C3 Fresh and Hardened Concrete Test
C3 Fresh and Hardened Concrete Test
C3 Fresh and Hardened Concrete Test
INTRODUCTION
Concrete is tested during its fresh and hardened state mainly to ensure that concrete mix
satisfies the specification of works. In its fresh state, concrete is tested for its consistency so as
to achieve the desired workability. Workability is an important property in concrete since a
workable mix will produce concrete, which can be well compacted, transported and placed
without segregation. A well-compacted concrete will produce a good strength concrete.
1. Slump Test
2. Compacting Factor Test
3. Vebe Test
1. Compression Test
2. Indirect Tension Test Methods
3. Flexural strength of concrete
OBJECTIVE
The objectives of the tests are to determine the properties of concrete as follows:
1|Page
C3 FRESH AND HARDENED CONCRETE TEST
APPARATUS
Slump Test:
1. An open-ended cylinder
2. A vibrating table
3. Glass plate rider
4. Metal cone
5. Stop watch
6. Standard iron rod
2|Page
C3 FRESH AND HARDENED CONCRETE TEST
PROCEDURE
1. The volume of concrete needed for the tests was calculated. Volume of (3 cubes
(150 x 150 x 150mm) + 1 cylinders (150mm dia. X 300mm) + 1 beam (100 x 100
x 500mm) + tests for workability) = 0.0257 + 25% contingencies = 0.032 m3
4. Cement, fine and course aggregate were thoroughly mixed in a mixer for 1
minute.
5. Water was added and the mix was mixed approximately for another 1minute.
6. When the mix were ready, proceed with the workability tests.
Slump test
2. Fill the mould with 3 layers of concrete approximately of the same thickness each.
3. Compact each layer of concrete by tamping it 25 times with the standard steel rod.
6. Measure the difference in level between the height of the mould and that of the
highest point of the subsided concrete. This difference in height in mm is taken as
slump of concrete.
3|Page
C3 FRESH AND HARDENED CONCRETE TEST
1. Assemble the apparatus vertically, placing the bigger hopper uppermost, the smaller
hopper in the middle and the cylinder at the bottom.
3. Each hopper has hinged door (trap-door) at the bottom. Make sure that this door is
closed before commencing the test.
5. Release the door to let the concrete falls into the lower hopper.
6. Release the door of the second hopper to let the concrete falls into the cylinder.
7. Cut off excess concrete from the top of the cylinder by sliding it across with two
floats.
8. Determine the net weight of the concrete. This weight is known as “weight of
partially compacted concrete”.
9. Empty the cylinder and refill it with the concrete from the same sample in three
layers. Tamp each layer 25 times with standard steel rod.
10. Level off the top surface of the cylinder and weigh it to the nearest 10gm. This weight
is known as “weight of fully compacted concrete”.
Vebe Test
1. Place the slump cone inside the cylindrical pot of the Vebe apparatus
3. Remove the cone and place the glass plate rider gently on top of the concrete.
4|Page
C3 FRESH AND HARDENED CONCRETE TEST
5. Continue the vibration until conical shape of the concrete assumes a cylindrical shape
This can be judge by observing the glass disc from the top for disappearance of
transparency. Switch off the stopwatch.
6. The time required from the shape of concrete to change from slump cone shape to
cylindrical shape is known as vebe degree (time
APPARATUS
Compression Test:
1. Standard steel cube mould, 150 x 150 x 150mm
2. Standard steel rod, 25mm square
PROCEDURES
Compression Test
1. Prepare three moulds of size 150mm x 150mm x 150mm.
2. Thinly coat the interior surfaces of the assembled mould with mould oil to prevent
adhesion of concrete.
5|Page
C3 FRESH AND HARDENED CONCRETE TEST
3. Fill each mould with three layers of concrete, tamp each layer 35 times with a 25mm
square steel rod. 4
4. Finish the top surface with a trowel and record the date of manufacturing on the
surface of the concrete.
6. After 24 hours strip the mould and cure the cubes further by immersing them in water
at temperature 19 to 21 C until the testing date.
8. Position the cube in the compressive machine with the cast faces in contact with the
platens.
3. Fill each mould with three layers of concrete, tamp each layer 35 times with a 16mm
x steel rod.
7. Place the cylinder with its axis horizontal between the platens of the testing machine.
8. Place narrow strips of plywood at the top and bottom between the platens and the
cylinder.
6|Page
C3 FRESH AND HARDENED CONCRETE TEST
3. Fill the mould with 3 layers of concrete, tamp each layer 35 times with a 25mm
square steel rod.
4. Cure the beam. The method of curing is similar as for the cubes.
6. The beam is positioned for testing with a span of 400mm i.e. 50mm from each end.
7|Page
C3 FRESH AND HARDENED CONCRETE TEST
DATA
CALCULATION
= 100ml
8|Page
C3 FRESH AND HARDENED CONCRETE TEST
RESULT
7mm
39%
Water Percentage
Figure C2-7: Distance from base (mm) versus water percentage graph
Water content for standard cement consistency = 40% (5mm penetration from the base of the
mould)
9|Page
C3 FRESH AND HARDENED CONCRETE TEST
QUESTION
The cement paste becomes warm when water was added because the cement undergoes hydration,
which are exothermic reaction meaning that the reactions generates heat. Hydration involves
multiple reactions that may occurs in series, in parallel manner, or maybe in some more complex
combination (Marchon & Flatt, 2015). They then added that cement hydration also involves a
collection of coupled chemical processes in which each one occurs at a rate that is determined by
2 factors that is by the nature of the process and also by the state of the system at that instant
(Marchon & Flatt, 2015).
CONCLUSION
10 | P a g e
C3 FRESH AND HARDENED CONCRETE TEST
REFERENCE
11 | P a g e