Standard Four-Storey School Building: (4 & 8 - Classrooms)
Standard Four-Storey School Building: (4 & 8 - Classrooms)
Standard Four-Storey School Building: (4 & 8 - Classrooms)
STANDARD FOUR-STOREY
SCHOOL BUILDING
(4 & 8 - CLASSROOMS)
JOINT VENTURE OF
REPUBLIC OF THE PHILIPPINES
MARIANO C. DEL CASTILLO GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON ARMIN A. LUISTRO
OIC, BUILDINGS DIVISION, BOD DIRECTOR IV, BOD UNDERSECRETARY SECRETARY SECRETARY
DEPARTMENT OF EDUCATION
BILL OF QUANTITIES
A. EIGHT-CLASSROOMS
I. Mobilization / Demobilization
VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 1
STANDARD FOUR-STOREY BILL OF QUANTITIES G-1
JOVEN T. SANTOS DOMICIANO B. LUSICA GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 38
SCHOOL BUILDING
QUANTITY ENGINEER COST ENGINEER PROJECT MANAGER OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 8-CLASSROOMS )
BILL OF QUANTITIES
X. Carpentry Works
VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 2
STANDARD FOUR-STOREY BILL OF QUANTITIES G-2
JOVEN T. SANTOS DOMICIANO B. LUSICA GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 38
SCHOOL BUILDING
QUANTITY ENGINEER COST ENGINEER PROJECT MANAGER OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 8-CLASSROOMS )
BILL OF QUANTITIES
A. FOUR-CLASSROOMS
I. Mobilization / Demobilization
VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 3
STANDARD FOUR-STOREY BILL OF QUANTITIES G-3
JOVEN T. SANTOS DOMICIANO B. LUSICA GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 38
SCHOOL BUILDING
QUANTITY ENGINEER COST ENGINEER PROJECT MANAGER OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 4-CLASSROOMS )
BILL OF QUANTITIES
X. Carpentry Works
VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 4
STANDARD FOUR-STOREY BILL OF QUANTITIES G-4
JOVEN T. SANTOS DOMICIANO B. LUSICA GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 38
SCHOOL BUILDING
QUANTITY ENGINEER COST ENGINEER PROJECT MANAGER OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 4-CLASSROOMS )
TABLE OF CONTENTS
GENERAL ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL
G-1 BILL OF QUANTITIES A-1 TABLE OF CONTENTS S-1 GENERAL NOTES P-1 GROUND FLOOR, TYPICAL SECOND, THIRD EE - 1 GENERAL NOTES, LEGEND, FLUORESCENT LIGHT
& FOURTH FLOOR PLUMBING LAYOUT, FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
G-2 BILL OF QUANTITIES
A-2 KEY PLAN S-2 GENERAL NOTES GROUNDFLOOR, TYPICAL SECOND, THIRD PANEL BOARD DIAGRAM AND ELECTRICAL RISER
G-3 BILL OF QUANTITIES & FOURTH FLOOR WATER LINE LAYOUT DIAGRAM ( 4-CL )
A-3 GROUND FLOOR, SECOND & THIRD FLOOR, FOURTH FLOOR, S-3 FOUNDATION PLAN, TYPICAL 2nd & 3RD FLOOR
G-4 BILL OF QUANTITIES
FRONT ELEVATION, AND SCHEDULE OF FINISHES FRAMING PLAN, 4th FLOOR FRAMING PLAN P-2 ISOMETRIC DRAINAGE LINE LAYOUT EE - 2 POWER LAYOUT ( 4-CL )
ROOF DRAINAGE LAYOUT,
A-4 REAR ELEVATION, RIGHT ELEVATION, LEFT ELEVATION, S-4 COLUMN SCHEDULE, SCHEDULE OF FOOTING, DETAIL SECTION OF DRAIN PIPE EE - 3 LIGHTING LAYOUT ( 4-CL )
LONGITUDINAL SECTION & CROSS SECTION SCHEDULE FOOTING BEAMS, TYPICAL FOOTING AND SPOT DETAIL
DETAIL, ELEVATION OF COLUMN, & DETAIL OF WALL EE - 1 GENERAL NOTES, LEGEND, FLUORESCENT LIGHT
A-5 GROUND FLOOR REFLECTED CEILING PLAN, SECOND & FOOTINGS P-3 ISOMETRIC WATER LINE LAYOUT AND FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
THIRD FLOOR REFLECTED CEILING PLAN, FOURTH FLOOR SEWER LINE LAYOUT PANEL BOARD DIAGRAM AND ELECTRICAL RISER
REFLECTED CEILING PLAN & ROOF PLAN S-5 PLAN FOOTING F-3, ELEVATION FOOTING F-3, DIAGRAM ( 8-CL )
PLAN FOOTING CF-1 & TYPICAL ELEVATION OF P-4 PLAN OF SEPTIC TANK, LONGITUDINAL
A-6 SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN, ELEVATION MICRO-PILE SECTION, CROSS SECTION DETAIL, EE - 2 POWER LAYOUT ( 8-CL )
& RAMP DETAILS MANHOLE COVER DETAIL,
S-6 SCHEDULE MAIN BEAMS, SCHEDULE OF SECONDARY CATCH BASIN DETAIL, LEGEND AND EE - 3 LIGHTING LAYOUT ( 8-CL )
A-7 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING, BEAMS, SCHEDULE OF SLABS, TYPICAL SLAB PLUMBING NOTES
CONCRETE SUNBREAKER DETAIL, PERSPECTIVE, SECTION & ELEVATION, TYPICAL BEAM ELEVATION,
SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION TYPE OF STIRRUPS
A-8 STAIR DETAILS S-7 DETAIL OF STAIR, RAMP DETAIL, DETAIL OF DC-1,
DETAIL OF STAIR ON GRADE &
A-9 FIRE ESCAPE DETAILS DETAIL OF WALL ON FTB
VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 5
NOTE : STANDARD FOUR-STOREY TABLE OF CONTENTS A-1
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 38
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 8-CLASSROOMS )
( 4-CLASSROOMS )
FOURTH FLOOR PLAN
( 4-CLASSROOMS ) ( 4-CLASSROOMS )
GROUND FLOOR PLAN SECOND & THIRD FLOOR PLAN
K E Y P L A N
VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 6
NOTE : STANDARD FOUR-STOREY KEY PLAN A-2
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 38
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 4-CLASSROOMS )
SECOND & THIRD FLOOR FRONT ELEVATION
SCHEDULE OF FINISH
VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS GROUND FLOOR, SECOND & BOD
THIRD FLOOR, FOURTH FLOOR, 7
NOTE : STANDARD FOUR-STOREY FRONT ELEVATION, AND A-3
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 38
SCHOOL BUILDING SCHEDULE OF FINISHES
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 8-CLASSROOM )
RIGHT ELEVATION LEFT ELEVATION CROSS SECTION
VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
REAR ELEVATION, RIGHT ELEVATION, 8
NOTE : STANDARD FOUR-STOREY LEFT ELEVATION, LONGITUDINAL A-4
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON SECTION & CROSS SECTION 38
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 8-CLASSROOM )