 0.55w13l13 =0.55×17.89×4.47 = 43.98 KN
Total load = 20.18+63.4+41.08+43.98
=168.64 KN
Let us assume that the cross -section of column as square with 230 × 230 𝑚𝑚
Ag = 230 X 230 =52900 𝑚𝑚 2
Load carrying capacity of column
Pu = 0.4fckAc + 0.67fyAsc
Asc = -942.64 𝑚𝑚 2
= 423.2 𝑚𝑚 2`
Dia of bar :
𝜋
4x x𝑑 2 =423.2
4
d = 11.60≅12 𝑚𝑚
Ast provided
π
Asc =4× ×122 = 452.39 𝑚𝑚 2
4
Lateral ties
Pitch
Least lateral dimension = 230 𝑚𝑚
16d = 16×12 = 192mm≅ 190 𝑚𝑚
300 𝑚𝑚
Diameter
1
×largest diameter = 3 𝑚𝑚
4
6 𝑚𝑚
𝐹𝐶𝐾 = 20 N/𝑚𝑚2
𝐹𝑦 = 415 N/𝑚𝑚2
Safe bearing capacity of soil = 150 KN / 𝑚2
Assume seif weight of footing is 10% of total load
10
I,e 𝑤𝑓 = x255 = 25.5 KN
100
= 194 KN/𝑚2
Critical section for maximum B.M lies at the base of the column
( from clause 3 .4.2.3.2 of IS 456)
B.M at the base of the column = force x distance
Total force acting on the hatched area multiplied by distance between the C.G of
force and face of the column.
𝑞 × 𝐵 ×(𝐵−𝑏)2
B.M =
8
194 ×1.4 ×(1.4−0.23)2
= = 46.47 KN-m
8
DEPTH OF FOOTING
Considering b = 1400 mm
B.M. = Q x b x𝑑 2
46.47 x 106 = 2.76 x 1400 x 𝑑 2
d =109.66 mm ≅ 110 mm
depth footing = 2 × 110
= 220mm
Effective depth of footing = 220mm
Effective cover = 50mm
Overall depth = 220+50 =270mm
REINFORCEMENT
𝐴 𝑠𝑡 ×𝑓𝑦
𝑀𝑢𝑑 =0.87 x𝑓𝑦 x 𝐴𝑠𝑡 x d (1- )
𝑓𝑐𝑘 ×𝑏×𝑑
𝐴𝑠𝑡 × 415
46.47x106 =0.87 x 415 x 𝐴𝑠𝑡 x 220 x(1- )
20 × 1400 ×220
Assme # 12mm
π
×122
4
Spacing = 𝑋 1400 = 259.52 ≅ 250 mm
610.11
= 99.134 KN
Vu
Nominal shear stress τv =
bd
99.134×103
=
1400×220
= 0.322 N/mm2
610.11
Percentage of steel = X 100
1400 𝑋 220
= 0.198 %
Design shear strength of the concrete (τc)
0.15 – 0.28
0.25 – 0.36
τc = 0.318 N/mm2
Permissible shear stress (kτc) depending upon the thickness of
slab, grade of concrete and % of Ast
kτc = 1.09 X 0.312 = 0.346 N/mm2
τv < kτc
hence section is safe
CHECK FOR FOR DIAGONAL SHEAR / 2WAY SHEAR /PUNCHING
d
The critical plane lies at a distance of around face of column
2
340.955X 103
= = 0.861 N/mm2
4(230+220)220
ks = 0.5+1 = 1.5
255 X 103
=
230×230
= 4.82 N/mm2
A1
Permissible bearing stress = 0.45 × fck × √
A2
(4×220+230)2
√ =4.82 > 2
230×230
A1
So take √ =2
A2
= 0.45 × 20 × 2
= 18 N/mm2
Nominal shear stress < permissible bearing stress
Hence section is safe
No of Total `Total
Description Dia of bar Length of bars length Wt/meter weight
of bars
of bar in mm bar in m in m in Kg/m kg
Effective length
(8) Centre to centre distance = 4240 + 230 = 4470 mm
(9) Clear span + effective depth = 4240 + 285 = 4525 mm
= 21.65 KN/m
LOAD ON PB 2:
14.61×19×0.23×1.5
= + 0.23 × 0.31 × 25 × 1.5
4.47
= 24.1 KN/m
LOAD ON PB 3:
13.50×19×0.23×1.5
= + 0.23 × 0.31 × 25 × 1.5
4.1
= 24.26 KN/m
MOMENTS :-
At middle of end span :
1
× 21.65 × 2.32 = 9.54 KN.m
12
DEPTH OF SECTION:-
Equate greater Mud to Mu(limit)
Mud = Mu(limit)
48.15 × 106 = Qu.bd2
48.15 × 106 = 2.76 × 230 × d2
11.243×106
d= √
2.76×230
415×𝐴𝑠𝑡
48.15 × 106 = 0.87× 415 × 𝐴𝑠𝑡 × 285 [1 − ]
20×230×285
𝜋
Ast = 3× × 162 = 603.18 mm2
4
So provide 3 # 16 mm
SHEAR CHECK
= 0.99 N/𝑚𝑚2
Percentage of steel:
𝜋
𝑋 162 𝑋 2
4
% Of AST = X 100
230 𝑋 285
= 0.613 %
For stirrups:
30.88
Vus =
2
= 15.44 KN
Spacing:
Assume two legged vertical stirrups of 6 mm dia
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62 𝑋 285
4
=
15.44 𝑋 103
= 376.86 mm ≅ 370 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62
4
=
0.4 𝑋 230
= 221.92 ≅ 220 mm
0.75 x d = 0.75 X 285
= 213.75 mm ≅ 210 mm
300 mm
TOTAL
TOTAL UNIT WEIGHT
S.No. DESCRIPTION DIAMETER NUMBERS LENGTH LENGTH WEIGHT IN KG
1 ALONG LONGER SPAN
(a)Straight bar 16 6 10.95 65.7 1.58 103.82
(b)Cranked bar 16 3 12.51 37.53 1.58 59.29
(c) Stirrups 6 54 1.024 55.29 0.22 12.16
(d)Hanger bars 10 6 10.95 65.7 0.62 103.82
(e)Negative steel at
support 10 8 1.34 10.72 0.62 6.64
2 ALONG SHORTER SPAN
(a)Straight bar 16 8 8.95 71.6 1.58 113.13
(b)Cranked bar 16 4 10.51 42.04 1.58 66.42
(c) Stirrups 6 44 1.024 45.06 0.22 9.91
(d)Hanger bars 10 8 8.95 71.6 0.62 44.39
(e)Negative steel at
support 10 8 1.7 13.6 0.62 8.43
QUANTITY= 528.01kg
RC LINTEL DESIGN
Required data :
Width of opening (S) =1500 mm
Bearing on each side (b) =150 mm
Height of masonry above opening (H) =1500 mm
Wall thickness (Tw) =230 mm
Masonry weight =19 KN/m³
Effective cover =20 mm
Characteristic compressive strength of concrete (fck) =15 N/mm²
Yeild stress in steel (fy) =415 N/mm²
Stiffness factor (S.f.) =12
From stiffness consideration :
(L/d) = 12
d = 125 mm
Revised (d) = 100 mm
over all depth (D) = 120 mm
Effective span :
Effective span shall be taken as per clause 22.2 (a)
1. Effective span = clear span + effective depth
Effective span (L) = (S) + d
= 1620 mm
2. Effective span = centre to centre supports
Effective span (L) = (S) + (2(b/2))
= 1730 mm
Effective span should be the least
Effective span (L) = 1620 mm
Check for type of loading
Height of triangle = Effective span x SIN 60
h = l x SIN 60
h = 1402.961 mm
h = 1.402961 m
For triangular loading,
1.25 times the height of triangle should be less than height of masonry above opening
(1.25 x h) < H
1.753701 < 1.5 m
Hence it is a triangular loading
Load:
Weight of masonry (Wm) = 4.966061597 KN
Dead load of lintel (Wd) = 0.69 KN/m
Bending moment (Mu) = ((Wm x l)/6)+((Wd x l x l)/8)
= 1.567191 KN-m
Factored Bending moment (Mud) = 2.350786697 KN-m
shear force = ((Wm/2)+((Wd x L)/2))
= 3.041930799 KN
Factored shear force (VU) = 4.562896198 KN
Minimum depth reuired to resist bending moment:
B.M.= 0.138 x fck x b x (dxd)
d= 70.267988 mm
Revised effective depth d = 120 mm
over all depth D = 140 mm
Steel required:
B.M.= 0.87xfyxdxAst(1-((fyxAst)/(fckxbxd)))
43.43065 ( AstxAst ) + -43326 Ast + 2350787 : 0 (quadratic eq)
Ast
Ast = 43767.213 mm² = 57.58177564 mm²
Ast = 57.581776 mm²
Check for minimum tension reinforcement:
Ast/(b x d) = (0.85/fy)
Ast = 58.885542 mm²
No. of bars = 1.172085 nos (using 8 mm dia bars)
= 2 < 3nos
Required Ast = 100.48 mm²
Hence provide a minimum of 8mm dia bars 3nos
Provided Ast = 150.72 mm²
Check for deflection:
(L/d) Provided = 13.5
(L/d) permitted = Modification factor x Basic value
For simply supported beams basic value = 20
% Max Ast = (Ast/(bxd))x100 = 0.546086957 %
Fs = 0.58xfyx(Ast required/Ast provided) = 91.95816 N/mm²
= 160.46667
Modification Factor (M.F.) = 2 (input)
(L/d) permitted = 40
Check for shear:
Ast at support = 100.48 mm²
Factored shear force (Vu)= 4.562896 KN
Nominal shear stress (τv) = (Vu/(bxd)) 0.165322326 N/mm²
(As/(bxd))X100 = 0.364058
τc is calculated with respect to %Ast at support and fck from table 19 of IS456
X = 0.364058
X1 = 0.46 X2 = 0.54 (input)
Y1 = 0.5 Y2 = 0.75
τc = 0.416499 N/mm²
Shear resistance by concrete = τc x b xd
= 11495.36 N
= 11.49536 KN
τv < τc hence it is safe in shear,provide the stirrups to hold the bars
Provide 6 mm dia bars two legged vertical stirrups
Area of stirrup(Asv)= 56.52 mm²
1.Minimum shear reinforcement:
Sv = (0.87 x fy x Asv)/(0.4 x b)
= 221.8103 mm
2.Maximum shear reinforcement:
Sv = 0.75 x d
= 90 mm
3.Maximum shear reinforcement:
Sv = 300 mm
Hence provide 6 mm dia two legged vertical stirrups at spacing of
90mm c/c
DESIGN OF SUNSHADE
EFFECTIVE DEPTH:
By stiffness considerations,
𝑙
Assume =8
𝑑
600
d = =75 mm
8
𝑊 × 𝑙2
Moment on sunshade =
2
2.16 𝑋 0.6752
= = 0.49 KN – m
2
MAIN STEEL:
𝐴𝑠𝑡 required to resist maximum B.M
fy Ast
Mu= 0.87fyAstd[1 − ]
fckbd
415×𝐴𝑠𝑡
0.49 × 106 = 0.87× 415 × 𝐴𝑠𝑡 × 75 [1 − ]
20×230×75
= 90 mm2
𝜋
Ast provided = 4 × ×62
4
= 113.1 mm2
Main steel :
Spacing of bars
𝑎𝑠𝑡 𝑜𝑓 𝑜𝑛𝑒 𝑏𝑎𝑟
= x 1000
ast provided
𝜋
𝑋62
4
=
113.1
= 249.99 ≅ 250 mm
= 3d
= 3x 75
= 225 mm
=300 mm
So provide 6 mm dia. stirrups at 225 mm c/c
DISTRIBUTION STEEL:
Minimum 𝐴𝑠𝑡 provided =113.1 𝑚𝑚2
Spacing of bars:
𝑎𝑠𝑡 𝑜𝑓 𝑜𝑛𝑒 𝑏𝑎𝑟
= x 1000
ast provided
𝜋 2
𝑥6
4
=
113.1
=249.99 mm ≅ 250 𝑚𝑚
=5d
= 5x 75
= 375 mm
= 450 mm
D1
TOILET
D2 1.5X1.2
D1 D1
D1 A
TOILET
A DressD1
2.0X1.5
D1 D1
CH.BED
HALL ROOM
5.1x4.6
3.84x3.0 15.4600 18.0000
D1 D1 MAIN
BEDROOM
DRAWING 3.84x4.1
ROOM
5.1x4.1
TOILET
D21.5x1.2
MD
1.5000
PLAN
DESIGN OF SLABS
FOR PANEL 4
Clear shorter span Lx = 4600 mm
Clear longer span Ly = 5100mm
Longer span 5100
LONGER SPAN BY SHORTER SPAN RATIO = =
Shorter span 4600
=1.108<2.
By Stiffness consideration
Lx
44 =
𝑑
4600
𝑑=
45
d =104.54mm~ 105mm
EFFECTIVE SPAN :
Ly = Longer span + effective depth
= 5100 + 110
= 5210mm
= loner span + centre to centre distance
= 5100 + 230/2
Ly = 5215mm
Lx = Shorter span + Effective depth
= 4600 + 110
= 4710mm
= shorter span + c/c distance
= 4600 + 230/2
= 4715mm
Providing the least of the effective lengths obtained,LX=4710,LY=5210
Total depth = Effective cover + effective ecover
= 110+20= 130 mm
LOADING :
Roof slab = 1.5 KN/M
Floor Finish = 0.6 KN/M
Dead load = 25 x 1 x 0.13 = 3.25 KN/M
Total load =1.5 + 1.0 +3.25 = 5.35 KN/M
Factored load = 1.5 x 5.35 = 8.025KN/M
DESIGN COEFFICIENTS
Lx =4.71m
Ly = 5.21m
Ly/Lx = 5.21/4.71 = 1.106
From table 26 of IS-456:2000
Postive moment :
αx = 0.03224
5 αy = 0.028
Negative moment :
αx = 0.0433
αy = 0.037
Moment per unit width are given by the following equation :
Mx = αx w 𝑙𝑥 2
My= αy w 𝑙𝑥 2
Postive moments :
Along shorter direction : Mx = αx w 𝑙𝑥 2
= 0.03224 x 8.025 x 4.712
= 5.74KN-M
Along longer direction : My= αy w 𝑙𝑥 2
= 0.028 x 8.025 x 4.712
= 4.98 KN-M
Negative moments :
Along shorter direction : Mx = αx w 𝑙𝑥 2
= 0.0433 x 8.025 x 4.712
= 7.709 KN-M
Along longer direction : My= αy w 𝑙𝑥 2
= 0.037 x 8.025 x 4.712
= 6.58 KN-M
By knowing the limiting depth by equating maximum moment to mu limit
Mu = mu limit
7.709x 10⁶ = 0.138 x fck x 𝑏𝑑 2
7.709 x 10⁶ = 0.138 x 20 x 1000 x 𝑑 2
d = 52.849mm
The limiting depth = 110mm
Hence, assume that the section is under reinforced section
Negative reinforcement : (-mx)
fy ast
Mu = 0.87 fy ast d (1- )
fck bd
415 x ast
7.709 x 10⁶ = 0.87 x 415 x ast x 110 ( 1- )
20 x 110x1000
= 2 nos
Ast provided = 226.195𝑚𝑚2 .
Spacing of bars :
𝑎𝑠𝑡 𝑜𝑓 𝑏𝑎𝑟
= x 1000 = 560.48 mm ≅ 560 mm
ast required
=300mm
Spacing = 300mm c /c
(-my)
fy ast
Mu = 0.87 fy ast d (1- )
fck bd
415 x ast
6.587 x 10⁶ = 0.87 x 415 x ast x 100 ( 1- )
20 x 110x1000
171.396
Number of bars = π = 3 nos
×102
4
= 3d = 3x110 = 330mm
=300mm
Spacing = 300mm c/c
Positive reinforcement
(+mx)
fy ast
Mu = 0.87 fy ast d (1- )
fck bd
415 x ast
5.74x 10⁶ = 0.87 x 415 x ast x 110 ( 1- )
20 x 110x1000
Ast=148.69 𝑚𝑚2 .
Assume dia of bar = 12mm
148.69
Number of bars = = 2 nos
50.265
= 542.5 mm ≅ 540mm
= 3d
= 3x110
=300mm
=300mm
(+my)
fy ast
Mu = 0.87 fy ast d (1- )
fck bd
415 x ast
4.98x 10⁶ = 0.87 x 415 x ast x 110 ( 1- )
20 x 110x1000
= 2nos
Ast provided = 157.08𝑚𝑚2 .
Spacing of bars :
𝑎𝑠𝑡 𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑
= x 1000
ast required
= 499.9 mm ≅ 450mm
= 3d
= 3x110
=330mm
=300mm
=0.156%
Maximum permitted value = Modification factor x Basic value
= 1.7 x 26
=44.2
: 44<44.2
Hence the section is safe in deflection check.
Total wt 617.77505
=
618KG
CLEAR SPANS:
For Bm11 = 4100 mm
For Bm12 = 4600 mm
For Bm13 = 4100 mm
EFFECTIVE LENGTHS:
Effective length Bm11
(10) Centre to Centre distance
230 230
=4600+ + = 4830 mm
2 2
(11) Clear span + effective depth =
4600+300 = 4900mm
=17.34 KN/m
=18.89 KN/m
=17.34 KN/m
.
KN/m
= 200≅ 230 mm
LOADS:
Dead load = 0.23 x 0.33 x 1 x 25 = 1.89 KN/m
Factored dead load = 1.5 x 1.955
= 2.84 KN/m
Imposed load on Bm11 =17.34 KN/m9
Total load on Bm11 (w1) = 17.34 + 2.84
= 20.18 KN
Imposed load on Bm12 = 18.89 KN/m
Total load on Bm12 (W2) = 18.89 + 2.84
= 21.73 KN
Case (i)
4330
For Bm11 = + 230 + 6 x130
6
= 1731.67≅ 1750 mm
4830
For Bm9 = + 230 + 6 x130
6
= 1815 mm
4330
For Bm8 = + 230 + 6 x130
6
= 1731.67≅ 1750 mm
Case (ii)
4330+4830+4330
Bf =
3
=4496.67 ≅ 4500 mm
Effective breadth = least of above 2 cases =1815 mm
For xu:
Assume xu lies within the flange
Equate compressive forces to tensile forces
0.36fck bf xu = 0.87fy Ast
0.36 x 20 x 1780 x Xu = 0.87 x415 x Ast
0.87 x415 x Ast
Xu =
0.36 x 20 x 1780
= 0.027Ast
MOMENTS:
For Bm11:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑓𝑑 𝑙 2 𝑓𝑙 𝑙 2
Mu = +
12 10
= 36.95 KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = − −
10 9
2.84 𝑋4.832 18.89𝑋 4.832
= − −
10 9
= 55.59 KN-m
For Bm12:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = +
12 10
2.84 𝑋4.832 18.89𝑋 4.832
= +
12 10
= 49.58N-m
NEGATIVE MOMENT AT SUPPORT:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = − −
10 9
= 55.59KN-m
For Bm13:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = +
12 10
2.84 𝑋4.332 17.34𝑋 4.332
= + = 36.95 KN-m
12 10
No. of bars:
For positive moment:
Assume diameter of bar = 16 mm
𝐴𝑠𝑡 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
No. of bars= 𝜋
𝑋𝑑 2
4
468.53
=𝜋
𝑋162
4
=2.33≅3 No’s
𝜋
Ast provided = 3x x162=603.185 mm2
4
523.59
=𝜋
𝑋162
4
=2.6≅3No’s
𝜋
Ast provided = 3x x162=603.18mm2
4
MOMENT OF RESISTANCE:
MR = 0.36fck bf Xu [d-0.42Xu]
= 0.36X20X1815X16.30[300-0.42X16.30]
=62.44 > 49.58 KN-m
Hence the section is safe
SHEAR REINFORCEMENT:
For Bm11:
Vu =0.4wl+0.45wl
=0.4 X 2.84X 4.33 + 0.45 X 17.34 X 4.33
= 49.96 KN
Vu =0.6wl+0.6wl
=0.6 X 2.84 X 4.33 + 0.6 X 17.34X 4.33
= 52.42 KN
For Bm12:
Vu =0.55 wl+0.6wl
=0.55 X 2.84 X 4.83 + 0.6 X 18.89 X 4.83
= 62.28 KN
For Bm13:
Vu =0.6wl+0.6wl
=0.6 X 2.84X 4.33 + 0.6 X 17.34X 4.33
=52.43 KN
Vu0 =0.4wl+0.45wl
=0.4 X 2.84 X 4.33 + 0.45 X 17.34 X 4.33
= 38.71 KN
= 0.9 N/mm2
Percentage of steel:
𝜋
2𝑋 𝑋 162
4
% of AST = X 100
230 𝑋 300
= 0.58 %
= 0.51
𝜏v > 𝜏c
The nominal shear stress is greater than design shear stress
VUS = VU - 𝜏c bd
= 62.28 X 103 – 0.51(230 X 300)
= 27.09 KN
Assume bentup bars are taken 50% of shear
Vus =0.87fy Asv sin 45°
𝜋
= 0.87 X 415 X (1 X 𝑋162 ) X0.707
4
= 51.33 KN
For stirrups:
27.09
Vus =
2
= 13.55KN
Spacing:
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82 𝑋 300
4
=
27.09𝑋 103
= 369.48≅360 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82
4
=
0.4 𝑋 230
= 394.53 ≅ 390 mm
0.75 x d = 0.75 X 300
= 225 ≅ 220 mm
Provide stirrups 8 mm ∅ @ 220 mm c/c
= 0.87 %
468.53
Fs = 0.58 X 415 X
603.186
= 186.97 N/mm2
Max. permitted value = MF X basic value
= 1.25 X 26
= 32.5
16.1 < 32.5
Hence the section is safe
TOTAL : 110KG
HENCE STEEL REQUIRED FOR CONTINUOUS T BEAM IS 110KG
T-Beam
TWO
SPAN
DESIGN
Deflection check :
(L/d) Provided = 12.142857
(L/d) permitted = Reduction factor x basic value
Basic value for continuous beams = 26
Ratio of breadth of web to breadth of flange
(bw/bf) = 0.1433022
From fig 6 of IS 456:
Reduction factor = 0.8
(L/d) permitted = 20.8
Check for shear :
Ast at support = 401.92 mm²
Factored shear force (Vu1) in span1= (W1 x L1)/2
= 85.062263 KN
= 85062.263 N
Factored shear force (Vu2) in span2= (W2 x L2)/2
= 0.0538537 KN
= 53.853731 N
Nominal shear stress (τv) = (Vu/(bxd)) 0.880562 N/mm²
(As/(bxd))X100 = 0.5637027 %
τc is calculated with respect to %Ast at support and fck from table 19 of IS 456
X = 0.563703
X1 = 0.48 X2 = 0.56 (input)
Y1 = 0.5 Y2 = 0.75
τc = 0.500385
Shear resistance by concrete = τc x b x d
= 48337.177 N
= 48.337177 KN
τv > τc hence design for shear
shear reinforcement required to carry (Vus) = Vu1 - ( τc x b x d)
= 36725.0857 N
= 36.7250857 KN
Assume shear taken by the cranked bars is 50% of Vus
Stirrups has to be designed to a shear of 18362.54 N
Assume 6 mm dia bars two legged vertical stirrups
Asv = 56.52 mm²
1. Spacing of stirrups as per design shear force:
Sv = (0.87 x fy x Asv x d)/(Vus)
= 344.5073 Mm
2.Minimum shear reinforcement:
Sv = (0.87 x fy x Asv)/(0.4 x b)
= 221.8103 Mm
3.Maximum shear reinforcement:
Sv = 0.75 x d
= 315 mm
4.Maximum shear reinforcement:
Sv = 300 mm
Hence provide 6mm dia two legged vertical stirrups at a spacing of 221.810283
Bar bending shedule :
Required data :
Effective span 1 (L1) = 5330 mm
Effective span 2 (L2) = 4070 mm
Top cover = 40 mm
Bottom cover = 40 mm
Side cover = 40 mm
Support width = 230 mm
A.Main straight bar 12mm dia 2nos :
Length = Effective span(L1+L2)+2(support width/2)-2(side cover)
= 9550 mm
= 9.55 m
B.Main bent up bar 12mm dia 1nos :
Additional bent up length = 0.42 x d
where, d= (Depth of beam-top cover-bottom cover-1 dia of main bar))
= 364 mm
Length = Effective span(L1+L2)+2(support width/2)-2(side cover)+(4 x additional bent up length)
= 10161.52 mm
= 10.16152 m
C.Hanger bars 12mm dia 2nos :
Length = Effective span(L1+L2)+2(support width/2)-2(side cover)
= 9550 mm
= 9.55 m
D.Stirrups of 6mm dia at 220mm c/c :
Length = (2 x ((width of beam-(2 x side cover))+(depth of beam-top cover-bottom cover)))
= 140 mm
= 0.14 m
Spacing of stirrups = 220 mm
no.of bars = ((Effective span(L1+L2)+2(support width/2)-2(side cover))/(spacing))+1
= 44.40909 nos
= 45 nos
E.Additional main bar at support 12mm dia 1no :
Length = length of cranked bar at top portion
= (S1/8)+bw+(S2/8)-(2 x Additional bent up length)
= 1041.74 mm
= 1.04174 m
=110 KG
RECTANGULAR
BEAM DESIGN 2
SPAN
(INPUT):
Clear span-1 (S1) = 5100 mm
Clear span-2 (S2) = 3840 mm
Depth of web (or) rib (Dw) = 230 mm
Depth of flange (Df) = 130 mm
Breadth of web(bw) = 230 mm
Live load on span-1 (W1) = 10.31 KN/m
Live load on span-2 (W2) = 8.16 KN/m
Characteristic compressive strength of concrete (fck) = 20 N/mm²
Yeild stress in steel (fy) = 415 N/mm²
Effective cover (d') = 40 mm
Effective span :
From clause 22.2 (b) of IS 456 for continuous beams
(1/12) of clear span - 1 = (S1)/12
= 425 mm
(1/12) of clear span - 2 = (S2)/12
= 320 mm
Support width < (1/12) of clear shorter span
Support width < (1/12) of clear longer span
Hence,
Effective span shall be taken as per clause 22.2 (a)
1. Effective span = clear span + effective depth
Effective span - 1 (L1) = (S1) + d
= 5420 mm
Effective span - 2 (L2) = (S2) + d
= 4160 mm
2. Effective span = centre to centre supports
Effective span - 1 (L1) = (S1) + (2(bw/2))
= 5330 mm
Effective span - 2 (L2) = (S1) + (2(bw/2))
= 4070 mm
Effective span should be the least
Effective span - 1 (L1) = 5330 mm
Effective span -2 (L2) = 4070 mm
Load :
Dead load = 1.98375 KN/m
Total load on span-1 (W1) = 12.29375 KN/m
Total load on span-2 (W2) = 10.14375 KN/m
Moment :
Moment on span-1 (M1) = 26.81631 KN-m
Moment on span-2 (M2) = 12.03241 KN-m
Support moment (Ms) = 39.970055 KN-m
Maximum moment occurs at support hence consider support moment for
effective depth calculation
Factored moment at support (MuS) = 59.955082 KN-m
Minimum depth reuired to resist bending moment:
B.M.= 0.138 x fck x b x (dxd)
d= 307.32263 mm
Revised effective depth d = 310 mm
over all depth D = 350 mm
Tension reinforcement :
Area of steel at support :
B.M.= 0.87xfyxdxAst(1-((fyxAst)/(fckxbxd)))
TOTAL
WEIGHT 2X62=124KG
DESIGN OF CONTINUOUS
RECTANGULAR BEAM
BASED ON STIFFNESS CONSIDERATION:
Assume
Effective depth (d) = 340 mm
Effective cover = 30mm
Overall depth (D) = 340 + 30 = 370mm
2
Breadth (B) = x 340
3
= 226.66≅ 230 mm
CLEAR SPANS:
For Bm3 = 4100 mm
For Bm4 = 4600mm
For Bm5 = 4100 mm
EFFECTIVE LENGTHS:
Effective length Bm3
(14) Centre to Centre distance
230 230
=4100+ + = 4330mm
2 2
= 10.53 KN/m
Area effected on Bm 4 = 5.29 𝑚2
𝑒𝑓𝑓𝑒𝑐𝑡𝑒𝑑 𝑎𝑟𝑒𝑎×𝑓𝑎𝑐𝑡𝑜𝑟𝑒𝑑 𝑙𝑜𝑎𝑑 𝑜𝑛 𝑠𝑙𝑎𝑏
Not fixed Load on Bm9 ( wl ) =
𝑒𝑓𝑓𝑒𝑐𝑡𝑖𝑣𝑒 𝑙𝑒𝑛𝑔𝑡ℎ
5.29×8.47
=
4.6
= 9.7KN/m
Area effected on Bm 5 = 5.462 𝑚2
𝑒𝑓𝑓𝑒𝑐𝑡𝑒𝑑 𝑎𝑟𝑒𝑎×𝑓𝑎𝑐𝑡𝑜𝑟𝑒𝑑 𝑙𝑜𝑎𝑑 𝑜𝑛 𝑠𝑙𝑎𝑏
Load on Bm 10 (wl) =
𝑒𝑓𝑓𝑒𝑐𝑡𝑖𝑣𝑒 𝑙𝑒𝑛𝑔𝑡ℎ
5.462×8.47
=
4.67
=9.88 KN/m
MOMENTS:
For Bm 3:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
12 10
= 33.02 KN-m
For Bm4:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
12 10
3.19𝑋4.62 9.74𝑋 3.12
= +
16 12
=21.39 KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = − −
10 9
3.19𝑋4.62 9.74𝑋 462
= − −
10 9
= -37.28KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = − −
10 9
3.19𝑋4.672 9.88𝑋 4672
= − −
10 9
= 30.89 KN-m
For Bm5:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
12 10
= 27.34KN-m
Max Positive Moment = 33.02 KN-m
Max Negative Moment = 37.28KN-m
No. of bars:
For maximum steel
Assume diameter of bar = 10 mm
𝐴𝑠𝑡 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
No. of bars= 𝜋
𝑋𝑑 2
4
333.15
=𝜋
𝑋122
4
=2.15≅3 No’s
𝜋
Ast provided = 3x x122 = 339.29 mm2
4
MOMENT OF RESISTANCE:
fy Ast
MR = 0.87 fy Ast d (1- )
fck bd
415×339.29
= 0.87× 415 × 339.29 ×340(1- )
20×230×340
SHEAR REINFORCEMENT:
For Bm3:
Vu =0.4 wdl +0.45 wl l
=0.4 X 3.19 X 5.00 + 0.45 X 10.53 X 5.00
= 30.07 KN
Vu =0.6wd l+0.6wl l
=0.6 X 3.19 X 5.00 + 0.6 X10.53 X 5.00
= 41.46 KN
For Bm4:
Vu =0.55 wd l+0.6wl l
=0.55 X 3.19 X 4.6 + 0.6 X 9.74 X 4.6
= 34.91 KN
Vu =0.55wd l+0.6wl l
=0.55 X 3.19 X 4.6 + 0.6 X 9.74 X 4.6
= 34.91 KN
For Bm5:
Vu =0.6wd l+0.6wl l
=0.6 X 3.19 X 4.67+ 0.6 X 9.88 X 4.67
=36.62 KN
Vu =0.4wd l+0.45wl l
=0.4 X 3.19 X 4.67 + 0.45 X 9.88 X 4.67
= 26.72 KN
= 0.53 N/mm2
Percentage of steel:
𝜋
2𝑋 𝑋 122
4
% of AST = X 100
230 𝑋 340
= 0.28%
= 0.369
𝜏v > 𝜏c
The nominal shear stress is greater than design shear stress
VUS = VU - 𝜏c bd
= 41.6 – 0.369(230 X 340)
= 12.72 KN
For stirrups:
Vus = 12.72/2
= 6.36 KN
Spacing:
Assume two legged vertical stirrups of 6 mm dia
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62 𝑋 320
4
=
6.36 𝑋 103
= 150 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62
4
=
0.4 𝑋 230
= 221.92 mm ≅ 220mm
0.75 x d = 0.75 X 320
= 240 mm
300 mm
= 236.36 N/mm2
339.27
% of Ast = × 100
230×350
=0.32
From fig – 4 of IS 456 2000, modification factor =1.8
Max. permitted value = modification factor X basic value
= 1.45 X 26
= 37.7
13.02 < 37.7
Hence the section is safe
BENDING SCHEDULE
S NO BAR NAME DIA NOS LENGTH TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
1 Main straight bar 12 2 14.65 29.3 0.88 26.04
2 Main bentup bar 12 1 16.31 16.31 0.88 14.35
3 Hanger bar 12 2 14.65 29.3 0.88 26.04
4 Stirrups 8 68 0.88 59.84 0.39 23.64
5 Additional steel
for negative
moment
(a)for 0.3l
10 1 5.845 5.845 0.61 3.56
(b)for 0.15l
10 1 3.21 3.21 0.61 1.95
Total: 96 KG
TOTAL AMOUNT OF STEEL REQUIRED FOR REC 2 BEAMS=96X2=192KG
=192 KG
DESIGN OF ISOLATED FOOTING
STEP-1:
=1.98KN
= 212.46 KN
= 424.1 KN
424.1
Total working load on plinth = = 282.73KN
1.5
𝐹𝐶𝐾 = 20 N/𝑚𝑚2
𝐹𝑦 = 415 N/𝑚𝑚2
311.03
= =2.07 𝑚2
150
= 424.1 KN
STEP – 2
BENDING MOMENT :
𝑓𝑎𝑐𝑡𝑜𝑟 𝑙𝑜𝑎𝑑
Actual upward soil pressure (q) =𝑎𝑟𝑒𝑎 𝑜𝑓 𝑓𝑜𝑜𝑡𝑖𝑛𝑔
424.1𝑥103
= 1.6𝑋1.6
= 196 KN/𝑚2
Critical section for maximum B.M lies at the base of the column ( from clause 3.4.2.3.2 of IS 456)
Total force acting on the hatched area multiplied by distance between the C.G of force and face of the
column.
𝑞 × 𝑙 ×(𝑙−𝑎)2
B.M = 8
196 ×1.6×(1.6−0.23)2
= 8
= 57.16KN-m
STEP – 3
DEPTH OF FOOTING
Considering b = 1600mm
B.M. = Q x b x𝑑2
57.16×106 = 2.76×1500×d2
d = 117.502 mm
depth footing = 2× (the least of the above)
= 2×117.502=250mm
STEP-4
REINFORCEMENT
𝐴 𝑠𝑡 ×𝑓𝑦
𝑀𝑢𝑑 =0.87 x𝑓𝑦 x 𝐴𝑠𝑡 x d (1-𝑓 )
𝑐𝑘 ×𝑏×𝑑
𝐴𝑠𝑡 × 415
57.16x106 =0.87 x 415 x 𝐴𝑠𝑡 x 250 x(1- )
20 × 1500𝑋250
Assme # 16mm
657.161
No. of bars = π = 3.26 no.s ≅ 4no.s
×162
4
π
Actual Ast = 4×4 ×162 =804.25mm2
STEP 5
1.6−0.23
= 196×1.6×[ 2
− 0.34]
= 114.82KN
V
Nominal shear stress τv = bdu
114.82×103
= 1500×300
= 0.306N/mm2
804.24
Percentage of steel = 1500𝑋300 X 100
= 0.29%
τc = 0.33
Permissible shear stress (kτc) depending upon the thickness of slab, grade of
τv < kτc
STEP 6
=0.189×(1.52-(0.23+0.25)2)
= 381.704KN
= 4×(230+250)×250
= 480000mm2
𝑞(𝑙 2 −(𝑎+𝑑)2 )
Nominal shear force τv =
4(𝑎+𝑑)𝑑
381.704X 103
= 480000
= 0.795N/mm2
ks = 0.5+βc
230
βc = 230
=1
ks = 0.5+1 = 1.5
STEP 7
282.73 X 103
= 230×230
= 5.35N/mm2
A
Permissible bearing stress = 0.45 × fck × √A1
2
(4×250+230)2
= 0.45×20×√ 230×230
= 48.06N/mm2
= 1400 mm
=1.4 m
No .of layers
= 7.67
= 8 nos
Length=(holding into footing +(depth of footing from g.l. –bottom cover of footing )+
=5200 mm
=0.744m
No of bars = 26.57nos
=27 nos
TOTAL WT 39.676
=40KG
= 59.1 Kn-m
NEGATIVE MOMENT AT SUPPORT AB :-
𝑓𝑑 𝑙 2
Mu =
10
28.46 𝑋5.02
=
10
= 71.15KN-m
Max Moment =71.15 KN-m
DEPTH OF SECTION:-
Equate greater Mud to Mu(limit)
Mud = Mu(limit)
71.1 × 106 = Qubd2
71.1 × 106 = 2.76 × 230 × d2
71.1×106
d= √
2.76×230
D = 330 + 30
D = 360 mm
NEGATIVE REINFORCEMENT AT AB :-
fy Ast
Mu = 0.87fyAstd[1 − ]
fckbd
415×𝐴𝑠𝑡
71.1× 106 = 0.87× 415 × 𝐴𝑠𝑡 × 330 [1 − ]
20×230×330
Assume # 16mm
A𝑠𝑡 757
No. of bars = =𝜋 = 3.48 ≅ 4 nos
𝑎𝑠𝑡 ×162
4
𝜋
Ast = 4× × 162 = 804.25mm2
4
So provide 4 # 16mm
CURTAILMENT
These bars are provided over the internal support
, these bars are placed parallel to the main bars 100% of bars are provided to a
distance of 0.15l on either side from face of support and 50% of bars are taken to
a distance of 0.3l on either side from face of support.
AT CB3
From span CC3 and CB3
0.15 l = 0.15 × 5000
= 750 mm
0.3 l = 0.3 × 5000
= 1500 mm
POSITIVE REINFORCEMENT
fy Ast
Mu = 0.87fyAstd[1 − ]
fckbd
415×𝐴𝑠𝑡
59.1 × 106 = 0.87× 415 × 𝐴𝑠𝑡 × 330 [1 − ]
20×230×330
Ast = 600mm2
Assume # 16mm
A𝑠𝑡 600
No. of bars = =𝜋 = 2.82 ≅ 3 no.s
𝑎𝑠𝑡 ×162
4
𝜋
Ast = 3× × 162 = 603.A85mm2
4
So provide 3 # 16mm
SHEAR CHECK
85.38𝑥103
=
230𝑥330
= 1.11 N/𝑚𝑚2
Percentage of steel:
𝜋
2𝑋 𝑋 162
4
% Of AST = X 100
230 𝑋 330
= 0.92 %
Design shear strength of concrete:
0.75 - 0.56
0.100 - 0.62
0.06
𝜏c = 0.56 + X .17
0.25
= 0.6008N/𝑚𝑚2
𝜏v > 𝜏c
The nominal shear stress is greater than design shear stress
VUS = VU - 𝜏c bd
= 85.38X 103 – 0.6008(230 X 330)
=39.77KN
Assume bent up bars are taken 50% of shear
Vus =0.87fy Asv sin 45°
𝜋
= 0.87 X 415 X (2 X 𝑋122 ) sin 45°
4
= 57.75KN
For stirrups:
57.75
Vus =
2
= 28.875 KN
Spacing:
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82 𝑋 330
4
=
28.46𝑋 103
= 421.24 ≅ 420 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82
4
=
0.4 𝑋 230
= 394.529 ≅ 390 mm
0.75 x d = 0.75 X 320
= 240 mm
300 mm
Provide stirrups 8 mm ∅ @ 240 mm c/c
BAR BENDING SCHEDULE
S NO BAR NAME DIA NOS LENGTH TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
1 Main straight bar 16 2 13.99 27.98 1.58 44.20
2 Main bentup bar 16 1 14.75 14.75 0.88 23.30
3 Hanger bar 10 2 13.9 27.98 0.61 17.06
4 Stirrups 8 60 1.19 71.52 0.39 27.89
5 Additional steel
for negative
moment
(a)for 0.3l
16 2 5.845 11.6 1.58 18.75
(b)for 0.15l
16 2 3.21 6.3 1.58 9.95
TOTAL: 142 KG
HENCE STEEL REQUIRED FOR PLINTH BEAM SIDE=142X3=426 `KG
RC LINTEL
DESIGN :-
Required data :
Width of opening (S) = 1500 mm
Bearing on each side (b) = 150 mm
Height of masonry above opening (H) = 1500 mm
Wall thickness (Tw) = 230 mm
Masonry weight = 19 KN/m³
Effective cover = 20 mm
Characteristic compressive strength of concrete (fck) = 15 N/mm²
Yeild stress in steel (fy) = 415 N/mm²
Stiffness factor (S.f.) = 12
From stiffness consideration :
(L/d) = 12
d = 125 mm
Revised (d) = 100 mm
over all depth (D) = 120 mm
Effective span :
Effective span shall be taken as per clause 22.2 (a)
1. Effective span = clear span + effective depth
Effective span (L) = (S) + d
= 1620 mm
2. Effective span = centre to centre supports
Effective span (L) = (S) + (2(b/2))
= 1730 mm
Effective span should be the least
Effective span (L) = 1620 mm
Check for type of loading
Height of triangle = Effective span x SIN 60
h = l x SIN 60
h = 1402.961 mm
h = 1.402961 m
For triangular loading,
1.25 times the height of triangle should be less than height of masonry above opening
(1.25 x h) < H
1.753701 < 1.5 m
Hence it is a triangular loading
Load:
Weight of masonry (Wm) = 4.966061597 KN
Dead load of lintel (Wd) = 0.69 KN/m
Bending moment (Mu) = ((Wm x l)/6)+((Wd x l x l)/8)
= 1.567191 KN-m
Factored Bending moment (Mud) = 2.350786697 KN-m
shear force = ((Wm/2)+((Wd x L)/2))
= 3.041930799 KN
Factored shear force (VU) = 4.562896198 KN
Minimum depth reuired to resist bending moment:
B.M.= 0.138 x fck x b x (dxd)
d= 70.267988 mm
Revised effective depth d = 120 mm
over all depth D = 140 mm
Steel required:
B.M.= 0.87xfyxdxAst(1-((fyxAst)/(fckxbxd)))
43.43065 ( AstxAst ) + -43326 Ast + 2350787 : 0 (quadratic eq)
Ast
Ast = 43767.213 mm² = 57.58177564 mm²
Ast = 57.581776 mm²
Check for minimum tension reinforcement:
Ast/(b x d) = (0.85/fy)
Ast = 58.885542 mm²
No. of bars = 1.172085 nos (using 8 mm dia bars)
= 2 < 3nos
Required Ast = 100.48 mm²
Hence provide a minimum of 8mm dia bars 3nos
Provided Ast = 150.72 mm²
Check for deflection:
(L/d) Provided = 13.5
(L/d) permitted = Modification factor x Basic value
For simply supported beams basic value = 20
% Max Ast = (Ast/(bxd))x100 = 0.546086957 %
Fs = 0.58xfyx(Ast required/Ast provided) = 91.95816 N/mm²
= 160.46667
Modification Factor (M.F.) = 2 (input)
(L/d) permitted = 40
Check for shear:
Ast at support = 100.48 mm²
Factored shear force (Vu)= 4.562896 KN
Nominal shear stress (τv) = (Vu/(bxd)) 0.165322326 N/mm²
(As/(bxd))X100 = 0.364058
τc is calculated with respect to %Ast at support and fck from table 19 of IS456
X = 0.364058
X1 = 0.46 X2 = 0.54 (input)
Y1 = 0.5 Y2 = 0.75
τc = 0.416499 N/mm²
Shear resistance by concrete = τc x b xd
= 11495.36 N
= 11.49536 KN
τv < τc hence it is safe in shear,provide the stirrups to hold the bars
Provide 6 mm dia bars two legged vertical stirrups
Area of stirrup(Asv)= 56.52 mm²
1.Minimum shear reinforcement:
Sv = (0.87 x fy x Asv)/(0.4 x b)
= 221.8103 mm
2.Maximum shear reinforcement:
Sv = 0.75 x d
= 90 mm
3.Maximum shear reinforcement:
Sv = 300 mm
Hence provide 6 mm dia two legged vertical stirrups at spacing of 90mm c/c
DESIGN OF SUNSHADE
EFFECTIVE DEPTH:
By stiffness considerations,
𝑙
Assume 𝑑=8
600
d = =75 mm
8
𝑊 × 𝑙2
Moment on sunshade = 2
2.16 𝑋 0.6752
= = 0.49 KN – m
2
MAIN STEEL:
𝐴𝑠𝑡 required to resist maximum B.M
fy Ast
Mu= 0.87fyAstd[1 − f ]
ckbd
415×𝐴𝑠𝑡
0.49 × 106 = 0.87× 415 × 𝐴𝑠𝑡 × 75 [1 − ]
20×230×75
= 90 mm2
= 113.1 mm2
Main steel :
Spacing of bars
𝑎𝑠𝑡 𝑜𝑓 𝑜𝑛𝑒 𝑏𝑎𝑟
= x 1000
ast provided
𝜋
𝑋62
4
= 113.1
= 249.99 ≅ 250 mm
= 3d
= 3x 75
= 225 mm
=300 mm
DISTRIBUTION STEEL:
Spacing of bars:
𝑎𝑠𝑡 𝑜𝑓 𝑜𝑛𝑒 𝑏𝑎𝑟
= x 1000
ast provided
𝜋
𝑥62
4
= 113.1
=249.99 mm ≅ 250 𝑚𝑚
=5d
= 5x 75
= 375 mm
= 450 mm
=1.103
By Stiffness consideration
Lx
43 = 𝑑
4440
𝑑=
43
d =103.4mm~ 105mm
EFFECTIVE SPAN:
Ly = Longer span + effective depth
= 4900 + 105
= 5005 mm
= longer span + centre to centre distance
= 4900+230/2+230/2
= 5130 mm
Ly = 5005 mm
Lx = Shorter span + Effective depth
= 4440 + 105
= 4545 mm
= shorter span + c/c distance
= 4440 + 230/2+230/2 = 4670 mm
Provide whichever is least
Total depth = Effective cover + cover +dia of bar
= 105 + 20 +10/2 = 130 mm
LOADING:
Roof slab = 1.8 KN /M
Floor Finish = 0.6 KN/M
Dead load = 25 x 1 x 0.13 = 3.25 KN/M
Total load =1.8 + 0.6 +3.25 = 5.65 KN/M
Factored load = 1.5 x 5.65 = 8.47 KN/M
DESIGN COEFFICIENTS
Lx =4.545m
Ly = 5.005m
Ly/Lx = 5.005/4.545= 1.102
From table 26 of IS-456:2000
Positive moment:
αx = 0.04012
αy = 0.035
Negative moment:
αx = 0.0532
αy = 0.047
Moment per unit width is given by the following equation:
Mx = αx w 𝑙𝑥 2
My= αy w 𝑙𝑥 2
Positive moments:
Along shorter direction: Mx = αx w 𝑙𝑥 2
= 0.04012 x 8.475 x 4.542
= 7.02KN-M
Along longer direction: My= αy w 𝑙𝑥 2
= 0.035 x 8.47 x 4.542
= 6.09KN-M
Negative moments:
Along shorter direction: Mx = αx w 𝑙𝑥 2
= 0.0532 x 8.47 x 4.542
= 9.21 KN-M
Along longer direction: My= αy w 𝑙𝑥 2
= 0.047 x 8.47 x 4.542
= 8.21 KN-M
By knowing the limiting depth by equating maximum moment to mu limit
Mu = mu limit
9.21 x 10⁶ = 0.138 x fck x 𝑏𝑑2
9.21 x 10⁶ = 0.138 x 20 x 1000 x 𝑑2
d = 57.92 mm
The limiting depth = 105mm
Ast = 255.87𝑚𝑚2 .
Assume dia of bar = 8mm
255.87
Number of bars = π
×82
4
= 6 nos
Ast provided = 301.59𝑚𝑚2 .
Spacing of bars:
𝑎𝑠𝑡 𝑜𝑓 𝑏𝑎𝑟
= ast required
x 1000 = mm ≅ 120 mm
Spacing = 120mm c /c
(-my)
fy ast
Mu = 0.87 fy ast d (1- fck bd
)
415 x ast
8.18 x 10⁶ = 0.87 x 415 x ast x 100 (1- 20 x 105x1000 )
Ast =225.85𝑚𝑚2.
Assume dia of bar = 8mm
225.85
Number of bars = π = 5 no’s
×82
4
= 3d = 3x100 = 300mm
=300mm
Ast= 192.49𝑚𝑚2 .
Assume dia of bar = 8mm
192.49
Number of bars = 50.265 = 4 no’s
=300mm
=300mm
(+my)
fy ast
Mu = 0.87 fy ast d (1- fck bd
)
415 x ast
6.09x 10⁶ = 0.87 x 415 x ast x 100 (1- 20 x 105x1000 )
Ast = 166.09𝑚𝑚2.
Provide minimum ast = 0.12% of gross cross sectional area
= o.12/100 x 130x1000
= 156𝑚𝑚2 .
Assume dia of bar = 8mm
156
Number of bars = ( 50.265 )
= 4nos
Ast provided = 201.06𝑚𝑚2 .
Spacing of bars:
Spacing of bars:
𝑎𝑠𝑡 𝑜𝑓 𝑏𝑎𝑟
= ast required
x 1000 = mm ≅ 120 mm
=300mm
Spacing = 120mm c /c
(-my)
fy ast
Mu = 0.87 fy ast d (1- fck bd
)
415 x ast
8.18 x 10⁶ = 0.87 x 415 x ast x 100 (1- )
20 x 105x1000
Ast =225.85𝑚𝑚2.
Assume dia of bar = 8mm
225.85
Number of bars = π = 5 no’s
×82
4
= 3d = 3x100 = 300mm
=300mm
Ast= 192.49𝑚𝑚2 .
Assume dia of bar = 8mm
192.49
Number of bars = 50.265 = 4 no’s
𝑎𝑠𝑡 𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑
ast required
x 1000
= 3d
= 3x100
=300mm
=300mm
(+my)
fy ast
Mu = 0.87 fy ast d (1- )
fck bd
415 x ast
6.09x 10⁶ = 0.87 x 415 x ast x 100 (1- 20 x 105x1000 )
Ast = 166.09𝑚𝑚2.
Provide minimum ast = 0.12% of gross cross sectional area
= o.12/100 x 130x1000
= 156𝑚𝑚2 .
Assume dia of bar = 8mm
156
Number of bars = ( 50.265 )
= 4nos
Ast provided = 201.06𝑚𝑚2 .
Spacing of bars:
𝑎𝑠𝑡 𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑
ast required
x 1000
= 128.88 mm ≅ 120mm
= 3d
= 3x100
=300mm
300mm
Provide 4 no’s 8 mm ∅ @ 300 mm c/c
DEFELECTION CHECK:
From fig 4 of modification factor for tension reinforcement.
Area of cross−section of steel required
fs = 0.58 fy Area of cross−section of steel provided
=0.24%
Maximum permitted value = 1.75 x Basic value (From figure 4 of IS 456:2000)
= 1.75x 26
=45.5
43<45.5
Hence the section is safe
EFFECTIVE LENGTHS:
Effective length Bm11
230 230
Centre to Centre distance =4770+ + = 5000 mm
2 2
=20.76 KN/m
=19.36 KN/m
=19.62 KN/m
BASED ON STIFFNESS CONSIDERATION:
l
Assume = 17
d
4770
d= = 280.58≅ 300mm
17
= 200≅ 230 mm
LOADS:
Dead load = 0.23 x 0.33 x 1 x 25 = 1.89 KN/m
Factored dead load = 1.5 x 1.955
= 2.84 KN/m
Imposed load on Bm11 =20.76 KN/m
Total load on Bm10 (w1) = 20.76 + 2.84
= 23.6 KN
Imposed load on Bm12 = 19.36 KN/m
Total load on Bm12 (W2) = 19.36 + 2.84
= 22.22 KN
Case (i)
5000
For Bm11 = + 230 + 6 x130
6
= 1843.33≅ 1850 mm
4600
For Bm9 = + 230 + 6 x130
6
= 1776.66≅1780 mm
4670
For Bm8 = + 230 + 6 x130
6
= 1790 mm
Case (ii)
5000+5030+4865
Bf =
3
= 4865≅ 4970 mm
Effective breadth = least of above 2 cases =1780 mm
For xu:
Assume xu lies within the flange
Equate compressive forces to tensile forces
0.36fck bf xu = 0.87fy Ast
0.36 x 20 x 1780 x Xu = 0.87 x415 x Ast
0.87 x415 x Ast
Xu =
0.36 x 20 x 1780
= 0.027Ast
MOMENTS:
For Bm11:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = +
12 10
= 52.61 KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = − −
10 9
2.84 𝑋4.772 20.76𝑋 4.772
= − −
10 9
= 58.94 KN-m
For Bm12:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = +
12 10
2.84 𝑋4.372 19.36𝑋 4.372
= +
12 10
= 41.48KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = − −
10 9
2.84 𝑋4.372 19.36𝑋 4.372
= − −
10 9
= 46.49 KN-m
For Bm13:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = +
12 10
= 43.33 KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑓𝑑 𝑙 2 𝑓𝑑 𝑙 2
Mu = − −
10 9
2.84 𝑋4.442 19.62𝑋 4.442
= − −
10 9
= 48.56KN-m
No. of bars:
For positive moment:
Assume diameter of bar = 16 mm
𝐴𝑠𝑡 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
No. of bars= 𝜋
𝑋𝑑 2
4
485.73
=𝜋
𝑋162
4
=2.77≅3 No’s
𝜋
Ast provided = 3x x162=603.185 mm2
4
544.18
=𝜋
𝑋162
4
=2.75≅3No’s
𝜋
Ast provided = 3x x162=603.18mm2
4
MOMENT OF RESISTANCE:
MR = 0.36fck bf Xu [d-0.42Xu]
= 0.36X20X1780X16.30[300-0.42X16.30]
=61.20 > 52.61 KN-m
Hence the section is safe
SHEAR REINFORCEMENT:
For Bm11:
Vu =0.4wl+0.45wl
=0.4 X 2.84X 5.0 + 0.45 X 20.76 X 5.0
= 50.55 KN
Vu =0.6wl+0.6wl
=0.6 X 2.84 X 5.0 + 0.6 X 20.76 X 5.0
= 70.8 KN
For Bm12:
Vu =0.55 wl+0.6wl
=0.55 X 2.84 X 4.6 + 0.6 X 19.36 X 4.6
= 58.44 KN
Vu =0.55wl+0.6wl
=0.55 X 2.84 X 4.6 + 0.6 X 19.36 X 4.6
= 60.61 KN
For Bm13:
Vu =0.6wl+0.6wl
=0.6 X 2.84X 4.67 + 0.6 X 19.63 X 4.67
=62.96 kn
Vu =0.4wl+0.45wl
=0.4 X 2.84 X 4.67 + 0.45 X 19.63 X 4.67
= 46.55 KN
= 1.00 N/mm2
Percentage of steel:
𝜋
2𝑋 𝑋 162
4
% of AST = X 100
230 𝑋 300
= 0.58 %
= 0.51
𝜏v > 𝜏c
The nominal shear stress is greater than design shear stress
VUS = VU - 𝜏c bd
= 62.96 X 103 – 0.51(230 X 300)
= 28.77 KN
Assume bentup bars are taken 50% of shear
Vus =0.87fy Asv sin 45°
𝜋
= 0.87 X 415 X (1 X 𝑋162 )
4
= 51.33 KN
For stirrups:
28.77
Vus =
2
= 14.38KN
Spacing:
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82 𝑋 300
4
=
14.38𝑋 103
= 425.72≅430 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82
4
=
0.4 𝑋 230
= 3940529 ≅ 390 mm
0.75 x d = 0.75 X 300
= 225 ≅ 220 mm
300 mm
Provide stirrups 8 mm ∅ @ 220 mm c/c
= 0.87 %
557.119
Fs = 0.58 X 415 X
603.186
= 222.317 N/mm2
Max. permitted value = MF X basic value
= 1.25 X 26
= 32.5
16.47 < 32.5
Hence the section is safe
5 Additional steel
for negative
moment
(a)for 0.3l
16 1 5.845 5.845 1.58 9.2
(b)for 0.15l
16 1 3.21 3.21 1.58 4.5
TOTAL : 120 KG
HENCE STEEL REQUIRED FOR CONTINUOUS T BEAM IS 120 KG
T-BEAM DESIGN
Clear span-1 (S1) = 3870 mm
Clear span-2 (S2) = 4440 mm
Depth of web (or) rib (Dw) = 230 mm
Depth of flange (Df) = 130 mm
Breadth of web(bw) = 230 mm
Live load on span-1 (W1) = 17.36 KN/M
Live load on span-2 (W2) = 19.77 KN/M
Characteristic compressive strength of concrete (fck) = 20 N/mm2
Yeild stress in steel (fy) = 415 N/mm2
Effective cover (d') = 40 mm
Effective span :
From clause 22.2 (b) of IS 456 for continuous beams
(1/12) of clear span - 1 = (S1)/12
= 322.5 mm
(1/12) of clear span - 2 = (S2)/12
= 370 mm
Support width < (1/12) of clear shorter span
Support width < (1/12) of clear longer span
Hence,
Effective span shall be taken as per clause 22.2 (a)
1. Effective span = clear span + effective depth
Effective span - 1 (L1) = (S1) + d
= 4190 mm
Effective span - 2 (L2) = (S2) + d
= 4760 mm
2. Effective span = centre to centre supports
Effective span - 1 (L1) = (S1) + (2(bw/2))
= 4100 mm
Effective span - 2 (L2) = (S1) + (2(bw/2))
= 4670 mm
Effective span should be the least
Effective span - 1 (L1) = 4100 mm
Effective span -2 (L2) = 4670 mm
Breadth of flange :
1. (Lo/6)+bw+6bf = 1461.5 mm
2. ((L1+L2)/2)+bW = 4385 mm
Breadth of flange (bf) is taken as 1461.5 mm
Assume the neutral axis lies within the flange
Now equate compressive force to tensile force
0.36 fck bf Xu = 0.87 fy Ast
Xu = 0.0343112 Ast
Load :
Dead load = 1.3225 KN/M
Total load on span-1 (W1) = 18.6825 KN/M
Total load on span-2 (W2) = 21.0925 KN/M
Moment :
Moment on span-1 (M1) = 25.999898 KN-M
Moment on span-2 (M2) = 38.973787 KN-M
Support moment (Ms) = 34.975742 KN-M
Maximum moment occurs at support hence consider support moment for effective depth calculation
Factored moment at support (MuS) = 52.46361 KN-M
Minimum depth required to resist moment :
Factored moment at support= 0.138*fck*b*d*d
depth required = 287.48199 mm
revised effective depth (d) = 290 mm
over all depth (D) = 330 mm
Tension reinforcement :
Area of steel at support :
Factored moment at support= 0.87 fy Ast (d-0.42Xu )
5.202986187 ( AstxAst ) + -104704.5 Ast + 52463612.7 : 0 (quadratic eq)
Ast = 114252.3 mm2 Ast = 514.2024 mm2
Ast = 514.2024 mm2
No.of bars = 4.5488534
= 5 nos
provided area of steel = 565.2 mm2
Area of steel along span 1 :
Factored moment on span1 = 0.87 fy Ast (d-0.42Xu )
5.202986187 ( AstxAst ) + -104704.5 Ast + 38999847.6 : 0 (quadratic eq)
114386.8 mm2 Ast = 379.6372 mm2
Ast = 379.6372 mm2
No.of bars = 3.3584326
= 4 nos
provided area of steel = 452.16 mm2
Area of steel along span 2 :
Factored moment on span 2 = 0.87 fy Ast (d-0.42Xu )
5.202986187 ( AstxAst ) + -104704.5 Ast + 58460680.8 : 0 (quadratic eq)
Ast = 114191.7 mm2 Ast = 574.7552 mm2
Ast = 574.7552 mm2
No.of bars = 5.0845292
= 7 nos
provided area of steel = 791.28 mm2
Ultimate moment of resistance (MUR) for (XU=DF) = 0.36 fck bf Xu (d-0.42 Xu)
= 57.5168841 KN-M
Hence Mus<MUR
Assume out of 3 bars of the tension reinforcement 1 bar is cranked at distance of (1/8)th from the fac
e of the support to counteract shear
Deflection check :
(L/d) Provided = 13.344828
(L/d) permitted = Reduction factor x basic value
Basic value for continuous beams = 26
Ratio of breadth of web to breadth of flange
(bw/bf) = 0.1573726
From fig 6 of IS 456:
Reduction factor = 0.8
(L/d) permitted = 20.8
Check for shear :
Ast at support = 401.92 mm2
Factored shear force (Vu1) in span1= (W1 x L1)/2
= 54.225956 KN
= 54225.956 N
Factored shear force (Vu2) in span2= (W2 x L2)/2
= 0.0738765 KN
= 73.876481 N
Nominal shear stress (τv) = (Vu/(bxd)) 0.812983 N/mm2
(As/(bxd))X100 = 0.5637027 %
τc is calculated with respect to %Ast at support and fck from table 19 of IS 456
X = 0.563703
X1 = 0.48 X2 = 0.56 (input)
Y1 = 0.5 Y2 = 0.75
τc = 0.500385
Shear resistance by concrete = τc x b x d
= 33375.67 N
= 33.37567 KN
τv > τc hence design for shear
shear reinforcement required to carry (Vus) = Vu1 - ( τc x b x d)
= 20850.2866 N
= 20.8502866 KN
Assume shear taken by the cranked bars is 50% of Vus
Stirrups has to be designed to a shear of 10425 N
Assume 6 mm dia bars two legged vertical stirrups
Asv = 56.52 mm2
1. Spacing of stirrups as per design shear force:
Sv = (0.87 x fy x Asv x d)/(Vus)
= 606.8134 mm
2.Minimum shear reinforcement:
Sv = (0.87 x fy x Asv)/(0.4 x b)
= 221.8103 mm
3.Maximum shear reinforcement:
Sv = 0.75 x d
= 217.5 mm
4.Maximum shear reinforcement:
Sv = 300 mm
Hence provide 6mm dia two legged vertical stirrups at a spacing of 220mmc/c
Bar bending shedule :
Required data :
Effective span 1 (L1) = 4100 mm
Effective span 2 (L2) = 4670 mm
Top cover = 40 mm
Bottom cover = 40 mm
Side cover = 40 mm
Support width = 230 mm
A.Main straight bar 12mm dia 2nos :
Length = Effective span(L1+L2)+2(support width/2)-2(side cover)
= 8920 mm
= 8.92 m
B.Main bent up bar 12mm dia 1nos :
Additional bent up length = 0.42 x d
where, d= (Depth of beam-top cover-bottom cover-1 dia of main bar))
= 234 mm
Length = Effective span(L1+L2)+2(support width/2)-2(side cover)+(4 x additional bent up length)
= 9313.12 mm
= 9.31312 m
C.Hanger bars 12mm dia 2nos :
Length = Effective span(L1+L2)+2(support width/2)-2(side cover)
= 8920 mm
= 8.92 m
D.Stirrups of 6mm dia at 220mm c/c :
Length = (2 x ((width of beam-(2 x side cover))+(depth of beam-top cover-bottom cover)))
= 140 mm
= 0.14 m
Spacing of stirrups = 220 mm
no.of bars = ((Effective span(L1+L2)+2(support width/2)-2(side cover))/(spacing))+1
= 41.54545 nos
= 42 nos
E.Additional main bar at support 12mm dia 1no :
Length = length of cranked bar at top portion
= (S1/8)+bw+(S2/8)-(2 x Additional bent up length)
= 1072.19 mm
= 1.07219 m
:
of
S.NO. bar in mm bar in m Length Total length Unit weight Total weight
1 A 12 8.92 2 17.84 0.88888889 15.85778
2 B 12 9.31312 2 18.62624 0.88888889 16.55666
3 C 12 8.92 2 17.84 0.88888889 15.85778
4 D 6 0.14 42 5.88 0.22222222 1.306667
5 E 12 1.07219 1 1.07219 0.88888889 0.953058
Total wt = 50.35
51kg
=102 KG
DESIGN OF CONTINUOUS
RECTANGULAR BEAM
BASED ON STIFFNESS CONSIDERATION:
Assume
Effective depth (d) = 340 mm
Effective cover = 30mm
Overall depth (D) = 340 + 30 = 370mm
2
Breadth (B) = x 340
3
= 226.66≅ 230 mm
CLEAR SPANS:
For Bm3 = 4770 mm
For Bm4 = 4370 mm
For Bm5 = 4440 mm
EFFECTIVE LENGTHS:
Effective length Bm3
(18) Centre to Centre distance
230 230
=4770+ + = 5000mm
2 2
= 10.53 KN/m
= 9.7KN/m
Area effected on Bm 5 = 5.462 𝑚2
𝑒𝑓𝑓𝑒𝑐𝑡𝑒𝑑 𝑎𝑟𝑒𝑎×𝑓𝑎𝑐𝑡𝑜𝑟𝑒𝑑 𝑙𝑜𝑎𝑑 𝑜𝑛 𝑠𝑙𝑎𝑏
Load on Bm 10 (wl) =
𝑒𝑓𝑓𝑒𝑐𝑡𝑖𝑣𝑒 𝑙𝑒𝑛𝑔𝑡ℎ
5.462×8.47
=
4.67
=9.88 KN/m
MOMENTS:
For Bm 3:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
12 10
3.19 𝑋5.002 10.53𝑋 5.002
= +
12 10
= 33.02 KN-m
For Bm4:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
12 10
3.19𝑋4.62 9.74𝑋 3.12
= +
16 12
=21.39 KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = − −
10 9
= -37.28KN-m
NEGATIVE MOMENT AT SUPPORT:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = − −
10 9
= 30.89 KN-m
For Bm5:
POSITIVE MOMENTAT MIDDLE STRIP:-
𝑤𝑑 𝑙 2 𝑤𝑙 𝑙 2
Mu = +
12 10
3.19𝑋4.672 9.88𝑋 4.672
= +
12 10
= 27.34KN-m
Max Positive Moment = 33.02 KN-m
Max Negative Moment = 37.28KN-m
No. of bars:
For maximum steel
Assume diameter of bar = 10 mm
𝐴𝑠𝑡 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
No. of bars= 𝜋
𝑋𝑑 2
4
333.15
=𝜋
𝑋122
4
=2.15≅3 No’s
𝜋
Ast provided = 3x x122 = 339.29 mm2
4
MOMENT OF RESISTANCE:
fy Ast
MR = 0.87 fy Ast d (1- )
fck bd
415×339.29
= 0.87× 415 × 339.29 ×340(1- )
20×230×340
SHEAR REINFORCEMENT:
For Bm3:
Vu =0.4 wdl +0.45 wl l
=0.4 X 3.19 X 5.00 + 0.45 X 10.53 X 5.00
= 30.07 KN
Vu =0.6wd l+0.6wl l
=0.6 X 3.19 X 5.00 + 0.6 X10.53 X 5.00
= 41.46 KN
For Bm4:
Vu =0.55 wd l+0.6wl l
=0.55 X 3.19 X 4.6 + 0.6 X 9.74 X 4.6
= 34.91 KN
Vu =0.55wd l+0.6wl l
=0.55 X 3.19 X 4.6 + 0.6 X 9.74 X 4.6
= 34.91 KN
For Bm5:
Vu =0.6wd l+0.6wl l
=0.6 X 3.19 X 4.67+ 0.6 X 9.88 X 4.67
=36.62 KN
Vu =0.4wd l+0.45wl l
=0.4 X 3.19 X 4.67 + 0.45 X 9.88 X 4.67
= 26.72 KN
= 0.53 N/mm2
Percentage of steel:
𝜋
2𝑋 𝑋 122
4
% of AST = X 100
230 𝑋 340
= 0.28%
= 0.369
𝜏v > 𝜏c
The nominal shear stress is greater than design shear stress
VUS = VU - 𝜏c bd
= 41.6 – 0.369(230 X 340)
= 12.72 KN
For stirrups:
Vus = 12.72/2
= 6.36 KN
Spacing:
Assume two legged vertical stirrups of 6 mm dia
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62 𝑋 320
4
=
6.36 𝑋 103
= 150 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 62
4
=
0.4 𝑋 230
= 221.92 mm ≅ 220mm
0.75 x d = 0.75 X 320
= 240 mm
300 mm
= 236.36 N/mm2
339.27
% of Ast = × 100
230×350
=0.32
From fig – 4 of IS 456 2000, modification factor =1.8
Max. permitted value = modification factor X basic value
= 1.45 X 26
= 37.7
13.02 < 37.7
Hence the section is safe
BAR BENDING SCHEDULE
S NO BAR NAME DIA NOS LENGTH TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
1 Main straight bar 12 2 14.65 29.3 0.88 26.04
2 Main bentup bar 12 1 16.31 16.31 0.88 14.35
3 Hanger bar 12 2 14.65 29.3 0.88 26.04
4 Stirrups 8 68 0.88 59.84 0.39 23.64
5 Additional steel
for negative
moment
(a)for 0.3l
10 1 5.845 5.845 0.61 3.56
(b)for 0.15l
10 1 3.21 3.21 0.61 1.95
Total: 96kg
HENCE STEEL REQUIRED FOR RECTANGULAR CONTINUOUS BEAM =96X2
=192 KG
DESIGN OF CONTINUOUS
RECTANGULAR BEAM
in of bars in
of bar mm bar in m m in Kg/m kg
1 A 12 8.92 2 17.84 0.888889 15.85777778
2 B 12 9.19552 2 18.39104 0.888889 16.34759111
3 C 12 8.92 2 17.84 0.888889 15.85777778
4 D 6 0.66 46 30.36 0.222222 6.746666667
5 E 12 1.18849 1 1.18849 0.888889 1.056435556
TOTAL = 56 kg
= 59.1 Kn-m
NEGATIVE MOMENT AT SUPPORT AB :-
𝑓𝑑 𝑙 2
Mu =
10
28.46 𝑋5.02
=
10
= 71.15KN-m
Max Moment =71.15 KN-m
DEPTH OF SECTION:-
Equate greater Mud to Mu(limit)
Mud = Mu(limit)
71.1 × 106 = Qubd2
71.1 × 106 = 2.76 × 230 × d2
71.1×106
d= √
2.76×230
D = 330 + 30
D = 360 mm
NEGATIVE REINFORCEMENT AT AB :-
fy Ast
Mu = 0.87fyAstd[1 − ]
fckbd
415×𝐴𝑠𝑡
71.1× 106 = 0.87× 415 × 𝐴𝑠𝑡 × 330 [1 − ]
20×230×330
Assume # 16mm
A𝑠𝑡 757
No. of bars = =𝜋 = 3.48 ≅ 4 nos
𝑎𝑠𝑡 ×162
4
𝜋
Ast = 4× × 162 = 804.25mm2
4
So provide 4 # 16mm
CURTAILMENT
These bars are provided over the internal support
, these bars are placed parallel to the main bars 100% of bars are provided to a
distance of 0.15l on either side from face of support and 50% of bars are taken to
a distance of 0.3l on either side from face of support.
AT CB3
From span CC3 and CB3
0.15 l = 0.15 × 5000
= 750 mm
0.3 l = 0.3 × 5000
= 1500 mm
POSITIVE REINFORCEMENT
fy Ast
Mu = 0.87fyAstd[1 − ]
fckbd
415×𝐴𝑠𝑡
59.1 × 106 = 0.87× 415 × 𝐴𝑠𝑡 × 330 [1 − ]
20×230×330
Ast = 600mm2
Assume # 16mm
A𝑠𝑡 600
No. of bars = =𝜋 = 2.82 ≅ 3 no.s
𝑎𝑠𝑡 ×162
4
𝜋
Ast = 3× × 162 = 603.A85mm2
4
So provide 3 # 16mm
SHEAR CHECK
= 1.11 N/𝑚𝑚2
Percentage of steel:
𝜋
2𝑋 𝑋 162
4
% Of AST = X 100
230 𝑋 330
= 0.92 %
= 0.6008N/𝑚𝑚2
𝜏v > 𝜏c
The nominal shear stress is greater than design shear stress
VUS = VU - 𝜏c bd
= 85.38X 103 – 0.6008(230 X 330)
=39.77KN
Assume bent up bars are taken 50% of shear
Vus =0.87fy Asv sin 45°
𝜋
= 0.87 X 415 X (2 X 𝑋122 ) sin 45°
4
= 57.75KN
For stirrups:
57.75
Vus =
2
= 28.875 KN
Spacing:
0.87fyAsv 𝑑
Sv =
𝑉𝑢𝑠
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82 𝑋 330
4
=
28.46𝑋 103
= 421.24 ≅ 420 mm
0.87fyAsv
Sv =
0.4𝑏
𝜋
0.87 𝑋 415 𝑋 2 𝑋 𝑋 82
4
=
0.4 𝑋 230
= 394.529 ≅ 390 mm
0.75 x d = 0.75 X 320
= 240 mm
300 mm
Provide stirrups 8 mm ∅ @ 240 mm c/c
TOTAL: 142 KG
HENCE STEEL REQUIRED FOR PLINTH BEAM FOR LONGER SIDE=142X3=426 KG
PLINTH BEAM
in
of bar mm bar in m of bars in m in Kg/m Kg
1 A 16 8.92 2 17.84 1.58 28.19
2 B 16 9.29632 1 9.29 1.58 14.69
3 C 16 8.92 2 17.84 1.58 28.1
4 D 6 0.78 42 32.76 0.22 7.28
5 E 16 2.861 3 8.583 1.58 13.5
TOTAL: 92 KG
HENCE STEEL REQUIRED FOR PLINTH BEAM ALONG SHORTER SPAN =92X4=368 KG
Slenderness ratio
effective length kl
= least lateral dimension = D
2340
= 230
= 10.17 < 12
Minimum eccentricity
kl D
emin = +
500 30
2340 230
= 500
+ 30
= 12.35 < 20mm
Loads
From BM 11 = 0.6x1.98x5.00 + 0.6x20.7x5.00 =68.04 KN
P =208.22KN
Asc =1/100 Ag
= 0.01 Ag
Ag=Ac + Asc
Ac=Ag - Asc
=52900-Asc
Asc=-796.09 mm2
Cheking of cross sectional area with maximum reinforcement and minimum reinforcement
With a percent of not less than 0.8 % and not more than 6% of the gross sectional area of the
column.
Dia of bar
𝜋
4x4 x𝑑2 =423.2
d = 11.66≅12mm
Ast provided
π
Asc =4× ×122 = 452.38mm2
4
Lateral ties
Pitch
Least lateral dimension = 230mm
16d = 16×12= 190mm
300mm
Diameter
1
4
×largest diameter = 3mm
6mm
=7.725KN
= 258.33 KN
= 501.27 KN
501.27
Total working load on plinth = = 334.18 KN
1.5
𝐹𝐶𝐾 = 20 N/𝑚𝑚2
𝐹𝑦 = 415 N/𝑚𝑚2
368.5
= 150
=2.45 𝑚2
= 502.5 KN
STEP – 2
BENDING MOMENT :
𝑓𝑎𝑐𝑡𝑜𝑟 𝑙𝑜𝑎𝑑
Actual upward soil pressure (q) =𝑎𝑟𝑒𝑎 𝑜𝑓 𝑓𝑜𝑜𝑡𝑖𝑛𝑔
502.5
= 1.6𝑋1.6
= 196 KN/𝑚2
Critical section for maximum B.M lies at the base of the column ( from clause 3.4.2.3.2 of IS 456)
Total force acting on the hatched area multiplied by distance between the C.G of force and face of the
column.
𝑞 × 𝑙 ×(𝑙−𝑎)2
B.M = 8
196 ×1.6×(1.6−0.23)2
= = 73.57KN-m
8
STEP – 3
DEPTH OF FOOTING
Considering b = 1600mm
B.M. = Q x b x𝑑2
73.57×106 = 2.76×1600×d2
d = 129.07 mm ≅ 130mm
depth footing = 2× (the least of the above)
= 2×130=260mm
STEP-4
REINFORCEMENT
𝐴 𝑠𝑡 ×𝑓𝑦
𝑀𝑢𝑑 =0.87 x𝑓𝑦 x 𝐴𝑠𝑡 x d (1- )
𝑓𝑐𝑘 ×𝑏×𝑑
𝐴𝑠𝑡 × 415
73.27x106 =0.87 x 415 x 𝐴𝑠𝑡 x 260 x(1- )
20 × 1600𝑋260
Assme # 16mm
1441.05
No. of bars = π = 7.16 no.s ≅ 8no.s
×162
4
π
Actual Ast = 8×4 ×162 = 1608.49mm2
STEP 5
1.6−0.23
= 196×1.6×[ 2
− 0.34]
= 108.19KN
V
Nominal shear stress τv = bdu
108.19×103
= 1600×310
= 0.21N/mm2
1441.05
Percentage of steel = X 100
1600𝑋310
= 0.29%
0.15 – 0.28
0.25 – 0.36
τc = 0.312
Permissible shear stress (kτc) depending upon the thickness of slab, grade of
τv < kτc
STEP 6
CHECK FOR FOR DIAGONAL SHEAR / 2WAY SHEAR /PUNCHING
d
The critical plane lies at a distance of around face of column
2
= 196×(1.62-(0.23+0.26)2)
= 454.72KN
= 4×(230+260)×260
= 509600mm2
𝑞(𝑙 2 −(𝑎+𝑑)2 )
Nominal shear force τv = 4(𝑎+𝑑)𝑑
454.72X 103
= = 0.89N/mm2
509600
ks = 0.5+βc
230
βc = 230
=1
ks = 0.5+1 = 1.5
STEP 7
335 X 103
= 230×230
= 6.33N/mm2
A
Permissible bearing stress = 0.45 × fck × √A1
2
(4×260+230)2
= 0.45×20×√ 230×230
= 85.21N/mm2
= 1500 mm
=1.5 m
No .of layers
= 8.14
= 9 nos
Length=(holding into footing +(depth of footing from g.l. –bottom cover of footing )+
=5500 mm
=0.744m
No of bars = 26.57nos
=27 nos
TOTAL WT 40.68
=41 KG
DESIGN OF LINTEL
= 0.838647 KN-m
Factored Bending moment (Mud) = 1.25797058 KN-m
shear force = ((Wm/2)+((Wd x L)/2))
= 2.047464354 KN
Factored shear force (VU) = 3.07119653 KN
Minimum depth required to resist bending moment:
B.M.= 0.87xfyxdxAst(1-((fyxAst)/(fckxbxd)))
32.57299 ( AstxAst ) + -43326 Ast + 1257971 : 0 (quadratic eq) 1713238828
Ast Ast
= 43961.36 mm2 = 29.69808384 mm2
Ast = 29.69808 mm2
Check for minimum tension reinforcement:
Ast/(b x d) = (0.85/fy)
Ast
= 47.10843 mm2
No. of bars = 0.937668 nos (using 8 mm dia bars)
= 1 < 3nos
Required Ast = 50.24 mm2
Hence provide a minimum of 8mm dia bars 3nos
Provided Ast = 150.72 mm2
Check for deflection:
(L/d) Provided = 10.83333
(L/d) permitted = Modification factor x Basic value
For simply supported beams basic value = 20
% Max Ast = (Ast/(bxd))x100 = 0.546086957 %
Fs
= 0.58xfyx(Ast required/Ast provided) = 47.42787 N/mm2
= 80.23333
Modification Factor (M.F.) = 2 (input)
(L/d) permitted = 40
Check for shear:
Ast at support = 100.48 mm2
Factored shear force (Vu)= 3.071197 KN
Nominal shear stress (τv) = (Vu/(bxd)) 0.111275237 N/mm2
(As/(bxd))X100 = 0.364058
τc is calculated with respect to %Ast at support and fck from table 19 of IS456
X = 0.364058
X1 = 0.36 X2 = 0.48 (input)
Y1 = 0.25 Y2 = 0.5
τc = 0.414748 N/mm2
Shear resistance by concrete = τc x b x d
= 11447.04 N
= 11.44704 KN
τv < τc hence it is safe in shear,provide the stirrups to hold the bars
Provide 6 mm dia bars two legged vertical stirrups
Area of stirrup(Asv)= 56.52 mm2
1.Minimum shear reinforcement:
Sv = (0.87 x fy x Asv)/(0.4 x b)
= 221.8103 mm
2.Maximum shear reinforcement:
Sv = 0.75 x d
= 90 mm
3.Maximum shear reinforcement:
Sv = 300 mm
Hence provide 6 mm dia two legged vertical stirrups at spacing of 90 Mm
= 1450 mm
= 1.45 m
B.Main bent up bar 8mm dia 1nos :
Additional bent up length = 0.42 x d
where, d= (Depth of lintel-top cover-bottom cover-1 dia of main bar))
= 87 mm
Length
= Width of opening+2(bearing)-2(side cover)+(2 x additional bent up length)
= 1523.08 mm
= 1.52308 m
C.Hanger bars 6mm dia 2nos :
Length = Width of opening+2(bearing)-2(side cover)
= 1450 mm
= 1.45 m
D.Stirrups of 6mm dia at 90mm c/c :
Length
= (2 x ((width of lintel-(2 x side cover))+(depth of lintel-top cover-bottom cover)))
= 560 mm
= 0.56 m
Spacing of stirrups = 90 mm
No.of bars = ((Width of opening+2(bearing)-2(side cover)/)(spacing))+1
= 20.77778 nos
= 21 nos
Shedule of reinforcement in lintel :
E.Main bar in sunshade 8mm dia bars at 240 mm c/c
Length = (width of lintel-side cover)+(projection of sunshade-side cover)+
= 0.52413 KN-m
Factored Bending moment (Mud) = 0.786195098 KN-m
shear force = ((Wm/2)+((Wd x L)/2))
= 1.524320632 KN
Factored shear force (VU) = 2.286480948 KN
Minimum depth reuired to resist bending moment:
B.M.= 0.138 x fck x b x (dxd)
d= 40.63648 mm
Revised effective depth d = 120 Mm
over all depth D = 140 Mm
Steel required:
B.M.= 0.87xfyxdxAst(1-((fyxAst)/(fckxbxd)))
43.43065 ( AstxAst ) + -43326 Ast + 786195.1 : 0 (quadratic eq)
Ast
Ast = 43326 mm2 = 498.7951807 mm2
Ast = 498.7952 mm2
Check for minimum tension reinforcement:
Ast/(b x d) = (0.85/fy)
Ast = 39.25703 mm2
No. of bars = 0.78139 nos (using 8 mm dia bars)
= 1 < 3nos
Required Ast = 50.24 mm2
Hence provide a minimum of 8mm dia bars 3nos
Provided Ast = 150.72 mm2
Check for deflection:
(L/d) Provided = 9.166667
(L/d) permitted = Modification factor x Basic value
For simply supported beams basic value = 20
% Max Ast = (Ast/(bxd))x100 = 0.546086957 %
Fs = 0.58xfyx(Ast required/Ast provided) = 796.5764 N/mm2
= 80.23333
Modification Factor (M.F.) = 2 (input)
(L/d) permitted = 40
Check for shear:
Ast at support = 100.48 mm2
Factored shear force (Vu)= 2.286481 KN
Nominal shear stress (τv) = (Vu/(bxd)) 0.082843513 N/mm2
(As/(bxd))X100 = 0.364058
τc is calculated with respect to %Ast at support and fck from table 19 of IS456
X = 0.364058
X1 = 0.48 X2 0.56 (input)
Y1 = 0.5 Y2 = 0.75
τc = 0.436499 N/mm2
Shear resistance by concrete = τc x b x d
= 12047.36 N
= 12.04736 KN
τv < τc hence it is safe in shear,provide the stirrups to hold the bars
Provide 6 mm dia bars two legged vertical stirrups
Area of stirrup(Asv)= 56.52 mm2
1.Minimum shear reinforcement:
Sv = (0.87 x fy x Asv)/(0.4 x b)
= 221.8103 mm
2.Maximum shear reinforcement:
Sv = 0.75 x d
= 90 mm
3.Maximum shear reinforcement:
Sv = 300 mm
Hence provide 6 mm dia two legged vertical stirrups at spacing of 90mm c/c
Bar bending shedule :
Required data :
Width of opening = 800 Mm
Bearing on each side (b) = 150 Mm
Width of lintel = 230 Mm
Over all depth of lintel = 140 Mm
Bottom cover of lintel = 20 Mm
Top cover of sunshade = 20 Mm
All other covers = 25 Mm
Shedule of reinforcement in lintel :
A.Main straight bar 8mm dia 2nos :
Length = Width of opening+2(bearing)-2(side cover)
= 1050 mm
= 1.05 m
B.Main bent up bar 8mm dia 1nos :
Additional bent up length = 0.42 x d
where, d= (Depth of lintel-top cover-bottom cover-1 dia of main bar))
= 87 mm
Length
= Width of opening+2(bearing)-2(side cover)+(2 x additional bent up length)
= 1123.08 mm
= 1.12308 m
C.Hanger bars 6mm dia 2nos :
Length = Width of opening+2(bearing)-2(side cover)
=1050 mm
=1.05 m
D.Stirrups of 6mm dia at 90mm c/c :
Length = (2 x ((width of lintel-(2 x side cover))+(depth of lintel-top cover-bottom cover)))
=560 mm
=0.56 m
Spacing of stirrups = 90 mm
No.of bars = ((Width of opening+2(bearing)-2(side cover)/)(spacing))+1
= 9.666667 nos
= 10 nos
Bar bending shedule :
Dia of Length Total Total
S.no Description bar of No of bars length Wt/meter weight
bar in of bars in
of bar in mm m m in Kg/m Kg
1 A 8 1.05 2 2.1 0.395062 0.82963
2 B 8 1.12308 1 1.12308 0.395062 0.443686
3 C 6 1.05 2 2.1 0.222222 0.466667
4 D 6 0.56 10 5.6 0.222222 1.244444
Total wt
= 2.984427
3
HENCE STEEL REQUIRED FOR 1.0 M LINTELS WITHOUT SUNSHADE = 3X4=12 KG
RC Lintel design of 0.9m
= 1050 mm
= 1.05 M
B.Main bent up bar 8mm dia 1nos :
Additional bent up length = 0.42 x d
where, d= (Depth of lintel-top cover-bottom cover-1 dia of main bar))
= 87 mm
=Width of opening+2(bearing)-2(side cover)+(2 x additional bent up length)
Length
=1123.08 Mm
=1.12308 M
C.Hanger bars 6mm dia 2nos :
Length = Width of opening+2(bearing)-2(side cover)
= 1050 mm
1.05 m
D.Stirrups of 6mm dia at 90mm c/c :
Length =(2 x ((width of lintel-(2 x side cover))+(depth of lintel-top cover-bottom cover)))
=560 mm
=0.56 M
Spacing of stirrups = 90 mm
No.of bars = ((Width of opening+2(bearing)-2(side cover)/)(spacing))+1
= 9.666667 nos
= 10 nos
Bar bending shedule :
Total
S.no Description Dia of bar Length of No of bars length Wt/meter Total weight
of bars in
of bar in mm bar in m m in Kg/m Kg
1 A 8 1.05 2 2.1 0.395062 0.82963
2 B 8 1.12308 1 1.12308 0.395062 0.443686
3 C 6 1.05 2 2.1 0.222222 0.466667
4 D 6 0.56 10 5.6 0.222222 1.244444
Total wt 2.984427kg
3kg
HENCE STEEL REQUIRED FOR 0.9 M LINTEL WITHOUT SUNSHADE=3X3=9 KG
RC Lintel design
= 1.531532 KN-m
Factored Bending moment (Mud) = 2.29729741 KN-m
shear force = ((Wm/2)+((Wd x L)/2))
= 3.646428707 KN
Factored shear force (VU) = 5.469643061 KN
Minimum depth reuired to resist bending moment:
B.M.= 0.138 x fck x b x (dxd)
d= 69.46396 mm
Revised effective depth d = 120 mm
over all depth D = 140 mm
Steel required:
B.M.= 0.87xfyxdxAst(1-((fyxAst)/(fckxbxd)))
43.43065 ( AstxAst ) + -43326 Ast + 2297297 : 0 (quadratic eq)
Ast
Ast = 43768.61 mm² = 56.18827722 mm²
Ast = 56.18828 mm²
Check for minimum tension reinforcement:
Ast/(b x d) = (0.85/fy)
Ast = 47.10843 mm²
No. of bars = 0.937668 nos (using 8 mm dia bars)
= 1 < 3nos
Required Ast = 50.24 mm²
Hence provide a minimum of 8mm dia bars 3nos
Provided Ast = 150.72 mm²
Check for deflection:
(L/d) Provided = 10.83333
(L/d) permitted = Modification factor x Basic value
For simply supported beams basic value = 20
% Max Ast = (Ast/(bxd))x100 = 0.546086957 %
Fs = 0.58xfyx(Ast required/Ast provided) = 89.73274 N/mm²
= 80.23333
Modification Factor (M.F.) = 2 (input)
(L/d) permitted = 40
Check for shear:
Ast at support = 100.48 mm²
Factored shear force (Vu)= 5.469643 KN
Nominal shear stress (τv) = (Vu/(bxd)) 0.198175473 N/mm²
(As/(bxd))X100 = 0.364058
τc is calculated with respect to %Ast at support and fck from table 19 of IS456
X = 0.364058
X1 = 0.46 X2 = 0.54 (input)
Y1 = 0.5 Y2 = 0.75
τc = 0.416499 N/mm²
Shear resistance by concrete = τc x b x d
= 11495.36 N
= 11.49536 KN
τv < τc hence it is safe in shear,provide the stirrups to hold the bars
Provide 6 mm dia bars two legged vertical stirrups
Area of stirrup(Asv)= 56.52 mm²
1.Minimum shear reinforcement:
Sv = (0.87 x fy x Asv)/(0.4 x b)
= 221.8103 mm
2.Maximum shear reinforcement:
Sv = 0.75 x d
= 90 mm
3.Maximum shear reinforcement:
Sv = 300 mm
Hence provide 6 mm dia two legged vertical stirrups at spacing of 90
Design of sunshade
Projection of sunshade (Ps) = 600 mm
Top cover = 20 mm
Stiffness factor (S.f.) = 8
Consideration breadth = 1000 mm
From stiffness consideration :
(L/d) = 8
d = 75 mm
Revised (d) = 80 mm
over all depth (D) = 100 mm
Effective span :
Effective span shall be taken as per clause 22.2 (a)
1. Effective span = clear span + effective depth
Effective span (L) = (S) + (d/2)
= 640 mm
2. Effective span = centre to centre supports
Effective span (L) = (S) + (2(b/2))
= 830 mm
Effective span should be the least
Effective span (L) = 640 mm
LOAD:
Dead load of sunshade (Wd) = 3 KN/m
Bending moment (Mu) = (W x L x L)/2
0 = 0.6144 KN-m
Factored Bending moment (Mud) = 0.9216 KN-m
Minimum depth reuired to resist bending moment:
B.M.= 0.138 x fck x b x (dxd)
d= 43.99691 mm
Revised effective depth d = 80 mm
over all depth D = 100 mm
Steel required:
Main steel :
B.M.= 0.87xfyxdxAst(1-((fyxAst)/(fckxbxd)))
9.98905 ( AstxAst ) + -28884 Ast + 921600 : 0 (quadratic eq)
Ast
Ast = 30297.52 mm² = 32.26700581 mm²
Ast = 32.26701 mm²
Check for minimum tension reinforcement:
Ast/(b x d) = (0.85/fy)
Ast = 163.8554 mm²
Spacing of bars using 8mm dia bars:
1. spacing of bars = (((3.14x(8x8))/4)/(req Ast))xbreadth = 306.6118 mm
2. spacing of bars = 3xd = 240 mm
3. spacing of bars
= = 300 mm
Hence provide 8mm dia bars at 240 mm c/c
Provided area of steel = (((3.14x(8x8))/4)/(spacing))xtotal breadth
= 314 mm²
Distribution steel :
Minimum area of steel (Ast)
Ast/(b x d) = (0.85/fy)
Ast = 163.8554 mm²
Spacing of bars using 8mm dia bars:
1. spacing of bars = (((3.14x(8x8))/4)/(req Ast))xbreadth = 306.6118 mm
2. spacing of bars = 5xd = 400 mm
3. spacing of bars
= = 300 mm
Hence provide 8mm dia bars at 300 mm c/c
Provided area of steel = (((3.14x(8x8))/4)/(spacing))xtotal breadth
= 251.2 mm²
Bar bending shedule :
Required data :
Width of opening = 1200 mm
Bearing on each side (b) = 150 mm
Projection of sunshade (Ps) = 600 mm
Width of lintel = 230 mm
Over all depth of lintel = 140 mm
Bottom cover of lintel = 20 mm
Top cover of sunshade = 20 mm
All other covers = 25 mm
Shedule of reinforcement in lintel :
A.Main straight bar 8mm dia 2nos :
Length = Width of opening+2(bearing)-2(side cover)
= 1450 mm
= 1.45 m
B.Main bent up bar 8mm dia 1nos :
Additional bent up length = 0.42 x d
where, d= (Depth of lintel-top cover-bottom cover-1 dia of main bar))
= 87 mm
Length = Width of opening+2(bearing)-2(side cover)+(2 x additional bent up length)
= 1523.08 mm
= 1.52308 m
C.Hanger bars 6mm dia 2nos :
Length = Width of opening+2(bearing)-2(side cover)
= 1450 mm
= 1.45 m
D.Stirrups of 6mm dia at 90mm c/c :
Length = (2 x ((width of lintel-(2 x side cover))+(depth of lintel-top cover-bottom cover)))
= 560 mm
= 0.56 m
Spacing of stirrups = 90 mm
No.of bars = ((Width of opening+2(bearing)-2(side cover)/)(spacing))+1
= 20.77778 nos
= 21 nos
Shedule of reinforcement in lintel :
E.Main bar in sunshade 8mm dia bars at 240 mm c/c
Length = (width of lintel-side cover)+(projection of sunshade-side cover)+
= (depth of lintel-top cover-bottom cover-effective depth of sunshade)
= 795 mm
= 0.795 m
No.of bars = ((Width of opening+2(bearing)-2(side cover)/)(spacing))+1
= 8.416667 nos
= 9 nos
F.Distribution steel 8mm dia bars at 300 mm c/c
Length = Width of opening+2(bearing)-2(side cover)
= 1450 mm
= 1.45 m
No.of bars = ((width of projection -side cover)/(spacing))+1
= 2.916667 nos
= 3 nos
Bar bending shedule :
Total Total
S.no Description Dia of bar Length of No of bars length Wt/meter weight
of bars in
of bar in mm bar in m m in Kg/m kg
1 A 8 1.45 2 2.9 0.3950 1.145679
2 B 8 1.52308 1 1.52308 0.3950 0.601711
3 C 6 1.45 2 2.9 0.22222 0.644444
4 D 6 0.56 21 11.76 0.22 2.613333
5 E 8 0.795 9 7.155 0.395 2.826667
6 F 8 1.45 3 4.35 0.395 1.718519
Total wt
= 9.550353
10
HENCE STEEL REQUIRED FOR 1.2M OPENINIG IS =10X5=50 KG
LINTEL DESIGN
= 1.512587 KN-m
Factored Bending moment (Mud) = 2.268879879 KN-m
shear force = ((Wm/2)+((Wd x L)/2))
= 2.974099849 KN
Factored shear force (VU) = 4.461149774 KN
Minimum depth reuired to resist bending moment:
B.M.= 0.138 x fck x b x (dxd)
d= 59.78432 mm
Revised effective depth d = 120 mm
over all depth D = 140 mm
Steel required:
B.M.= 0.87xfyxdxAst(1-((fyxAst)/(fckxbxd)))
32.57299 ( AstxAst ) + -43326 Ast + 2268880 : 0 (quadratic eq)
Ast
Ast = 43936.45 mm2 = 54.60969535 mm2
Ast = 54.6097 mm2
Check for minimum tension reinforcement:
Ast/(b x d) = (0.85/fy)
Ast = 58.88554 mm2
No. of bars = 1.172085 nos (using 8 mm dia bars)
= 2 < 3nos
Required Ast = 100.48 mm2
Hence provide a minimum of 8mm dia bars 3nos
Provided Ast = 150.72 mm2
Check for deflection:
(L/d) Provided = 13.33333
(L/d) permitted = Modification factor x Basic value
For simply supported beams basic value = 20
% Max Ast = (Ast/(bxd))x100 = 0.546086957 %
Fs = 0.58xfyx(Ast required/Ast provided) = 87.21174 N/mm2
= 160.4667
Modification Factor (M.F.) = 2 (input)
(L/d) permitted = 40
Check for shear:
Ast at support = 100.48 mm2
Factored shear force (Vu)= 4.46115 KN
Nominal shear stress (τv) = (Vu/(bxd)) 0.161635861 N/mm2
(As/(bxd))X100 = 0.364058
τc is calculated with respect to %Ast at support and fck from table 19 of IS456
X = 0.364058
X1 = 0.46 X2 = 0.54 (input)
Y1 = 0.5 Y2 = 0.75
τc = 0.416499 N/mm2
Shear resistance by concrete = τc x b x d
= 11495.36 N
= 11.49536 KN
τv < τc hence it is safe in shear,provide the stirrups to hold the bars
Provide 6 mm dia bars two legged vertical stirrups
Area of stirrup(Asv)= 56.52 mm2
1.Minimum shear reinforcement:
Sv = (0.87 x fy x Asv)/(0.4 x b)
= 221.8103 mm
2.Maximum shear reinforcement:
Sv = 0.75 x d
= 90 mm
3.Maximum shear reinforcement:
Sv = 300 mm
Hence provide 6 mm dia two legged vertical stirrups at spacing of 90
Design of sunshade
Projection of sunshade (Ps) = 600 mm
Top cover = 20 mm
Stiffness factor (S.f.) = 8
Consideration breadth = 1000 mm
From stiffness consideration :
(L/d) = 8
d = 75 mm
Revised (d) = 80 mm
over all depth (D) = 100 mm
Effective span :
Effective span shall be taken as per clause 22.2 (a)
1. Effective span = clear span + effective depth
Effective span (L) = (S) + (d/2)
= 640 mm
2. Effective span = centre to centre supports
Effective span (L) = (S) + (2(b/2))
= 830 mm
Effective span should be the least
Effective span (L) = 640 mm
LOAD:
Dead load of sunshade (Wd) = 3.6 KN/m
Bending moment (Mu) = (W x L x L)/2
0 = 0.73728 KN-m
Factored Bending moment (Mud) = 1.10592 KN-m
Minimum depth reuired to resist bending moment:
B.M.= 0.138 x fck x b x (dxd)
d= 41.73913 mm
Revised effective depth d = 80 mm
over all depth D = 100 mm
Steel required:
Main steel :
B.M.= 0.87xfyxdxAst(1-((fyxAst)/(fckxbxd)))
7.491788 ( AstxAst ) + -28884 Ast + 1105920 : 0 (quadratic eq)
Ast
Ast = 30773.03 mm2 = 38.67631369 mm2
Ast = 38.67631 mm2
Check for minimum tension reinforcement:
Ast/(b x d) = (0.85/fy)
Ast = 163.8554 mm2
Spacing of bars using 8mm dia bars:
1. spacing of bars = (((3.14x(8x8))/4)/(req Ast))xbreadth = 306.6118 mm
2. spacing of bars = 3xd = 240 mm
3. spacing of bars
= = 300 mm
Hence provide 8mm dia bars at 240 mm c/c
Provided area of steel = (((3.14x(8x8))/4)/(spacing))xtotal breadth
= 376.8 mm2
Distribution steel :
Minimum area of steel (Ast)
Ast/(b x d) = (0.85/fy)
Ast = 163.8554 mm2
Spacing of bars using 8mm dia bars:
1. spacing of bars = (((3.14x(8x8))/4)/(req Ast))xbreadth = 306.6118 mm
2. spacing of bars = 5xd = 400 mm
3. spacing of bars
= = 300 mm
Hence provide 8mm dia bars at 300 mm c/c
Provided area of steel = (((3.14x(8x8))/4)/(spacing))xtotal breadth
= 301.44 mm2
Bar bending shedule :
Required data :
Width of opening = 1200 mm
Bearing on each side (b) = 150 mm
Projection of sunshade (Ps) = 600 mm
Width of lintel = 230 mm
Over all depth of lintel = 140 mm
Bottom cover of lintel = 20 mm
Top cover of sunshade = 20 mm
All other covers = 25 mm
Shedule of reinforcement in lintel :
A.Main straight bar 8mm dia 2nos :
Length = Width of opening+2(bearing)-2(side cover)
= 1450 mm
= 1.45 m
B.Main bent up bar 8mm dia 1nos :
Additional bent up length = 0.42 x d
where, d= (Depth of lintel-top cover-bottom cover-1 dia of main bar))
= 87 mm
Length = Width of opening+2(bearing)-2(side cover)+(2 x additional bent up length)
= 1523.08 mm
= 1.52308 m
C.Hanger bars 6mm dia 2nos :
Length = Width of opening+2(bearing)-2(side cover)
= 1450 mm
= 1.45 m
D.Stirrups of 6mm dia at 90mm c/c :
Length = (2 x ((width of lintel-(2 x side cover))+(depth of lintel-top cover-bottom cover)))
= 560 mm
= 0.56 m
Spacing of stirrups = 90 mm
No.of bars = ((Width of opening+2(bearing)-2(side cover)/)(spacing))+1
= 20.77778 nos
= 21 nos
Shedule of reinforcement in lintel :
E.Main bar in sunshade 8mm dia bars at 240 mm c/c
Length = (width of lintel-side cover)+(projection of sunshade-side cover)+
= (depth of lintel-top cover-bottom cover-effective depth of sunshade)
= 795 mm
= 0.795 m
No.of bars = ((Width of opening+2(bearing)-2(side cover)/)(spacing))+1
= 8.416667 nos
= 9 nos
F.Distribution steel 8mm dia bars at 300 mm c/c
Length = Width of opening+2(bearing)-2(side cover)
= 1450 mm
= 1.45 m
No.of bars = ((width of projection -side cover)/(spacing))+1
= 2.916667 nos
= 3 nos
Bar bending shedule :
Total Total
S.no Description Dia of bar Length of No of bars length Wt/meter weight
of bars in
of bar in mm bar in m m in Kg/m kg
1 A 8 1.45 2 2.9 0.395062 1.145679
2 B 8 1.52308 1 1.52308 0.395062 0.601711
3 C 6 1.45 2 2.9 0.222222 0.644444
4 D 6 0.56 21 11.76 0.222222 2.613333
5 E 8 0.795 9 7.155 0.395062 2.826667
6 F 8 1.45 3 4.35 0.395062 1.718519
Total wt
= 9.550353
10
HENCE STEEL REQUIRED FOR 1.5 M LINTELS IS =3X 10= 30 KG
DETAILED ESTIMATE FOR LIG:
Total
quantity
Quantity (m3 /
Length Depth (m3 /m2/ m2 /
s.no Description of item nos (m) Breadth (m) (m) RM/NO's) RM)
earth work excavation for
1. foundation 8 1.1 1.1 1 9.68 9.68
2. Refilling 8 1.1 1.1 1 9.68
a. deductions for footing 8 1.1 1.1 0.31 3.01
b. deductions for column 8 0.23 0.23 0.69 0.29 6.39
3. sand filling 1 8.58 5.54 0.6 28.51 28.51
4. P.C.C.(1:4:8) 8 1.1 1.1 0.1 0.97 0.97
5. R.C.C (1:1.5:8)
a. for footing 8 1.1 1.1 0.21 2.03
b. for column upto G.L 8 0.23 0.23 0.69 0.29
c. for plinth beam 1 41.62 0.23 0.3 2.87
d. for columns 8 0.23 0.23 3.9 1.65
e. for beams
(a) For t beam 2 5.77 0.23 0.15 0.40
(b) For ss Beam 2 5.77 0.23 0.33 0.88
(c)for continuous beam 2 9.27 0.23 0.38 1.62
f. for slab 1 9.27 5.77 0.12 6.42
g. For Lintel and Sunshade 6 1.2 0.23 0.12 0.20
1) For 1000 mm Doors 2 1 0.23 0.12 0.06
2) For 1200 mm Doors 4 1.2 0.23 0.12 0.13
h. For Waist Slab 2 2.99 1 0.15 0.90 17.804
6. brick masonry
a. for basement 1 41.62 0.23 0.6 5.74
b. for Super structure 1 4 4.5 0.6 10.80
(1)around the building 1 30.08 0.23 3.3 22.85
(2) internal walls
(a) for bed room 1 6.73 0.23 3.3 5.11
(b)for kitchen 1 4.81 0.23 3.3 3.65
(c) for pooja and toilet 1 6.23 0.1 3.3 2.06
(d)for parapet wall 1 30.6 0.1 0.9 2.75
c. for steps 20 1 0.25 0.15 0.75
deductions
(a) doors
(1)D1 2 1.2 0.23 2 1.10
(2)D2 2 1.2 0.23 1.8 0.99
(3)D3 2 1 0.23 1.8 0.83
(b)windows
(1) W1 4 1.2 0.23 1 1.10
(2) W2 2 1.2 0.23 0.9 0.50
ventilators(V1) 10 0.6 0.23 0.3 0.41 48.78
7. Plasteering
a. around the building 1 30.08 3.9 117.31
b. inside bed room 1 6.5 3.3 21.45
c. outside bed room 1 6.96 3.3 22.97
d. inside the kitchen 1 4.58 3.3 15.11
e. out side kitchen 1 5.04 3.3 16.63
f. toilet walls 1 5 3.3 16.50
g. inside pooja 1 3.5 3.3 11.55
h. outside pooja 1 3.96 3.3 13.07
inside the outer wall of
i. building 1 29.16 3.3 96.23
j. For outside parapet wall 1 15.5 0.6 9.30
k. inside parapet wall 1 15.1 0.6 9.06
Deductions
(a) doors
(1) D1 2 1.2 2 4.80
(2)D2 2 1.2 1.8 4.32
(3)D3 2 1 1.8 3.60
(b)windows
(1)W1 4 1.2 1 4.80
(2)W2 2 1.2 3.3 2.16
(c) ventilators 10 0.6 0.3 1.80 318.64
WHITEWASHING TWO
COATS WITH JANATA GUM SAME AS
INSIDE AND OUTSIDE THE PLASTERING
8. BUILDING 318.64
SUPPLY AND FIXING OF
TEAK WOOD WITH ALL
9. IRON FURNITURE
(a) For D1,D2 6 6 nos
(b)For D3 2 2 nos
c) for windows 6 6nos
(d) for ventilator 4 4 nos
PROVISION FOR
ARCHITECHTURAL WORKS
10. 1% OF BUILDING COST L.S.
PROVISION OF WATER
SUPPLY &SANITATION AT
11. 7.5% OF BUILDING COST L.S.
PROVISION OF ELECTRICAL
FITTINGS AT 7.5% OF
12. BUILDING COST L.S.
PROVISION OF
UNFORSEEN ITEMS AT
13. 2.5% OF BUILDING COST L.S.
PROVISION OF PETTY
SUPERVISION AT 2.5% OF
14. BUILDING COST L.S.
PROVISION FOR
VARIATION OF RATES AT
15. 2.5% OF BUILDING COST L.S.
TOTAL QUANTITY :- 749.414
MIG DETAILED ESTIMATE
brick masonry
=500 no.s)
8 Cement mortar (1:3) for
(12mm thick
plastering plaster shall be
used for
(a)Cement 0.333333 270 bag plastering)
(b)fine aggregate 1 cu.m 973 1 cu.m 3565
9 Cement mortar (1:3) for
flooring of D.P.C.
(a)Cement 0.333333 270 bag
(C.M. in 50mm
(b)fine aggregate 1 cu.m 973 1 cu.m 3565 thickness is
used for
flooring over
C.C.bed)
10 Binding of steel
(charges for 1
(a)steel 1 tonne 36000 tonne tonne of steel
including
binding
(b)bar benders 5 585 day 38925 charges)
11 Brick work of 1 cu.m
1000
(a)bricks 500 nos 5376 nos
0.23 (by considering
(b)cement Mortar (1:4) cu.m 3698 cu.m size of brick
(c)mazdoors 1.59 370 day 19 x9 x9 cm)
(d)masons 0.88 465 day 4536.04
12 plastering with 12 mm thick
in C.M.(1:3) for 10 sq.m
0.12
(a) C.M.(1:3) cu.m 4346 cu.m
(b)mason 0.1 465 day
(c)mazdoor 0.5 370 day 753.02 (For 10 sq.m)
13 laying of D.P.C.course 50 mm
thick for 10 sq.m
(a) C.M.(1:3) 0.5 cu.m 4346 cu.m
(b)mason 1.05 465 day
1. EARTH WORK
EXCAVATION 9.68 199.99 1m3 1935.9
2. REFILLING OF
EARTHWORK 6.39 199.99 1m3 1277.93
3. SAND FILLING 28.51 1343 1m3 38288.93
4. C.C(1:4:8) 0.97 3890.72 1m3 3773.99
5. C.C(1:1.5:3) 17.804 5530.41 1m3 98463.41
6. PLASTERING WITH 318.64 111536.74
CEMENT MORTAR 2917 0.12 m3
(1:3)
7. BRICKMASONRY 221268.03
3
WITH CEMENT 48.78 4536.04 1m
MORTAR(1:4)
8. STEEL 833.41 38925 1 Tonne 32440.44
9. PAINTING WITH
TWO COATS 318.64 168 1 m2 53531.52
ENAMEL PAINT AND
WHITE LEAD
10. SUPPLY & FIXING OF
DOORS &WINDOWS
(A) FOR DOORS(D1) 2 4950 No's 9900
(B) FOR DOORS (D2) 2 4180 No's 8360
(C) FOR DOORS(D3) 2 4080 No's 8160
(D) FOR WINDOWS(W1) 4 3300 No's 13200
(E) FOR WINDOWS(W2) 2 2800 No's 5600
COST OF BUILDING :-607740 /-
11. PROVISION FOR
ELECTRICIAN & 607740 X 0.08 = 48619.2
FITTING CHARGES
8%
12. PROVISION FOR 607740 X 0.08 = 48619.2
WATER SUPPLY 8%
13. PROVISION FOR
PRETTY 607740 X 0.03 = 18232.2
SUPERVISION
CHARGES 3%
14. PROVISION FOR
ARCHITECTURAL 607740 X 0.01 =6077.4
CHARGES 1%
15. PROVISION FOR
FLUCTUTATION 607740 X 0.03 = 18232.2
CHARGES 3%
16. PROVISION FOR
UNFORCEEN 607740 X 0.02 = 12154.8
CHARGES 2%
17. PROVISION FOR
VARIATION OF 607740 X 0.05 = 30387
RATES 5%
SUNDRIES : - 8.0
651072
11 PROVISION FOR ELECTRICIAN 651072 X 0.08 52085.8
AND FITTING INCLUDING
CHARGES 8%
12 PROVISION FOR WATER 651072 X 0.08 52085.8
SUPPLY OF 8%
13 PROVISION FOR PRETTY
SUPERVISION CHARGES 3% 651072 X 0.03 19532.2
14 PROVISION FOR
ARCHITECTURAL CHARGES 1% 651072 X 0.01 6510.7
15 PROVISION FOR FLUCTUATION
CHARGES 3% 651072 X 0.03 19532.2
16 PROVISION FOR UNFORCEEN
CHARGES 2% 651072 X 0.02 13021.4
17 PROVISION FOR VARIATION OF
RATES 5% 651072 X 0.05 32553.6
SUNDRIES 6.3
TOTAL COST OF BUILDING = 8,46,400